| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$34,425.27 |
$70,000.00 |
$50,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 28,426 | CY |
$7.00 |
$17.00 |
$9.31 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 23,935 | CY |
$8.50 |
$19.00 |
$14.17 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$59,316.57 |
$35,000.00 |
$125,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,775 | LF |
$1.72 |
$1.49 |
$1.59 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 49 | EA |
$142.20 |
$119.00 |
$126.74 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 256 | LF |
$8.27 |
$14.95 |
$15.92 |
| 8 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 4 | CY |
$114.23 |
$200.00 |
$106.50 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 54,565 | SY |
$1.46 |
$1.29 |
$1.50 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 11 | AC |
$328.41 |
$195.00 |
$207.68 |
| 11 | 234(A) 2824 |
FERTILIZING (10-20-10) | 6 | TON |
$678.32 |
$550.00 |
$585.75 |
| 12 | 241 2832 |
MOWING | 22 | AC |
$60.71 |
$59.00 |
$62.84 |
| 13 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 12,547 | CY |
$45.00 |
$68.00 |
$46.40 |
| 14 | 319(B) 5254 |
OPEN-GRADED PORTLAND CEMENT BASE | 40,374 | SY |
$9.00 |
$15.50 |
$14.06 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 100,385 | SY |
$1.10 |
$1.30 |
$3.00 |
| 16 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 49,621 | SY |
$2.00 |
$2.10 |
$3.25 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 4,352 | TON |
$27.00 |
$30.00 |
$30.00 |
| 18 | 407(B) 0250 |
TACK COAT | 1,752 | GAL |
$4.48 |
$4.27 |
$4.55 |
| 19 | 408 5774 |
PRIME COAT | 34,024 | GAL |
$3.31 |
$4.21 |
$2.00 |
| 20 | 411(A) 5930 |
SUPERPAVE, TYPE S2(PG 64-22 OK) | 1,884 | TON |
$90.00 |
$76.85 |
$95.00 |
| 21 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 572 | TON |
$101.94 |
$91.80 |
$105.00 |
| 22 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 523 | TON |
$90.00 |
$89.45 |
$110.00 |
| 23 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 1,237 | TON |
$95.00 |
$91.90 |
$105.00 |
| 24 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 529 | TON |
$90.00 |
$88.80 |
$98.00 |
| 25 | 412 5267 |
COLD MILLING PAVEMENT | 800 | SY |
$11.15 |
$20.00 |
$15.12 |
| 26 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 17,712 | SY |
$14.00 |
$38.25 |
$15.00 |
| 27 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 27,550 | SY |
$18.00 |
$40.25 |
$27.00 |
| 28 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 1,587 | SY |
$63.33 |
$120.00 |
$85.00 |
| 29 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 14,225 | CY |
$125.00 |
$115.00 |
$145.00 |
| 30 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 59 | CY |
$22.27 |
$23.00 |
$33.08 |
| 31 | 509(A) 0319 |
CLASS AA CONCRETE | 146 | CY |
$568.38 |
$366.00 |
$750.00 |
| 32 | 509(B) 0321 |
CLASS A CONCRETE | 12 | CY |
$582.30 |
$560.00 |
$239.22 |
| 33 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 34 | CY |
$577.34 |
$550.00 |
$452.55 |
| 34 | 509(D) 0325 |
CLASS C CONCRETE | 53 | CY |
$321.41 |
$350.00 |
$515.99 |
| 35 | 511(A) 0332 |
REINFORCING STEEL | 23,828 | LB |
$1.00 |
$0.9000 |
$1.04 |
| 36 | 609(A) 0287 |
CONCRETE CURB (4" MNTBLE-INTEGRAL) | 843 | LF |
$7.41 |
$15.00 |
$16.00 |
| 37 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 3,803 | LF |
$8.87 |
$12.00 |
$18.00 |
| 38 | 609(A) 5864 |
CONCRETE CURB (6" BARRIER-DOWELLED) | 233 | LF |
$10.00 |
$25.00 |
$35.00 |
| 39 | 609(B) 1513 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) | 33 | LF |
$18.70 |
$40.00 |
$36.08 |
| 40 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 755 | SY |
$54.55 |
$44.00 |
$47.16 |
| 41 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 766 | SY |
$63.50 |
$68.00 |
$57.82 |
| 42 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 176 | SY |
$20.00 |
$44.00 |
$34.08 |
| 43 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 64 | SF |
$28.94 |
$38.00 |
$30.40 |
| 44 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 3 | EA |
$3,543.25 |
$3,450.00 |
$4,612.46 |
| 45 | 611(G) 5113 |
INLET CI DES. 2 (B) | 3 | EA |
$4,477.53 |
$3,800.00 |
$6,076.12 |
| 46 | 611(G) 5115 |
INLET CI DES. 2 (D) | 7 | EA |
$5,249.48 |
$5,400.00 |
$7,675.39 |
| 47 | 611(G) 5117 |
INLET CI DES. 2 (2B) | 1 | EA |
$3,500.00 |
$6,400.00 |
$7,790.93 |
| 48 | 611(G) 5327 |
INLET GPI TYPE 1 (DES. 1) | 6 | EA |
$3,000.00 |
$3,800.00 |
$3,125.42 |
| 49 | 611(G) 5329 |
INLET GPI TYPE 1 (DES. 3) | 1 | EA |
$5,000.00 |
$3,400.00 |
$3,622.81 |
| 50 | 611(G) 5334 |
INLET GPI TYPE 2 (DES. 8) | 2 | EA |
$3,000.00 |
$5,300.00 |
$4,349.27 |
| 51 | 611(G) 5699 |
INLET - LONGITUDINAL BARRIER - TYPE I, DES. 2 | 12 | EA |
$4,000.00 |
$4,800.00 |
$5,872.64 |
| 52 | 611(G) 5970 |
INLET W/SMALL JCT. BOX, CI, DES.2 | 1 | EA |
$8,000.00 |
$10,000.00 |
$9,238.57 |
| 53 | 611(G) 5972 |
INLET W/SMALL JCT. BOX, CI, DES.2(B) | 1 | EA |
$8,000.00 |
$10,900.00 |
$10,172.47 |
| 54 | 611(G) 5986 |
INLET W/SMALL JCT. BOX, CI, DES.3(D) | 1 | EA |
$4,000.00 |
$15,000.00 |
$13,573.02 |
| 55 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 3 | EA |
$2,325.57 |
$1,300.00 |
$3,503.95 |
| 56 | 611(G) 6004 |
INLET (SMD-TYPE 2A) | 5 | EA |
$2,500.00 |
$2,500.00 |
$3,314.62 |
| 57 | 611(G) 6006 |
INLET (SMD-TYPE 2B) | 6 | EA |
$2,873.87 |
$3,200.00 |
$3,872.84 |
| 58 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 18.91 | VF |
$399.76 |
$760.00 |
$253.36 |
| 59 | 611(H) 5374 |
ADD'L DEPTH IN INLET GPI TYPE 1 | 0.66 | VF |
$600.00 |
$550.00 |
$841.64 |
| 60 | 611(H) 5375 |
ADD'L DEPTH IN INLET GPI TYPE 2 | 3.2 | VF |
$700.00 |
$660.00 |
$433.17 |
| 61 | 611(H) 5970 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 2 | 1.03 | VF |
$600.00 |
$800.00 |
$700.68 |
| 62 | 611(H) 5972 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 2(B) | 1.93 | VF |
$600.00 |
$800.00 |
$523.98 |
| 63 | 611(H) 5986 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 3(D) | 1.33 | VF |
$500.00 |
$900.00 |
$615.21 |
| 64 | 611(K) 5961 |
(PL)RPL DROP INLET GRATES-CDI RCB DES.11 | 7 | EA |
$200.00 |
$8,700.00 |
$322.20 |
| 65 | 611(L) 0487 |
JUNCTION BOXES | 698 | CF |
$48.99 |
$89.00 |
$70.04 |
| 66 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 4,100 | LF |
$49.00 |
$48.00 |
$85.00 |
| 67 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 1,148 | LF |
$65.00 |
$64.00 |
$95.00 |
| 68 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 1,101 | LF |
$75.28 |
$88.00 |
$105.00 |
| 69 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 688 | LF |
$110.26 |
$100.00 |
$110.00 |
| 70 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 24 | LF |
$173.79 |
$250.00 |
$135.00 |
| 71 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 110 | LF |
$33.89 |
$38.00 |
$40.89 |
| 72 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$16.70 |
$20.00 |
$13.05 |
| 73 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 9,080 | LF |
$8.62 |
$9.00 |
$12.42 |
| 74 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$667.56 |
$1,500.00 |
$1,159.28 |
| 75 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,046.52 |
$3,000.00 |
$1,379.24 |
| 76 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 3,598 | CY |
$40.00 |
$68.00 |
$92.33 |
| 77 | 613(V) 1180 |
TRENCH EXCAVATION | 5,772 | CY |
$6.61 |
$28.00 |
$24.67 |
| 78 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,447.13 |
$53,800.00 |
$22,080.74 |
| 79 | 619(B) 0291 |
REMOVAL OF HEADWALL | 6 | EA |
$979.78 |
$1,000.00 |
$1,807.59 |
| 80 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 2,800 | LF |
$5.43 |
$9.00 |
$6.00 |
| 81 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 5,321 | SY |
$8.83 |
$10.50 |
$8.00 |
| 82 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 33,843 | SY |
$3.22 |
$7.50 |
$6.00 |
| 83 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 889 | SY |
$10.39 |
$14.00 |
$5.00 |
| 84 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,524 | LF |
$3.30 |
$2.20 |
$2.64 |
| 85 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 458 | SY |
$8.77 |
$11.00 |
$3.23 |
| 86 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 1,335 | LF |
$6.79 |
$7.50 |
$1.92 |
| 87 | 619(C) 0924 |
SAWING PAVEMENT | 6,759 | LF |
$3.50 |
$3.00 |
$2.41 |
| 88 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,325 | LF |
$17.77 |
$13.55 |
$18.11 |
| 89 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$721.23 |
$1,800.00 |
$2,662.50 |
| 90 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 5 | EA |
$1,839.43 |
$1,450.00 |
$1,970.25 |
| 91 | 627(A) 4317 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 215 | LF |
$51.67 |
$150.00 |
$109.61 |
| 92 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 29 | EA |
$10.42 |
$15.00 |
$37.28 |
| 93 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 175 | CY |
$27.00 |
$17.48 |
$28.68 |
| 94 | 501(G) 6309 |
CLSM BACKFILL | 210 | CY |
$175.00 |
$131.11 |
$159.03 |
| 95 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 549 | LF |
$250.00 |
$283.94 |
$265.00 |
| 96 | 504(A) 1304 |
APPROACH SLAB | 364.1 | SY |
$200.00 |
$216.10 |
$211.42 |
| 97 | 504(B) 1305 |
SAW-CUT GROOVING | 735.5 | SY |
$4.50 |
$4.60 |
$4.90 |
| 98 | 504(C) 6250 |
SEALED EXPANSION JOINT | 70.4 | LF |
$350.00 |
$241.72 |
$227.20 |
| 99 | 504(E) 1381 |
CONCRETE PARAPET | 32.4 | LF |
$90.00 |
$143.03 |
$137.48 |
| 100 | 504(E) 6190 |
42" F-SHAPED PARAPET | 170.7 | LF |
$90.00 |
$135.86 |
$94.54 |
| 101 | 506(A) 1322 |
STRUCTURAL STEEL | 380 | LB |
$3.00 |
$2.04 |
$1.07 |
| 102 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 5 | EA |
$2,000.00 |
$2,687.76 |
$1,066.22 |
| 103 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 5 | EA |
$2,000.00 |
$2,698.37 |
$1,066.22 |
| 104 | 509 6152 |
SPECIAL CONCRETE FINISH | 119 | SY |
$20.00 |
$100.00 |
$7.99 |
| 105 | 509(A) 1326 |
CLASS AA CONCRETE | 102.6 | CY |
$625.00 |
$669.25 |
$850.00 |
| 106 | 509(B) 1328 |
CLASS A CONCRETE | 134.9 | CY |
$625.00 |
$583.39 |
$600.60 |
| 107 | 510(C) 6138 |
SLOPE WALL (5") | 565 | SY |
$100.00 |
$75.53 |
$119.70 |
| 108 | 511 6306 |
MECHANICAL SPLICES | 317 | EA |
$32.00 |
$45.92 |
$35.66 |
| 109 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 31,360 | LB |
$1.10 |
$0.9400 |
$1.25 |
| 110 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 444 | LF |
$40.00 |
$45.56 |
$32.31 |
| 111 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 444 | LF |
$16.50 |
$8.17 |
$29.33 |
| 112 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 113 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 450 | SY |
$4.00 |
$3.50 |
$3.73 |
| 114 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 3 | SY |
$800.00 |
$1,000.00 |
$948.38 |
| 115 | 523(A) 6550 |
SEALER CRACK PREPARATION | 110.7 | LF |
$4.50 |
$4.00 |
$4.26 |
| 116 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$110.00 |
$150.00 |
$159.75 |
| 117 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 56 | LF |
$30.00 |
$8.72 |
$23.55 |
| 118 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 112 | LF |
$27.50 |
$8.72 |
$14.06 |
| 119 | 619(B) 2515 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 2 | EA |
$1,500.00 |
$3,078.19 |
$1,933.08 |
| 120 | 619(B) 2525 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 2 | EA |
$2,500.00 |
$7,105.08 |
$2,530.55 |
| 121 | 619(B) 2535 |
REMOVAL OF BRIDGE ITEM (TYPE C) | 6 | EA |
$250.00 |
$488.07 |
$3,405.47 |
| 122 | 619(B) 6189 |
REMOVAL OF EXISTING SLAB | 149.9 | SY |
$25.00 |
$52.92 |
$129.56 |
| 123 | 619(B) 6252 |
REMOVAL OF EXISTING PARAPET | 203.1 | LF |
$30.00 |
$47.23 |
$29.95 |
| 124 | 619(B) 6319 |
REMOVAL OF DECK | 28.9 | SY |
$100.00 |
$319.07 |
$4,200.00 |
| 125 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 175 | CY |
$27.00 |
$17.48 |
$28.68 |
| 126 | 501(G) 6309 |
CLSM BACKFILL | 210 | CY |
$175.00 |
$131.11 |
$159.03 |
| 127 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 549 | LF |
$250.00 |
$283.94 |
$265.00 |
| 128 | 504(A) 1304 |
APPROACH SLAB | 364.1 | SY |
$200.00 |
$224.25 |
$211.42 |
| 129 | 504(B) 1305 |
SAW-CUT GROOVING | 735.5 | SY |
$4.50 |
$4.60 |
$4.90 |
| 130 | 504(C) 6250 |
SEALED EXPANSION JOINT | 70.4 | LF |
$350.00 |
$241.72 |
$227.20 |
| 131 | 504(E) 1381 |
CONCRETE PARAPET | 32.4 | LF |
$90.00 |
$142.95 |
$137.48 |
| 132 | 504(E) 6190 |
42" F-SHAPED PARAPET | 170.7 | LF |
$90.00 |
$135.86 |
$94.54 |
| 133 | 506(A) 1322 |
STRUCTURAL STEEL | 380 | LB |
$3.00 |
$2.04 |
$1.07 |
| 134 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 5 | EA |
$2,000.00 |
$2,687.76 |
$1,066.22 |
| 135 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 5 | EA |
$2,000.00 |
$2,698.37 |
$1,066.22 |
| 136 | 509 6152 |
SPECIAL CONCRETE FINISH | 119 | SY |
$20.00 |
$100.00 |
$7.99 |
| 137 | 509(A) 1326 |
CLASS AA CONCRETE | 102.6 | CY |
$625.00 |
$669.25 |
$850.00 |
| 138 | 509(B) 1328 |
CLASS A CONCRETE | 135 | CY |
$625.00 |
$583.37 |
$600.60 |
| 139 | 510(C) 6138 |
SLOPE WALL (5") | 565 | SY |
$100.00 |
$75.32 |
$119.70 |
| 140 | 511 6306 |
MECHANICAL SPLICES | 317 | EA |
$32.00 |
$46.18 |
$35.66 |
| 141 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 31,360 | LB |
$1.10 |
$0.9400 |
$1.25 |
| 142 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 525 | LF |
$40.00 |
$45.38 |
$32.31 |
| 143 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 525 | LF |
$16.50 |
$8.17 |
$29.33 |
| 144 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 145 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 450 | SY |
$4.00 |
$3.50 |
$3.73 |
| 146 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 3 | SY |
$800.00 |
$1,000.00 |
$948.38 |
| 147 | 523(A) 6550 |
SEALER CRACK PREPARATION | 110.7 | LF |
$4.50 |
$4.00 |
$4.26 |
| 148 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$110.00 |
$150.00 |
$159.75 |
| 149 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 56 | LF |
$30.00 |
$8.72 |
$23.55 |
| 150 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 112 | LF |
$27.50 |
$8.72 |
$14.06 |
| 151 | 619(B) 2515 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 2 | EA |
$1,500.00 |
$3,078.19 |
$1,933.08 |
| 152 | 619(B) 2525 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 2 | EA |
$2,500.00 |
$7,105.08 |
$2,530.55 |
| 153 | 619(B) 2535 |
REMOVAL OF BRIDGE ITEM (TYPE C) | 6 | EA |
$250.00 |
$488.07 |
$3,405.47 |
| 154 | 619(B) 6189 |
REMOVAL OF EXISTING SLAB | 149.9 | SY |
$25.00 |
$52.92 |
$129.56 |
| 155 | 619(B) 6252 |
REMOVAL OF EXISTING PARAPET | 203.1 | LF |
$30.00 |
$47.23 |
$29.95 |
| 156 | 619(B) 6319 |
REMOVAL OF DECK | 28.9 | SY |
$100.00 |
$319.07 |
$4,200.00 |
| 157 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 60 | CY |
$27.00 |
$17.48 |
$28.69 |
| 158 | 501(G) 6309 |
CLSM BACKFILL | 64 | CY |
$175.00 |
$131.11 |
$159.03 |
| 159 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$25,000.00 |
$31,250.19 |
$16,396.08 |
| 160 | 504(A) 1304 |
APPROACH SLAB | 96.6 | SY |
$200.00 |
$222.65 |
$211.42 |
| 161 | 504(B) 1305 |
SAW-CUT GROOVING | 253.2 | SY |
$4.50 |
$4.60 |
$4.90 |
| 162 | 504(C) 6250 |
SEALED EXPANSION JOINT | 145.4 | LF |
$350.00 |
$241.72 |
$227.19 |
| 163 | 504(E) 1381 |
CONCRETE PARAPET | 5.3 | LF |
$90.00 |
$332.67 |
$236.72 |
| 164 | 504(E) 6190 |
42" F-SHAPED PARAPET | 224.1 | LF |
$90.00 |
$131.10 |
$94.54 |
| 165 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 83.2 | LF |
$29.00 |
$67.15 |
$46.42 |
| 166 | 506(A) 1322 |
STRUCTURAL STEEL | 63,240 | LB |
$3.00 |
$2.91 |
$2.62 |
| 167 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 9 | EA |
$2,000.00 |
$2,098.60 |
$1,066.25 |
| 168 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 9 | EA |
$2,000.00 |
$2,109.23 |
$1,066.25 |
| 169 | 509(A) 1326 |
CLASS AA CONCRETE | 53.9 | CY |
$675.00 |
$744.12 |
$1,250.00 |
| 170 | 509(B) 1328 |
CLASS A CONCRETE | 62.7 | CY |
$675.00 |
$731.50 |
$1,401.28 |
| 171 | 511 6306 |
MECHANICAL SPLICES | 239 | EA |
$32.00 |
$46.18 |
$35.66 |
| 172 | 511(A) 1332 |
REINFORCING STEEL | 520 | LB |
$1.00 |
$0.8300 |
$1.03 |
| 173 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 24,130 | LB |
$1.10 |
$0.9400 |
$1.14 |
| 174 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 2.7 | SY |
$500.00 |
$600.32 |
$153.41 |
| 175 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 346 | LF |
$38.00 |
$34.70 |
$37.50 |
| 176 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 346 | LF |
$15.00 |
$8.17 |
$35.36 |
| 177 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 178 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 221 | SY |
$4.00 |
$3.50 |
$3.73 |
| 179 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 58 | LF |
$1,150.00 |
$1,195.71 |
$1,152.30 |
| 180 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,000.00 |
$2,500.00 |
$1,801.80 |
| 181 | 523(A) 6550 |
SEALER CRACK PREPARATION | 150.2 | LF |
$4.50 |
$4.00 |
$4.26 |
| 182 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$110.00 |
$150.00 |
$159.75 |
| 183 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 951.5 | SY |
$15.00 |
$23.90 |
$9.59 |
| 184 | 545 4815 |
(PL)REPLACE BRIDGE ITEM (TYPE A) | 10 | EA |
$1,500.00 |
$1,848.75 |
$1,176.80 |
| 185 | 601(H) 1390 |
TYPE IV GROUTED RIPRAP | 90 | SY |
$150.00 |
$43.30 |
$60.78 |
| 186 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 20 | LF |
$30.00 |
$8.72 |
$23.59 |
| 187 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$27.50 |
$8.72 |
$14.07 |
| 188 | 619(B) 2515 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 2 | EA |
$1,500.00 |
$2,870.74 |
$1,933.08 |
| 189 | 619(B) 6189 |
REMOVAL OF EXISTING SLAB | 11.7 | SY |
$25.00 |
$183.47 |
$129.18 |
| 190 | 619(B) 6252 |
REMOVAL OF EXISTING PARAPET | 78.6 | LF |
$30.00 |
$50.81 |
$29.95 |
| 191 | 619(B) 6319 |
REMOVAL OF DECK | 19.4 | SY |
$100.00 |
$406.44 |
$2,600.00 |
| 192 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$25,000.00 |
$31,250.19 |
$16,396.08 |
| 193 | 504(C) 6250 |
SEALED EXPANSION JOINT | 100.1 | LF |
$350.00 |
$241.72 |
$227.21 |
| 194 | 504(E) 1381 |
CONCRETE PARAPET | 10.6 | LF |
$90.00 |
$1,176.90 |
$237.09 |
| 195 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 101.2 | LF |
$29.00 |
$57.89 |
$46.43 |
| 196 | 509(A) 1326 |
CLASS AA CONCRETE | 8.8 | CY |
$1,000.00 |
$1,087.77 |
$3,500.00 |
| 197 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 1,550 | LB |
$1.10 |
$0.9400 |
$1.14 |
| 198 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 4 | SY |
$4.00 |
$3.50 |
$3.73 |
| 199 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 1,156.2 | SY |
$15.00 |
$23.90 |
$17.52 |
| 200 | 545 4815 |
(PL)REPLACE BRIDGE ITEM (TYPE A) | 10 | EA |
$1,500.00 |
$1,782.82 |
$1,176.80 |
| 201 | 601(H) 1390 |
TYPE IV GROUTED RIPRAP | 75 | SY |
$150.00 |
$51.96 |
$60.79 |
| 202 | 619(B) 6252 |
REMOVAL OF EXISTING PARAPET | 10.6 | LF |
$30.00 |
$113.26 |
$40.63 |
| 203 | 619(B) 6319 |
REMOVAL OF DECK | 30.9 | SY |
$100.00 |
$284.76 |
$2,600.00 |
| 204 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 147.5 | LF |
$850.00 |
$900.00 |
$900.90 |
| 205 | 804(A) 2915 |
STRUCTURAL CONCRETE | 68.37 | CY |
$548.51 |
$1,125.00 |
$1,198.13 |
| 206 | 804(B) 2916 |
REINFORCING STEEL | 4,342 | LB |
$1.60 |
$3.75 |
$3.99 |
| 207 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 95 | EA |
$30.70 |
$50.00 |
$53.25 |
| 208 | 805(D) 8760 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 1 | EA |
$2,000.00 |
$350.00 |
$372.75 |
| 209 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 787.56 | SF |
$14.29 |
$15.00 |
$15.97 |
| 210 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 263.25 | SF |
$32.75 |
$23.00 |
$24.50 |
| 211 | 850(B) 8114 |
EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 1,198 | SF |
$27.15 |
$25.00 |
$26.63 |
| 212 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 94 | LF |
$21.01 |
$45.00 |
$47.93 |
| 213 | 851(A) 3207 |
6"@15 GALV.STEEL WIDE FLANGE BEAM POST | 43 | LF |
$32.59 |
$55.00 |
$58.58 |
| 214 | 851(C) 8324 |
2" SQUARE TUBE POST | 255 | LF |
$8.68 |
$6.00 |
$6.39 |
| 215 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 1,346.5 | LF |
$7.98 |
$6.00 |
$6.39 |
| 216 | 852(C) 0110 |
OVHD.SN.STR., MONOTUBE TYPE A 80' | 1 | EA |
$50,000.00 |
$98,500.00 |
$104,902.50 |
| 217 | 852(E) 0500 |
OVHD.SN.STR., MONOTUBE TYPE C | 2 | EA |
$44,000.00 |
$49,500.00 |
$52,717.50 |
| 218 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 9,580 | LF |
$0.9000 |
$0.4000 |
$0.4300 |
| 219 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 37,980 | LF |
$0.5600 |
$0.6000 |
$0.6400 |
| 220 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 8,260 | LF |
$1.46 |
$2.00 |
$2.13 |
| 221 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 1,300 | LF |
$4.72 |
$3.00 |
$3.20 |
| 222 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 400 | LF |
$8.30 |
$5.00 |
$5.33 |
| 223 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 104 | EA |
$104.91 |
$75.00 |
$79.88 |
| 224 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 3 | EA |
$20,768.76 |
$23,000.00 |
$24,495.00 |
| 225 | 877(A) 8483 |
PORTABLE LONGITUDINAL BARRIER | 475 | LF |
$21.80 |
$45.00 |
$42.93 |
| 226 | 802(A) 8300 |
3/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 225 | LF |
$12.50 |
$14.00 |
$14.91 |
| 227 | 802(A) 8306 |
1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 560 | LF |
$13.50 |
$16.00 |
$17.04 |
| 228 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 2,565 | LF |
$5.94 |
$6.10 |
$6.50 |
| 229 | 802(E) 8372 |
JUNCTION BOX(8" X 8" X 6") | 6 | EA |
$575.00 |
$615.00 |
$654.98 |
| 230 | 803(A) 8065 |
PULL BOX(SIZE I) | 7 | EA |
$426.74 |
$545.00 |
$580.43 |
| 231 | 804(A) 2915 |
STRUCTURAL CONCRETE | 8.7 | CY |
$522.63 |
$602.00 |
$641.13 |
| 232 | 804(B) 2916 |
REINFORCING STEEL | 501 | LB |
$1.88 |
$1.71 |
$1.82 |
| 233 | 805(A) 8712 |
(PL)REMOVAL OF LIGHT POLE | 59 | EA |
$276.12 |
$630.00 |
$670.95 |
| 234 | 806(D) 8989 |
40' MTG.HT.HL.PTP.(G.STL.) | 15 | EA |
$2,100.00 |
$2,343.00 |
$2,495.30 |
| 235 | 807 8092 |
BREAKAWAY BASE (DES. B) | 3 | EA |
$545.45 |
$648.00 |
$690.12 |
| 236 | 809(A) 8090 |
ROADWAY LUMINAIRE | 15 | EA |
$1,500.00 |
$1,495.50 |
$1,592.71 |
| 237 | 809(B) 8098 |
UNDERPASS LUMINIARE | 6 | EA |
$950.00 |
$627.00 |
$667.76 |
| 238 | 810(A) 3118 |
SERVICE POLE | 1 | EA |
$1,791.28 |
$5,210.00 |
$5,548.65 |
| 239 | 811 8038 |
1/C NO.4 ELECTRICAL CONDUCTOR | 6,565 | LF |
$2.10 |
$2.23 |
$2.37 |
| 240 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 600 | LF |
$1.14 |
$1.00 |
$1.07 |
| 241 | 811 8046 |
1/C NO.12 ELECTRICAL CONDUCTOR | 1,875 | LF |
$0.9500 |
$1.00 |
$1.07 |
| 242 | 890 7700 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$7,500.00 |
$6,940.00 |
$7,391.10 |
| 243 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 30 | DAY |
$260.00 |
$260.00 |
$260.00 |
| 244 | 823 8482 |
(SP)TRAFFIC SIGNAL SPAN WIRE EQUIPMENT | 1 | LSUM |
$10,000.00 |
$74,500.00 |
$79,342.50 |
| 245 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 17,600 | LF |
$0.2000 |
$0.3000 |
$0.3200 |
| 246 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 18,600 | LF |
$0.6100 |
$1.00 |
$1.07 |
| 247 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 2,000 | EA |
$0.7100 |
$1.00 |
$1.07 |
| 248 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 9,700 | LF |
$0.2500 |
$0.2000 |
$0.2100 |
| 249 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 720 | SD |
$9.80 |
$13.00 |
$13.85 |
| 250 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 360 | SD |
$4.48 |
$3.00 |
$3.20 |
| 251 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 4,275 | LF |
$24.00 |
$36.00 |
$40.00 |
| 252 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 11,425 | LF |
$4.22 |
$8.00 |
$8.00 |
| 253 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 2,200 | SD |
$4.86 |
$1.00 |
$1.07 |
| 254 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 54,000 | SD |
$0.1300 |
$0.0500 |
$0.0500 |
| 255 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 39,600 | SD |
$0.5400 |
$0.5000 |
$0.5300 |
| 256 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 36,000 | SD |
$1.45 |
$0.2500 |
$0.2700 |
| 257 | 880(C) 8836 |
CONSTRUCTION BARRICADES(TYPE II) | 2,000 | SD |
$0.3500 |
$0.5000 |
$0.5300 |
| 258 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 22,900 | SD |
$0.3500 |
$0.7500 |
$0.8000 |
| 259 | 880(C) 8848 |
WING BARRICADES | 2,160 | SD |
$1.02 |
$0.1500 |
$1.25 |
| 260 | 880(D) 8854 |
VERTICAL PANELS | 6,750 | SD |
$0.4000 |
$0.5000 |
$0.5300 |
| 261 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 47,250 | SD |
$0.1600 |
$0.2000 |
$0.2100 |
| 262 | 880(F) 8878 |
DRUMS | 98,000 | SD |
$0.0900 |
$0.2000 |
$0.2100 |
| 263 | 880(G) 8884 |
TUBE CHANNELIZERS | 3,000 | SD |
$0.1200 |
$0.7500 |
$1.20 |
| 264 | 880(G) 8890 |
CHANNELIZER CONES | 20,000 | SD |
$0.2100 |
$0.5000 |
$0.5300 |
| 265 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 500 | HOUR |
$72.23 |
$65.00 |
$63.00 |
| 266 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,080 | SD |
$11.55 |
$20.00 |
$21.30 |
| 267 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$55,000.00 |
$60,000.00 |
$125,000.00 |
| 268 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,171.76 |
$5,000.00 |
$777.71 |
| 269 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$30,000.00 |
$17,500.00 |
| 270 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$410,000.00 |
$601,620.00 |
$700,000.00 |