| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$13,000.00 |
$33,000.00 |
$29,139.88 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 96,175 | CY |
$4.50 |
$3.14 |
$3.20 |
$4.88 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 150,699 | CY |
$6.00 |
$3.36 |
$3.40 |
$4.53 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$86,500.00 |
$86,500.00 |
$103,003.02 |
| 5 | 210 0121 |
OBLITERATING ABANDONED ROAD | 20,161 | LF |
$4.50 |
$14.00 |
$5.65 |
$8.59 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 11,330 | LF |
$3.00 |
$1.17 |
$1.45 |
$3.19 |
| 7 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 9 | EA |
$115.00 |
$115.00 |
$1,035.00 |
$462.41 |
| 8 | 221(E) 2804 |
TEMPORARY SEDIMENT BASIN | 1 | EA |
$800.00 |
$225.00 |
$225.00 |
$1,670.58 |
| 9 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,557 | LF |
$8.00 |
$7.87 |
$8.80 |
$5.82 |
| 10 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 31 | CY |
$90.00 |
$63.00 |
$63.00 |
$271.50 |
| 11 | 230(A) 2806 |
SOLID SLAB SODDING | 324,150 | SY |
$1.50 |
$1.22 |
$1.22 |
$1.38 |
| 12 | 233(A) 2817 |
VEGETATIVE MULCHING | 68 | AC |
$350.00 |
$389.00 |
$389.00 |
$200.00 |
| 13 | 234(A) 2824 |
FERTILIZING (10-20-10) | 33 | TON |
$550.00 |
$677.00 |
$677.00 |
$767.33 |
| 14 | 241 2832 |
MOWING | 115 | AC |
$115.00 |
$84.00 |
$84.00 |
$50.00 |
| 15 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 34,991 | CY |
$30.00 |
$34.00 |
$33.05 |
$31.81 |
| 16 | 325 5271 |
SEPARATOR FABRIC | 113,886 | SY |
$1.50 |
$1.10 |
$1.27 |
$1.02 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 16,412 | TON |
$22.00 |
$18.00 |
$20.30 |
$18.22 |
| 18 | 407(B) 0250 |
TACK COAT | 22,002 | GAL |
$2.40 |
$2.50 |
$3.30 |
$2.50 |
| 19 | 408 5774 |
PRIME COAT | 73,856 | GAL |
$4.00 |
$2.50 |
$4.66 |
$0.8000 |
| 20 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 11,616 | TON |
$70.00 |
$64.00 |
$66.90 |
$67.63 |
| 21 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 22,076 | TON |
$65.00 |
$58.00 |
$58.35 |
$60.39 |
| 22 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 17,912 | TON |
$78.00 |
$78.00 |
$79.90 |
$75.23 |
| 23 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,637 | TON |
$75.00 |
$65.50 |
$65.05 |
$64.22 |
| 24 | 412 5267 |
COLD MILLING PAVEMENT | 956 | SY |
$3.50 |
$4.23 |
$10.25 |
$7.74 |
| 25 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 43 | CY |
$15.00 |
$25.00 |
$25.00 |
$62.60 |
| 26 | 509(A) 0319 |
CLASS AA CONCRETE | 138 | CY |
$450.00 |
$425.00 |
$425.00 |
$485.11 |
| 27 | 509(D) 0325 |
CLASS C CONCRETE | 463 | CY |
$280.00 |
$250.00 |
$190.00 |
$283.36 |
| 28 | 511(A) 0332 |
REINFORCING STEEL | 16,792 | LB |
$1.00 |
$1.00 |
$1.00 |
$1.13 |
| 29 | 611(G) 5704 |
INLET CDI RCP DES. 1 | 3 | EA |
$2,000.00 |
$1,400.00 |
$1,400.00 |
$1,586.80 |
| 30 | 611(G) 5705 |
INLET CDI RCP DES. 2 | 2 | EA |
$3,500.00 |
$1,700.00 |
$1,700.00 |
$2,380.20 |
| 31 | 611(G) 5706 |
INLET CDI RCP DES. 3 | 2 | EA |
$4,500.00 |
$1,950.00 |
$1,950.00 |
$2,436.87 |
| 32 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 2 | EA |
$1,750.00 |
$1,500.00 |
$1,500.00 |
$1,700.14 |
| 33 | 611(H) 5790 |
ADD'L DEPTH IN INLET CDI RCP DES. 2 | 2.68 | VF |
$300.00 |
$75.00 |
$75.00 |
$524.85 |
| 34 | 611(H) 5791 |
ADD'L DEPTH IN INLET CDI RCP DES. 3 | 17.74 | VF |
$350.00 |
$100.00 |
$100.00 |
$146.57 |
| 35 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 2,477 | LF |
$45.00 |
$26.36 |
$26.50 |
$29.98 |
| 36 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 870 | LF |
$55.00 |
$33.10 |
$33.10 |
$43.85 |
| 37 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 329 | LF |
$65.00 |
$46.30 |
$46.30 |
$59.89 |
| 38 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 134 | LF |
$80.00 |
$56.80 |
$56.80 |
$100.50 |
| 39 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 640 | LF |
$50.00 |
$72.12 |
$72.15 |
$69.08 |
| 40 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 136 | LF |
$60.00 |
$87.92 |
$87.95 |
$75.89 |
| 41 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 2,544 | LF |
$23.00 |
$20.10 |
$20.10 |
$23.51 |
| 42 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 154 | LF |
$30.00 |
$26.30 |
$26.30 |
$45.52 |
| 43 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 288 | LF |
$30.00 |
$19.47 |
$19.50 |
$61.68 |
| 44 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 44 | LF |
$30.00 |
$26.01 |
$26.05 |
$125.33 |
| 45 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,443 | LF |
$10.00 |
$3.50 |
$4.50 |
$5.00 |
| 46 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 478 | LF |
$10.00 |
$3.50 |
$4.50 |
$5.00 |
| 47 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$250.00 |
$1,112.00 |
$1,112.00 |
$2,285.16 |
| 48 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$300.00 |
$971.00 |
$971.00 |
$2,095.53 |
| 49 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$800.00 |
$1,346.00 |
$1,350.00 |
$3,594.99 |
| 50 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,000.00 |
$1,304.00 |
$1,305.00 |
$3,750.10 |
| 51 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,100.00 |
$2,735.00 |
$2,735.00 |
$4,042.63 |
| 52 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 54 | EA |
$800.00 |
$925.00 |
$925.00 |
$1,048.42 |
| 53 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 5 | EA |
$900.00 |
$1,000.00 |
$1,000.00 |
$1,133.43 |
| 54 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 1 | EA |
$1,000.00 |
$1,200.00 |
$1,200.00 |
$1,360.12 |
| 55 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 7 | EA |
$500.00 |
$500.00 |
$500.00 |
$566.71 |
| 56 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 945 | CY |
$20.00 |
$37.80 |
$37.80 |
$38.00 |
| 57 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 430 | CY |
$33.00 |
$43.64 |
$43.65 |
$42.00 |
| 58 | 613(V) 1180 |
TRENCH EXCAVATION | 2,088 | CY |
$9.00 |
$7.50 |
$7.50 |
$15.32 |
| 59 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$6,400.00 |
$16,400.00 |
$115,719.27 |
| 60 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$600.00 |
$800.00 |
$1,000.00 |
$2,440.92 |
| 61 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,820 | SY |
$3.30 |
$2.75 |
$6.70 |
$3.00 |
| 62 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 478 | LF |
$3.00 |
$3.00 |
$3.00 |
$4.00 |
| 63 | 619(C) 0924 |
SAWING PAVEMENT | 5,915 | LF |
$3.25 |
$3.00 |
$1.75 |
$0.9600 |
| 64 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 800 | LF |
$16.00 |
$14.35 |
$15.50 |
$17.17 |
| 65 | 623(F) 4447 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 2 | EA |
$700.00 |
$525.00 |
$450.00 |
$510.05 |
| 66 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 2 | EA |
$2,100.00 |
$2,350.00 |
$2,100.00 |
$2,380.20 |
| 67 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$1,400.00 |
$1,295.00 |
$1,625.00 |
$1,841.82 |
| 68 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 14 | EA |
$50.00 |
$75.00 |
$75.00 |
$85.01 |
| 69 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 5 | EA |
$130.00 |
$125.00 |
$125.00 |
$141.68 |
| 70 | 629(C) 4960 |
MAILBOX | 25 | EA |
$40.00 |
$20.00 |
$20.00 |
$22.67 |
| 71 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 24 | EA |
$16.00 |
$10.00 |
$15.00 |
$9.07 |
| 72 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 24 | EA |
$2.00 |
$10.00 |
$10.00 |
$11.33 |
| 73 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$18.00 |
$15.00 |
$15.00 |
$17.00 |
| 74 | 501(G) 6309 |
CLSM BACKFILL | 257.8 | CY |
$130.00 |
$130.00 |
$130.00 |
$147.35 |
| 75 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 696.01 | LF |
$180.00 |
$215.00 |
$215.00 |
$243.69 |
| 76 | 504(A) 1304 |
APPROACH SLAB | 214.4 | SY |
$165.00 |
$175.00 |
$175.00 |
$198.35 |
| 77 | 504(B) 1305 |
SAW-CUT GROOVING | 834.1 | SY |
$4.50 |
$5.00 |
$5.00 |
$5.67 |
| 78 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 447 | LF |
$65.00 |
$75.00 |
$75.00 |
$85.01 |
| 79 | 506(A) 1322 |
STRUCTURAL STEEL | 1,040 | LB |
$4.40 |
$2.25 |
$2.25 |
$2.55 |
| 80 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$900.00 |
$850.00 |
$850.00 |
$963.41 |
| 81 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,800.00 |
$1,830.00 |
$1,830.00 |
$2,074.17 |
| 82 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$450.00 |
$250.00 |
$250.00 |
$283.36 |
| 83 | 509(A) 1326 |
CLASS AA CONCRETE | 211.3 | CY |
$500.00 |
$550.00 |
$550.00 |
$651.72 |
| 84 | 509(B) 1328 |
CLASS A CONCRETE | 142.3 | CY |
$450.00 |
$575.00 |
$575.00 |
$651.72 |
| 85 | 511(A) 1332 |
REINFORCING STEEL | 1,360 | LB |
$0.9000 |
$1.00 |
$1.00 |
$1.13 |
| 86 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 84,760 | LB |
$1.10 |
$1.10 |
$1.10 |
$1.25 |
| 87 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 630 | LF |
$35.00 |
$45.00 |
$45.00 |
$51.00 |
| 88 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 630 | LF |
$15.00 |
$15.00 |
$15.00 |
$17.00 |
| 89 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 931 | SY |
$4.10 |
$4.00 |
$4.00 |
$4.53 |
| 90 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 132 | LF |
$700.00 |
$690.00 |
$690.00 |
$782.07 |
| 91 | 523(A) 6550 |
SEALER CRACK PREPARATION | 162 | LF |
$3.25 |
$6.00 |
$6.00 |
$6.80 |
| 92 | 523(B) 6560 |
SEALER RESIN | 1.1 | GAL |
$120.00 |
$300.00 |
$300.00 |
$340.03 |
| 93 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,010 | TON |
$30.00 |
$35.00 |
$35.00 |
$39.67 |
| 94 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 210.2 | TON |
$27.00 |
$30.00 |
$30.00 |
$34.00 |
| 95 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 82 | LF |
$10.00 |
$25.00 |
$25.00 |
$28.34 |
| 96 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 22 | LF |
$10.00 |
$15.00 |
$15.00 |
$17.00 |
| 97 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$32,000.00 |
$12,000.00 |
$23,000.00 |
$13,601.13 |
| 98 | 804(A) 2915 |
STRUCTURAL CONCRETE | 3.08 | CY |
$410.00 |
$300.00 |
$300.00 |
$340.03 |
| 99 | 804(B) 2916 |
REINFORCING STEEL | 518 | LB |
$2.00 |
$1.00 |
$1.00 |
$1.13 |
| 100 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$2,000.00 |
$1,000.00 |
$1,000.00 |
$1,133.42 |
| 101 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 10 | EA |
$150.00 |
$100.00 |
$100.00 |
$113.34 |
| 102 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 760.5 | SF |
$17.00 |
$12.00 |
$12.00 |
$13.60 |
| 103 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 82.5 | SF |
$22.00 |
$20.00 |
$20.00 |
$22.67 |
| 104 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 111 | LF |
$17.00 |
$20.00 |
$20.00 |
$22.67 |
| 105 | 851(B) 3217 |
2 1/2"@5.79 GALV.STEEL PIPE POST | 30 | LF |
$18.00 |
$16.00 |
$16.00 |
$18.14 |
| 106 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 62 | LF |
$20.00 |
$15.00 |
$15.00 |
$17.00 |
| 107 | 851(C) 8324 |
2" SQUARE TUBE POST | 1,241 | LF |
$8.00 |
$6.00 |
$6.00 |
$6.80 |
| 108 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 105,000 | LF |
$0.5000 |
$0.3400 |
$0.3500 |
$0.3900 |
| 109 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 24 | EA |
$100.00 |
$75.00 |
$75.00 |
$85.01 |
| 110 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 47,520 | LF |
$0.1700 |
$0.0700 |
$0.0800 |
$0.0800 |
| 111 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 43,600 | LF |
$0.1500 |
$0.0700 |
$0.0800 |
$0.0800 |
| 112 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 975 | SD |
$3.50 |
$5.00 |
$5.00 |
$5.67 |
| 113 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,000 | LF |
$20.00 |
$26.00 |
$29.00 |
$18.00 |
| 114 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 2,000 | LF |
$3.50 |
$3.00 |
$4.00 |
$4.47 |
| 115 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 650 | SD |
$5.00 |
$1.00 |
$1.00 |
$1.13 |
| 116 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 11,375 | SD |
$0.2500 |
$0.5000 |
$0.5000 |
$0.5700 |
| 117 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 35,425 | SD |
$0.8000 |
$0.1000 |
$0.1000 |
$0.1100 |
| 118 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,225 | SD |
$1.50 |
$4.00 |
$4.00 |
$4.53 |
| 119 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 3,900 | SD |
$0.5000 |
$2.00 |
$2.00 |
$2.27 |
| 120 | 880(C) 8848 |
WING BARRICADES | 1,300 | SD |
$1.00 |
$0.1000 |
$0.1000 |
$0.1100 |
| 121 | 880(D) 8854 |
VERTICAL PANELS | 137,475 | SD |
$0.1000 |
$0.0200 |
$0.0300 |
$0.0200 |
| 122 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,250 | SD |
$0.5000 |
$1.00 |
$1.00 |
$1.13 |
| 123 | 880(F) 8878 |
DRUMS | 47,450 | SD |
$0.2500 |
$0.0400 |
$0.0500 |
$0.0500 |
| 124 | 880(G) 8884 |
TUBE CHANNELIZERS | 137,475 | SD |
$0.3000 |
$0.1000 |
$0.1000 |
$0.1100 |
| 125 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 325 | SD |
$20.00 |
$10.00 |
$10.00 |
$11.33 |
| 126 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$127,350.00 |
$77,560.00 |
$60,375.00 |
$115,677.61 |
| 127 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$5,000.00 |
$18,000.00 |
$1,500.00 |
| 128 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$25,000.00 |
$6,090.00 |
$2,833.57 |
| 129 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$500,000.00 |
$357,195.00 |
$389,000.00 |
$340,028.27 |
| 130 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$20,000.00 |
$90,000.00 |
$56,840.00 |
$102,008.48 |