| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$35,000.00 |
$55,000.00 |
$240,460.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 247,338 | CY |
$6.50 |
$8.80 |
$7.20 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,017 | CY |
$9.00 |
$1.10 |
$8.55 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$100,000.00 |
$77,000.00 |
$88,916.00 |
| 5 | 208 0400 |
CLAY PLATING | 16,065 | CY |
$20.00 |
$5.04 |
$9.20 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 13,264 | LF |
$2.00 |
$1.76 |
$3.55 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 518 | LF |
$9.00 |
$6.60 |
$13.15 |
| 8 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 106 | CY |
$84.00 |
$77.00 |
$87.45 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 197,883 | SY |
$1.40 |
$1.30 |
$1.37 |
| 10 | 230(F) 2812 |
WATERING | 7,916 | KGAL |
$7.00 |
$6.60 |
$2.45 |
| 11 | 232(B) 2814 |
SEEDING METHOD B | 38.49 | AC |
$450.00 |
$660.00 |
$109.30 |
| 12 | 233(A) 2817 |
VEGETATIVE MULCHING | 38.49 | AC |
$375.00 |
$385.00 |
$311.50 |
| 13 | 234(A) 2824 |
FERTILIZING (10-20-10) | 19.78 | TON |
$700.00 |
$880.00 |
$653.65 |
| 14 | 241 2832 |
MOWING | 38.49 | AC |
$60.00 |
$110.00 |
$71.05 |
| 15 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 11,544 | CY |
$50.00 |
$66.00 |
$69.85 |
| 16 | 307(A) 4200 |
FLY ASH | 3,600 | TON |
$70.00 |
$73.70 |
$82.00 |
| 17 | 307(D) 4230 |
LIME | 540 | TON |
$160.00 |
$194.15 |
$187.15 |
| 18 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 59,310 | SY |
$2.60 |
$2.50 |
$2.45 |
| 19 | 307(G) 4260 |
LIME PRETREATMENT | 9,875 | SY |
$4.50 |
$2.44 |
$2.45 |
| 20 | 325 5271 |
SEPARATOR FABRIC | 56,845 | SY |
$1.20 |
$1.10 |
$2.20 |
| 21 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 4,746 | TON |
$35.00 |
$33.00 |
$45.75 |
| 22 | 407(B) 0250 |
TACK COAT | 8,319 | GAL |
$3.00 |
$3.50 |
$3.60 |
| 23 | 408 5774 |
PRIME COAT | 37,974 | GAL |
$4.00 |
$2.50 |
$4.75 |
| 24 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 16,118 | TON |
$75.00 |
$58.21 |
$77.80 |
| 25 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,664 | TON |
$90.00 |
$63.07 |
$89.60 |
| 26 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 378 | CY |
$50.00 |
$5.50 |
$32.80 |
| 27 | 509(A) 0319 |
CLASS AA CONCRETE | 150 | CY |
$450.00 |
$556.17 |
$280.00 |
| 28 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 3 | CY |
$400.00 |
$1,500.00 |
$203.30 |
| 29 | 509(D) 0325 |
CLASS C CONCRETE | 1,215 | CY |
$270.00 |
$231.00 |
$203.30 |
| 30 | 511(A) 0332 |
REINFORCING STEEL | 23,590 | LB |
$1.00 |
$0.9900 |
$1.10 |
| 31 | 514(J) 6390 |
TEMPORARY SHEET PILING | 1 | LSUM |
$30,000.00 |
$55,000.00 |
$47,000.00 |
| 32 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 83 | TON |
$50.00 |
$100.00 |
$63.40 |
| 33 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 20 | TON |
$55.00 |
$100.00 |
$52.50 |
| 34 | 611(G) 5388 |
INLET CDI RCB DES. 2 | 1 | EA |
$1,900.00 |
$4,000.00 |
$1,750.00 |
| 35 | 611(L) 0487 |
JUNCTION BOXES | 472 | CF |
$65.00 |
$120.00 |
$96.25 |
| 36 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 2,068 | LF |
$55.00 |
$52.84 |
$67.45 |
| 37 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 80 | LF |
$90.00 |
$113.92 |
$116.65 |
| 38 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 208 | LF |
$110.00 |
$100.58 |
$133.00 |
| 39 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 282 | LF |
$200.00 |
$135.19 |
$145.40 |
| 40 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 204 | LF |
$90.00 |
$104.29 |
$82.90 |
| 41 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 1,937 | LF |
$30.00 |
$16.10 |
$35.60 |
| 42 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 50 | LF |
$80.00 |
$24.49 |
$63.30 |
| 43 | 613(B) 0693 |
42" CORR. GALV. STEEL PIPE | 130 | LF |
$65.00 |
$27.54 |
$59.95 |
| 44 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 198 | LF |
$110.00 |
$36.42 |
$88.65 |
| 45 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 202 | LF |
$40.00 |
$16.46 |
$47.10 |
| 46 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 725 | LF |
$20.00 |
$18.18 |
$6.60 |
| 47 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 242 | LF |
$25.00 |
$21.54 |
$6.60 |
| 48 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$675.00 |
$1,488.60 |
$1,150.00 |
| 49 | 613(L) 5736 |
42" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,575.00 |
$2,521.86 |
$1,840.00 |
| 50 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,800.00 |
$3,174.28 |
$3,980.00 |
| 51 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 59 | EA |
$1,750.00 |
$1,375.00 |
$981.00 |
| 52 | 613(M) 7199 |
TYPE D6 CULVERT END TREATMENT | 1 | EA |
$1,900.00 |
$1,870.00 |
$2,460.00 |
| 53 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 4 | EA |
$350.00 |
$1,000.00 |
$1,640.00 |
| 54 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 377 | CY |
$36.00 |
$42.00 |
$52.90 |
| 55 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 73 | CY |
$50.00 |
$60.00 |
$72.95 |
| 56 | 613(V) 1180 |
TRENCH EXCAVATION | 822 | CY |
$7.00 |
$9.00 |
$10.85 |
| 57 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$30,000.00 |
$27,500.00 |
$53,000.00 |
| 58 | 619(B) 0291 |
REMOVAL OF HEADWALL | 1 | EA |
$1,500.00 |
$1,500.00 |
$1,640.00 |
| 59 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 31,194 | SY |
$5.00 |
$5.62 |
$5.15 |
| 60 | 619(C) 0924 |
SAWING PAVEMENT | 5,613 | LF |
$4.00 |
$1.21 |
$5.50 |
| 61 | 624(A) 4281 |
FENCE-STYLE WWF | 451 | LF |
$5.50 |
$4.79 |
$7.00 |
| 62 | 624(B) 4464 |
GATES-STYLE WWF (4.5'HIGH X 14'LONG) | 1 | EA |
$925.00 |
$880.00 |
$957.00 |
| 63 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 10,157 | LF |
$5.25 |
$3.96 |
$6.00 |
| 64 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 7 | EA |
$100.00 |
$110.00 |
$109.30 |
| 65 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$225.00 |
$159.50 |
$218.60 |
| 66 | 629(C) 4960 |
MAILBOX | 11 | EA |
$35.00 |
$22.00 |
$27.35 |
| 67 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 11 | EA |
$35.00 |
$27.50 |
$27.35 |
| 68 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 15,540 | CY |
$8.00 |
$7.15 |
$7.70 |
| 69 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 2,052 | TON |
$30.00 |
$26.25 |
$34.45 |
| 70 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 343 | CY |
$20.00 |
$5.50 |
$32.80 |
| 71 | 509(A) 1326 |
CLASS AA CONCRETE | 887.5 | CY |
$400.00 |
$367.04 |
$208.00 |
| 72 | 511(A) 1332 |
REINFORCING STEEL | 183,420 | LB |
$1.00 |
$0.9900 |
$1.00 |
| 73 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$4,918.50 |
| 74 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$10,000.00 |
$10,930.00 |
| 75 | 413(D) 4869 |
RUMBLE STRIP METHOD PCC-CYC | 18,970 | LF |
$2.50 |
$0.2300 |
$0.2700 |
| 76 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$55.00 |
$71.50 |
$109.30 |
| 77 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 17.44 | SF |
$15.00 |
$44.00 |
$32.80 |
| 78 | 851(C) 8324 |
2" SQUARE TUBE POST | 46.5 | LF |
$6.00 |
$9.35 |
$10.95 |
| 79 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 42,000 | LF |
$0.4000 |
$0.3900 |
$0.4500 |
| 80 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$35,000.00 |
$55,000.00 |
$201,990.00 |
| 81 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 216,881 | CY |
$6.50 |
$2.75 |
$7.17 |
| 82 | 202(D) 0184 |
UNCLASSIFIED BORROW | 4,779 | CY |
$8.00 |
$1.10 |
$8.30 |
| 83 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$100,000.00 |
$77,000.00 |
$224,065.00 |
| 84 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,360 | LF |
$2.50 |
$1.76 |
$3.55 |
| 85 | 221(F) 0100 |
TEMPORARY SILT DIKE | 910 | LF |
$9.00 |
$6.60 |
$13.15 |
| 86 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 220 | CY |
$82.00 |
$77.00 |
$87.45 |
| 87 | 230(A) 2806 |
SOLID SLAB SODDING | 309,662 | SY |
$1.30 |
$1.30 |
$1.37 |
| 88 | 230(F) 2812 |
WATERING | 12,387 | KGAL |
$6.00 |
$6.60 |
$2.45 |
| 89 | 232(B) 2814 |
SEEDING METHOD B | 63.98 | AC |
$425.00 |
$660.00 |
$316.00 |
| 90 | 233(A) 2817 |
VEGETATIVE MULCHING | 63.98 | AC |
$375.00 |
$385.00 |
$311.50 |
| 91 | 234(A) 2824 |
FERTILIZING (10-20-10) | 31 | TON |
$700.00 |
$880.00 |
$653.60 |
| 92 | 241 2832 |
MOWING | 63.98 | AC |
$60.00 |
$110.00 |
$71.05 |
| 93 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 16,351 | CY |
$45.00 |
$66.00 |
$69.90 |
| 94 | 307(A) 4200 |
FLY ASH | 5,600 | TON |
$65.00 |
$73.70 |
$82.00 |
| 95 | 307(D) 4230 |
LIME | 263 | TON |
$170.00 |
$194.15 |
$187.15 |
| 96 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 97,217 | SY |
$2.50 |
$2.50 |
$2.46 |
| 97 | 307(G) 4260 |
LIME PRETREATMENT | 14,583 | SY |
$1.75 |
$2.44 |
$2.46 |
| 98 | 325 5271 |
SEPARATOR FABRIC | 86,584 | SY |
$1.00 |
$1.10 |
$2.15 |
| 99 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 12,000 | TON |
$25.00 |
$33.00 |
$46.05 |
| 100 | 407(B) 0250 |
TACK COAT | 14,667 | GAL |
$2.75 |
$3.50 |
$3.60 |
| 101 | 408 5774 |
PRIME COAT | 57,401 | GAL |
$3.75 |
$2.50 |
$4.65 |
| 102 | 409(A) 4242 |
FABRIC REINFORCEMENT | 9,702 | SY |
$2.00 |
$5.76 |
$2.65 |
| 103 | 409(B) 4268 |
BITUMINOUS BINDER | 2,264 | GAL |
$5.00 |
$7.26 |
$7.25 |
| 104 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 33,668 | TON |
$75.00 |
$58.21 |
$77.80 |
| 105 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 11,649 | TON |
$85.00 |
$63.07 |
$89.60 |
| 106 | 412 5267 |
COLD MILLING PAVEMENT | 19,403 | SY |
$4.00 |
$3.74 |
$4.90 |
| 107 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 107 | CY |
$50.00 |
$5.50 |
$32.80 |
| 108 | 509(A) 0319 |
CLASS AA CONCRETE | 285 | CY |
$450.00 |
$441.56 |
$280.00 |
| 109 | 509(D) 0325 |
CLASS C CONCRETE | 2,744 | CY |
$250.00 |
$231.00 |
$203.30 |
| 110 | 511(A) 0332 |
REINFORCING STEEL | 43,605 | LB |
$0.9500 |
$0.9900 |
$1.10 |
| 111 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 478 | TON |
$40.00 |
$100.00 |
$67.80 |
| 112 | 611(G) 6006 |
INLET (SMD-TYPE 2B) | 3 | EA |
$2,700.00 |
$4,250.00 |
$6,012.00 |
| 113 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 62 | LF |
$55.00 |
$63.91 |
$57.20 |
| 114 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 268 | LF |
$90.00 |
$125.31 |
$116.65 |
| 115 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 90 | LF |
$200.00 |
$148.71 |
$145.20 |
| 116 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 54 | LF |
$90.00 |
$114.72 |
$80.85 |
| 117 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 977 | LF |
$30.00 |
$13.29 |
$31.15 |
| 118 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 3,347 | LF |
$30.00 |
$17.71 |
$35.60 |
| 119 | 613(B) 0693 |
42" CORR. GALV. STEEL PIPE | 68 | LF |
$65.00 |
$30.29 |
$66.60 |
| 120 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 63 | LF |
$100.00 |
$40.06 |
$69.90 |
| 121 | 613(B) 0695 |
54" CORR. GALV. STEEL PIPE | 68 | LF |
$60.00 |
$44.22 |
$98.55 |
| 122 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 303 | LF |
$39.00 |
$18.11 |
$47.10 |
| 123 | 613(B) 4532 |
57" X 38" CORR. GALV. STEEL PIPE ARCH | 1,400 | LF |
$65.00 |
$54.07 |
$98.65 |
| 124 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,284 | LF |
$15.00 |
$20.00 |
$6.60 |
| 125 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 428 | LF |
$15.00 |
$23.69 |
$6.60 |
| 126 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$700.00 |
$1,387.03 |
$1,100.00 |
| 127 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,200.00 |
$2,515.96 |
$1,770.00 |
| 128 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,500.00 |
$3,491.70 |
$4,000.00 |
| 129 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 1 | EA |
$1,110.00 |
$990.00 |
$821.00 |
| 130 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 101 | EA |
$1,500.00 |
$1,100.00 |
$980.60 |
| 131 | 613(M) 7199 |
TYPE D6 CULVERT END TREATMENT | 1 | EA |
$1,900.00 |
$1,980.00 |
$2,460.00 |
| 132 | 613(M) 7200 |
TYPE E6 CULVERT END TREATMENT | 1 | EA |
$3,305.00 |
$2,420.00 |
$1,875.00 |
| 133 | 613(M) 7204 |
TYPE DD6 CULVERT END TREATMENT | 8 | EA |
$2,800.00 |
$3,850.00 |
$5,430.00 |
| 134 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 6 | EA |
$500.00 |
$1,000.00 |
$1,040.00 |
| 135 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 526 | CY |
$35.00 |
$46.20 |
$52.90 |
| 136 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 140 | CY |
$35.00 |
$66.00 |
$72.95 |
| 137 | 613(V) 1180 |
TRENCH EXCAVATION | 807 | CY |
$8.00 |
$9.90 |
$10.85 |
| 138 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$40,000.00 |
$27,500.00 |
$91,250.00 |
| 139 | 619(B) 0291 |
REMOVAL OF HEADWALL | 3 | EA |
$1,500.00 |
$1,500.00 |
$1,640.00 |
| 140 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 42,426 | SY |
$2.50 |
$5.62 |
$4.65 |
| 141 | 619(C) 0924 |
SAWING PAVEMENT | 27,974 | LF |
$3.00 |
$1.21 |
$5.50 |
| 142 | 624(A) 4281 |
FENCE-STYLE WWF | 2,357 | LF |
$5.50 |
$4.79 |
$7.00 |
| 143 | 624(B) 4464 |
GATES-STYLE WWF (4.5'HIGH X 14'LONG) | 2 | EA |
$900.00 |
$880.00 |
$960.00 |
| 144 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 11,306 | LF |
$5.25 |
$3.96 |
$6.00 |
| 145 | 624(E) 4288 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 338 | LF |
$17.00 |
$23.87 |
$15.30 |
| 146 | 624(F) 5849 |
GATES-STYLE CLF (4'HIGH X 14'LONG) | 3 | EA |
$1,000.00 |
$1,320.00 |
$550.00 |
| 147 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 22 | EA |
$95.00 |
$110.00 |
$109.30 |
| 148 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 2 | EA |
$200.00 |
$159.50 |
$218.60 |
| 149 | 629(C) 4960 |
MAILBOX | 26 | EA |
$35.00 |
$22.00 |
$27.35 |
| 150 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 26 | EA |
$25.50 |
$27.50 |
$27.35 |
| 151 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 930 | CY |
$8.00 |
$7.15 |
$11.00 |
| 152 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 95 | CY |
$20.00 |
$5.50 |
$32.80 |
| 153 | 509(A) 1326 |
CLASS AA CONCRETE | 252.8 | CY |
$400.00 |
$567.27 |
$248.10 |
| 154 | 511(A) 1332 |
REINFORCING STEEL | 43,400 | LB |
$1.00 |
$0.9900 |
$1.10 |
| 155 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$4,918.50 |
| 156 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$10,930.00 |
| 157 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 6,880 | CY |
$8.00 |
$7.15 |
$7.65 |
| 158 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 1,389 | TON |
$30.00 |
$26.25 |
$46.05 |
| 159 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 236 | CY |
$20.00 |
$5.50 |
$32.80 |
| 160 | 509(A) 1326 |
CLASS AA CONCRETE | 769.6 | CY |
$400.00 |
$383.90 |
$225.30 |
| 161 | 511(A) 1332 |
REINFORCING STEEL | 113,190 | LB |
$1.00 |
$0.9900 |
$1.00 |
| 162 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$4,919.00 |
| 163 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$10,000.00 |
$10,930.00 |
| 164 | 413(D) 4869 |
RUMBLE STRIP METHOD PCC-CYC | 32,250 | LF |
$2.50 |
$0.2400 |
$0.3000 |
| 165 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 44 | EA |
$55.00 |
$49.50 |
$109.30 |
| 166 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$150.00 |
$93.50 |
$218.60 |
| 167 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 256.09 | SF |
$15.00 |
$30.80 |
$19.65 |
| 168 | 851(C) 8324 |
2" SQUARE TUBE POST | 171 | LF |
$6.00 |
$8.80 |
$8.75 |
| 169 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 484 | LF |
$7.50 |
$8.80 |
$8.75 |
| 170 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 74,000 | LF |
$0.5000 |
$0.4400 |
$0.5000 |
| 171 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$13,200.00 |
$23,500.00 |
| 172 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 22,038 | CY |
$9.00 |
$2.75 |
$9.75 |
| 173 | 202(D) 0184 |
UNCLASSIFIED BORROW | 7,280 | CY |
$10.00 |
$1.10 |
$8.95 |
| 174 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$18,700.00 |
$34,540.00 |
| 175 | 221(C) 2801 |
TEMPORARY SILT FENCE | 900 | LF |
$2.00 |
$1.76 |
$3.55 |
| 176 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$225.00 |
$440.00 |
$1,366.25 |
| 177 | 221(F) 0100 |
TEMPORARY SILT DIKE | 84 | LF |
$9.00 |
$6.60 |
$13.15 |
| 178 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 24 | CY |
$140.00 |
$77.00 |
$87.45 |
| 179 | 230(A) 2806 |
SOLID SLAB SODDING | 42,411 | SY |
$1.60 |
$1.30 |
$1.37 |
| 180 | 230(F) 2812 |
WATERING | 1,697 | KGAL |
$10.00 |
$6.60 |
$2.45 |
| 181 | 232(B) 2814 |
SEEDING METHOD B | 7.22 | AC |
$375.00 |
$660.00 |
$109.30 |
| 182 | 233(A) 2817 |
VEGETATIVE MULCHING | 7.22 | AC |
$350.00 |
$385.00 |
$311.50 |
| 183 | 234(A) 2824 |
FERTILIZING (10-20-10) | 5 | TON |
$750.00 |
$880.00 |
$653.60 |
| 184 | 241 2832 |
MOWING | 7.22 | AC |
$100.00 |
$110.00 |
$71.05 |
| 185 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 3,586 | CY |
$50.00 |
$68.20 |
$69.90 |
| 186 | 307(A) 4200 |
FLY ASH | 950 | TON |
$80.00 |
$73.70 |
$82.00 |
| 187 | 307(D) 4230 |
LIME | 45 | TON |
$175.00 |
$194.15 |
$187.15 |
| 188 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 16,478 | SY |
$2.75 |
$2.50 |
$2.50 |
| 189 | 307(G) 4260 |
LIME PRETREATMENT | 2,472 | SY |
$4.00 |
$2.44 |
$2.50 |
| 190 | 325 5271 |
SEPARATOR FABRIC | 18,826 | SY |
$1.50 |
$1.10 |
$2.95 |
| 191 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 792 | TON |
$32.50 |
$33.00 |
$52.65 |
| 192 | 407(B) 0250 |
TACK COAT | 3,024 | GAL |
$3.25 |
$3.50 |
$3.60 |
| 193 | 408 5774 |
PRIME COAT | 11,886 | GAL |
$7.00 |
$2.50 |
$4.75 |
| 194 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 7,656 | TON |
$80.00 |
$58.21 |
$77.80 |
| 195 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,191 | TON |
$100.00 |
$63.07 |
$89.60 |
| 196 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 29 | CY |
$35.00 |
$5.50 |
$32.80 |
| 197 | 509(A) 0319 |
CLASS AA CONCRETE | 95 | CY |
$450.00 |
$563.15 |
$280.00 |
| 198 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 2 | CY |
$1,000.00 |
$1,500.00 |
$1,093.00 |
| 199 | 509(D) 0325 |
CLASS C CONCRETE | 343 | CY |
$285.00 |
$231.00 |
$203.30 |
| 200 | 511(A) 0332 |
REINFORCING STEEL | 11,680 | LB |
$1.00 |
$0.9900 |
$1.10 |
| 201 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 77 | TON |
$45.00 |
$100.00 |
$67.80 |
| 202 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 37 | TON |
$45.00 |
$100.00 |
$67.80 |
| 203 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 10 | TON |
$60.00 |
$100.00 |
$67.80 |
| 204 | 609(B) 1524 |
2'-8" COMB. CURB & GUTTER (6" MNTBLE) | 3,072 | LF |
$28.00 |
$40.00 |
$27.35 |
| 205 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 684 | SY |
$50.00 |
$65.00 |
$60.15 |
| 206 | 611(G) 5120 |
INLET CI DES. 3 (STD) | 2 | EA |
$5,000.00 |
$4,000.00 |
$7,105.00 |
| 207 | 611(L) 0487 |
JUNCTION BOXES | 182 | CF |
$60.00 |
$120.00 |
$65.60 |
| 208 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 486 | LF |
$50.00 |
$63.91 |
$57.20 |
| 209 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 74 | LF |
$70.00 |
$58.12 |
$67.45 |
| 210 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 48 | LF |
$100.00 |
$125.31 |
$116.65 |
| 211 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 114 | LF |
$28.00 |
$13.29 |
$31.15 |
| 212 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 102 | LF |
$33.00 |
$13.62 |
$42.80 |
| 213 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 174 | LF |
$30.00 |
$20.00 |
$6.60 |
| 214 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 58 | LF |
$25.00 |
$23.69 |
$6.60 |
| 215 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 3,072 | LF |
$9.00 |
$20.00 |
$17.50 |
| 216 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 330 | LF |
$12.00 |
$23.69 |
$17.50 |
| 217 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$700.00 |
$1,637.46 |
$1,146.00 |
| 218 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 5 | EA |
$1,900.00 |
$1,100.00 |
$651.45 |
| 219 | 613(M) 7199 |
TYPE D6 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$1,870.00 |
$2,460.00 |
| 220 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 6 | EA |
$400.00 |
$1,000.00 |
$983.70 |
| 221 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 208 | CY |
$38.00 |
$46.20 |
$52.90 |
| 222 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 18 | CY |
$55.00 |
$66.00 |
$72.95 |
| 223 | 613(V) 1180 |
TRENCH EXCAVATION | 310 | CY |
$9.00 |
$9.90 |
$10.85 |
| 224 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$7,000.00 |
$8,250.00 |
$16,395.00 |
| 225 | 619(B) 0291 |
REMOVAL OF HEADWALL | 4 | EA |
$1,800.00 |
$1,500.00 |
$1,640.00 |
| 226 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 12,307 | SY |
$3.25 |
$5.62 |
$11.20 |
| 227 | 619(C) 0924 |
SAWING PAVEMENT | 3,303 | LF |
$3.00 |
$1.21 |
$5.50 |
| 228 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 581 | LF |
$4.00 |
$3.74 |
$6.60 |
| 229 | 804(A) 2915 |
STRUCTURAL CONCRETE | 0.72 | CY |
$515.00 |
$385.00 |
$382.55 |
| 230 | 804(B) 2916 |
REINFORCING STEEL | 130 | LB |
$1.60 |
$1.76 |
$2.20 |
| 231 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$55.00 |
$71.50 |
$109.30 |
| 232 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 13 | EA |
$150.00 |
$137.50 |
$218.60 |
| 233 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 26 | SF |
$15.00 |
$55.00 |
$27.35 |
| 234 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 49 | SF |
$25.00 |
$33.00 |
$43.75 |
| 235 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 45 | LF |
$23.00 |
$24.20 |
$32.80 |
| 236 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 39 | LF |
$18.00 |
$19.80 |
$26.25 |
| 237 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 10,000 | LF |
$0.5000 |
$0.4600 |
$1.00 |
| 238 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$13,200.00 |
$23,500.00 |
| 239 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 25,762 | CY |
$9.00 |
$2.75 |
$10.05 |
| 240 | 202(D) 0184 |
UNCLASSIFIED BORROW | 500 | CY |
$12.00 |
$1.10 |
$10.95 |
| 241 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$18,700.00 |
$42,080.50 |
| 242 | 221(C) 2801 |
TEMPORARY SILT FENCE | 300 | LF |
$2.00 |
$1.76 |
$3.55 |
| 243 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$230.00 |
$440.00 |
$1,312.00 |
| 244 | 221(F) 0100 |
TEMPORARY SILT DIKE | 420 | LF |
$9.00 |
$6.60 |
$13.15 |
| 245 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 18 | CY |
$140.00 |
$77.00 |
$87.45 |
| 246 | 230(A) 2806 |
SOLID SLAB SODDING | 47,078 | SY |
$1.80 |
$1.30 |
$1.37 |
| 247 | 230(F) 2812 |
WATERING | 1,900 | KGAL |
$10.00 |
$6.60 |
$2.45 |
| 248 | 232(B) 2814 |
SEEDING METHOD B | 9.81 | AC |
$370.00 |
$660.00 |
$109.30 |
| 249 | 233(A) 2817 |
VEGETATIVE MULCHING | 9.81 | AC |
$350.00 |
$385.00 |
$344.30 |
| 250 | 234(A) 2824 |
FERTILIZING (10-20-10) | 5 | TON |
$750.00 |
$880.00 |
$653.60 |
| 251 | 241 2832 |
MOWING | 9.81 | AC |
$100.00 |
$110.00 |
$71.05 |
| 252 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 4,085 | CY |
$50.00 |
$68.20 |
$70.00 |
| 253 | 307(A) 4200 |
FLY ASH | 1,129 | TON |
$80.00 |
$73.70 |
$82.00 |
| 254 | 307(D) 4230 |
LIME | 53 | TON |
$175.00 |
$194.15 |
$187.15 |
| 255 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 19,587 | SY |
$2.50 |
$2.50 |
$2.50 |
| 256 | 307(G) 4260 |
LIME PRETREATMENT | 2,938 | SY |
$4.00 |
$2.44 |
$2.50 |
| 257 | 325 5271 |
SEPARATOR FABRIC | 19,587 | SY |
$1.50 |
$1.10 |
$2.45 |
| 258 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,813 | TON |
$35.00 |
$33.00 |
$46.05 |
| 259 | 407(B) 0250 |
TACK COAT | 3,924 | GAL |
$3.25 |
$3.50 |
$3.80 |
| 260 | 408 5774 |
PRIME COAT | 15,007 | GAL |
$6.75 |
$2.50 |
$4.75 |
| 261 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 8,956 | TON |
$80.00 |
$58.21 |
$77.80 |
| 262 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,668 | TON |
$95.00 |
$63.07 |
$89.60 |
| 263 | 509(D) 0325 |
CLASS C CONCRETE | 68 | CY |
$290.00 |
$231.00 |
$203.30 |
| 264 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 535 | SY |
$51.00 |
$65.00 |
$60.15 |
| 265 | 611(G) 5709 |
INLET CDI RCP DES. 6 | 1 | EA |
$5,000.00 |
$4,500.00 |
$4,373.00 |
| 266 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 164 | LF |
$70.00 |
$58.12 |
$67.45 |
| 267 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 92 | LF |
$180.00 |
$148.71 |
$145.60 |
| 268 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 1,124 | LF |
$28.00 |
$13.29 |
$31.20 |
| 269 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 69 | LF |
$34.00 |
$13.62 |
$42.80 |
| 270 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 375 | LF |
$25.00 |
$20.00 |
$7.45 |
| 271 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 125 | LF |
$25.00 |
$23.69 |
$7.45 |
| 272 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,500.00 |
$3,491.70 |
$2,550.00 |
| 273 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 24 | EA |
$1,700.00 |
$1,100.00 |
$651.45 |
| 274 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 4 | EA |
$1,750.00 |
$1,320.00 |
$980.60 |
| 275 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$400.00 |
$1,000.00 |
$983.70 |
| 276 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 208 | CY |
$38.00 |
$46.20 |
$52.90 |
| 277 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 113 | CY |
$44.00 |
$66.00 |
$73.00 |
| 278 | 613(V) 1180 |
TRENCH EXCAVATION | 342 | CY |
$9.00 |
$9.90 |
$10.85 |
| 279 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$7,000.00 |
$8,250.00 |
$25,665.00 |
| 280 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 37,828 | SY |
$5.00 |
$5.62 |
$4.75 |
| 281 | 619(C) 0924 |
SAWING PAVEMENT | 4,451 | LF |
$4.00 |
$1.21 |
$5.50 |
| 282 | 624(A) 4281 |
FENCE-STYLE WWF | 1,178 | LF |
$9.50 |
$4.79 |
$6.00 |
| 283 | 624(B) 4462 |
GATES-STYLE WWF (4.5'HIGH X 12'LONG) | 1 | EA |
$860.00 |
$880.00 |
$983.70 |
| 284 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,699 | LF |
$6.50 |
$3.96 |
$8.75 |
| 285 | 624(C) 4465 |
FENCE-STYLE SWF (5 BARBLESS WIRE) | 265 | LF |
$4.50 |
$4.13 |
$8.75 |
| 286 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 7 | EA |
$105.00 |
$110.00 |
$109.30 |
| 287 | 629(C) 4960 |
MAILBOX | 7 | EA |
$55.00 |
$22.00 |
$27.35 |
| 288 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 7 | EA |
$35.00 |
$27.50 |
$27.35 |
| 289 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 143,000 | LF |
$0.1500 |
$0.1000 |
$0.1100 |
| 290 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 8,000 | EA |
$0.5500 |
$0.5700 |
$0.8500 |
| 291 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 104,700 | LF |
$0.1500 |
$0.1000 |
$0.1600 |
| 292 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 2,200 | SD |
$10.00 |
$4.40 |
$16.40 |
| 293 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 50 | SD |
$18.00 |
$5.50 |
$82.00 |
| 294 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,700 | LF |
$23.00 |
$30.00 |
$28.45 |
| 295 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 11,100 | LF |
$4.00 |
$10.00 |
$8.00 |
| 296 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 16,500 | SD |
$0.3000 |
$0.0600 |
$1.10 |
| 297 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 57,750 | SD |
$0.7000 |
$0.0600 |
$0.5500 |
| 298 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 18,700 | SD |
$1.50 |
$2.75 |
$3.30 |
| 299 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 148,500 | SD |
$1.00 |
$0.0200 |
$0.0500 |
| 300 | 880(C) 8848 |
WING BARRICADES | 4,400 | SD |
$1.00 |
$0.0600 |
$0.5500 |
| 301 | 880(D) 8854 |
VERTICAL PANELS | 14,300 | SD |
$0.1200 |
$0.0200 |
$0.2700 |
| 302 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 319,000 | SD |
$0.2000 |
$0.0200 |
$0.0300 |
| 303 | 880(F) 8878 |
DRUMS | 41,250 | SD |
$0.2000 |
$0.6600 |
$0.2700 |
| 304 | 880(G) 8890 |
CHANNELIZER CONES | 99,000 | SD |
$0.2500 |
$0.6600 |
$0.1100 |
| 305 | 880(I) 8902 |
FLAGGER | 50 | SD |
$140.00 |
$500.00 |
$246.00 |
| 306 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 2,256 | SD |
$13.00 |
$8.80 |
$16.40 |
| 307 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 16 | EAGP |
$530.00 |
$484.00 |
$480.00 |
| 308 | 804(A) 2915 |
STRUCTURAL CONCRETE | 6.94 | CY |
$515.00 |
$220.00 |
$382.55 |
| 309 | 804(B) 2916 |
REINFORCING STEEL | 964 | LB |
$1.60 |
$1.65 |
$2.20 |
| 310 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 5 | EA |
$55.00 |
$93.50 |
$109.30 |
| 311 | 805(A) 8726 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$5,000.00 |
$5,500.00 |
$6,558.00 |
| 312 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 8 | EA |
$150.00 |
$137.50 |
$218.60 |
| 313 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 421.37 | SF |
$15.00 |
$35.20 |
$19.70 |
| 314 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 94.25 | SF |
$25.00 |
$28.60 |
$43.75 |
| 315 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 80 | LF |
$23.00 |
$22.00 |
$32.80 |
| 316 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 168 | LF |
$18.00 |
$19.80 |
$26.25 |
| 317 | 851(C) 8324 |
2" SQUARE TUBE POST | 264 | LF |
$6.00 |
$8.25 |
$8.75 |
| 318 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 264 | LF |
$7.50 |
$9.35 |
$8.75 |
| 319 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 24,000 | LF |
$0.5000 |
$0.3500 |
$0.8500 |
| 320 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 260 | LF |
$3.30 |
$1.76 |
$3.30 |
| 321 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 112 | LF |
$7.00 |
$6.60 |
$10.95 |
| 322 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 20 | EA |
$170.00 |
$220.00 |
$163.95 |
| 323 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$236,260.00 |
$419,700.00 |
$259,041.00 |
| 324 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$100,000.00 |
$19,675.00 |
| 325 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$40,000.00 |
$13,116.00 |
| 326 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$1,019,500.00 |
$873,048.00 |
|