Filtered by: District: District 3 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jul 30, 2021 | 66L21 | KendallDistrict 3 | Removing and replacing 6' of the culvert barrel and wing walls on on both ends of the culverts and guardrail r This work is located on FAP Route 607 (US 52) at Sta. 398+51 approximately 7.5 miles East of IL 47 (1.6 miles West of Will County Line). This project consists of removing and replacing 6' of the culvert barrel and wing walls on on both ends of the culverts and guardrail removal and replacement, also including other related construction items. | — | Executed | Riber Construction, Inc. $220,993 · | ||
| Jul 30, 2021 | 66L81 | LivingstonDistrict 3 | Centerline repairs cleaning and filling potholes, depressions and cracks and micro surfacing This project is located at two locations on FAI 55 (I-55) in Livingston County. Location 1 begins at M.M. 205.0 and ends at M.M. 209.0 (S. of Odell), Location 2 begins at M.M. 212.0 and ends at M.M. 215.3 (N. of Odell). This project consists of centerline repairs cleaning and filling potholes, depressions and cracks and micro surfacing. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $557,717 · | ||
| Jul 30, 2021 | 66L83 | IroquoisDistrict 3 | Class A pavement patching, pavement striping, and other related construction items This project is located on FAI 57 (I-57) beginning at the Ford County Line and ending at IL Route 116 (Ashkum). This work consists of Class A pavement patching, pavement striping, and other related construction items. | — | Executed | G. M. Sipes Construction, Inc. $448,168 · | ||
| Jul 30, 2021 | 66L91 | FordIroquoisDistrict 3 | The project consists of 7.15 miles of crack routing and crack sealing on FAP 71 (IL 54) from IL 115 in Roberts to Structure 038-0213 in Ford and Iroquois Counties. | — | Executed | Freehill Asphalt, Inc. $62,711 · | ||
| Jul 30, 2021 | 87754 | DeKalbDistrict 3 | Resurfacing, sidewalk replacement, curb and gutter, pavement markings and pedestrian signal improvements at three locations on Northern University Campus in the City of DeKalb. | — | Rejected | Stenstrom Excavation & Blacktop, Inc. $369,273 · | ||
| Jul 30, 2021 | 87767 | DeKalbDistrict 3 | Replace the bridge carrying TR 244 over Coon Creek 0.30 mile south of IL 72. | — | Rejected | Sjostrom & Sons, Inc. $456,936 · | ||
| Jul 30, 2021 | 87780 | FordDistrict 3 | Resurfacing and aggregate shoulders on Elliot Road from IL 54 to IL 9. | — | Executed | Iroquois Paving Corporation $1,626,354 · | ||
| Jul 30, 2021 | 87781 | BureauDistrict 3 | Repair the undermining at the abutments and install improved drainage at the bridge carrying Peru Road over Negro Creek, just south of US 6. | — | Executed | D. Construction, Inc. $198,183 · | ||
| Sep 17, 2021 | 66997 | KankakeeDistrict 3 | The structure replacement carrying Maple St/Waldron Rd over I-57 in Kankakee along with construction of adjace The project consists of the structure replacement carrying Maple St/Waldron Rd over I-57 in Kankakee along with construction of adjacent retaining walls. The project includes the reconstruction of portions of Maple St, Waldron Rd, construction of shared-use path and realigning/reconstructing County RD S89E. | — | Executed | Kankakee Valley Construction Company, Inc. $11,309,823 · | ||
| Sep 17, 2021 | 66D53 | IroquoisDistrict 3 | US 52 - 3P milling and resurfacing, shoulder widening and ADA in Iroquois from East of IL 1 to South of Donovan in Iroquois county. | — | Executed | Iroquois Paving Corporation $5,186,160 · | ||
| Sep 17, 2021 | 66F11 | KankakeeDistrict 3 | Removal and replacement of SN 046-0063 carrying Armour Road over Illinois Central Railroad located 0.3 miles west of IL 50. | — | Executed | D. Construction, Inc. $5,976,820 · | ||
| Sep 17, 2021 | 66K18 | KankakeeDistrict 3 | This project consists of 5.9 miles of shoulder widening and rumble strip installation on IL 17 from 0.10 miles South of IL 1/17 (E Taylor St) to State Line Rd in Kankakee County. | — | Executed | Kankakee Valley Construction Company, Inc. $1,262,477 · | ||
| Sep 17, 2021 | 66L97 | IroquoisDistrict 3 | Removal and replacement of existing 48" and 12" storm sewer, catch basin, manhole, pavement patching and other This project is located at failed 48- diameter pipe culvert at Sta. 391+00 carrying IL 49 over Shavetail Creek approximately 8 miles South of US 24 (Cresent City). This project consists of removal and replacement of existing 48" and 12" storm sewer, catch basin, manhole, pavement patching and other related construction items. | — | Executed | Dirtworks Trucking & Excavating $69,245 · | ||
| Sep 17, 2021 | 66M06 | VariousDistrict 3 | The removal and replacement of all symbol and stop bar pavement markings at various interchanges throughout Di This project consists of the removal and replacement of all symbol and stop bar pavement markings at various interchanges throughout District 3. | — | Executed | A. C. Pavement Striping Co. $978,534 · | ||
| Sep 17, 2021 | 66M07 | VariousDistrict 3 | The installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic con This project consists of the installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic control systems. The work will be completed on a work order basis for repairs and maintenance activities. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $574,990 · | ||
| Sep 17, 2021 | 66M08 | BureauLaSalleDistrict 3 | The installation of four changeable speed warning signs on the outer interchange ramps at I-80 and I-39 and th This project consists of the installation of four changeable speed warning signs on the outer interchange ramps at I-80 and I-39 and three changeable speed warning signs at the I-80 and I-180 interchange. | — | Executed | T.M.F. Construction Company $71,655 · | ||
| Nov 5, 2021 | 46583 | VariousDistrict 3 | Repairing various widths of pavement markings including lines, letters, numbers and symbols This project is located on various highways throughout District 3. This project consists of repairing various widths of pavement markings including lines, letters, numbers and symbols. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,854,677 · | ||
| Nov 5, 2021 | 46924 | LaSalleDistrict 3 | Reconstructing a new retaining wall with associated appurtenances, HMA pavement, aggregate base course, type B The project consists of reconstructing a new retaining wall with associated appurtenances, HMA pavement, aggregate base course, type B gutter, guardrail, pavement markings and other improvements along the Entrance Road to the Buffalo Rock State Park, gross and net length 0.05 mi. | — | Executed | D. Construction, Inc. $637,507 · | ||
| Nov 5, 2021 | 66F01 | IroquoisDistrict 3 | The project length is 700 feet. It is located along IL 1 and includes the replacement of the exisiting SN 038-0028 over Gay Creek approximately 0.2 miles South of Wellington, Il. | — | Executed | Iroquois Paving Corporation $1,138,320 · | ||
| Nov 5, 2021 | 66F71 | KankakeeDistrict 3 | Pier, pier cap, and bearing seat repairs, abutment repairs, and expansion joint gland repairs This project is located on FAP 330 (US 45/52) North of Bourbonnais in Kankakee County. SN 046-0047 carries US 45/52 over South Branch Rock Creek approximately 1.5 miles South of County Highway 9. Work on this project consists of pier, pier cap, and bearing seat repairs, abutment repairs, and expansion joint gland repairs. | — | Executed | Tobey's Construction & Cartage, Inc. $169,192 · | ||
| Nov 5, 2021 | 66H26 | BureauDistrict 3 | The project is a bridge replacement over the Hennepin Feeder Canal located on IL 92, 1 mile East of IL 172 in Bureau County. The profile grade will be raised approx 5'-10", therefore, additional work such as guardrail upgrades, embankment, etc is expected. Work within IDNR property is also proposed. Construction shall be achieved via Detour. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $2,548,314 · | ||
| Nov 5, 2021 | 66J01 | BureauDistrict 3 | Removal and replacement of superstructures on SN 006-0014 and 006-0015, milling and resurfacing of mainline an This project is located on FAI 80 (I-80) at the Maple Grove Creek crossing, approximately 2 miles north of Wyanet, in Bureau County. The work consists of removal and replacement of superstructures on SN 006-0014 and 006-0015, milling and resurfacing of mainline and shoulders, guardrail removal and replacement, and other work. | — | Executed | D. Construction, Inc. $2,541,583 · | ||
| Nov 5, 2021 | 66L96 | GrundyDistrict 3 | Removing and replace failed wing wall stems and headwall This project is located at Structure No. 032-2525, a 12' x 8' concrete box culvert, 400' feet West of Ashley Rd. in Grundy County. This project consists of removing and replace failed wing wall stems and headwall. | — | Executed | D. Construction, Inc. $239,279 · | ||
| Nov 5, 2021 | 87742 | LaSalleDistrict 3 | Replace the bridge carrying TR 222 over a tributary of Indian Creek, 0.5 mile north of Earville. | — | Executed | Riber Construction, Inc. $815,302 · | ||
| Nov 5, 2021 | 87752 | LaSalleDistrict 3 | Realign and reconstruct the intersection of Commercial Street, Broadway Street, and Main Street in Marseilles. | — | Executed | D. Construction, Inc. $810,168 · | ||
| Nov 5, 2021 | 87782 | GrundyDistrict 3 | Resurfacing, sidewalk replacement, curb and gutter replacement and pedestrian traffic signal improvements on Minooka Road from Tables Road to Ridge Road in Minooka. | — | Executed | D. Construction, Inc. $2,146,151 · | ||
| Jan 21, 2022 | 66932 | IroquoisDistrict 3 | Bridge Replacement (SN 038-0023) at Coon Creek, 5.4 miles South of US 24. | — | Executed | Iroquois Paving Corporation $2,285,001 · | ||
| Jan 21, 2022 | 66E20 | DeKalbDistrict 3 | 3P milling and resurfacing (designed overlay) The project is located on FAP 17 (IL 64) from Clare Rd to 0.4 Ml W of IL 23(S) in Sycamore, for a total of 6.59 miles, the work consists of 3P milling and resurfacing (designed overlay). Other work includes grading and shaping ditches, shoulder stone, culvert work, guardrail work, pavement marking, and raised reflectors. | — | Executed | William Charles Construction Company, LLC $3,764,401 · | ||
| Jan 21, 2022 | 66F74 | KankakeeDistrict 3 | Removal and replacement of four structures carrying I-57 over Grinnell Road and the Norfolk Southern Railway tracks in Kankakee county. The work includes the reconstruction of a section of I-57 affected by the new structures. The length of the project is 0.83 miles. Staging will be accomplished using crossovers. | — | Executed | Kankakee Valley Construction Company, Inc. and Tobey's Construction & Cartage, Inc. JV $23,568,802 · | ||
| Jan 21, 2022 | 66J00 | LaSalleDistrict 3 | Bridge replacement (SN 050-0039) at Sutphens Run, 0.6 mile East of E 12th Rd. | — | Executed | D. Construction, Inc. $1,835,069 · | ||
| Jan 21, 2022 | 66L98 | LaSalleDistrict 3 | This project is located at Structure No. 050-0215 carrying FAP 653 (IL 18) over FAI 39 (I-39) approximately 1.05 miles North of the Marshall County Line. | — | Executed | D. Construction, Inc. $420,050 · | ||
| Jan 21, 2022 | 66M11 | IroquoisDistrict 3 | Cleaning and painting all structural steel and other steel components of the structures This project is located at two structures on I-57, SN 038-0123 carrying I-57 over IL 116 (Ashkum Interchange) and SN 038-0125 carrying TR 89 over I-57, 2.5 mi. south of IL 116 and one structure on US 52, SN 038-0182 carrying US 52 over the Iroquois River near the village of Iroquois. This project consists of cleaning and painting all structural steel and other steel components of the structures. | — | Executed | ERA-Valdivia Contractors, Inc. $549,318 · | ||
| Jan 21, 2022 | 66M12 | FordDistrict 3 | Cleaning and painting all structural steel and other steel components of the structure This work is located at one structure on IL 54: Structure No. 027-0076 over the E. Branch of the Vermilion River, two structures on IL 9/47: Structure No. 027-0084 over Drummer Creek (in Gibson) and Structure No. 027-0085_over Drummer Creek (In Gibson). This project consists of cleaning and painting all structural steel and other steel components of the structure. | — | Executed | ERA-Valdivia Contractors, Inc. $311,138 · | ||
| Jan 21, 2022 | 66M22 | VariousDistrict 3 | Work consists on performing Bridge Deck Concrete sealing at various bridges decks with bare PCC wearing surfaces in Dekalb, Kendall, Grundy counties, and the Abraham Lincoln Bridge in LaSalle county. | — | Executed | All States Painting, Inc. $197,300 · | ||
| Jan 21, 2022 | 87669 | KankakeeDistrict 3 | Construction of a shared use path, pedestrian crosswalks and signals, storm sewer, sidewalks and pavment markings adjacent to IL route 50 from the South Northfield Square Mall entrance on Bradley Drive to Larry Power Road in Bradley | — | Executed | Kankakee Valley Construction Company, Inc. $419,998 · | ||
| Jan 21, 2022 | 87761 | KankakeeDistrict 3 | Construction of new curb bump outs, sidewalk replacement, landscaping, pavment markings for proposed bike lanes and pavement resurfacing on IL 50 from East Station Street to just north of East Charles Street in Kankakee. | — | Executed | Kankakee Valley Construction Company, Inc. $813,406 · | ||
| Jan 21, 2022 | 87763 | DeKalbDistrict 3 | Full depth pavement reclamation, HMA pavement, curb and gutter, sidewalks, storm sewer, water main construction and pavement markings on Latham Street from Center Street to Sandhurst Drive in Sandwich. | — | Executed | Berger Excavating Contractors, Inc. $3,227,920 · | ||
| Mar 11, 2022 | 66H54 | KankakeeDistrict 3 | Replacing SN 046-0046 with SN 046-0160, carrying FAP 330 (US45/52) over the North Branch of Rock Creek This project is located on FAP 330 (US 45/52) 1.5 miles North of Manteno Road. The work consists of replacing SN 046-0046 with SN 046-0160, carrying FAP 330 (US45/52) over the North Branch of Rock Creek. | — | Executed | Herlihy Mid-Continent Company $2,195,737 · | ||
| Mar 11, 2022 | 66H63 | IroquoisDistrict 3 | Project consists on milling and resurfacing I-57 interstate and Buckley interchange ramps in Iroquois County. The project length is 6.9 miles. The work also includes structural upgrades, underdrain removal / replacement, guardrail upgrades and grading/shaping ditches. Resurfacing on Buckley Interchange ramps shall be accomplished at night. | — | Executed | Iroquois Paving Corporation $20,672,340 · | ||
| Mar 11, 2022 | 66K31 | IroquoisDistrict 3 | Work begins East of Sugar Creek on US 24 and goes East 3.08 miles including a 3P milling and resurfacing of US 24 including drainage and ADA improvements. The project terminates at East end of Watseka city limit. | — | Executed | Iroquois Paving Corporation $3,586,035 · | ||
| Mar 11, 2022 | 66K77 | IroquoisDistrict 3 | HMA milling and resurfacing, shoulder work, ADA ramps, pavement marking, and raised reflective markers This project is located on FAP 71/FAS 323 (IL 54) from 0.4 mile west of I-57 to US 45/52 in Onarga. The work consists of HMA milling and resurfacing, shoulder work, ADA ramps, pavement marking, and raised reflective markers. | — | Rejected | Iroquois Paving Corporation $1,584,326 · | ||
| Mar 11, 2022 | 66L57 | BureauDistrict 3 | Work begins in Ohio, Illinois at the intersection of IL 26 and IL 92 and goes West 9.9 miles including a 3P milling and resurfacing of IL 92, drainage improvements, and guardrail improvements. The project terminates at the junction of US 34 and IL 89 in La Moille, Illinois. | — | Executed | Advanced Asphalt Company $3,472,037 · | ||
| Mar 11, 2022 | 66L74 | LaSalleDistrict 3 | Microsilica overlay, expansion joint replacement and deck repairs on the structures SN 050-0173 and SN 050-0174 carrying I-39 over Tomahawk Creek, 3.5 miles north of I-80 in LaSalle County. | — | Executed | D. Construction, Inc. $1,066,495 · | ||
| Mar 11, 2022 | 66L75 | LivingstonDistrict 3 | Latex overlay, expansion joint replacement and deck repairs on the structures structures SN 053-0124 and SN 053-0125 carrying I-55 over Rooks creek, 3 miles southwest of Pontiac in Livingston County. | — | Rejected | Tobey's Construction & Cartage, Inc. $1,906,501 · | ||
| Mar 11, 2022 | 66M20 | LaSalleDistrict 3 | Cleaning and painting all structural steel and other steel components of the structures This project is located at three structures in LaSalle County. Structure No. 050-0-166 carrying N36th Rd. over I-39, 1.0 mile South of US 34. Structure No. 050-0172 carrying N42nd Rd. over I-39, 1.0 mile South of US 52. Stucture No. 050-0218 carrying IL 351/71 over the Lone Star Cement Co. Railroad. 2.6 miles South of US 6 (in Oglesby). This project consists of cleaning and painting all structural steel and other steel components of the structures. | — | Executed | ERA-Valdivia Contractors, Inc. $511,038 · | ||
| Mar 11, 2022 | 66M32 | LaSalleDistrict 3 | Tree and shrub planting from mile marker 88 to mile marker 89 on the North side (WB). | — | Executed | Central Landscaping, LP $72,720 · | ||
| Mar 11, 2022 | 66M36 | VariousDistrict 3 | Weed Spray Districtwide (I-80, I-180, I-39, I-55, and I-57 including all interchanges). | — | Executed | The Daltons Inc. $121,355 · | ||
| Mar 11, 2022 | 87760 | IroquoisDistrict 3 | Roadway reconstruction, Curb and gutter, storm sewers, landscaping, streetscape, lighting, and pavement markings on North Central Street, from Crescent St. to East 3rd. Street, and on East 2nd Street from the IC Railroad to North Central Street, and on East Front Street from North Central St. to North Main Street in Gilman. | — | Executed | Iroquois Paving Corporation $3,193,594 · | ||
| Mar 11, 2022 | 87773 | LivingstonDistrict 3 | Replace the bridge carrying TR 70 over Mud Creek, 2.5 miles southeast of Manville. | — | Executed | Tobey's Construction & Cartage, Inc. $406,355 · | ||
| Mar 11, 2022 | 87774 | LivingstonDistrict 3 | Replace the bridge carrying TR 244 over Gooseberry Creek, 2.5 miles north of Emington. | — | Executed | Riber Construction, Inc. $388,075 · | ||
| Mar 11, 2022 | 87775 | LivingstonDistrict 3 | Resurfacing Weston Road from 900N Road/McLean County Line to 1650N Road. | — | Executed | Kankakee Valley Construction Company, Inc. $2,085,137 · | ||
| Mar 11, 2022 | 87784 | BureauDistrict 3 | Sidewarlk construction and replacemnt at various locations within Princeton. | — | Executed | Advanced Asphalt Company $363,355 · | ||
| Mar 11, 2022 | 87785 | BureauDistrict 3 | Sidewalk replacement at various locations in DePue. | — | Executed | Advanced Asphalt Company $248,541 · | ||
| Apr 29, 2022 | 46587 | VariousDistrict 3 | Removing existing raised reflective pavement markers, installing new raised reflective pavement markers and re This work is located on 1-39 and 1-80 in Various Counties. This work consists of removing existing raised reflective pavement markers, installing new raised reflective pavement markers and removing and replacing raised reflective pavement marker reflectors. | — | Executed | Marking Specialists Corporation $789,990 · | ||
| Apr 29, 2022 | 46588 | VariousDistrict 3 | Raised reflective pavement marker removal and replacement and replacement of raised reflective pavement marker This work is located on I-39 and I-80 in Livingston, Ford, Iroquois, and Kankakee Counties. This work consists of raised reflective pavement marker removal and replacement and replacement of raised reflective pavement marker reflectors. | — | Executed | Marking Specialists Corporation $479,809 · | ||
| Apr 29, 2022 | 66A79 | BureauDistrict 3 | 3P milling and resurfacing This work is located at FAS 1247 (US 6), approximately 1.0 miles East of Henry County Line to US 34 (S) in Sheffield in Bureau County (+/-5.74 miles). This work consists of 3P milling and resurfacing. | — | Executed | Advanced Asphalt Company $3,588,523 · | ||
| Apr 29, 2022 | 66D60 | IroquoisDistrict 3 | 7.71 miles,Milling and Resurfacing (Designed Overlay) and ADA Work begins 0.15 miles South of South St in Donovan and ends at US 24 in Sheldon. | — | Executed | Iroquois Paving Corporation $4,931,854 · | ||
| Apr 29, 2022 | 66E51 | GrundyDistrict 3 | HMA milling and resurfacing, ADA ramps, signals, pavement marking and Raised reflectors 0.7 MI OF MCCLINDON RD IN CHANNAHON TO 0.2 MI W OF WILL CO LINE. This work consists of HMA milling and resurfacing, ADA ramps, signals, pavement marking and Raised reflectors. | — | Executed | D. Construction, Inc. $2,116,332 · | ||
| Apr 29, 2022 | 66F91 | BureauDistrict 3 | The project consists on the removal and replacement of six concrete box culverts on IL 29 (DePue Spur) in Bureau County. The scope of work includes milling and resurfacing the area in between culverts and guardrail upgrades. Traffic control shall be achieved by detour. The project length is 0.6 miles. | — | Executed | Gensini Excavating, Inc. $3,420,890 · | ||
| Apr 29, 2022 | 66J64 | DeKalbDistrict 3 | Milling and resurfacing IL 38 (2 Project consists of milling and resurfacing IL 38 (2.5" to 3.75") from 5th St in city of Dekalb to County Line Rd, Dekalb County. The length of the job is 7.96 miles. Work includes ADA improvements, Traffic signal upgrades and miscellaneous drainage improvements. Local participation from Dekalb is expected for parking lanes and ADA ramps. | — | Executed | Curran Contracting Company $5,740,762 · | ||
| Apr 29, 2022 | 66K35 | BureauDistrict 3 | Spot improvement to remove and replace a box culvert located 0.2 mile South of IL 92 in Ohio IL. | — | Executed | Phoenix Corporation of the Quad Cities $535,704 · | ||
| Apr 29, 2022 | 66K57 | BureauDistrict 3 | Work begin at IL 92/IL 89 intersection just North of Lamoille and end 0.2 mile South of Plank Road in Cherry. The project is a 3P milling and resurfacing of IL 89 including drainage and ADA improvements. | — | Executed | Advanced Asphalt Company $5,628,157 · | ||
| Apr 29, 2022 | 66K73 | BureauDistrict 3 | Bridge Replacements SN 006-0117 and SN 006-0121 under TR 60B 4.8 miles East of Henry County Line; under TR 82C, 1.5 miles north of Sheffield. | — | Executed | D. Construction, Inc. $7,246,218 · | ||
| Apr 29, 2022 | 66L03 | FordDistrict 3 | A SMART overlay with 1 This work is located on FAP 326 (IL 47) from the Livingston County line to 8th Street in Gibson City in Ford County (+/-10.58 miles). This work consists of a SMART overlay with 1.5" milling, as well as drainage improvements. | — | Executed | Kankakee Valley Construction Company, Inc. $3,153,189 · | ||
| Apr 29, 2022 | 66L50 | DeKalbDistrict 3 | Milling and resurfacing 3 Project consists of milling and resurfacing 3.75" on IL 38 from W. of John Huber Huber Pkwy to 5th St in Dekalb, Dekalb County. The omission area is from 1st St to W of 4th St. Milling and resurfacing at IL23/IL 38 shall be 2.5". The paving work shall be done at night. Some ADA work and traffic signal improvements are proposed. Project length is 2.52 miles. | — | Executed | Curran Contracting Company $3,744,002 · | ||
| Apr 29, 2022 | 66L72 | BureauDistrict 3 | Work begin 0.1 mile East of Lincoln Avenue in Depue and at IL 89 in Spring Valley. The project is a SMART overlay, shoulder widening and rumble strips. | — | Executed | Advanced Asphalt Company $1,899,841 · | ||
| Apr 29, 2022 | 66L73 | KankakeeDistrict 3 | Milling resurfacing 1 1/2", pavement marking, update traffic signals and guardrail replacement 0.1 MI E of Lowe Rd E of Kankakee To 0.5 MI E of IL 1 in Sun River Terrace. This work shall consist of milling resurfacing 1 1/2", pavement marking, update traffic signals and guardrail replacement. | — | Executed | Kankakee Valley Construction Company, Inc. $4,199,388 · | ||
| Apr 29, 2022 | 66L90 | LivingstonDistrict 3 | 3P milling and resurfacing (designed overlay) This work is located at FAP 317 (US 24) 0.3 miles East of IL 47 in Forrest to Ford County Line in Livingston County (+/- 8.75 miles). This work consists of 3P milling and resurfacing (designed overlay). | — | Executed | Iroquois Paving Corporation $5,795,600 · | ||
| Apr 29, 2022 | 66M01 | GrundyDistrict 3 | This work is located at the intersections of IL 47 and Pine Bluff Road and at the intersection of IL 47 and Southmor Road South of Morris in Grundy County. This work consists off the removal of existing traffic signal equipment, signal heads, concrete foundations, controller cabinets, UPS and other related traffic signal equipment. | — | Executed | Van-Mack Electric Co. $359,960 · | ||
| Apr 29, 2022 | 66M10 | DeKalbIroquoisDistrict 3 | This project includes traffic signal improvements and railroad interconnect system upgrades at five intersections on US 24/IL 1 from Second St TO Eighth St in Watseka. This project also includes the aforementioned improvements at the intersection of US 30 and Elm St in Waterman. | — | Executed | Outsen Electric, Incorporated $238,185 · | ||
| Apr 29, 2022 | 66M27 | LaSalleDistrict 3 | Milling and resurfacing, preparation of base and aggregate base repairs This work is located at the Illinois Department of Transportation District 3 LaSalle Maintenance Facility. This work consists of milling and resurfacing, preparation of base and aggregate base repairs. | — | Executed | Advanced Asphalt Company $699,074 · | ||
| Apr 29, 2022 | 66M29 | DeKalbDistrict 3 | Milling and resurfacing, preparation of base and aggregate base repairs This work is located at the Illinois Department of Transportation District 3 Sycamore Maintenance Facility. This work consists of milling and resurfacing, preparation of base and aggregate base repairs. | — | Executed | Curran Contracting Company $191,273 · | ||
| Apr 29, 2022 | 66M34 | FordDistrict 3 | Class B pavement patching and other related construction work This work is located on FAP Route 71 (IL 54) beginning at the Ford/Iroquois County line (L.M. 0.00) and ending at the South Intersection of IL Route 54 and and IL Route 115 (L.M. 4.90) in Roberts. This work consists of Class B pavement patching and other related construction work. | — | Executed | Terrazas, LLC $183,566 · | ||
| Apr 29, 2022 | 66M41 | KendallDistrict 3 | Work begin at US 30/IL 47 intersection and ends 0.3 mile North of Waterpark Way in Yorkville. The project is an interim improvement to address poor pavement condition which include milling 2.25" and replacing in kind. | — | Executed | D. Construction, Inc. $725,559 · | ||
| Apr 29, 2022 | 66M42 | IroquoisDistrict 3 | Class B pavement patching and related construction work This work is located on FAP Route 840 (IL 49) beginning at the intersection of IL 49 and IL 24 (L.M. 0.00) and ending at the Vermilion County Line (L.M. 21.50) This work consists of Class B pavement patching and related construction work. | — | Rejected | Ramirez Diversified Services, LLC $324,616 · | ||
| Apr 29, 2022 | 66M43 | IroquoisDistrict 3 | Class B pavement patching and related construction work This work is located on FAP Route 317 (US 24) beginning at the intersection of US 45/24 (L.M. 0.00) in Gilman and ending at the intersection of US 24 and IL 1 (L.M. 12.34) in Watseka. This work consists of Class B pavement patching and related construction work. | — | Rejected | G. M. Sipes Construction, Inc. $155,429 · | ||
| Apr 29, 2022 | 66M45 | FordDistrict 3 | Class B pavement patching and related construction work This work is located on FAS Route 340 (IL 115) beginning at the intersection of IL 115 and IL 54 in Roberts (Log Mile 0.00) and ending at the intersection of IL 115 and IL 9 (Log Mile 10.57). This work consists of Class B pavement patching and related construction work. | — | Rejected | Iroquois Paving Corporation $391,494 · | ||
| Apr 29, 2022 | 66M46 | LivingstonDistrict 3 | Class A pavement patching and related construction work This work is located on FAI Route 55 (I-55) beginning at the McLean County Line (Mile Marker 187.87) and ending at Wolf-s creek, Structure No. 053-2506 (Mile Marker 206.12). This work consists of Class A pavement patching and related construction work. | — | Executed | G. M. Sipes Construction, Inc. $590,810 · | ||
| Apr 29, 2022 | 66M49 | IroquoisDistrict 3 | Intermittent milling 2" and resurfacing, pavement striping, raised reflective pavement marker removal and repl This project is located on F.A.I. Route 57 (I-57) beginning at the Ford County Line and ending approximately 4.5 miles North of US 24 (Gilman). This work consists of intermittent milling 2" and resurfacing, pavement striping, raised reflective pavement marker removal and replacement. | — | Rejected | Iroquois Paving Corporation $509,531 · | ||
| Apr 29, 2022 | 87750 | DeKalbDistrict 3 | Pavement widening, resurfacing, aggregate and HMA shoulders, curb and gutter, traffic signal modernization, pavement markings on Peace Road from the I-80 westbound exit ramp to IL 38 in the city of DeKalb. | — | Executed | William Charles Construction Company, LLC $3,514,800 · | ||
| Apr 29, 2022 | 87770 | DeKalbDistrict 3 | Resurfacing Suydam Road from Rollo Road to Il 23. | — | Executed | Curran Contracting Company $1,698,623 · | ||
| Apr 29, 2022 | 87771 | FordDistrict 3 | Resurfacing Buckley Road from IL 54 to the Iroquois County line. | — | Executed | Iroquois Paving Corporation $1,239,137 · | ||
| Apr 29, 2022 | 87777 | LaSalleDistrict 3 | Pavement removal, 7" PCC pavement, sidewalks, curb and gutter, storm sewer, and pavement markings on Autumnwood Drive from North 30th Road to Evans Street, and on Evans Street to west of Bluff Street in the city of Ottawa. | — | Executed | D. Construction, Inc. $1,713,095 · | ||
| Apr 29, 2022 | 87787 | LaSalleDistrict 3 | Reconstrution of 12th Street from IL 23 to Smith Douglass Road in Streator. | — | Executed | Tobey's Construction & Cartage, Inc. $3,357,439 · | ||
| Apr 29, 2022 | 87788 | DeKalbDistrict 3 | Resurfacing, HMA Shoulders and Pavement Markings on North First Street from Bethany Road to Old State Road. | — | Executed | Curran Contracting Company $843,488 · | ||
| Jun 17, 2022 | 46589 | VariousDistrict 3 | Guardrail and barrier wall delineation. | — | Executed | Northern Contracting, Inc. $484,247 · | ||
| Jun 17, 2022 | 66616 | LaSalleDistrict 3 | Milling and resurfacing 3 Project consists of milling and resurfacing 3.75" on IL 23, from N. of I-80 in Ottawa to S. of US 52 (W. Junction) in LaSalle for a total of 6.31 miles. The scope of work includes some traffic signal upgrades, guardrail, and drainage improvements. | — | Executed | Advanced Asphalt Company $4,883,010 · | ||
| Jun 17, 2022 | 66957 | KankakeeDistrict 3 | Widening and resurfacing of the intersection with Armour Road. Other items include storm sewer, shared use path, sidewalk, curb and gutter, roadway lighting, traffic signals, and landscape restoration. (0.72 miles) | — | Executed | Kankakee Valley Construction Company, Inc. $13,879,194 · | ||
| Jun 17, 2022 | 66A80 | DeKalbDistrict 3 | Milling and resurfacing 4 Work consists of milling and resurfacing 4.25" on IL 72 from Bull Run Creek in Kirkland to State St. in Genoa in Dekalb County. Additional work includes resurfacing parking lanes in Kirkland, guardrail upgrades, and drainage improvements. The total length of the job is 8.1 miles. | — | Executed | Curran Contracting Company $4,683,751 · | ||
| Jun 17, 2022 | 66B77 | FordDistrict 3 | 3P milling and resurfacing (design overlay) This work is located on FAP 796 (IL 115) from South Corporate Limits of Cabery to IL 116 (+/-7.83 miles) in Ford County. This work consists of 3P milling and resurfacing (design overlay). | — | Executed | Kankakee Valley Construction Company, Inc. $4,357,980 · | ||
| Jun 17, 2022 | 66E48 | GrundyDistrict 3 | Milling and resurfacing 3 Project consists of milling and resurfacing 3.75" on IL 113 from Lincoln St to Will Rd in Grundy County. The project length is 1.60 miles. Additional work includes ADA improvements and traffic signal upgrades. Minor drainage repairs are also proposed. | — | Executed | D. Construction, Inc. $1,189,717 · | ||
| Jun 17, 2022 | 66E49 | LaSalleDistrict 3 | Milling and resurfacing 3 3/4" of mainline, pavement marking, and raised reflectors This 3P project is located on FAP 68 (US 34) from IL 23 North to IL 23 South in Leland, IL. The length is 4.33 miles, and the work consists of milling and resurfacing 3 3/4" of mainline, pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $2,310,316 · | ||
| Jun 17, 2022 | 66E53 | LivingstonDistrict 3 | Milling 3 Project consists of milling 3.50" and resurfacing 3.75" on IL 116, 100' East of the intersection of IL 23 in Pontiac for a total of 1.71 miles. The scope of work includes some traffic signal upgrades, pavement patching, ADA ramp improvements, and minor drainage maintenance work. | — | Executed | Kankakee Valley Construction Company, Inc. $2,680,230 · | ||
| Jun 17, 2022 | 66H07 | DeKalbDistrict 3 | This work is located on FAP 573 (US 30) from the Lee County line to 0.5 miles East of Shabbona Road in Shabbona. This work consists of 3.96 miles of 3-3/4" milling and hot-mix asphalt resurfacing. The project also_includes the reconstruction of several ADA sidewalk ramps throughout Shabbona. | — | Executed | Builders Paving, LLC $2,738,000 · | ||
| Jun 17, 2022 | 66J62 | GrundyDistrict 3 | Spot improvements to remove SN 032-0052 carrying Nettle Creek Road over I-80, 8.2 miles West of IL 47. | — | Executed | D. Construction, Inc. $1,320,668 · | ||
| Jun 17, 2022 | 66J71 | KendallDistrict 3 | Milling and resurfacing 3 3/4" (designed overlay), shoulder work, guardrail replacement, pavement marking, rai LaSalle County Line to 0.2 MI W of IL 47 in Yorkville. This work consists of milling and resurfacing 3 3/4" (designed overlay), shoulder work, guardrail replacement, pavement marking, raised reflectors, and ADA ramps. | — | Executed | D. Construction, Inc. $4,944,149 · | ||
| Jun 17, 2022 | 66K68 | IroquoisDistrict 3 | 3P milling and resurfacing (designed overlay) and ADA improvements This work is located on FAS 1324 (US 45) from First South Street in Chebanse to Third Ave in Clifton in Iroquois County (+/-4.73 miles). This work consists of 3P milling and resurfacing (designed overlay) and ADA improvements. | — | Executed | Iroquois Paving Corporation $4,264,818 · | ||
| Jun 17, 2022 | 66K76 | LivingstonDistrict 3 | Milling and resurfacing (designed overlay) with ADA sidewalk work This work is located at FAP 326 (IL 47) from US 24 in Forrest to Ford County line in Livingston County (+/-9.35 miles). This work consists of milling and resurfacing (designed overlay) with ADA sidewalk work. | — | Executed | Kankakee Valley Construction Company, Inc. $6,277,406 · | ||
| Jun 17, 2022 | 66K78 | IroquoisDistrict 3 | Milling and resurfacing (designed overlay), ADA ramps, pavement marking, and raised reflectors This project is located on FAS 317 (US 45), beginning at North St in Danforth to US 24, for a total of 4.09 miles. The work consists of milling and resurfacing (designed overlay), ADA ramps, pavement marking, and raised reflectors. | — | Executed | Iroquois Paving Corporation $2,398,343 · | ||
| Jun 17, 2022 | 66L45 | KankakeeDistrict 3 | 1.7 Miles, Milling and Resurfacing (SMART OVERLAY) and ADA. Work begins 0.35 miles West of Roosevelt Ave and ends just West of 5th Ave in Kankakee. | — | Executed | Kankakee Valley Construction Company, Inc. $2,504,023 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.