IDOT Jobs

All dates · 205 jobs · — Sign up free
★ My Jobs

Filtered by: County: Lasalle Clear all

205 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 21, 2022 66L98 LaSalleDistrict 3 This project is located at Structure No. 050-0215 carrying FAP 653 (IL 18) over FAI 39 (I-39) approximately 1.05 miles North of the Marshall County Line. — Executed Nov 26 New D. Construction, Inc. $420,050 ·
Mar 11, 2022 66L74 LaSalleDistrict 3 Microsilica overlay, expansion joint replacement and deck repairs on the structures SN 050-0173 and SN 050-0174 carrying I-39 over Tomahawk Creek, 3.5 miles north of I-80 in LaSalle County. — Executed Nov 26 New D. Construction, Inc. $1,066,495 ·
Mar 11, 2022 66M20 LaSalleDistrict 3 Cleaning and painting all structural steel and other steel components of the structures This project is located at three structures in LaSalle County. Structure No. 050-0-166 carrying N36th Rd. over I-39, 1.0 mile South of US 34. Structure No. 050-0172 carrying N42nd Rd. over I-39, 1.0 mile South of US 52. Stucture No. 050-0218 carrying IL 351/71 over the Lone Star Cement Co. Railroad. 2.6 miles South of US 6 (in Oglesby). This project consists of cleaning and painting all structural steel and other steel components of the structures. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $511,038 ·
Mar 11, 2022 66M32 LaSalleDistrict 3 Tree and shrub planting from mile marker 88 to mile marker 89 on the North side (WB). — Executed Nov 26 New Central Landscaping, LP $72,720 ·
Apr 29, 2022 66M27 LaSalleDistrict 3 Milling and resurfacing, preparation of base and aggregate base repairs This work is located at the Illinois Department of Transportation District 3 LaSalle Maintenance Facility. This work consists of milling and resurfacing, preparation of base and aggregate base repairs. — Executed Nov 26 New Advanced Asphalt Company $699,074 ·
Apr 29, 2022 87777 LaSalleDistrict 3 Pavement removal, 7" PCC pavement, sidewalks, curb and gutter, storm sewer, and pavement markings on Autumnwood Drive from North 30th Road to Evans Street, and on Evans Street to west of Bluff Street in the city of Ottawa. — Executed Nov 26 New D. Construction, Inc. $1,713,095 ·
Apr 29, 2022 87787 LaSalleDistrict 3 Reconstrution of 12th Street from IL 23 to Smith Douglass Road in Streator. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $3,357,439 ·
Jun 17, 2022 66616 LaSalleDistrict 3 Milling and resurfacing 3 Project consists of milling and resurfacing 3.75" on IL 23, from N. of I-80 in Ottawa to S. of US 52 (W. Junction) in LaSalle for a total of 6.31 miles. The scope of work includes some traffic signal upgrades, guardrail, and drainage improvements. — Executed Nov 26 New Advanced Asphalt Company $4,883,010 ·
Jun 17, 2022 66E49 LaSalleDistrict 3 Milling and resurfacing 3 3/4" of mainline, pavement marking, and raised reflectors This 3P project is located on FAP 68 (US 34) from IL 23 North to IL 23 South in Leland, IL. The length is 4.33 miles, and the work consists of milling and resurfacing 3 3/4" of mainline, pavement marking, and raised reflectors. — Executed Nov 26 New Advanced Asphalt Company $2,310,316 ·
Jun 17, 2022 66M15 LaSalleDistrict 3 The installation of an overhead flashing beacon at the intersection of IL 71 and US 52 in LaSalle County This project consists of the installation of an overhead flashing beacon at the intersection of IL 71 and US 52 in LaSalle County. An additional flashing beacon will be installed adjacent to each of the four legs at the existing intersection warning sign location. — Executed Nov 26 New D. Construction, Inc. $200,000 ·
Jun 17, 2022 66M16 LaSalleDistrict 3 This project consists of 6.8 miles of shoulder widening and rumble strip installation on IL 170 from N 16th Rd to N 21st Rd in LaSalle County. — Executed Nov 26 New Advanced Asphalt Company $1,512,236 ·
Jun 17, 2022 66M25 LaSalleDistrict 3 Of cleaning and painting all structural and non-structural steel components of the structure This project is located at Structure No. 050-0233 carrying FAS 1265 (Old US 34, W. Union Street) over Indian Creek in Earlville. This work consists of of cleaning and painting all structural and non-structural steel components of the structure. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $189,647 ·
Jun 17, 2022 66M35 BureauLaSalleDistrict 3 Washing all structural and non-structural steel, entire bridge deck surface, parapet walls, abutment seats, to This project is located at five structures spanning the Illinois River in IDOT District 3. This work consists of washing all structural and non-structural steel, entire bridge deck surface, parapet walls, abutment seats, tops of piers, deck drains and scuppers. — Executed Nov 26 New All States Painting, Inc. $378,400 ·
Jun 17, 2022 66M40 LaSalleDistrict 3 Class A and B patching, pavement marking, and shoulder reconstruction This project is located on I-39 beginning at the Marshall Co line and ending at 0.3 mi S of the Lee Co line (36.2 miles); I-80 interchange ramps._The work shall consist of Class A and B patching, pavement marking, and shoulder reconstruction. — Executed Nov 26 New G. M. Sipes Construction, Inc. $2,515,927 ·
Sep 23, 2022 66M91 BureauLaSalleDistrict 3 Centerline milling and resurfacing 2 feet wide, at a depth of 2", pavement marking, and raised reflectors This project is located on FAI 80 (I-80) from 0.7 mile East of I-180 to 0.7 mile West of Il 251. The work consists of centerline milling and resurfacing 2 feet wide, at a depth of 2", pavement marking, and raised reflectors. — Executed Nov 26 New Advanced Asphalt Company $1,093,285 ·
Nov 18, 2022 66M51 LaSalleDistrict 3 Structure No. 050-2574, Box Culvert Rehabilitation, 2.47 miles north of US Route 52. — Executed Nov 26 New Riber Construction, Inc. $337,464 ·
Nov 18, 2022 87810 LaSalleDistrict 3 Construction of a soldier pile wall and slope stabilization along North 2550th Road from North 2551st Road to a point approximently 0.25 mile east along 2550th Road in the Peru Road District. — Executed Nov 26 New D. Construction, Inc. $1,662,869 ·
Jan 20, 2023 66M66 LaSallePutnamDistrict 3 This project consists on performing Bridge Decks Concrete Sealing with the parapets/curbs on various routes at various location throughout LaSalle and Putnam Counties. — Executed Nov 26 New All States Painting, Inc. $169,800 ·
Jan 20, 2023 66M73 LaSalleDistrict 3 Crack routing and filling as well as pavement marking This project is located on FAP 68 (IL 23) and FAP 623 (US 6). It consists of crack routing and filling as well as pavement marking. — Executed Nov 26 New Freehill Asphalt, Inc. $136,066 ·
Jan 20, 2023 87673 LaSalleDistrict 3 Replace the bridge carrying CH 57 over the Vermilion River, 1.2 miles north of 18th Road. — Executed Nov 26 New D. Construction, Inc. $4,537,912 ·
Jan 20, 2023 87807 LaSalleDistrict 3 Resurface Chartres Street from Raccuglia Drive to Pershing Road in LaSalle. — Rejected Nov 26 New Advanced Asphalt Company $400,127 ·
Mar 10, 2023 87813 LaSalleDistrict 3 Remove and replace sidewalks along various streets in the Kimes Elementary School area of Streator. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $417,120 ·
Apr 28, 2023 66M33 LaSalleDistrict 3 This project is located in LaSalle county, on I-80 over Fox River, 2.5 mile east of IL 23, Latex Overlay and bridge deck repairs. — Executed Nov 26 New D. Construction, Inc. $3,081,875 ·
Apr 28, 2023 66M69 LaSalleDistrict 3 This project is located on county highway 13 over I-80, 0.45 mi west of the I-80 and I-39 interchange, and 6th Road over I-80, 0.57 mi east of the I-80 and I-39 interchange, in LaSalle county. Latex overlay, Bridge deck repairs. — Executed Nov 26 New D. Construction, Inc. $1,439,925 ·
Jun 16, 2023 66B05 LaSalleLivingstonDistrict 3 Milling and resurfacing with a designed overlay of IL 18 including storm_sewer construction, drainage and ADA ramp improvements. From the intersection of IL 17 and IL 18 in south eastern Streator and ends at the intersection of Otter Creek Road and IL 18 in Streator. — Executed Nov 26 New Advanced Asphalt Company $4,236,173 ·
Jun 16, 2023 66M76 LaSalleDistrict 3 This work is located at two box culverts on IL Route 170: SN 050-2542 and SN 050-2543. — Executed Nov 26 New D. Construction, Inc. $627,241 ·
Jun 16, 2023 66N43 GrundyLaSalleDistrict 3 Washing the bridge components and replacing the elastomeric (expansion) trough on SN 050-0079 and the structur This project consists of washing the bridge components and replacing the elastomeric (expansion) trough on SN 050-0079 and the structure carrying IL 47 over the Illinois River and the IandM Canal approximately 1.2 miles south of US 6 in Morris. — Executed Nov 26 New All States Painting, Inc. $349,800 ·
Jun 16, 2023 87836 LaSalleDistrict 3 Resurface Chartres Street Raccuglia Drive to 24th Street in La Salle. — Executed Nov 26 New Advanced Asphalt Company $353,063 ·
Jun 16, 2023 87837 LaSalleDistrict 3 Sidewalk reconstruction with ADA accommodations along Shooting Park Road from Sycamore Street to Parkside School entrance in Peru. — Executed Nov 26 New Gensini Excavating, Inc. $119,776 ·
Aug 4, 2023 66N37 LaSalleDistrict 3 The removal and replacement of 6 foot of the structrure slab and sidewalls, guardrail replacement, striping, p This project is located at Structure No. 050-2540 carrying IL Route 170 over a stream approximately 3.8 miles north of Ransom. This project consists of the removal and replacement of 6 foot of the structrure slab and sidewalls, guardrail replacement, striping, pavement patching and other related work. — Executed Nov 26 New Riber Construction, Inc. $495,072 ·
Jan 19, 2024 66N34 LaSalleLivingstonDistrict 3 This project consists of 5.8 miles of shoulder widening and rumble strip installation on IL 17 from E 11th Rd in LaSalle County to IL 23 in Livingston County. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $1,328,740 ·
Jan 19, 2024 66N59 LaSalleDistrict 3 Pavement removal and replacement, PCC shoulder removal and replacement, drainage inlet box removal and replace This work is located on the I-80 and IL 178 interchange Structure No. 050-0248 at the north abutment bridge approach pavement connectors, northbound and southbound lanes. This work consists of pavement removal and replacement, PCC shoulder removal and replacement, drainage inlet box removal and replacement, concrete median removal and replacement, approach slab repair and other related construction work. — Executed Nov 26 New D. Construction, Inc. $156,145 ·
Mar 8, 2024 66M56 LaSalleDistrict 3 Milling and resurfacing (standard overlay), pavement marking, raised reflective markers, and ADA improvements on FAP 623 (US 6) from the Bureau County Line 4.35 miles to the Little Vermilion River bridge in LaSalle. — Executed Nov 26 New Advanced Asphalt Company $6,430,186 ·
Mar 8, 2024 66N30 LaSallePutnamDistrict 3 This project consists of 6.2 miles of shoulder widening and rumble strip installation, guardrail removal, and guardrail replacement on IL 18 from 200 feet east of IL 89 in Putnam County to 1.1 miles east of E 3rd Rd in LaSalle County. — Executed Nov 26 New Advanced Asphalt Company $1,993,993 ·
Mar 8, 2024 87830 LaSalleDistrict 3 HMA resurfacing with aggregate wedge shoulders and other miscellaneous work on County Highway 41 from the DeKalb County Line to Brown Street in Earlville. — Executed Nov 26 New Advanced Asphalt Company $567,219 ·
Mar 8, 2024 87845 LaSalleDistrict 3 Sidewalk construction on 11th Street from Rutland Street to Carrie Lane, and on Rutland street from 11th Street to Fillebrowne Street in Marseilles. — Executed Nov 26 New Gensini Excavating, Inc. $544,677 ·
Apr 26, 2024 66N92 LaSalleDistrict 3 Cleaning and painting all structural steel on Structure No. 050-0019 carrying IL 351 over the Lone Star Cement Railroad, 2.0 miles south of US Route 6 (Oglesby). — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $186,186 ·
Apr 26, 2024 87847 LaSalleDistrict 3 Resurfacing CH 2 from the Somonauk South City Limits to US 52. — Executed Nov 26 New Curran Contracting Company $2,100,248 ·
Jun 14, 2024 66K85 LaSalleDistrict 3 2.6 Miles. SN 050-0040 Bridge Replacement with 2 span SN 050-0265 US 34 reprofiling and detour route improvements. Located on US 34 over Indian Creek in Earlville 0.3 miles east of 1251st Road. — Executed Nov 26 New D. Construction, Inc. $5,077,494 ·
Jun 14, 2024 66N75 LaSalleDistrict 3 3.46 Miles OF Class B pavement patching and shoulder repair. Work is at the exterior ramps of I-39. — Executed Nov 26 New Advanced Asphalt Company $1,918,205 ·
Jun 14, 2024 66P06 LaSalleDistrict 3 Removal and replacement of the finger plate expansion joint elastomeric troughs on SN 050-0191 carrying I-39 over the Illinois River, IAIS Railroad, and an abandoned railroad approximately 2.82 miles south of Interstate 80 (I-80). — Executed Nov 26 New D. Construction, Inc. $1,356,516 ·
Jun 14, 2024 66P24 LaSalleDistrict 3 14.45 miles of routing and crack sealing. Work begins in Ottawa at IL 23 and E Freemont Street on IL 23/IL71 including Columbus Street and LaSalle Street. Work continues at the intersection of Hitt Street and IL 23 to McKinley Rd. Work continues in Streator on IL 18, 0.1 miles east of IL 251 to east 0.1 miles West of E 16th Rd. — Executed Nov 26 New Denler, Inc. $88,496 ·
Jun 14, 2024 66P38 LaSalleDistrict 3 Class A pavement patching, joint and pothole repairs, striping and traffic control on FAI 39 beginning at the Marshall/LaSalle County Line and ending at the LaSalle/Lee County Line in LaSalle County. — Executed Nov 26 New G. M. Sipes Construction, Inc. $793,086 ·
Jun 14, 2024 66P40 GrundyLaSalleDistrict 3 Centerline striping on I-39 in LaSalle County and on I-80 in LaSalle and Grundy Counties. — Executed Nov 26 New Maintenance Coatings Co. $1,382,491 ·
Jun 14, 2024 87801 LaSalleDistrict 3 HMA Resurfacing and widening with HMA shoulders, aggregate shoulder, culvert re placement, pavement marking, shoulder rubmble strips, gaurdrail replacement, an d other work along county highway from 21st road to the Livingston county line. — Executed Nov 26 New Advanced Asphalt Company $6,972,036 ·
Jun 14, 2024 87838 LaSalleDistrict 3 Reconstruction of Plank Road to provide a 3 lane roadway with bi-directional tu rn lane from Ed Urban Drive to Midtown Road in the City of Peru. — Executed Nov 26 New Advanced Asphalt Company $2,875,373 ·
Aug 2, 2024 66K82 BureauLaSalleDistrict 3 Milling and resurfacing (designed overlay), structure repairs, patching, pavement marking, and raised reflective markers on FAI 80 (I-80) from 1 mile west of IL 89 to 0.7 mile west of IL 251. — Executed Nov 26 New Advanced Asphalt Company $21,687,508 ·
Aug 2, 2024 87865 LaSalleDistrict 3 Resurfacing 8th Street from Crosat St. to Sterling St. and Richard Hallett Road from US 6 to the south city limits of LaSalle. — Executed Nov 26 New Advanced Asphalt Company $535,616 ·
Sep 20, 2024 66P11 KendallLaSalleDistrict 3 5.62 miles of milling and resurfacing on US 52 from east of the IL-71 intersection to the north leg of Townhouse Road. — Executed Nov 26 New D. Construction, Inc. $2,515,676 ·
Sep 20, 2024 66P42 LaSalleLivingstonDistrict 3 16.21 miles of HMA milling and resurfacing on IL 170 from 0.2 mile south of River Road in Seneca to the intersection with IL 17. — Executed Nov 26 New D. Construction, Inc. $6,376,242 ·
Sep 20, 2024 66P50 LaSalleDistrict 3 35.55 miles gross of On-Call Class A pavement patching, pavement striping, and other related items to complete the work as described herein on I-39 from the Marshall County Line to the Lee County Line including interchange ramps. — Executed Nov 26 New G. M. Sipes Construction, Inc. $2,186,049 ·
Sep 20, 2024 66P58 LaSalleDistrict 3 Removal of HMA shoulders and replacing with PCC shoulders, striping, and traffic control at SN 050-0195 carrying US Route 6 over I-39 and SN 050-0181 carrying CH 19 over I-39. — Executed Nov 26 New G. M. Sipes Construction, Inc. $1,146,789 ·
Sep 20, 2024 66P80 LaSalleDistrict 3 2,596 gross ft of intermittent milling and resurfacing the mainline, merge lanes, and gore areas as show on plan details on F.A.I. Route 80 (I-80) from 0.5 miles west of the I-80/I-39 Interchange (just east of SN 050-0093) to west of SN 050-0178 in LaSalle County. — Executed Nov 26 New Advanced Asphalt Company $148,365 ·
Jan 17, 2025 66P36 LaSalleDistrict 3 Shoulder replacement, seeding, storm sewers, drainage repairs, bridge repairs including expansion joint replacement, PPC I-beam repairs structural repair of concrete, bridge washing and other related construction work at SN 050-0175 carrying CH 33 over I-39 3.0 miles north of the I-39 and I-80 interchange. — Executed Nov 25 New D. Construction, Inc. $425,002 ·
Jan 17, 2025 87852 LaSalleDistrict 3 Rehabiliate the bridge carrying Walnut Street over the IC Railroad, 0.9 miles east of IL 71. — Rejected Nov 25 New D. Construction, Inc. $946,209 ·
Mar 7, 2025 66N42 LaSalleDistrict 3 Washing the entire structural steel superstructure, washing and sealing the concrete (deck surface, inside face of parapets, top surface of the abutments and piers) at various structures over the Illinois River in LaSalle County. — Executed Nov 25 New Interstate Maintenance, Incorporated $262,302 ·
Mar 7, 2025 66P95 LaSalleDistrict 3 HMA milling and resurfacing on the frontage road, parallel to IL 23 on the north side of Streator, and is approximately 0.22 mile long. — Executed Nov 25 New Kankakee Valley Construction Company, Inc. $180,130 ·
Mar 7, 2025 66R05 LaSalleDistrict 3 Replacing the 6" centerline pavement marking with 9" contrast pavement marking tape and replacing the 8" lane lines at interchange ramps on I-39 from north of Oglesby Interchange at M.M. 54 to M.M. 76.4. — Executed Nov 25 New A. C. Pavement Striping Co. $936,906 ·
Mar 7, 2025 66R06 LaSalleLivingstonDistrict 3 Contrast pavement marking of the 8" lane lines on IL 23 at Richards Rd in LaSalle County and ending at Adams St in Livingston County and also on IL 18 beginning at Second Ave and ending at Wasson St in LaSalle County. — Executed Nov 25 New Varsity Striping & Construction Co. $268,247 ·
Mar 7, 2025 87853 LaSalleDistrict 3 Replace the bridge carrying Kelly Street over Prairie Creek, north of Bluff Street. — Executed Nov 25 New D. Construction, Inc. $852,364 ·
Mar 7, 2025 87861 LaSalleDistrict 3 HMA resurfacing wiht HMA and Aggregate shoulders on County Highway 51 from Old Chicago Road to the City of Marseilles. — Executed Nov 25 New Advanced Asphalt Company $1,516,752 ·
Mar 7, 2025 87876 LaSalleDistrict 3 Construct a PCC Shared-use path with a pedestrian bridge over Il 125. This project is located south of Wenzel Road in the City of Peru. — Executed Nov 25 New D. Construction, Inc. $4,565,811 ·
Mar 7, 2025 87877 LaSalleDistrict 3 Resurfacing and Shoulder Widening on CH 4 from CH 15 to the Grundy County Line. — Executed Nov 25 New D. Construction, Inc. $1,868,000 ·
Mar 7, 2025 87878 LaSalleDistrict 3 Resurfacing and shoulder widening on CH 4 from IL 71 to CH 15. — Executed Nov 25 New Advanced Asphalt Company $1,448,524 ·
Mar 7, 2025 87879 LaSalleDistrict 3 HMA resurfacing of Iowa Avenue, Proter Street, and Bronson Street from Main Street to Johnson Street in Streator. Inlcudes Curb and Gutter, sidewalks, and storm sewers. — Executed Nov 25 New Advanced Asphalt Company $1,674,922 ·
Apr 25, 2025 66R11 LaSalleDistrict 3 Aggregate Wedge Shoulder, Type B along I 39 at LaSalle county extending from Marshall County Line (M.M. 40.32) to Lee County Line (M.M. 76.85) and includes exit and entrance ramps at the IL 18, Tonica, IL 71, IL 251, Oglesby Spur, US 6, US 52 and US 34 Interchanges, 36.5 miles gross length. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $704,100 ·
Apr 25, 2025 66R12 GrundyLaSalleDistrict 3 Pavement patching along I-80 in LaSalle and Grundy counties_extending from east of Illinois 23 interchange (M.M.90) to Grundy county line (M.M.103), LaSalle County Line (M.M.103) to Seneca interchange (M.M.105), Brisbon interchange Grundy county, and Minooka interchange (Ridge Rd), 15 miles gross length. — Executed Nov 25 New D. Construction, Inc. $579,432 ·
Apr 25, 2025 66R15 DeKalbLaSalleDistrict 3 Furnishing and placing Aggregate Wedge Shoulders, Type B adjacent to existing mainline pavement or stabilized shoulders along IL 23 and US 34 in LaSalle County. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $199,908 ·
Apr 25, 2025 66R16 LaSalleDistrict 3 4 miles Centerline Crack Sealing beginning at 0.3 Mi South of N. 40th Rd and ends at 1.3 MI. South of US Route 34. — Executed Nov 25 New SKC Construction, Inc. $23,407 ·
Apr 25, 2025 66R36 LaSalleDistrict 3 Milling and resurfacing 2" on I 80 from 1.4 miles east of the Bureau County Line to 0.1 miles east of IL 351. Additional work includes shoulder improvement and ramp resurfacing at IL 251, 2.4 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $5,338,646 ·
Apr 25, 2025 87881 LaSalleDistrict 3 Sidewalk removal and replacement at various locations in Mendota. — Executed Nov 25 New D. Construction, Inc. $247,455 ·
Jun 13, 2025 46937 LaSalleDistrict 3 Roadway improvements (HMA resurfacing, A3 oil and chip, drainage improvements and other work) within Illini State Park (IDNR) in LaSalle County, IL. 1.6 miles gross length. — Executed Nov 25 New D. Construction, Inc. $1,632,707 ·
Jun 13, 2025 46941 LaSalleDistrict 3 PCC concrete patching of the parking lot at the lodge at Starved Rock State Park (IDNR) in LaSalle County, IL. — Executed Nov 25 New Advanced Asphalt Company $513,534 ·
Jun 13, 2025 66N05 LaSalleDistrict 3 Cleaning and painting all structural steel of two structures, Location 1: SN 050-0195 carrying US 6 over I-39, 2.7 mi. east of IL 351 near LaSalle; Location 2: SN 053-0181 carrying CH 19 (F.A.S. 270) over I-39, 2.3 mi. north of US 52. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $946,914 ·
Jun 13, 2025 66N36 LaSalleDistrict 3 Latex Overlay, Expansion Joints, and Deck Repairs to SN 050-0177/-0178 on I-39 at SN 050-0177/0178 carrying I-39 over I-80, 2.6 miles west of IL 178. — Executed Nov 25 New D. Construction, Inc. $3,715,629 ·
Jun 13, 2025 66P53 LaSalleDistrict 3 Bridge deck repairs,bridge deck latex overlay, pavement patching, and pavement marking replacement_on IL 23 in Ottawa. — Executed Nov 25 New D. Construction, Inc. $1,897,015 ·
Jun 13, 2025 66P54 LaSalleDistrict 3 Milling and resurfacing designed overlay of Il 251 including 4' safety shoulders, shoulder rumble strips, and centerline rumble strips from US 52 to the north limit. 10.99 miles gross. — Executed Nov 25 New Advanced Asphalt Company $6,445,788 ·
Jun 13, 2025 66R47 LaSalleDistrict 3 Class A Pavement Patching and Cross Stitching on I-39 at US-52 interchange ramps. — Executed Nov 25 New G. M. Sipes Construction, Inc. $456,512 ·
Jun 13, 2025 87882 LaSalleDistrict 3 Construction of a single-span PPC deck beam bridge to carry River Road over a drainage ditch, 0.7 miles west of IL 170 in Seneca. — Executed Nov 25 New D. Construction, Inc. $535,667 ·
Aug 1, 2025 87904 LaSalleDistrict 3 Construct PCC sidewalk at various locations in La Salle. Includes; ADA ramps, curb and gutter, and driveways. — Executed Nov 25 New Gensini Excavating, Inc. $340,268 ·
Sep 19, 2025 66R59 LaSalleDistrict 3 Scour mitigation by placing stone dumped riprap at both ends of the culvert and other related construction items at SN 050-2006 carrying IL 18 over Eagle Creek approximately 1.7 miles west of IL Route 23 near Streator. — Executed Nov 25 New D. Construction, Inc. $27,740 ·
Sep 19, 2025 87871 LaSalleDistrict 3 Sidewalk construction at various locations in Oglesby. — Executed Nov 25 New D. Construction, Inc. $283,773 ·
Jan 16, 2026 66R21 LaSalleDistrict 3 Bridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures: SN's 050-0077 and 050-0078 carrying IL Route 251 over I-80 in LaSalle County. — Executed Nov 25 New D. Construction, Inc. $1,801,296 ·
Jan 16, 2026 66R83 LaSalleDistrict 3 Milling and resurfacing, patching, pavement striping, pavment markers, and other related construction work on FAU_Route 6081 north of I-80 in Peru beginning at Il Route 251 and ending at Airport Rd; also on Charles St adjacent to east 3rd Rd in Lasalle County. — Executed Nov 25 New Advanced Asphalt Company $836,744 ·
Jan 16, 2026 66R85 LaSalleDistrict 3 Filling existing shoulder inlets, paved shoulder removal and replacement with PCC shoulders and concrete curbs, pipe drain removal, riprap installation Class A Patching (Special) and other related construction work on FAI 39 north and south of SNs 050-0167 and 050-0168 over the Chicago and Northwestern Railroad. — Executed Nov 25 New D. Construction, Inc. $333,979 ·
Feb 27, 2026 64U03 LaSalleLeeDistrict 2 19.3 miles, ultra-thin bonded wearing course, microsurfacing joint repairs, pavement patching, and rest_area improvements from LaSalle County Line_to Ogle County Line. — Executed Nov 25 New Rock Road Companies, Inc. $14,540,979 ·
Feb 27, 2026 66P67 LaSalleDistrict 3 Milling and resurfacing 3 3/4" (designed overlay)_on FAP 587 (US 34) beginning 0.6 mile east of I-39 and ending at E 12th Road in Earlville. Additional work includes micro-surface with high friction aggregate and sinusoidal rumble strips in the curves, ditch cleaning, culvert cleaning, and end section replacements, pavement marking, and raised reflective pavement markers. 7.07 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $3,606,240 ·
Feb 27, 2026 87910 LaSalleDistrict 3 HMA resurfacing of CH 29 from IL 18 to CH 64 in LaSalle County. Additionally includes HMA shoulders, aggregate shoulders and other required work. — Executed Nov 25 New Advanced Asphalt Company $1,225,765 ·
Apr 24, 2026 66M55 LaSalleDistrict 3 Bridge Replacement (SN 050-0033) over the Fox River in Ottawa IL and milling and resurfacing to US 6. 1.75 miles gross length. — Executed Nov 25 New D. Construction, Inc. $20,377,827 ·
Apr 24, 2026 66R64 LaSalleDistrict 3 Joint replacement, Deck patch, approach repairs, bearing retainer and paint, substructure repairs, Anti- Graffiti at structure No. 050-0218 carrying IL 351 over Lone Star Cement Railroad and structure No. 050-0019 carrying IL 351 over Lone Star Cement Railroad 2.0 miles South of US 6 in La Salle County. — Executed Nov 25 New D. Construction, Inc. $660,277 ·
Apr 24, 2026 66T58 LaSalleDistrict 3 Routing and filling the cracks along the centerline, significant transverse cracks and pavement markings along US 34 from 12th Rd. west of Earlville to west of the US 34 and IL 23 junction in LaSalle County. 6.44 miles gross length. — Executed Nov 25 New Complete Asphalt Service Co. $49,800 ·
Apr 24, 2026 87909 LaSalleDistrict 3 Sidewalk construction and ADA ramps on various routes near Marseilles Elementary School in Marseilles. — Executed Nov 25 New Davis Concrete Construction Co. $274,017 ·
Jun 12, 2026 66A91 LaSalleDistrict 3 Pavement resurfacing on the I-80 and I-39 interchange entrance/exit ramps with minor rehabilitation and repair work at select structures, improvements to existing pipe and box culverts, slope and ditch grading, upgrading guardrails, impact attenuators, high tension cable barriers, and superelevation on FAI 80(I-80) from 0.1 miles east of IL-351 to 0.3 miles west of IL-178. Approximately 4.13 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $19,753,741 ·
Jun 12, 2026 66M84 LaSalleDistrict 3 Removal of the existing box culvert (SN 050-2546) and replacement with 2-42" EQRS 42" culverts on US 34 over Mendota Creek Tributary, approximately 4.1 miles west of I-39 in Mendota in LaSalle County. Approximately 259 feet gross length. — Executed Nov 25 New D. Construction, Inc. $443,941 ·
Jun 12, 2026 66T10 LaSalleDistrict 3 Removal and replacement of the fabric reinforced elastomeric troughs and associated hardware at Structure No. 050-0219 carrying F.A.S. Route 268A (CH 15) over the Illinois River approximately 0.4 mile south of US 6 (Marseilles) in LaSalle County. — Executed Nov 25 New Riber Construction, Inc. $236,720 ·
Jun 12, 2026 66T11 LaSalleDistrict 3 Washing all components of Structure No. 050-0079 carrying F.A.P. Route 46 (IL 251) over the Illinois River and CSX Railroad approximately 0.1 mile south of US 6 (Peru) in LaSalle County. This includes all structural steel (beams, girders, diaphragms, bearings, cross framing, lateral framing), top surface of piers and abutments, deck drains (scuppers), entire deck surface, inside face of parapets, finger plate expansion joints and elastomeric troughs. — Executed Nov 25 New All States Painting, Inc. $58,232 ·
Jun 12, 2026 66T39 LaSalleDistrict 3 Pavement patching and joint repair along I-39 at the following interchanges in LaSalle County: Tonica (SB only), IL 71, IL 251, Oglesby, I-80, and US 34. 3.06 miles gross length. — Executed Nov 25 New G. M. Sipes Construction, Inc. $2,815,825 ·
Jun 12, 2026 66T45 LaSalleDistrict 3 Class B patching at the concrete section of FAP 603 (US 52) over I-39, beginning 0.47 miles west of I-39 (Station 191+44) and ending 0.35 miles east of I-39 (Station 234+23), and also includes the entrance and exit ramps at the interchange in LaSalle County. 4,500 feet gross length. — Executed Nov 25 New G. M. Sipes Construction, Inc. $639,792 ·
Jul 31, 2026 66T13 BureauLaSalleDistrict 3 Milling, resurfacing,_pavement marking, and aggregate construction on a frontage north of I-80 beginning at a dead end (L.M. 0.00) in Bureau County and ending approximately 85 feet west of Plank Rd. in LaSalle County. 1.36 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $729,412 ·
Jul 31, 2026 66T14 BureauLaSalleDistrict 3 Removing and installing new mast arms, foundations, and street signs in three intersections: Wenzel Road and IL 251, Shooting Park Road and IL 251 in LaSalle County and IL 26 and Backbone Rd in Bureau County. — Active Nov 25 New
101–200 of 205‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.