Sep 20, 2019 87711 LaSalleDistrict 3 construction of the extension of Unytite Drive between Plank Road and Donlar Ave. in Peru. — Executed Nov 26 New Advanced Asphalt Company $1,487,056 ·
Sep 20, 2019 87713 LaSalleDistrict 3 Pavement widening and resurfacing on CH 15 from I-80 to IL 71. — Executed Nov 26 New D. Construction, Inc. $2,346,622 ·
Nov 8, 2019 46902 GrundyDistrict 3 Remove and replace three span structures SN 032-7004 and SN 032-7099 carrying Price street over the IandM Canal, seal and stripe parking lots, and other associatd work at the William G. Stratton State Park in Morris. — Executed Nov 26 New D. Construction, Inc. $896,861 ·
Nov 8, 2019 66E50 DeKalbDistrict 3 3P milling and resurfacing on IL 38 from the Ogle County line to John Huber Parkway. Other work includes guardrail with stabilization, shoulder stone, detector loop installation, pavement marking, and raised reflectors. — Executed Nov 26 New Rock Road Companies, Inc. $2,665,406 ·
Nov 8, 2019 66F60 FordDistrict 3 Remove and replace culvert SN 027-2509 that carries a tributary to Spring Creek under IL 115, located 7.2 miles S of US 24. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $432,193 ·
Nov 8, 2019 66F70 IroquoisDistrict 3 Removal and replacement of SN 038-0039, reconstruction of adjacent pavement, and associated earthwork and traffic control of US 45 over Prairie Creek. — Executed Nov 26 New Iroquois Paving Corporation $1,710,724 ·
Nov 8, 2019 66F75 LaSalleDistrict 3 Deck replacement and beam repair on SN 050-0201 carrying US 52 over Indian Creek, located 2.1 miles E of IL 23. — Executed Nov 26 New Civil Constructors, Inc. $2,219,448 ·
Nov 8, 2019 66J72 LaSalleDistrict 3 Bridge repair SN 050-0163 and 050-0164 on I-39 above BandN RR, 0.8 miles N of US 34. — Executed Nov 26 New D. Construction, Inc. $568,614 ·
Nov 8, 2019 66J86 VariousDistrict 3 Bridge deck concrete sealing at various bare concrete bridge decks. — Executed Nov 26 New All States Painting, Inc. $159,900 ·
Nov 8, 2019 66K27 FordDistrict 3 Removing and replacing expansion joints, removing and replacing bridge deck overlay and PPC I-beam repairs on SN's 027-0052 and 027-0053 carrying I-57 over Big Four Creek 2.37 miles S of IL 9. — Executed Nov 26 New Iroquois Paving Corporation $841,960 ·
Nov 8, 2019 66K43 VariousDistrict 3 District wide tree removal on state maintained routes as needed. — Rejected Nov 26 New Endrizzi Contracting, Inc $127,900 ·
Nov 8, 2019 87548 IroquoisDistrict 3 Replace the deck on a three span, non-continuous composite steel wide flange bridge carrying CH 40 over Sugar Creek, located 2.7 miles east of IL 1. — Rejected Nov 26 New Rausch Infrastructure, LLC $1,885,543 ·
Nov 8, 2019 87706 LaSalleDistrict 3 Construction of a shared-use-path and the construction of a pedestrian bridge over I-80, located west of IL 23 from Stevenson Road to Etna Road in the City of Ottawa. — Executed Nov 26 New D. Construction, Inc. $1,756,388 ·
Jan 17, 2020 46533 VariousDistrict 3 "On-Call" pavement marking with various materials including thermoplastic, paint, preformed plastic, polyurea, modified urethane, pavement marking removal , hot-spray thermoplastic, grooving for pavement marking, and aerial markings. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,187,470 ·
Jan 17, 2020 66961 KankakeeDistrict 3 Removal and replacement of SN 046-0087, Larry Power Rd over I-57. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $3,949,761 ·
Jan 17, 2020 66A51 GrundyDistrict 3 Milling and resurfacing shoulders and 8.5" of HMA mainline pavement, replacing cable median barrier, and structural repairs with scarification on some. The project will be staged using crossovers. It is located on I-55 from 0.39 miles S of Gardner Rd to 0.83 miles S of Reed Rd interchange. — Executed Nov 26 New D. Construction, Inc. $18,872,523 ·
Jan 17, 2020 66C59 LaSalleDistrict 3 Replacing the existing structure carrying CH 9 over I-80 including a new embankment and CH 9 realignment and reconstruction. Resurfacing of the IDOT buildings is also proposed under CI funds. — Executed Nov 26 New D. Construction, Inc. $4,314,254 ·
Jan 17, 2020 66E68 LivingstonDistrict 3 Removing SN 053-0065 and replacing it with SN 053-0192. The work also includes guardrail removal and replacement, channel excavation, rip rap placement, milling and resurfacing of adjacent pavement, pavement marking, and pavement markers. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $2,828,867 ·
Jan 17, 2020 66F08 BureauPutnamDistrict 3 Complete deck replacement of the I-180 bridge over the Illinois River and pavement resurfacing and replacement on the approach to the bridge. — Executed Nov 26 New Civil Constructors, Inc. $25,110,125 ·
Jan 17, 2020 66H21 LaSalleDistrict 3 1.279 miles of superstructure replacements and bridge repairs from LaSalle Rd to Little Vermilion River. — Executed Nov 26 New D. Construction, Inc. $16,388,867 ·
Jan 17, 2020 66H52 DeKalbDistrict 3 Bridge replacement (Ex:019-0021, Prop:019-0050) over a tributary to the Kishwaukee River and associated approach roadway work. — Executed Nov 26 New Sjostrom & Sons, Inc. $1,311,673 ·
Jan 17, 2020 66J57 LaSalleDistrict 3 Class A patching on the on/off ramp terminals and Class B patching on the on/off ramp pavements and US 52 mainline pavements at the interchanges of FAI 39 and US 52. — Executed Nov 26 New G. M. Sipes Construction, Inc. $415,883 ·
Jan 17, 2020 66K36 BureauDistrict 3 Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components on SN's 006-0125 and 006-0126. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $416,773 ·
Jan 17, 2020 66K37 DeKalbDistrict 3 Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN's 019-0036 and 019-0037. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $246,571 ·
Jan 17, 2020 66K38 LaSalleDistrict 3 Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN 050-0165 carrying US Rte 34 over FAI 39 interchange of US 34 and I-39. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $351,131 ·
Jan 17, 2020 66K48 LivingstonDistrict 3 Various bridge repairs to SN's 053-0139(SB) and 053-0140(NB) carrying FAI 55 over the west fork of Mazon River 3.0 miles southwest of IL Rte 17. — Executed Nov 26 New D. Construction, Inc. $353,644 ·
Jan 17, 2020 66K74 BureauDistrict 3 Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN 006-0123 carrying TR 148 over I-80. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $194,041 ·
Jan 17, 2020 66K75 GrundyIroquoisDistrict 3 Weed spraying on various routes in Grundy and Livingston counties. — Executed Nov 26 New Endrizzi Contracting, Inc $27,192 ·
Jan 17, 2020 87688 DeKalbDistrict 3 Replace the bridge carrying TR11 (McNeal Road) over South Branch Kishwaukee River, located east of County Line Road. — Executed Nov 26 New Sjostrom & Sons, Inc. $1,976,413 ·
Mar 6, 2020 66A82 GrundyDistrict 3 3P milling and resurfacing on IL 113 from IL 47 to Mary Ave in Coal City. 6.73 miles. — Executed Nov 26 New D. Construction, Inc. $2,696,227 ·
Mar 6, 2020 66B76 FordDistrict 3 3.903 miles of milling and resurfacing 3" of HMA from the S edge of Gibson City to the Champaign County Line. Also replacing one cross-road culvert. — Executed Nov 26 New Iroquois Paving Corporation $1,695,669 ·
Mar 6, 2020 66J48 LaSalleDistrict 3 2.766 miles of milling and resurfacing and ADA improvements from 0.8 miles W of Boyce Memorial Dr to Champlain St in Ottawa. Widen shoulders 1' at west end of the project. — Executed Nov 26 New Advanced Asphalt Company $3,711,915 ·
Mar 6, 2020 66K29 LaSallePutnamDistrict 3 3.83 miles of microsurfacing (1-pass) full width on IL 71 from IL 89 to Cedar Creek in Cedar Point. , 8.390 miles of patching from W of I-55 to the Livingston County Line. — Executed Nov 26 New A. C. Pavement Striping Co. $306,765 ·
Mar 6, 2020 66K49 LivingstonDistrict 3 Bridge expansion joint seal removal and replacement, removal and replacement of existing bridge approach slabs on SN 053-0047 carrying IL 47 over 5 Mile Creek 0.30 mile N of IL 116. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $532,961 ·
Mar 6, 2020 66K80 LivingstonDistrict 3 13.10 miles consisting of 2" SMART cold milling and resurfacing from 0.9 miles S of IL 17 in Dwight to IL 116 in Saunemin. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $3,727,955 ·
Mar 6, 2020 66K83 VariousDistrict 3 Monitoring traffic backups on the interstate in various counties in region 2 using ITS-Smart Work Zone Technology Traffic Management. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $988,000 ·
Mar 6, 2020 87693 LivingstonDistrict 3 Replace the bridge carrying TR 32 over Mole Creek, 4.0 miles southeast of Long Point. — Executed Nov 26 New Riber Construction, Inc. $378,893 ·
Mar 6, 2020 87696 DeKalbDistrict 3 Resurfacing Peace Road from IL 64 to Bethany Road, and Mercantile Drive from IL 23 to Peace Road in Sycamore. — Executed Nov 26 New Curran Contracting Company $1,105,600 ·
Mar 6, 2020 87718 BureauDistrict 3 Resurfacing and aggregate shoulders on CH 24 from CH 8 to Tiskilwa Spur Road in Tiskilwa. — Executed Nov 26 New Advanced Asphalt Company $998,904 ·
Mar 6, 2020 87719 BureauDistrict 3 Replace the bridge carrying W. Epperson Road over Epperson Run Creek at the western limits of the City of Princeton. — Executed Nov 26 New Curnyn Construction Co. $495,779 ·
Mar 6, 2020 87728 LivingstonDistrict 3 Cold in Place recycling and resurfacing on Campus Road from IL 17 to CH 1. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $1,897,377 ·
Mar 6, 2020 87734 BureauDistrict 3 Approximately 96.28 miles of bituminous surface treatment and crack filling on various county highways in Bureau County. — Executed Nov 26 New Pavement Maintenance Services, Inc. $2,594,660 ·
Apr 24, 2020 66968 BureauDistrict 3 3P milling and resurfacing on FAP 613 (US 34) from Henry County Line to 1200N Rd in Bureau County. — Executed Nov 26 New Advanced Asphalt Company $2,572,903 ·
Apr 24, 2020 66A87 LivingstonDistrict 3 7.27 miles of 3P milling and resurfacing on IL 116 from 0.7 mile E of IL 47 in Saunemin to W of Cullom. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $3,700,015 ·
Apr 24, 2020 66B75 IroquoisKankakeeDistrict 3 Milling and resurfacing 3.75" of HMA binder and surface on the mainline (3P Designed Overlay) with guardrail upgrades and drainage improvements. It begins from 0.2 mile S of I-57 to IL 79. — Executed Nov 26 New Iroquois Paving Corporation $7,393,021 ·
Apr 24, 2020 66B80 LivingstonDistrict 3 3P milling and resurfacing of 3.75" with guardrail replacement from E city limits of Cornell to IL 116 in Pontiac. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $6,285,284 ·
Apr 24, 2020 66D56 LivingstonDistrict 3 3P milling and resurfacing (Designed Overlay) from IL 18 to West Fork Mazon River, 1.4 miles W of I-55. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $5,416,536 ·
Apr 24, 2020 66E15 FordIroquoisDistrict 3 7.18 miles of milling and resurfacing 2.5" of HMA on IL 54 from IL 115 in Roberts to Spring Creek and updating guardrail at 2 structures. — Executed Nov 26 New Iroquois Paving Corporation $2,417,273 ·
Apr 24, 2020 66J41 DeKalbDistrict 3 Milling and resurfacing 2.75" on mainline pavement and parking located mainly on IL 23 from Sycamore and ending in Genoa. ADA improvements, guardrail updates , and minor drainage work are also included. — Executed Nov 26 New Curran Contracting Company $3,661,661 ·
Apr 24, 2020 66J63 KankakeeDistrict 3 3.069 miles of milling and resurfacing from 0.1 mile N of Armour Rd in Bourbonnais to IL 17 in Kankakee. — Executed Nov 26 New Gallagher Asphalt Corporation $4,614,478 ·
Apr 24, 2020 66J73 DeKalbDistrict 3 3P milling and resurfacing (Standard Overlay) on SBI 23 from Coltonville Rd to Highland Dr in Sycamore. — Rejected Nov 26 New Herbig Blacktop Construction $261,874 ·
Apr 24, 2020 66K30 BureauDistrict 3 5.76 miles of SMART overlay consisting of milling and resurfacing of 2" of HMA and additional ADA, guardrail, and drainage improvements from E of IL 40 to Hazelwood Dr in Wyanet. — Executed Nov 26 New Advanced Asphalt Company $1,697,790 ·
Apr 24, 2020 66K45 LaSalleDistrict 3 3P milling and resurfacing (designed overlay) and ADA from Bureau County Line to IL 251 in Mendota. — Executed Nov 26 New Advanced Asphalt Company $1,104,965 ·
Apr 24, 2020 66K58 BureauDistrict 3 Milling 3" and resurfacing 3.75" on the first mile, the rest of the project will be milled and resurfaced with 3.75" of HMA. The city of Princeton will participate with milling and resurfacing the parking lanes and ADA improvements. Minor drainage improvements are included. The project length is 1.34 miles. — Executed Nov 26 New Advanced Asphalt Company $967,303 ·
Apr 24, 2020 66K72 FordDistrict 3 4.15 miles of 3.75" HMA milling and resurfacing with spot guardrail updating and culvert cleaning on IL 9 from the McLean County Line to just W of IL 47 in Gibson City. — Executed Nov 26 New Cross Construction, Inc. $2,121,820 ·
Apr 24, 2020 66K92 BureauDistrict 3 Furnishing and installing stone dumped riprap to armor existing foreslope erosion on NB I-180 0.2 mile S of TR 281 (SN 006-0126). — Executed Nov 26 New D. Construction, Inc. $52,700 ·
Apr 24, 2020 87702 KendallDistrict 3 Resurfacing and sidewalk replacement on Lew Street from Church Street to Main Street in the city of Plano. — Executed Nov 26 New Geneva Construction Company $645,500 ·
Apr 24, 2020 87729 LivingstonDistrict 3 Replace the bridge carrying TR 41D over Mud Creek, 2.5 miles southeast of Blackstone. — Executed Nov 26 New Riber Construction, Inc. $310,925 ·
Apr 24, 2020 87730 DeKalbDistrict 3 Construction of a multi-use trial from existing Great Western Trail to Pleasant Street. The project is located within the DeKalb County Forest Preserve District, in the City of Sycamore and unincorporated Dekalb County. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $2,107,561 ·
Apr 24, 2020 87733 KankakeeDistrict 3 Construction of a raised median, sidewalk replacement, curb and gutter, flashing beacons, pedestrian push buttons and pavement markings on IL 17 from Orchard Road to Hunter Avenue in Kankakee. — Rejected Nov 26 New Lion Construction 1, LLC $232,572 ·
Apr 24, 2020 87736 GrundyDistrict 3 Sidewalk replacement and construction, and pavement martings at various locations in Mazon. — Executed Nov 26 New D. Construction, Inc. $167,522 ·
Jun 12, 2020 46548 VariousDistrict 3 Raised reflective pavement marker removal, furnishing and installing raised reflective pavement markers and replacement of raised reflective pavement marker reflectors. — Executed Nov 26 New Precision Pavement Markings Inc. $376,970 ·
Jun 12, 2020 46549 VariousDistrict 3 Raised reflective pavement marker removal, furnishing and installing raised reflective pavement markers and replacement of raised reflective pavement marker reflectors at various locations. — Executed Nov 26 New Precision Pavement Markings Inc. $349,588 ·
Jun 12, 2020 46550 VariousDistrict 3 Raised reflective pavement marker removal, installing raised reflective pavement markers and replacement of raised reflective pavement marker reflectors at various locations. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $502,136 ·
Jun 12, 2020 66A86 KankakeeDistrict 3 Milling and resurfacing the existing pavement 3.75", guardrail updates, and various types of drainage work on IL 115 from S13000W Rd in Herscher to S600W Rd N of Irwin. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $3,406,011 ·
Jun 12, 2020 66B04 FordDistrict 3 15.17 miles of milling and resurfacing the existing pavement 3.75" on IL 54 from IL 115 in Roberts to IL 9 in Gibson City. The project also includes guardrail updates and various drainage work. , 15.17 miles of milling and resurfacing the existing pavement 3.75" on IL 54 from IL 115 in Roberts to IL 9 in Gibson City. The project also includes guardrail updates and various drainage work. — Executed Nov 26 New Iroquois Paving Corporation $7,095,506 ·
Jun 12, 2020 66B78 FordKankakeeDistrict 3 9.26 miles of milling and resurfacing existing pavement 3.75- on IL 115 from CH 18 to 0.3 mile S of Main St in Cabery and Cabery to west corporate limits of Herscher. Work includes guardrail updates, various types of drainage work, and ADA ramp construction in Cabery. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $4,595,011 ·
Jun 12, 2020 66D81 FordDistrict 3 8.999 miles of milling and resurfacing from US 24 to IL 54 (N) in Roberts. — Executed Nov 26 New Iroquois Paving Corporation $3,941,216 ·
Jun 12, 2020 66J34 LaSalleDistrict 3 Class B patching on IL 18 and IL 71 and Class A and B patching on the entrance and exit ramps, at the interchanges of I-39 and IL 18 and IL 71. — Executed Nov 26 New G. M. Sipes Construction, Inc. $396,409 ·
Jun 12, 2020 66J96 LaSalleDistrict 3 HMA milling and resurfacing, PCC pavement replacement, storm sewer replacement, gutter removal, guardrail, and striping on FAP Rte 68 (IL 23) from the N intersection of IL 23 and US 34 to 400' N of SN 050-0042 (BNSF Railway). — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $485,332 ·
Jun 12, 2020 66K08 IroquoisDistrict 3 Class B pavement patching from N 2950 East Rd to US 24. — Executed Nov 26 New G. M. Sipes Construction, Inc. $145,923 ·
Jun 12, 2020 66K14 LaSalleDistrict 3 Cleaning and painting all structural steel components, including beams/girders, diaphragms, cross and lateral framing, bearings, drains, angle brackets, steel handrails when present, and other related steel components of SN 050-0129 carrying E. 14th Rd (TR 244) over FAI 80 (I-80) 6 miles E of IL 178. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $249,708 ·
Jun 12, 2020 66K21 KankakeeDistrict 3 4.96 miles of shoulder widening and rumble strip installation on US 45/52 from 0.37 mile N of 6000N Rd to 0.40 mile S of the Will County line. — Executed Nov 26 New Gallagher Asphalt Corporation $1,350,428 ·
Jun 12, 2020 66K28 BureauDistrict 3 3P milling and resurfacing (designed overlay) and ADA from US 6/34 to BSNF RR S of Buda. — Executed Nov 26 New Advanced Asphalt Company $1,374,338 ·
Jun 12, 2020 66K44 KankakeeDistrict 3 This contract is for 2 permanent crossovers in Kankakee. The North crossover is located approximately 1500' N of SN 046-0010/11 over Grinnell Rd, the South crossover is located 2300' S of SN 046-0008/0009 over railroad tracks. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $1,630,706 ·
Jun 12, 2020 66K52 LivingstonDistrict 3 Milling and resurfacing 2.75- HMA from the mainline as part of the 3P standard overlay. Areas on Culverts SN 053-2003 and SN 053-2029 will have additional HMA lifts so the new HMA overlay equals 2.75-. In addition, the project includes guardrail upgrades, grading and shaping ditches, and ADA improvements in Forrest. — Executed Nov 26 New Iroquois Paving Corporation $2,599,878 ·
Jun 12, 2020 66K53 KankakeeDistrict 3 1.91 miles of 3P milling and resurfacing on FAU 6194 (IL 113) from Indian Trail to IL 17 in Kankakee. — Executed Nov 26 New Gallagher Asphalt Corporation $1,679,008 ·
Jun 12, 2020 66K59 BureauDistrict 3 8.532 miles of milling and resurfacing 3-3/4" of mainline from the eastern city limit of Dover to IL 89 in Lamoille. This project includes pavement markings. — Executed Nov 26 New Advanced Asphalt Company $3,113,802 ·
Jun 12, 2020 66K79 LivingstonDistrict 3 Bridge expansion joint removal and replacement, bridge approach shoulder removal and replacement, deck slab repairs, guardrail and terminal sections sections removal and replacement, pavement striping removal and replacement, traffic control, and other related construction items on SN 053-0158 carrying FAP 649 (IL 17) over the west fork of the Mazon River 1.33 miles west of I-55 near Dwight. — Executed Nov 26 New P. T. Ferro Construction Co. $249,319 ·
Jun 12, 2020 66K89 GrundyLaSalleDistrict 3 Beam end cleaning and painting on SN 032-0099 (IL 47 in Morris) and SN 050-0219 (CH 15, Marseilles Rd in Marseilles). — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $407,093 ·
Jun 12, 2020 66K90 IroquoisDistrict 3 Class A pavement patching and pavement marking on I-57 from the Ford/Iroquois county line to the Iroquois/Kankakee county line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $396,436 ·
Jun 12, 2020 66K91 FordDistrict 3 Class A pavement patching and pavement marking on I-57 from the Champaign/Ford county line to the Ford/Iroquois county line. — Executed Nov 26 New Lion Construction 1, LLC $88,128 ·
Jun 12, 2020 66K97 LaSalleDistrict 3 Class A patching, longitudinal partial depth patching, and pavement marking on I-39 beginning at CH 54 W of Tonica (MP 48.4) and ending 0.8 mile S of 42nd Rd (MP 70.0). , Class A patching, longitudinal partial depth patching, and pavement marking on I-39 beginning at CH 54 W of Tonica (MP 48.4) and ending 0.8 mile S of 42nd Rd (MP 70.0). — Executed Nov 26 New G. M. Sipes Construction, Inc. $1,483,376 ·
Jun 12, 2020 87692 LaSalleDistrict 3 Replace the bridge carrying FAS 263 (CH 5) over the Vermilion River, 4.0 miles east of Leonore. — Executed Nov 26 New ICC Group Inc. $8,028,500 ·
Jun 12, 2020 87716 IroquoisDistrict 3 Resurfacing CH 23 from CH 4 to IL 116. — Executed Nov 26 New Iroquois Paving Corporation $1,295,043 ·
Jun 12, 2020 87717 LaSalleDistrict 3 Sidewalk replacement, paving brick sidewalk, traffic signals and street lighting along IL 18 from the Vermilion River to Wasson Street, on Vemilion Street from Hickory St. to Bridge St. and on Monroe St. from Hickory St. to Bridge St. in Streator. — Rejected Nov 26 New H. J. Eppel & Co. $926,471 ·
Jun 12, 2020 87720 BureauDistrict 3 Replace the bridge carrying Jefferson Street over Rocky run Creek in Tiskilwa. — Executed Nov 26 New D. Construction, Inc. $331,165 ·
Jun 12, 2020 87721 BureauDistrict 3 Resurface Ladd Road from US 6 to Dakota Street in Spring Valley. — Executed Nov 26 New Advanced Asphalt Company $226,431 ·
Jun 12, 2020 87723 DeKalbDistrict 3 Replace the bridge carrying TR 160 (Motel Road) over the east branch of the Kishwaukee River, 0.5 mile north of IL route 64. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $1,463,053 ·
Jun 12, 2020 87724 FordDistrict 3 Replace the bridge carrying CH 2 over Wall Town Drainage Ditch, 5 miles west of Loda. — Executed Nov 26 New Iroquois Paving Corporation $495,240 ·
Jun 12, 2020 87732 DeKalbDistrict 3 Sidewalk improvements at various locations in Somonauk. — Executed Nov 26 New Copenhaver Construction, Inc. $147,919 ·
Jun 12, 2020 87758 IroquoisDistrict 3 Remove existing guardrail and terminals, install new guardrail and terminals, pipe culverts and shaping ditches at various locations in Iroquois County. — Executed Nov 26 New Lovewell Fencing, Inc. $1,490,938 ·
Jul 31, 2020 66K22 KendallDistrict 3 5.92 miles of shoulder widening and rumble strip installation on US 52 from Townhouse Rd (South leg) to 0.17 mile W of IL 47. — Executed Nov 26 New D. Construction, Inc. $1,043,916 ·
Jul 31, 2020 66K93 VariousDistrict 3 One year contract to repair damaged high tension cable median barrier, guard rail, attenuators, etc., caused by motorists along various routes. — Executed Nov 26 New Northern Contracting, Inc. $918,117 ·
Jul 31, 2020 66K96 KendallDistrict 3 Pavement patching and striping on FAP 311 (US 34) beginning at the intersection of US 34 and Boulder Hill Pass Rd and ending at the S intersection of US 30 in Kendall County. — Executed Nov 26 New Triggi Construction, Inc. $195,788 ·
Jul 31, 2020 66K99 FordDistrict 3 Crack and joint serling on FAI 57 (IL 57) from Champaign County line to Irroquois County line in Ford County for a total length of 6.35 mi. — Executed Nov 26 New Complete Asphalt Service Co. $101,312 ·
Jul 31, 2020 66L04 KankakeeDistrict 3 Crack and Joint Sealing on FAP 41 (IL 17) from NS RR to 0.3 mi W of Roosevelt Ave in Kankakee and on FAP 330 (US 45/52) from Indian Oaks Rd (5000 N) to 0.1 mi N of Armour Rd in Bourbonnais for a total legnth of 5.32 miles. — Executed Nov 26 New Complete Asphalt Service Co. $63,926 ·
Jul 31, 2020 66L05 LaSalleDistrict 3 Crack and Joint Sealing on FAP 623 (US 6) from 0.31 mi of 1-39 to IL 178 in Utica in LaSalle for a total length of 3.57 miles. — Executed Nov 26 New Complete Asphalt Service Co. $17,440 ·
Jul 31, 2020 66L06 DeKalbDistrict 3 Crack and Joint Sealing on FAP 324 (IL 23) from Fox Ave in Sycamore to Davy St in Dekalb for a total length of 4.19 miles. — Executed Nov 26 New Complete Asphalt Service Co. $79,996 ·
Jul 31, 2020 66L07 LaSalleDistrict 3 Repairing scour/erosion damage under both abutments by filling the existing void under the footings with a self-consolidating concrete and installing a riprap slope at SN 050-0059 carrying FAP 607 (US 52) over Mission Creek approximately 0.3 mi W of IL 71 in LaSalle County. — Rejected Nov 26 New D. Construction, Inc. $32,407 ·
201–300 of 1,128‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.