Filtered by: County: Lasalle Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 21, 2022 | 66L98 | LaSalleDistrict 3 | This project is located at Structure No. 050-0215 carrying FAP 653 (IL 18) over FAI 39 (I-39) approximately 1.05 miles North of the Marshall County Line. | — | Executed | D. Construction, Inc. $420,050 · | ||
| Mar 11, 2022 | 66L74 | LaSalleDistrict 3 | Microsilica overlay, expansion joint replacement and deck repairs on the structures SN 050-0173 and SN 050-0174 carrying I-39 over Tomahawk Creek, 3.5 miles north of I-80 in LaSalle County. | — | Executed | D. Construction, Inc. $1,066,495 · | ||
| Mar 11, 2022 | 66M20 | LaSalleDistrict 3 | Cleaning and painting all structural steel and other steel components of the structures This project is located at three structures in LaSalle County. Structure No. 050-0-166 carrying N36th Rd. over I-39, 1.0 mile South of US 34. Structure No. 050-0172 carrying N42nd Rd. over I-39, 1.0 mile South of US 52. Stucture No. 050-0218 carrying IL 351/71 over the Lone Star Cement Co. Railroad. 2.6 miles South of US 6 (in Oglesby). This project consists of cleaning and painting all structural steel and other steel components of the structures. | — | Executed | ERA-Valdivia Contractors, Inc. $511,038 · | ||
| Mar 11, 2022 | 66M32 | LaSalleDistrict 3 | Tree and shrub planting from mile marker 88 to mile marker 89 on the North side (WB). | — | Executed | Central Landscaping, LP $72,720 · | ||
| Apr 29, 2022 | 66M27 | LaSalleDistrict 3 | Milling and resurfacing, preparation of base and aggregate base repairs This work is located at the Illinois Department of Transportation District 3 LaSalle Maintenance Facility. This work consists of milling and resurfacing, preparation of base and aggregate base repairs. | — | Executed | Advanced Asphalt Company $699,074 · | ||
| Apr 29, 2022 | 87777 | LaSalleDistrict 3 | Pavement removal, 7" PCC pavement, sidewalks, curb and gutter, storm sewer, and pavement markings on Autumnwood Drive from North 30th Road to Evans Street, and on Evans Street to west of Bluff Street in the city of Ottawa. | — | Executed | D. Construction, Inc. $1,713,095 · | ||
| Apr 29, 2022 | 87787 | LaSalleDistrict 3 | Reconstrution of 12th Street from IL 23 to Smith Douglass Road in Streator. | — | Executed | Tobey's Construction & Cartage, Inc. $3,357,439 · | ||
| Jun 17, 2022 | 66616 | LaSalleDistrict 3 | Milling and resurfacing 3 Project consists of milling and resurfacing 3.75" on IL 23, from N. of I-80 in Ottawa to S. of US 52 (W. Junction) in LaSalle for a total of 6.31 miles. The scope of work includes some traffic signal upgrades, guardrail, and drainage improvements. | — | Executed | Advanced Asphalt Company $4,883,010 · | ||
| Jun 17, 2022 | 66E49 | LaSalleDistrict 3 | Milling and resurfacing 3 3/4" of mainline, pavement marking, and raised reflectors This 3P project is located on FAP 68 (US 34) from IL 23 North to IL 23 South in Leland, IL. The length is 4.33 miles, and the work consists of milling and resurfacing 3 3/4" of mainline, pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $2,310,316 · | ||
| Jun 17, 2022 | 66M15 | LaSalleDistrict 3 | The installation of an overhead flashing beacon at the intersection of IL 71 and US 52 in LaSalle County This project consists of the installation of an overhead flashing beacon at the intersection of IL 71 and US 52 in LaSalle County. An additional flashing beacon will be installed adjacent to each of the four legs at the existing intersection warning sign location. | — | Executed | D. Construction, Inc. $200,000 · | ||
| Jun 17, 2022 | 66M16 | LaSalleDistrict 3 | This project consists of 6.8 miles of shoulder widening and rumble strip installation on IL 170 from N 16th Rd to N 21st Rd in LaSalle County. | — | Executed | Advanced Asphalt Company $1,512,236 · | ||
| Jun 17, 2022 | 66M25 | LaSalleDistrict 3 | Of cleaning and painting all structural and non-structural steel components of the structure This project is located at Structure No. 050-0233 carrying FAS 1265 (Old US 34, W. Union Street) over Indian Creek in Earlville. This work consists of of cleaning and painting all structural and non-structural steel components of the structure. | — | Executed | ERA-Valdivia Contractors, Inc. $189,647 · | ||
| Jun 17, 2022 | 66M35 | BureauLaSalleDistrict 3 | Washing all structural and non-structural steel, entire bridge deck surface, parapet walls, abutment seats, to This project is located at five structures spanning the Illinois River in IDOT District 3. This work consists of washing all structural and non-structural steel, entire bridge deck surface, parapet walls, abutment seats, tops of piers, deck drains and scuppers. | — | Executed | All States Painting, Inc. $378,400 · | ||
| Jun 17, 2022 | 66M40 | LaSalleDistrict 3 | Class A and B patching, pavement marking, and shoulder reconstruction This project is located on I-39 beginning at the Marshall Co line and ending at 0.3 mi S of the Lee Co line (36.2 miles); I-80 interchange ramps._The work shall consist of Class A and B patching, pavement marking, and shoulder reconstruction. | — | Executed | G. M. Sipes Construction, Inc. $2,515,927 · | ||
| Sep 23, 2022 | 66M91 | BureauLaSalleDistrict 3 | Centerline milling and resurfacing 2 feet wide, at a depth of 2", pavement marking, and raised reflectors This project is located on FAI 80 (I-80) from 0.7 mile East of I-180 to 0.7 mile West of Il 251. The work consists of centerline milling and resurfacing 2 feet wide, at a depth of 2", pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $1,093,285 · | ||
| Nov 18, 2022 | 66M51 | LaSalleDistrict 3 | Structure No. 050-2574, Box Culvert Rehabilitation, 2.47 miles north of US Route 52. | — | Executed | Riber Construction, Inc. $337,464 · | ||
| Nov 18, 2022 | 87810 | LaSalleDistrict 3 | Construction of a soldier pile wall and slope stabilization along North 2550th Road from North 2551st Road to a point approximently 0.25 mile east along 2550th Road in the Peru Road District. | — | Executed | D. Construction, Inc. $1,662,869 · | ||
| Jan 20, 2023 | 66M66 | LaSallePutnamDistrict 3 | This project consists on performing Bridge Decks Concrete Sealing with the parapets/curbs on various routes at various location throughout LaSalle and Putnam Counties. | — | Executed | All States Painting, Inc. $169,800 · | ||
| Jan 20, 2023 | 66M73 | LaSalleDistrict 3 | Crack routing and filling as well as pavement marking This project is located on FAP 68 (IL 23) and FAP 623 (US 6). It consists of crack routing and filling as well as pavement marking. | — | Executed | Freehill Asphalt, Inc. $136,066 · | ||
| Jan 20, 2023 | 87673 | LaSalleDistrict 3 | Replace the bridge carrying CH 57 over the Vermilion River, 1.2 miles north of 18th Road. | — | Executed | D. Construction, Inc. $4,537,912 · | ||
| Jan 20, 2023 | 87807 | LaSalleDistrict 3 | Resurface Chartres Street from Raccuglia Drive to Pershing Road in LaSalle. | — | Rejected | Advanced Asphalt Company $400,127 · | ||
| Mar 10, 2023 | 87813 | LaSalleDistrict 3 | Remove and replace sidewalks along various streets in the Kimes Elementary School area of Streator. | — | Executed | Tobey's Construction & Cartage, Inc. $417,120 · | ||
| Apr 28, 2023 | 66M33 | LaSalleDistrict 3 | This project is located in LaSalle county, on I-80 over Fox River, 2.5 mile east of IL 23, Latex Overlay and bridge deck repairs. | — | Executed | D. Construction, Inc. $3,081,875 · | ||
| Apr 28, 2023 | 66M69 | LaSalleDistrict 3 | This project is located on county highway 13 over I-80, 0.45 mi west of the I-80 and I-39 interchange, and 6th Road over I-80, 0.57 mi east of the I-80 and I-39 interchange, in LaSalle county. Latex overlay, Bridge deck repairs. | — | Executed | D. Construction, Inc. $1,439,925 · | ||
| Jun 16, 2023 | 66B05 | LaSalleLivingstonDistrict 3 | Milling and resurfacing with a designed overlay of IL 18 including storm_sewer construction, drainage and ADA ramp improvements. From the intersection of IL 17 and IL 18 in south eastern Streator and ends at the intersection of Otter Creek Road and IL 18 in Streator. | — | Executed | Advanced Asphalt Company $4,236,173 · | ||
| Jun 16, 2023 | 66M76 | LaSalleDistrict 3 | This work is located at two box culverts on IL Route 170: SN 050-2542 and SN 050-2543. | — | Executed | D. Construction, Inc. $627,241 · | ||
| Jun 16, 2023 | 66N43 | GrundyLaSalleDistrict 3 | Washing the bridge components and replacing the elastomeric (expansion) trough on SN 050-0079 and the structur This project consists of washing the bridge components and replacing the elastomeric (expansion) trough on SN 050-0079 and the structure carrying IL 47 over the Illinois River and the IandM Canal approximately 1.2 miles south of US 6 in Morris. | — | Executed | All States Painting, Inc. $349,800 · | ||
| Jun 16, 2023 | 87836 | LaSalleDistrict 3 | Resurface Chartres Street Raccuglia Drive to 24th Street in La Salle. | — | Executed | Advanced Asphalt Company $353,063 · | ||
| Jun 16, 2023 | 87837 | LaSalleDistrict 3 | Sidewalk reconstruction with ADA accommodations along Shooting Park Road from Sycamore Street to Parkside School entrance in Peru. | — | Executed | Gensini Excavating, Inc. $119,776 · | ||
| Aug 4, 2023 | 66N37 | LaSalleDistrict 3 | The removal and replacement of 6 foot of the structrure slab and sidewalls, guardrail replacement, striping, p This project is located at Structure No. 050-2540 carrying IL Route 170 over a stream approximately 3.8 miles north of Ransom. This project consists of the removal and replacement of 6 foot of the structrure slab and sidewalls, guardrail replacement, striping, pavement patching and other related work. | — | Executed | Riber Construction, Inc. $495,072 · | ||
| Jan 19, 2024 | 66N34 | LaSalleLivingstonDistrict 3 | This project consists of 5.8 miles of shoulder widening and rumble strip installation on IL 17 from E 11th Rd in LaSalle County to IL 23 in Livingston County. | — | Executed | Kankakee Valley Construction Company, Inc. $1,328,740 · | ||
| Jan 19, 2024 | 66N59 | LaSalleDistrict 3 | Pavement removal and replacement, PCC shoulder removal and replacement, drainage inlet box removal and replace This work is located on the I-80 and IL 178 interchange Structure No. 050-0248 at the north abutment bridge approach pavement connectors, northbound and southbound lanes. This work consists of pavement removal and replacement, PCC shoulder removal and replacement, drainage inlet box removal and replacement, concrete median removal and replacement, approach slab repair and other related construction work. | — | Executed | D. Construction, Inc. $156,145 · | ||
| Mar 8, 2024 | 66M56 | LaSalleDistrict 3 | Milling and resurfacing (standard overlay), pavement marking, raised reflective markers, and ADA improvements on FAP 623 (US 6) from the Bureau County Line 4.35 miles to the Little Vermilion River bridge in LaSalle. | — | Executed | Advanced Asphalt Company $6,430,186 · | ||
| Mar 8, 2024 | 66N30 | LaSallePutnamDistrict 3 | This project consists of 6.2 miles of shoulder widening and rumble strip installation, guardrail removal, and guardrail replacement on IL 18 from 200 feet east of IL 89 in Putnam County to 1.1 miles east of E 3rd Rd in LaSalle County. | — | Executed | Advanced Asphalt Company $1,993,993 · | ||
| Mar 8, 2024 | 87830 | LaSalleDistrict 3 | HMA resurfacing with aggregate wedge shoulders and other miscellaneous work on County Highway 41 from the DeKalb County Line to Brown Street in Earlville. | — | Executed | Advanced Asphalt Company $567,219 · | ||
| Mar 8, 2024 | 87845 | LaSalleDistrict 3 | Sidewalk construction on 11th Street from Rutland Street to Carrie Lane, and on Rutland street from 11th Street to Fillebrowne Street in Marseilles. | — | Executed | Gensini Excavating, Inc. $544,677 · | ||
| Apr 26, 2024 | 66N92 | LaSalleDistrict 3 | Cleaning and painting all structural steel on Structure No. 050-0019 carrying IL 351 over the Lone Star Cement Railroad, 2.0 miles south of US Route 6 (Oglesby). | — | Executed | ERA-Valdivia Contractors, Inc. $186,186 · | ||
| Apr 26, 2024 | 87847 | LaSalleDistrict 3 | Resurfacing CH 2 from the Somonauk South City Limits to US 52. | — | Executed | Curran Contracting Company $2,100,248 · | ||
| Jun 14, 2024 | 66K85 | LaSalleDistrict 3 | 2.6 Miles. SN 050-0040 Bridge Replacement with 2 span SN 050-0265 US 34 reprofiling and detour route improvements. Located on US 34 over Indian Creek in Earlville 0.3 miles east of 1251st Road. | — | Executed | D. Construction, Inc. $5,077,494 · | ||
| Jun 14, 2024 | 66N75 | LaSalleDistrict 3 | 3.46 Miles OF Class B pavement patching and shoulder repair. Work is at the exterior ramps of I-39. | — | Executed | Advanced Asphalt Company $1,918,205 · | ||
| Jun 14, 2024 | 66P06 | LaSalleDistrict 3 | Removal and replacement of the finger plate expansion joint elastomeric troughs on SN 050-0191 carrying I-39 over the Illinois River, IAIS Railroad, and an abandoned railroad approximately 2.82 miles south of Interstate 80 (I-80). | — | Executed | D. Construction, Inc. $1,356,516 · | ||
| Jun 14, 2024 | 66P24 | LaSalleDistrict 3 | 14.45 miles of routing and crack sealing. Work begins in Ottawa at IL 23 and E Freemont Street on IL 23/IL71 including Columbus Street and LaSalle Street. Work continues at the intersection of Hitt Street and IL 23 to McKinley Rd. Work continues in Streator on IL 18, 0.1 miles east of IL 251 to east 0.1 miles West of E 16th Rd. | — | Executed | Denler, Inc. $88,496 · | ||
| Jun 14, 2024 | 66P38 | LaSalleDistrict 3 | Class A pavement patching, joint and pothole repairs, striping and traffic control on FAI 39 beginning at the Marshall/LaSalle County Line and ending at the LaSalle/Lee County Line in LaSalle County. | — | Executed | G. M. Sipes Construction, Inc. $793,086 · | ||
| Jun 14, 2024 | 66P40 | GrundyLaSalleDistrict 3 | Centerline striping on I-39 in LaSalle County and on I-80 in LaSalle and Grundy Counties. | — | Executed | Maintenance Coatings Co. $1,382,491 · | ||
| Jun 14, 2024 | 87801 | LaSalleDistrict 3 | HMA Resurfacing and widening with HMA shoulders, aggregate shoulder, culvert re placement, pavement marking, shoulder rubmble strips, gaurdrail replacement, an d other work along county highway from 21st road to the Livingston county line. | — | Executed | Advanced Asphalt Company $6,972,036 · | ||
| Jun 14, 2024 | 87838 | LaSalleDistrict 3 | Reconstruction of Plank Road to provide a 3 lane roadway with bi-directional tu rn lane from Ed Urban Drive to Midtown Road in the City of Peru. | — | Executed | Advanced Asphalt Company $2,875,373 · | ||
| Aug 2, 2024 | 66K82 | BureauLaSalleDistrict 3 | Milling and resurfacing (designed overlay), structure repairs, patching, pavement marking, and raised reflective markers on FAI 80 (I-80) from 1 mile west of IL 89 to 0.7 mile west of IL 251. | — | Executed | Advanced Asphalt Company $21,687,508 · | ||
| Aug 2, 2024 | 87865 | LaSalleDistrict 3 | Resurfacing 8th Street from Crosat St. to Sterling St. and Richard Hallett Road from US 6 to the south city limits of LaSalle. | — | Executed | Advanced Asphalt Company $535,616 · | ||
| Sep 20, 2024 | 66P11 | KendallLaSalleDistrict 3 | 5.62 miles of milling and resurfacing on US 52 from east of the IL-71 intersection to the north leg of Townhouse Road. | — | Executed | D. Construction, Inc. $2,515,676 · | ||
| Sep 20, 2024 | 66P42 | LaSalleLivingstonDistrict 3 | 16.21 miles of HMA milling and resurfacing on IL 170 from 0.2 mile south of River Road in Seneca to the intersection with IL 17. | — | Executed | D. Construction, Inc. $6,376,242 · | ||
| Sep 20, 2024 | 66P50 | LaSalleDistrict 3 | 35.55 miles gross of On-Call Class A pavement patching, pavement striping, and other related items to complete the work as described herein on I-39 from the Marshall County Line to the Lee County Line including interchange ramps. | — | Executed | G. M. Sipes Construction, Inc. $2,186,049 · | ||
| Sep 20, 2024 | 66P58 | LaSalleDistrict 3 | Removal of HMA shoulders and replacing with PCC shoulders, striping, and traffic control at SN 050-0195 carrying US Route 6 over I-39 and SN 050-0181 carrying CH 19 over I-39. | — | Executed | G. M. Sipes Construction, Inc. $1,146,789 · | ||
| Sep 20, 2024 | 66P80 | LaSalleDistrict 3 | 2,596 gross ft of intermittent milling and resurfacing the mainline, merge lanes, and gore areas as show on plan details on F.A.I. Route 80 (I-80) from 0.5 miles west of the I-80/I-39 Interchange (just east of SN 050-0093) to west of SN 050-0178 in LaSalle County. | — | Executed | Advanced Asphalt Company $148,365 · | ||
| Jan 17, 2025 | 66P36 | LaSalleDistrict 3 | Shoulder replacement, seeding, storm sewers, drainage repairs, bridge repairs including expansion joint replacement, PPC I-beam repairs structural repair of concrete, bridge washing and other related construction work at SN 050-0175 carrying CH 33 over I-39 3.0 miles north of the I-39 and I-80 interchange. | — | Executed | D. Construction, Inc. $425,002 · | ||
| Jan 17, 2025 | 87852 | LaSalleDistrict 3 | Rehabiliate the bridge carrying Walnut Street over the IC Railroad, 0.9 miles east of IL 71. | — | Rejected | D. Construction, Inc. $946,209 · | ||
| Mar 7, 2025 | 66N42 | LaSalleDistrict 3 | Washing the entire structural steel superstructure, washing and sealing the concrete (deck surface, inside face of parapets, top surface of the abutments and piers) at various structures over the Illinois River in LaSalle County. | — | Executed | Interstate Maintenance, Incorporated $262,302 · | ||
| Mar 7, 2025 | 66P95 | LaSalleDistrict 3 | HMA milling and resurfacing on the frontage road, parallel to IL 23 on the north side of Streator, and is approximately 0.22 mile long. | — | Executed | Kankakee Valley Construction Company, Inc. $180,130 · | ||
| Mar 7, 2025 | 66R05 | LaSalleDistrict 3 | Replacing the 6" centerline pavement marking with 9" contrast pavement marking tape and replacing the 8" lane lines at interchange ramps on I-39 from north of Oglesby Interchange at M.M. 54 to M.M. 76.4. | — | Executed | A. C. Pavement Striping Co. $936,906 · | ||
| Mar 7, 2025 | 66R06 | LaSalleLivingstonDistrict 3 | Contrast pavement marking of the 8" lane lines on IL 23 at Richards Rd in LaSalle County and ending at Adams St in Livingston County and also on IL 18 beginning at Second Ave and ending at Wasson St in LaSalle County. | — | Executed | Varsity Striping & Construction Co. $268,247 · | ||
| Mar 7, 2025 | 87853 | LaSalleDistrict 3 | Replace the bridge carrying Kelly Street over Prairie Creek, north of Bluff Street. | — | Executed | D. Construction, Inc. $852,364 · | ||
| Mar 7, 2025 | 87861 | LaSalleDistrict 3 | HMA resurfacing wiht HMA and Aggregate shoulders on County Highway 51 from Old Chicago Road to the City of Marseilles. | — | Executed | Advanced Asphalt Company $1,516,752 · | ||
| Mar 7, 2025 | 87876 | LaSalleDistrict 3 | Construct a PCC Shared-use path with a pedestrian bridge over Il 125. This project is located south of Wenzel Road in the City of Peru. | — | Executed | D. Construction, Inc. $4,565,811 · | ||
| Mar 7, 2025 | 87877 | LaSalleDistrict 3 | Resurfacing and Shoulder Widening on CH 4 from CH 15 to the Grundy County Line. | — | Executed | D. Construction, Inc. $1,868,000 · | ||
| Mar 7, 2025 | 87878 | LaSalleDistrict 3 | Resurfacing and shoulder widening on CH 4 from IL 71 to CH 15. | — | Executed | Advanced Asphalt Company $1,448,524 · | ||
| Mar 7, 2025 | 87879 | LaSalleDistrict 3 | HMA resurfacing of Iowa Avenue, Proter Street, and Bronson Street from Main Street to Johnson Street in Streator. Inlcudes Curb and Gutter, sidewalks, and storm sewers. | — | Executed | Advanced Asphalt Company $1,674,922 · | ||
| Apr 25, 2025 | 66R11 | LaSalleDistrict 3 | Aggregate Wedge Shoulder, Type B along I 39 at LaSalle county extending from Marshall County Line (M.M. 40.32) to Lee County Line (M.M. 76.85) and includes exit and entrance ramps at the IL 18, Tonica, IL 71, IL 251, Oglesby Spur, US 6, US 52 and US 34 Interchanges, 36.5 miles gross length. | — | Executed | Phoenix Corporation of the Quad Cities $704,100 · | ||
| Apr 25, 2025 | 66R12 | GrundyLaSalleDistrict 3 | Pavement patching along I-80 in LaSalle and Grundy counties_extending from east of Illinois 23 interchange (M.M.90) to Grundy county line (M.M.103), LaSalle County Line (M.M.103) to Seneca interchange (M.M.105), Brisbon interchange Grundy county, and Minooka interchange (Ridge Rd), 15 miles gross length. | — | Executed | D. Construction, Inc. $579,432 · | ||
| Apr 25, 2025 | 66R15 | DeKalbLaSalleDistrict 3 | Furnishing and placing Aggregate Wedge Shoulders, Type B adjacent to existing mainline pavement or stabilized shoulders along IL 23 and US 34 in LaSalle County. | — | Executed | Phoenix Corporation of the Quad Cities $199,908 · | ||
| Apr 25, 2025 | 66R16 | LaSalleDistrict 3 | 4 miles Centerline Crack Sealing beginning at 0.3 Mi South of N. 40th Rd and ends at 1.3 MI. South of US Route 34. | — | Executed | SKC Construction, Inc. $23,407 · | ||
| Apr 25, 2025 | 66R36 | LaSalleDistrict 3 | Milling and resurfacing 2" on I 80 from 1.4 miles east of the Bureau County Line to 0.1 miles east of IL 351. Additional work includes shoulder improvement and ramp resurfacing at IL 251, 2.4 miles gross length. | — | Executed | Advanced Asphalt Company $5,338,646 · | ||
| Apr 25, 2025 | 87881 | LaSalleDistrict 3 | Sidewalk removal and replacement at various locations in Mendota. | — | Executed | D. Construction, Inc. $247,455 · | ||
| Jun 13, 2025 | 46937 | LaSalleDistrict 3 | Roadway improvements (HMA resurfacing, A3 oil and chip, drainage improvements and other work) within Illini State Park (IDNR) in LaSalle County, IL. 1.6 miles gross length. | — | Executed | D. Construction, Inc. $1,632,707 · | ||
| Jun 13, 2025 | 46941 | LaSalleDistrict 3 | PCC concrete patching of the parking lot at the lodge at Starved Rock State Park (IDNR) in LaSalle County, IL. | — | Executed | Advanced Asphalt Company $513,534 · | ||
| Jun 13, 2025 | 66N05 | LaSalleDistrict 3 | Cleaning and painting all structural steel of two structures, Location 1: SN 050-0195 carrying US 6 over I-39, 2.7 mi. east of IL 351 near LaSalle; Location 2: SN 053-0181 carrying CH 19 (F.A.S. 270) over I-39, 2.3 mi. north of US 52. | — | Executed | ERA-Valdivia Contractors, Inc. $946,914 · | ||
| Jun 13, 2025 | 66N36 | LaSalleDistrict 3 | Latex Overlay, Expansion Joints, and Deck Repairs to SN 050-0177/-0178 on I-39 at SN 050-0177/0178 carrying I-39 over I-80, 2.6 miles west of IL 178. | — | Executed | D. Construction, Inc. $3,715,629 · | ||
| Jun 13, 2025 | 66P53 | LaSalleDistrict 3 | Bridge deck repairs,bridge deck latex overlay, pavement patching, and pavement marking replacement_on IL 23 in Ottawa. | — | Executed | D. Construction, Inc. $1,897,015 · | ||
| Jun 13, 2025 | 66P54 | LaSalleDistrict 3 | Milling and resurfacing designed overlay of Il 251 including 4' safety shoulders, shoulder rumble strips, and centerline rumble strips from US 52 to the north limit. 10.99 miles gross. | — | Executed | Advanced Asphalt Company $6,445,788 · | ||
| Jun 13, 2025 | 66R47 | LaSalleDistrict 3 | Class A Pavement Patching and Cross Stitching on I-39 at US-52 interchange ramps. | — | Executed | G. M. Sipes Construction, Inc. $456,512 · | ||
| Jun 13, 2025 | 87882 | LaSalleDistrict 3 | Construction of a single-span PPC deck beam bridge to carry River Road over a drainage ditch, 0.7 miles west of IL 170 in Seneca. | — | Executed | D. Construction, Inc. $535,667 · | ||
| Aug 1, 2025 | 87904 | LaSalleDistrict 3 | Construct PCC sidewalk at various locations in La Salle. Includes; ADA ramps, curb and gutter, and driveways. | — | Executed | Gensini Excavating, Inc. $340,268 · | ||
| Sep 19, 2025 | 66R59 | LaSalleDistrict 3 | Scour mitigation by placing stone dumped riprap at both ends of the culvert and other related construction items at SN 050-2006 carrying IL 18 over Eagle Creek approximately 1.7 miles west of IL Route 23 near Streator. | — | Executed | D. Construction, Inc. $27,740 · | ||
| Sep 19, 2025 | 87871 | LaSalleDistrict 3 | Sidewalk construction at various locations in Oglesby. | — | Executed | D. Construction, Inc. $283,773 · | ||
| Jan 16, 2026 | 66R21 | LaSalleDistrict 3 | Bridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures: SN's 050-0077 and 050-0078 carrying IL Route 251 over I-80 in LaSalle County. | — | Executed | D. Construction, Inc. $1,801,296 · | ||
| Jan 16, 2026 | 66R83 | LaSalleDistrict 3 | Milling and resurfacing, patching, pavement striping, pavment markers, and other related construction work on FAU_Route 6081 north of I-80 in Peru beginning at Il Route 251 and ending at Airport Rd; also on Charles St adjacent to east 3rd Rd in Lasalle County. | — | Executed | Advanced Asphalt Company $836,744 · | ||
| Jan 16, 2026 | 66R85 | LaSalleDistrict 3 | Filling existing shoulder inlets, paved shoulder removal and replacement with PCC shoulders and concrete curbs, pipe drain removal, riprap installation Class A Patching (Special) and other related construction work on FAI 39 north and south of SNs 050-0167 and 050-0168 over the Chicago and Northwestern Railroad. | — | Executed | D. Construction, Inc. $333,979 · | ||
| Feb 27, 2026 | 64U03 | LaSalleLeeDistrict 2 | 19.3 miles, ultra-thin bonded wearing course, microsurfacing joint repairs, pavement patching, and rest_area improvements from LaSalle County Line_to Ogle County Line. | — | Executed | Rock Road Companies, Inc. $14,540,979 · | ||
| Feb 27, 2026 | 66P67 | LaSalleDistrict 3 | Milling and resurfacing 3 3/4" (designed overlay)_on FAP 587 (US 34) beginning 0.6 mile east of I-39 and ending at E 12th Road in Earlville. Additional work includes micro-surface with high friction aggregate and sinusoidal rumble strips in the curves, ditch cleaning, culvert cleaning, and end section replacements, pavement marking, and raised reflective pavement markers. 7.07 miles gross length. | — | Executed | Advanced Asphalt Company $3,606,240 · | ||
| Feb 27, 2026 | 87910 | LaSalleDistrict 3 | HMA resurfacing of CH 29 from IL 18 to CH 64 in LaSalle County. Additionally includes HMA shoulders, aggregate shoulders and other required work. | — | Executed | Advanced Asphalt Company $1,225,765 · | ||
| Apr 24, 2026 | 66M55 | LaSalleDistrict 3 | Bridge Replacement (SN 050-0033) over the Fox River in Ottawa IL and milling and resurfacing to US 6. 1.75 miles gross length. | — | Executed | D. Construction, Inc. $20,377,827 · | ||
| Apr 24, 2026 | 66R64 | LaSalleDistrict 3 | Joint replacement, Deck patch, approach repairs, bearing retainer and paint, substructure repairs, Anti- Graffiti at structure No. 050-0218 carrying IL 351 over Lone Star Cement Railroad and structure No. 050-0019 carrying IL 351 over Lone Star Cement Railroad 2.0 miles South of US 6 in La Salle County. | — | Executed | D. Construction, Inc. $660,277 · | ||
| Apr 24, 2026 | 66T58 | LaSalleDistrict 3 | Routing and filling the cracks along the centerline, significant transverse cracks and pavement markings along US 34 from 12th Rd. west of Earlville to west of the US 34 and IL 23 junction in LaSalle County. 6.44 miles gross length. | — | Executed | Complete Asphalt Service Co. $49,800 · | ||
| Apr 24, 2026 | 87909 | LaSalleDistrict 3 | Sidewalk construction and ADA ramps on various routes near Marseilles Elementary School in Marseilles. | — | Executed | Davis Concrete Construction Co. $274,017 · | ||
| Jun 12, 2026 | 66A91 | LaSalleDistrict 3 | Pavement resurfacing on the I-80 and I-39 interchange entrance/exit ramps with minor rehabilitation and repair work at select structures, improvements to existing pipe and box culverts, slope and ditch grading, upgrading guardrails, impact attenuators, high tension cable barriers, and superelevation on FAI 80(I-80) from 0.1 miles east of IL-351 to 0.3 miles west of IL-178. Approximately 4.13 miles gross length. | — | Executed | Advanced Asphalt Company $19,753,741 · | ||
| Jun 12, 2026 | 66M84 | LaSalleDistrict 3 | Removal of the existing box culvert (SN 050-2546) and replacement with 2-42" EQRS 42" culverts on US 34 over Mendota Creek Tributary, approximately 4.1 miles west of I-39 in Mendota in LaSalle County. Approximately 259 feet gross length. | — | Executed | D. Construction, Inc. $443,941 · | ||
| Jun 12, 2026 | 66T10 | LaSalleDistrict 3 | Removal and replacement of the fabric reinforced elastomeric troughs and associated hardware at Structure No. 050-0219 carrying F.A.S. Route 268A (CH 15) over the Illinois River approximately 0.4 mile south of US 6 (Marseilles) in LaSalle County. | — | Executed | Riber Construction, Inc. $236,720 · | ||
| Jun 12, 2026 | 66T11 | LaSalleDistrict 3 | Washing all components of Structure No. 050-0079 carrying F.A.P. Route 46 (IL 251) over the Illinois River and CSX Railroad approximately 0.1 mile south of US 6 (Peru) in LaSalle County. This includes all structural steel (beams, girders, diaphragms, bearings, cross framing, lateral framing), top surface of piers and abutments, deck drains (scuppers), entire deck surface, inside face of parapets, finger plate expansion joints and elastomeric troughs. | — | Executed | All States Painting, Inc. $58,232 · | ||
| Jun 12, 2026 | 66T39 | LaSalleDistrict 3 | Pavement patching and joint repair along I-39 at the following interchanges in LaSalle County: Tonica (SB only), IL 71, IL 251, Oglesby, I-80, and US 34. 3.06 miles gross length. | — | Executed | G. M. Sipes Construction, Inc. $2,815,825 · | ||
| Jun 12, 2026 | 66T45 | LaSalleDistrict 3 | Class B patching at the concrete section of FAP 603 (US 52) over I-39, beginning 0.47 miles west of I-39 (Station 191+44) and ending 0.35 miles east of I-39 (Station 234+23), and also includes the entrance and exit ramps at the interchange in LaSalle County. 4,500 feet gross length. | — | Executed | G. M. Sipes Construction, Inc. $639,792 · | ||
| Jul 31, 2026 | 66T13 | BureauLaSalleDistrict 3 | Milling, resurfacing,_pavement marking, and aggregate construction on a frontage north of I-80 beginning at a dead end (L.M. 0.00) in Bureau County and ending approximately 85 feet west of Plank Rd. in LaSalle County. 1.36 miles gross length. | — | Executed | Advanced Asphalt Company $729,412 · | ||
| Jul 31, 2026 | 66T14 | BureauLaSalleDistrict 3 | Removing and installing new mast arms, foundations, and street signs in three intersections: Wenzel Road and IL 251, Shooting Park Road and IL 251 in LaSalle County and IL 26 and Backbone Rd in Bureau County. | — | Active |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.