| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$240,000.00 |
$157,570.00 |
$66,175.00 |
$409,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 225,501 | CY |
$6.00 |
$6.00 |
$7.33 |
$10.30 |
$5.77 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 3,500 | CY |
$9.00 |
$5.50 |
$7.00 |
$15.25 |
$1.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$200,000.00 |
$127,187.16 |
$111,525.00 |
$131,524.68 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,876 | LF |
$1.20 |
$1.50 |
$1.20 |
$1.00 |
$2.45 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 2,324 | LF |
$6.00 |
$9.00 |
$7.20 |
$6.00 |
$7.77 |
| 7 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 37 | CY |
$84.50 |
$165.00 |
$150.47 |
$127.00 |
$101.58 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 8,262 | LF |
$1.50 |
$1.90 |
$1.50 |
$1.30 |
$1.39 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 320,026 | SY |
$1.25 |
$1.20 |
$1.19 |
$1.00 |
$1.11 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 1.19 | AC |
$500.00 |
$700.00 |
$234.73 |
$50.75 |
$218.11 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 66.12 | AC |
$200.00 |
$110.00 |
$119.17 |
$152.00 |
$110.73 |
| 12 | 241 2832 |
MOWING | 132.24 | AC |
$52.00 |
$45.00 |
$30.09 |
$50.00 |
$27.96 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 62,049 | CY |
$45.00 |
$30.00 |
$32.79 |
$29.50 |
$30.80 |
| 14 | 307(K) 4300 |
STABILIZED SUBGRADE | 200,168 | SY |
$4.25 |
$4.75 |
$6.02 |
$4.35 |
$4.07 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 200,168 | SY |
$1.00 |
$1.00 |
$0.7600 |
$0.7000 |
$0.8300 |
| 16 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 4,239 | SY |
$1.75 |
$1.25 |
$2.30 |
$1.25 |
$2.28 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 36,021 | TON |
$20.00 |
$15.00 |
$17.80 |
$13.00 |
$14.25 |
| 18 | 407(B) 0250 |
TACK COAT | 27,420 | GAL |
$2.50 |
$2.25 |
$2.81 |
$2.00 |
$2.24 |
| 19 | 408 5774 |
PRIME COAT | 129,908 | GAL |
$2.25 |
$1.25 |
$1.00 |
$3.00 |
$3.00 |
| 20 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 11,918 | TON |
$70.00 |
$53.00 |
$51.49 |
$57.80 |
$64.65 |
| 21 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 48,256 | TON |
$60.00 |
$48.00 |
$45.45 |
$51.00 |
$57.04 |
| 22 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 11,918 | TON |
$75.00 |
$65.00 |
$61.28 |
$62.50 |
$69.91 |
| 23 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 12,944 | TON |
$65.00 |
$57.00 |
$55.43 |
$54.00 |
$60.39 |
| 24 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 142 | CY |
$35.00 |
$20.00 |
$50.56 |
$30.50 |
$17.30 |
| 25 | 509(A) 0319 |
CLASS AA CONCRETE | 408 | CY |
$425.00 |
$525.00 |
$433.35 |
$395.00 |
$537.03 |
| 26 | 509(D) 0325 |
CLASS C CONCRETE | 1,482 | CY |
$250.00 |
$350.00 |
$258.81 |
$205.00 |
$245.89 |
| 27 | 511(A) 0332 |
REINFORCING STEEL | 66,743 | LB |
$0.9500 |
$0.7500 |
$0.8100 |
$1.00 |
$1.00 |
| 28 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 212 | LF |
$60.00 |
$60.00 |
$48.11 |
$44.60 |
$52.40 |
| 29 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 247 | LF |
$65.00 |
$65.00 |
$59.05 |
$56.60 |
$59.14 |
| 30 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 83 | LF |
$90.00 |
$75.00 |
$93.32 |
$72.00 |
$100.58 |
| 31 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 190 | LF |
$80.00 |
$85.00 |
$123.85 |
$86.50 |
$109.93 |
| 32 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 182 | LF |
$100.00 |
$115.00 |
$137.86 |
$101.70 |
$123.95 |
| 33 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 99 | LF |
$135.00 |
$120.00 |
$136.42 |
$130.30 |
$192.31 |
| 34 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 106 | LF |
$80.00 |
$85.00 |
$108.69 |
$85.25 |
$71.73 |
| 35 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 72 | LF |
$150.00 |
$140.00 |
$220.64 |
$124.00 |
$115.51 |
| 36 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 61 | LF |
$200.00 |
$200.00 |
$235.48 |
$193.00 |
$211.67 |
| 37 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 206 | LF |
$30.00 |
$40.00 |
$45.16 |
$41.00 |
$35.07 |
| 38 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 3,292 | LF |
$30.00 |
$43.00 |
$37.22 |
$48.00 |
$39.07 |
| 39 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 60 | LF |
$40.00 |
$47.00 |
$72.82 |
$56.50 |
$80.29 |
| 40 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 36 | LF |
$45.00 |
$50.00 |
$88.27 |
$61.75 |
$84.41 |
| 41 | 613(B) 4525 |
17" X 13" CORR. GALV. STEEL PIPE ARCH | 31 | LF |
$35.00 |
$40.00 |
$49.12 |
$41.45 |
$36.01 |
| 42 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 910 | LF |
$40.00 |
$42.00 |
$44.23 |
$44.25 |
$38.01 |
| 43 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 253 | LF |
$45.00 |
$45.00 |
$73.00 |
$48.75 |
$42.06 |
| 44 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 141 | LF |
$60.00 |
$70.00 |
$122.44 |
$84.00 |
$70.92 |
| 45 | 613(B) 4534 |
71" X 47" CORR. GALV. STEEL PIPE ARCH | 157 | LF |
$100.00 |
$125.00 |
$156.79 |
$124.30 |
$152.84 |
| 46 | 613(B) 5168 |
24" X 18" CORR. GALV. STEEL PIPE ARCH | 268 | LF |
$40.00 |
$45.00 |
$55.24 |
$44.00 |
$40.19 |
| 47 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 2,270 | LF |
$13.00 |
$7.00 |
$6.62 |
$13.20 |
$13.50 |
| 48 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 757 | LF |
$20.00 |
$6.00 |
$6.62 |
$20.30 |
$9.59 |
| 49 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 16 | EA |
$1,200.00 |
$800.00 |
$1,053.28 |
$850.00 |
$1,010.97 |
| 50 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 118 | EA |
$1,400.00 |
$900.00 |
$1,161.62 |
$1,000.00 |
$1,179.52 |
| 51 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 4 | EA |
$1,500.00 |
$1,000.00 |
$1,444.50 |
$1,330.00 |
$1,498.00 |
| 52 | 613(M) 7199 |
TYPE D6 CULVERT END TREATMENT | 2 | EA |
$1,700.00 |
$1,500.00 |
$1,444.50 |
$1,625.00 |
$1,865.44 |
| 53 | 613(M) 7201 |
TYPE AA6 CULVERT END TREATMENT | 10 | EA |
$2,000.00 |
$1,800.00 |
$1,324.12 |
$1,200.00 |
$1,281.13 |
| 54 | 613(M) 7202 |
TYPE BB6 CULVERT END TREATMENT | 2 | EA |
$2,500.00 |
$2,000.00 |
$1,564.88 |
$1,420.00 |
$1,554.98 |
| 55 | 613(M) 7203 |
TYPE CC6 CULVERT END TREATMENT | 2 | EA |
$3,000.00 |
$2,200.00 |
$1,685.25 |
$2,100.00 |
$2,093.78 |
| 56 | 613(N) 7520 |
TYPE A6 SLOPED CONCRETE END SECTION | 2 | EA |
$1,000.00 |
$1,500.00 |
$1,444.50 |
$1,350.00 |
$2,648.24 |
| 57 | 613(N) 7521 |
TYPE B6 SLOPED CONCRETE END SECTION | 4 | EA |
$1,500.00 |
$1,700.00 |
$1,203.75 |
$1,125.00 |
$2,746.05 |
| 58 | 613(N) 7522 |
TYPE C6 SLOPED CONCRETE END SECTION | 4 | EA |
$2,000.00 |
$1,800.00 |
$1,474.59 |
$2,000.00 |
$3,034.32 |
| 59 | 613(N) 7523 |
TYPE D6 SLOPED CONCRETE END SECTION | 4 | EA |
$2,200.00 |
$1,900.00 |
$1,594.97 |
$2,400.00 |
$3,176.29 |
| 60 | 613(N) 7524 |
TYPE E6 SLOPED CONCRETE END SECTION | 4 | EA |
$2,500.00 |
$2,000.00 |
$2,046.37 |
$4,225.00 |
$3,792.30 |
| 61 | 613(N) 7525 |
TYPE F6 SLOPED CONCRETE END SECTION | 2 | EA |
$3,000.00 |
$2,100.00 |
$2,287.12 |
$4,300.00 |
$3,962.00 |
| 62 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 6 | EA |
$600.00 |
$500.00 |
$704.15 |
$610.00 |
$273.33 |
| 63 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 919 | CY |
$50.00 |
$40.00 |
$38.47 |
$48.00 |
$20.00 |
| 64 | 613(V) 1180 |
TRENCH EXCAVATION | 1,742 | CY |
$6.00 |
$5.00 |
$27.16 |
$15.60 |
$3.00 |
| 65 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$150,000.00 |
$96,626.66 |
$92,000.00 |
$11,917.50 |
| 66 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 93,277 | SY |
$3.00 |
$2.00 |
$2.16 |
$2.00 |
$2.52 |
| 67 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,306 | LF |
$5.00 |
$10.00 |
$3.19 |
$2.00 |
$3.72 |
| 68 | 619(C) 0924 |
SAWING PAVEMENT | 1,479 | LF |
$3.00 |
$4.00 |
$4.81 |
$4.00 |
$2.94 |
| 69 | 624(A) 4281 |
FENCE-STYLE WWF | 679 | LF |
$5.00 |
$5.00 |
$6.02 |
$4.75 |
$5.20 |
| 70 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 263 | LF |
$5.00 |
$4.00 |
$4.81 |
$3.85 |
$4.25 |
| 71 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 34,655 | LF |
$3.00 |
$4.50 |
$4.21 |
$3.90 |
$4.31 |
| 72 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 987 | LF |
$4.50 |
$5.00 |
$5.42 |
$4.25 |
$4.70 |
| 73 | 624(E) 4288 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 132 | LF |
$15.00 |
$25.00 |
$18.06 |
$25.20 |
$27.74 |
| 74 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 24 | EA |
$70.00 |
$80.00 |
$90.28 |
$76.00 |
$83.89 |
| 75 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$120.00 |
$500.00 |
$240.75 |
$200.00 |
$223.70 |
| 76 | 629(C) 4960 |
MAILBOX | 27 | EA |
$40.00 |
$30.00 |
$30.09 |
$25.50 |
$27.96 |
| 77 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 25 | EA |
$30.00 |
$70.00 |
$24.07 |
$20.25 |
$22.37 |
| 78 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,355 | CY |
$12.00 |
$10.00 |
$4.81 |
$4.00 |
$17.30 |
| 79 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 245 | CY |
$20.00 |
$10.00 |
$43.33 |
$30.40 |
$17.30 |
| 80 | 509(A) 1326 |
CLASS AA CONCRETE | 617.9 | CY |
$575.00 |
$525.00 |
$382.79 |
$307.00 |
$537.03 |
| 81 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 116,120 | LB |
$1.05 |
$1.00 |
$0.9600 |
$1.25 |
$1.50 |
| 82 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$4,000.00 |
$4,750.00 |
$3,611.24 |
$2,550.00 |
$2,539.88 |
| 83 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$45,400.00 |
$4,814.99 |
$4,050.00 |
$3,356.99 |
| 84 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,190 | CY |
$12.00 |
$10.00 |
$4.81 |
$4.05 |
$17.30 |
| 85 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 190 | CY |
$20.00 |
$10.00 |
$44.54 |
$30.50 |
$17.30 |
| 86 | 509(A) 1326 |
CLASS AA CONCRETE | 563 | CY |
$575.00 |
$525.00 |
$385.20 |
$405.00 |
$537.03 |
| 87 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 73,770 | LB |
$1.05 |
$1.00 |
$0.9600 |
$1.25 |
$1.50 |
| 88 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$4,000.00 |
$4,750.00 |
$3,611.24 |
$2,500.00 |
$2,539.88 |
| 89 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$45,399.60 |
$4,814.99 |
$5,575.00 |
$2,679.53 |
| 90 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 230,600 | LF |
$0.1500 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0400 |
| 91 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 1,500 | LF |
$0.7500 |
$1.10 |
$1.20 |
$1.00 |
$1.12 |
| 92 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 214,200 | LF |
$0.1500 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
| 93 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 400 | SD |
$10.00 |
$1.10 |
$1.20 |
$1.00 |
$1.12 |
| 94 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 200 | SD |
$22.00 |
$6.00 |
$6.02 |
$5.00 |
$5.59 |
| 95 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 200 | LF |
$20.00 |
$30.00 |
$39.94 |
$40.55 |
$11.18 |
| 96 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 20,480 | SD |
$0.3000 |
$1.10 |
$1.20 |
$1.00 |
$1.12 |
| 97 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 6,400 | SD |
$0.7500 |
$2.60 |
$2.71 |
$2.50 |
$2.80 |
| 98 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 15,360 | SD |
$1.50 |
$0.2500 |
$0.3000 |
$0.2500 |
$0.2800 |
| 99 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 24,000 | SD |
$1.00 |
$0.0500 |
$0.0600 |
$0.0500 |
$0.0600 |
| 100 | 880(C) 8848 |
WING BARRICADES | 1,280 | SD |
$1.00 |
$5.40 |
$6.02 |
$5.10 |
$5.59 |
| 101 | 880(D) 8854 |
VERTICAL PANELS | 25,600 | SD |
$0.2000 |
$0.2000 |
$0.1800 |
$0.1500 |
$0.1700 |
| 102 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 64,960 | SD |
$0.2500 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
| 103 | 880(F) 8878 |
DRUMS | 22,400 | SD |
$0.2000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
| 104 | 880(G) 8890 |
CHANNELIZER CONES | 224,000 | SD |
$0.3000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
| 105 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 960 | SD |
$14.00 |
$6.00 |
$6.02 |
$5.10 |
$5.59 |
| 106 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 31,510 | LF |
$0.2000 |
$0.2500 |
$0.2600 |
$0.3500 |
$0.0800 |
| 107 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 64,600 | LF |
$0.2000 |
$0.2500 |
$0.1700 |
$0.2500 |
$0.0800 |
| 108 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 7 | EA |
$70.00 |
$100.00 |
$30.09 |
$25.30 |
$27.96 |
| 109 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 40 | EA |
$125.00 |
$200.00 |
$180.56 |
$152.00 |
$167.77 |
| 110 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 25 | SF |
$18.00 |
$50.00 |
$16.85 |
$14.25 |
$15.66 |
| 111 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 56 | LF |
$8.00 |
$15.00 |
$12.04 |
$10.00 |
$11.18 |
| 112 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 102,000 | LF |
$0.6000 |
$0.3200 |
$0.3600 |
$0.3000 |
$0.3400 |
| 113 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 150 | LF |
$5.00 |
$15.00 |
$12.04 |
$10.00 |
$11.18 |
| 114 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$150,000.00 |
$85,000.00 |
$225,000.00 |
$100,000.00 |
$73,764.38 |
| 115 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$25,000.00 |
$6,467.70 |
$9,028.11 |
$47,000.00 |
$2,500.00 |
| 116 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$700,000.00 |
$636,000.00 |
$700,000.00 |
$695,000.00 |
$592,636.55 |