| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jul 31, 2026 | 46949 | ClintonDistrict 8 | Resurfacing parking areas with PCC surface, sidewalk construction and drainage improvements at Eldon State Recreational Area. | — | Executed | McCarthy Improvement Company $2,907,718 · | ||
| Jul 31, 2026 | 46951 | VermilionDistrict 5 | Resurfacing of internal park roads and parking areas with an HMA surface; culvert replacement; sidewalk construction; drainage improvements; and associated work at the Kickapoo State Recreation Area in Vermilion County. Approximately 1.741 miles gross length. | — | Executed | Feutz Contractors, Inc. $4,107,350 · | ||
| Jul 31, 2026 | 61K85 | CookDistrict 1 | Reconstruction of Weber Dr. from Central Rd. to IL 62 in the city of Rolling Meadows. | — | Executed | Plote Construction, Inc. $2,813,311 · | ||
| Jul 31, 2026 | 61M13 | KaneDistrict 1 | Demolition of existing 18-span bridge and construction of three PPC beam single span bridges carrying Kirk Rd. over Reed Rd., UPRR and White's Creek. | — | Executed | Dunnet Bay Construction Company $36,611,206 · | ||
| Jul 31, 2026 | 61M40 | DuPageDistrict 1 | Implementation of flashing yellow arrow signals at five existing signalized intersections along 63rd St. in Dupage County. | — | Executed | Home Towne Electric, Inc. $2,996,846 · | ||
| Jul 31, 2026 | 61M50 | CookDistrict 1 | Construction of a single-lane roundabout at the intersection of Ravina Ave. and 153rd St. in the village of Orland Park. | — | Active | |||
| Jul 31, 2026 | 62J64 | CookDistrict 1 | Hot-mix asphalt surface removal, placement of hot mix surface course, pedestrian ramp improvements, pavement p (3,478-Ft) SMART overlay, Traffic Signal Modernization and ADA improvement project consists of hot-mix asphalt surface removal, placement of hot mix surface course, pedestrian ramp improvements, pavement patching, placement of pavement markings.Located within the Villages of Glencoe and Northbrook in Cook County. | — | Executed | Peter Baker & Son Co. $2,925,476 · | ||
| Jul 31, 2026 | 62T84 | CookDistrict 1 | Sidewalk and ADA improvements (848.83-Ft) The improvement includes replacement of the existing concrete box culvert (SN 016-0926) with a proposed triple cell concrete box culvert (SN 016-8321) consists of sidewalk and ADA improvements. This improvement is located along FAU 2843 (Dixie Highway) over Thron Creek Tributary (0.4 miles North of IL 1) in the City of Chicago Heights, Cook County, IL. | — | Executed | D. Construction, Inc. $1,552,966 · | ||
| Jul 31, 2026 | 62V29 | CookDistrict 1 | Cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement (3.4-Mile) The improvement consists of cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane pavement marking lines. Location is in villages of Maywood, Forest Park, Melrose Park and River Grove in Cook counties. | — | Executed | Denler, Inc. $334,302 · | ||
| Jul 31, 2026 | 62V45 | CookDistrict 1 | HMA pavement resurfacing with binder and surface courses, class B patching, cleaning and sealing of longitudin (3.3-Mile) Designed Overlay consists of HMA pavement resurfacing with binder and surface courses, class B patching, cleaning and sealing of longitudinal pavement joints between traffic lanes and curb and gutter, placement of thermoplastic and modified urethane pavement markings. This project is located within the City of Alsip and Blue Island in Cook County. | — | Executed | D. Construction, Inc. $1,062,900 · | ||
| Jul 31, 2026 | 62V46 | WillDistrict 1 | (3,381-Ft) Crack and Joint Seal project includes routing, cleaning, and sealing of longitudinal cracks in existing hot-mix asphalt (HMA) pavement and PCC pavement, performing class B patching on PCC Pavement and refreshing existing pavement marks with modified urethane pavement markings. This project is in the City of Joliet, Will County. | — | Executed | Mosley Construction 1, LLC $424,498 · | ||
| Jul 31, 2026 | 62V64 | CookDistrict 1 | Cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement (3,765-Ft) Project consists of cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane marking lines. Located through the Municipalities of Hanover Park, Bartlett, and Streamwood in Cook County. | — | Executed | Denler, Inc. $85,435 · | ||
| Jul 31, 2026 | 62V79 | LakeDistrict 1 | 5,203-Ft) Crack and Joint Sealant improvement consisting of routing, cleaning, and sealing of longitudinal cracks and joints within the hot-mix asphalt pavement, grading and shaping shoulders, restriping with modified urethane pavement marking is located within the Villages of Island Lake and Wauconda in Lake County. | — | Executed | Denler, Inc. $190,610 · | ||
| Jul 31, 2026 | 62V80 | WillDistrict 1 | Routing, cleaning, and sealing of longitudinal cracks in existing pavement, between the existing pavement and (2,897-Ft) This improvement consists of routing, cleaning, and sealing of longitudinal cracks in existing pavement, between the existing pavement and curb and gutter, restriping with modified urethane marking lines. This project is located within the Village of Plainfield in Will County. | — | Executed | Denler, Inc. $51,792 · | ||
| Jul 31, 2026 | 62W20 | CookDistrict 1 | Widening shoulder widths, replaced approach slabs, continuation of the new shared use pedestrian path, removal (1.413-Mile) Bridge Superstructure Replacement (SN 016-0927) consists of widening shoulder widths, replaced approach slabs, continuation of the new shared use pedestrian path, removal and installation of new guardrail, striping ond drainage improvements. The project is in Oak Park Avenue (FAU Route 2774) over I-80 in Tinley Park, IL. | — | Executed | D. Construction, Inc. $7,166,048 · | ||
| Jul 31, 2026 | 62X43 | CookDistrict 1 | Reconstruction of the joints with strip seals, hydro scarification 3/4-), deck repairs, installation of a late (166-Ft) Glenwood Road Bridge (SN 016-0793) over Butterfield Creek project consists of reconstruction of the joints with strip seals, hydro scarification 3/4-), deck repairs, installation of a latex concrete overlay (2¼-) with diamond grinding, application of a protective coat, and substructure concrete repairs, installation of HMA on each side of the bridge. Located within Glenwood Road over Butterfield Creek in the Village of Glenwood in Cook County. | — | Executed | D. Construction, Inc. $290,657 · | ||
| Jul 31, 2026 | 62Y20 | CookDistrict 1 | Deck patching, bridge deck joint replacements, and hydro-scarification and overlay bridge deck overlay (262-Ft) Bridge Deck Overlay and Bridge Joint Replacement will involve bridge repairs. These repairs will generally consist of deck patching, bridge deck joint replacements, and hydro-scarification and overlay bridge deck overlay. This proposed Bridge Repair (SN 016-2705) is located on Ogden Avenue over IL 50 Cicero Avenue, located in Cook County, IL. | — | Executed | Martam Construction Incorporated $1,236,716 · | ||
| Jul 31, 2026 | 64T48 | WhitesideDistrict 2 | Bridge repairs and joint replacement on SN 098-0102, carrying Moline Rd over drainage ditch, 1 mile northeast of Lyndon. | — | Executed | Martin & Company Excavating $523,502 · | ||
| Jul 31, 2026 | 64T49 | OgleDistrict 2 | Bridge repairs and joint replacement on SN 071-0015, carrying IL 64 over drainage ditch, 5.7 miles east of junction IL 26. | — | Executed | Martin & Company Excavating $443,472 · | ||
| Jul 31, 2026 | 64V16 | Jo DaviessDistrict 2 | The proposed scope of work is considered an interim repair only and includes installing lagging boards to the existing guardrail posts to prevent water from sheet flowing over the retaining wall and slow down the progression of failure on E. Canyon Road in Jo Daviess County in Section 3, Range 4E and Township 28N. The project is along E. Canyon Road approximately 0.5 miles west of Fiedler Road. | — | Executed | Law Excavating, Inc. $45,940 · | ||
| Jul 31, 2026 | 64V30 | BooneDistrict 2 | Tree removal in advance to CN 64G98 from Shaw Rd east of Winnebago County Line to 0.1 miles northeast of State St in Belvidere. 3.051 miles gross length. | — | Executed | Clean Cut Tree Service, Inc. $615,524 · | ||
| Jul 31, 2026 | 64V41 | Rock IslandDistrict 2 | 2.37 Miles of intermittent resurfacing between US 150 and 38th St. along 27th St. | — | Executed | Valley Construction Co. $755,266 · | ||
| Jul 31, 2026 | 66M85 | LivingstonDistrict 3 | Deck replacement (SN 053-0149) on IL 23 at the BNSF RR and Vermilion River, 0.8 miles south of the LaSalle County Line. | — | Executed | ICC Group Inc. $9,933,000 · | ||
| Jul 31, 2026 | 66N23 | LivingstonDistrict 3 | Removal and replacement of the existing culvert structure (SN 053-2548) carrying IL 116 over_a stream located 5.6 miles west of I-55 in Livingston County. Additional work includes roadway resurfacing, guardrail placement,_and slope and ditch grading. | — | Executed | Riber Construction, Inc. $615,314 · | ||
| Jul 31, 2026 | 66P22 | BureauDistrict 3 | Repairing the Red Covered Bridge (SN 006-0134) on TR 246 (Old Dad Joe_Trail), over Big Bureau Creek, approximately 0.5 mile west of IL-26 in Bureau County. Repairs include roof replacement, truss replacement, floor beam replacement, and other items needed to restore the bridge to its original condition. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,257,661 · | ||
| Jul 31, 2026 | 66T13 | BureauLaSalleDistrict 3 | Milling, resurfacing,_pavement marking, and aggregate construction on a frontage north of I-80 beginning at a dead end (L.M. 0.00) in Bureau County and ending approximately 85 feet west of Plank Rd. in LaSalle County. 1.36 miles gross length. | — | Executed | Advanced Asphalt Company $729,412 · | ||
| Jul 31, 2026 | 66T14 | BureauLaSalleDistrict 3 | Removing and installing new mast arms, foundations, and street signs in three intersections: Wenzel Road and IL 251, Shooting Park Road and IL 251 in LaSalle County and IL 26 and Backbone Rd in Bureau County. | — | Active | |||
| Jul 31, 2026 | 66T15 | LaSalleDistrict 3 | Removing and installing new mast arms, foundations, and street signs in three intersections: I-80 EB Exit Ramp at IL 251, I-80 WB Exit Ramp at IL 251, and May Rd and IL 251 in LaSalle County. | — | Rejected | ROADSAFE TRAFFIC SYSTEMS, INC. $1,096,580 · | ||
| Jul 31, 2026 | 66T21 | FordDistrict 3 | Class D pavement patching of mainline pavement on F.A.S. Route 2482 (IL 165), beginning at IL 47 and 165 (L.M. 0.00) and ending at McLean_County line in Ford County. 4.2 miles gross length. | — | Executed | G. M. Sipes Construction, Inc. $690,200 · | ||
| Jul 31, 2026 | 66T22 | FordDistrict 3 | Class D pavement patching of_mainline pavement on F.A.P. Route 693 (IL 9), beginning at IL 9/47 intersection (L.M. 0.00) and ending at Ford/McLean County Line (L.M. 4.30) in Ford County._Approximately 4.3 miles gross length. | — | Executed | G. M. Sipes Construction, Inc. $610,480 · | ||
| Jul 31, 2026 | 66T30 | LaSalleDistrict 3 | Installation of flashing beacons at the intersection of IL18 and E 15th Rd. | — | Executed | CSD Environmental Services, Inc. $404,001 · | ||
| Jul 31, 2026 | 66T35 | KankakeeDistrict 3 | Removing and replacing high-mast tower, underpass and roadway lighting luminares at the I-57 and IL 50 Interchange and at the south IL 1/17 intersection. | — | Executed | Laser Electric, Inc. $447,135 · | ||
| Jul 31, 2026 | 66T37 | LaSalleDistrict 3 | Furnishing and installing video detection systems at_the intersections of IL 351/5th St. Intersection, IL 351/ 11th Street Intersection, and IL 351 and Civic Rd. Intersections. | — | Executed | Ficek Electric & Communication Systems, Inc. $241,801 · | ||
| Jul 31, 2026 | 66T53 | DeKalbDistrict 3 | Milling and resurfacing 2 1/4" (standard overlay) and additional work including shoulder and centerline rumble strips, pavement marking, and raised reflective pavement markers on FAP 17 (IL 64) beginning from Ogle County Line to Clare Rd. in DeKalb County. Approximately 6.108 miles gross length. | — | Executed | Curran Contracting Company $2,389,089 · | ||
| Jul 31, 2026 | 68K27 | TazewellWoodfordDistrict 4 | Milling and resurfacing IL 26 from Spring Bay to NCL to IL Rte 116 in Tazewell and Woodford Counties. Approximately 6.87 miles gross length. | — | Executed | Advanced Asphalt Company $1,822,642 · | ||
| Jul 31, 2026 | 68L01 | PeoriaDistrict 4 | HMA patching and resurfacing of the intersection at_ IL91/Alta Rd in Peoria. Approximately 0.303 miles gross length. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $892,489 · | ||
| Jul 31, 2026 | 68L02 | PeoriaDistrict 4 | HMA patching on IL 8/IL 78 from Il 8 to Main St in Elmwood. Approximately 0.53 miles gross length. | — | Executed | Advanced Asphalt Company $253,825 · | ||
| Jul 31, 2026 | 68L03 | FultonKnoxDistrict 4 | HMA patching on IL 97 from Littlers Creek to IL 116. Approximately 2.92 miles gross length. | — | Executed | Brandt Construction Co. $630,038 · | ||
| Jul 31, 2026 | 70G29 | ChampaignDistrict 5 | 0.72 mile of sanitary sewer at Illini Prairie Rest Areas. | — | Executed | Stark Excavating, Inc. $3,219,237 · | ||
| Jul 31, 2026 | 70J06 | VariousDistrict 5 | District wide on-call guardrail and fence repairs. | — | Executed | COLLINS & HERMANN, INC. $1,317,046 · | ||
| Jul 31, 2026 | 70J08 | ChampaignDouglasDistrict 5 | Tree removal at various locations along I 74 and I 57 | — | Executed | Thor General Contracting LLC $87,478 · | ||
| Jul 31, 2026 | 72372 | LoganMontgomeryDistrict 6 | 14.85 miles of crack and joint sealing on I-155 from 2 miles south of US 136 to the Tazwell County Line; on I-55 from 0.8 miles north of IL 16 to 0.6 miles north of IL 108; on IL 108 at the I-55 interchange. | — | Executed | Freehill Asphalt, Inc. $143,774 · | ||
| Jul 31, 2026 | 72E81 | HancockPikeDistrict 6 | ITS expansion in Hancock and Pike Counties. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $279,735 · | ||
| Jul 31, 2026 | 72E85 | ScottDistrict 6 | Resurfacing on US 67 at the median crossover 0.2 miles north of the Greene County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $105,717 · | ||
| Jul 31, 2026 | 72E86 | SangamonDistrict 6 | Resurfacing on Stevenson Drive from east of Adloff Lane to east of I-55 northbound ramps in Springfield. | — | Executed | Truman L. Flatt & Sons Co., Inc. $286,492 · | ||
| Jul 31, 2026 | 72J00 | MacoupinSangamonDistrict 6 | 9.32 Miles of crack and joint Sealing on IL 4 from 0.3 miles south of IL 104 in Auburn to north of George Street in Virden and on IL 4 from 0.3 miles southwest of IL 29 (J David Jones Pkwy) to 0.2 miles north of Washington Street. | — | Executed | Freehill Asphalt, Inc. $92,224 · | ||
| Jul 31, 2026 | 72J44 | BrownPikeDistrict 6 | 6.4 miles of milling and resurfacing, storm sewer replacement, bridge repairs and guardrail upgrades on IL 99 from south of Versailles northern city limits to Mckee Drainage Ditch, 0.1 miles north of IL 104. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $8,178,851 · | ||
| Jul 31, 2026 | 74829 | MoultrieDistrict 7 | 1.5 miles of resurfacing with curb and gutter upgrades on IL 32 in Sullivan. | — | Executed | Howell Paving, Inc. $3,050,707 · | ||
| Jul 31, 2026 | 74E43 | ColesDistrict 7 | Bridge deck overlay on SN 015-0032 carrying Old State Road over I-57 east of Mattoon. | — | Executed | Howell Paving, Inc. $61,319 · | ||
| Jul 31, 2026 | 74E44 | VariousDistrict 7 | Repairs of known guardrail damage and repairs of future damage on an on-call basis. | — | Executed | COLLINS & HERMANN, INC. $825,162 · | ||
| Jul 31, 2026 | 76V11 | MadisonDistrict 8 | 13 miles of pavement patching on IL 140 from Hamel to Alhambra and on IL 4 from IL 143 to south of US 40. | — | Executed | Kinney Contractors, Inc. $951,953 · | ||
| Jul 31, 2026 | 76V21 | BondDistrict 8 | 7.8 miles of chip seal with fog seal on IL 140 from Linder Boulevard in Greenville to the Fayette County line. | — | Executed | Evergreen Roadworks, LLC $622,539 · | ||
| Jul 31, 2026 | 76V22 | MadisonSt. ClairDistrict 8 | 2 miles of chip seal on IL 111 / Collinsville Road from 0.1 miles west of Roselake Drive to a joint east of Jondro Avenue in Fairmont City. | — | Executed | DMS Contracting, Inc. $899,907 · | ||
| Jul 31, 2026 | 78520 | JeffersonDistrict 9 | 4.4 miles of milling, resurfacing, crown and superelevation corrections, safety shoulders, earthwork and drainage improvements on IL 37 from south of SN 041-0032, carrying IL 37 over the Casey Fork, to Campground Road north of Bonnie. | — | Executed | E. T. Simonds Construction Company $9,952,613 · | ||
| Jul 31, 2026 | 78935 | JeffersonDistrict 9 | Removal and replacement of SN 041-0043 carrying IL 142 over an unnamed creek 1.8 miles south of Mt. Vernon. | — | Executed | E. T. Simonds Construction Company $1,269,718 · | ||
| Jul 31, 2026 | 78B60 | UnionDistrict 9 | 5.2 miles of patching, milling and resurfacing on IL 146 from IL 3 in Ware to IL 127 west of Jonesboro. | — | Executed | E. T. Simonds Construction Company $4,132,778 · | ||
| Jul 31, 2026 | 78B80 | FranklinDistrict 9 | 10.5 miles of tree trimming on IL 34 from Akin Blacktop to the Saline County line. | — | Executed | Mosley Construction 1, LLC $717,325 · | ||
| Jul 31, 2026 | 78C18 | JacksonWilliamsonDistrict 9 | 9.1 miles of tree planting along the Crab Orchard Greenway multi-use path and the Wolf Creek Interchange. | — | Executed | CSD Environmental Services, Inc. $241,350 · | ||
| Jul 31, 2026 | 78C21 | VariousDistrict 9 | Repairing or replacing damaged guardrail, barrier terminals, impact attenuators, cable median barriers and fence on a workorder basis throughout District 9. | — | Executed | COLLINS & HERMANN, INC. $1,458,402 · | ||
| Jul 31, 2026 | 80B42 | VariousDistrict 1 | Repairing damaged concrete barrier wall, sound wall, bridge parapet, bridge fence railing, retaining wall, med This project consists of repairing damaged concrete barrier wall, sound wall, bridge parapet, bridge fence railing, retaining wall, median barrier gate system. Location is on various State maintained routes located in Various Counties throughout District 1. | — | Executed | D. Construction, Inc. $1,380,593 · | ||
| Jul 31, 2026 | 80B44 | CookDistrict 1 | Bridge deck scarification and latex concrete overlay, transverse joint repair at the north and south abutments (2,800-Ft) Bridge Overlay includes HMA resurfacing and patching consists of bridge deck scarification and latex concrete overlay, transverse joint repair at the north and south abutments, concrete pier repair, cleaning and adjusting deck drains, road surface removal, HMA overlay and paving, pavement patching, removal and replacement of combination curb and gutter, removal and replacement of guardrail, pavement markings. Located in the Village of Alsip, Cook County. | — | Executed | D. Construction, Inc. $2,052,202 · | ||
| Jul 31, 2026 | 80C87 | CookDistrict 1 | (HMA) overlay on PCC pavement with (HMA) binder and surface course, patching, resurfacing with (HMA) surface c (1,538-Ft) Standard Overlay consists of (HMA) overlay on PCC pavement with (HMA) binder and surface course, patching, resurfacing with (HMA) surface course and (HMA) binder course, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, pavement markings, raised reflective pavement markers. This project is located in the Village of Calumet Park, within Cook County. | — | Executed | Gallagher Asphalt Corporation $288,498 · | ||
| Jul 31, 2026 | 80D50 | CookDistrict 1 | Removing graffiti from the surfaces on State DOT right of way or other locations as directed by the Engineer GRAFFITI REMOVAL shall consist of removing graffiti from the surfaces on State DOT right of way or other locations as directed by the Engineer. Located on the Eisenhower (I-290) from Wells St to Mannheim Rd (US 45) in Cook County. | — | Executed | ERA-Valdivia Contractors, Inc. $2,425,000 · | ||
| Jul 31, 2026 | 85781 | Rock IslandDistrict 2 | PCC full-depth roadway construction extending Bend Blvd. from 3rd St. to 7th St. in the city of East Moline. | — | Executed | Miller Trucking & Excavating Company $6,393,210 · | ||
| Jul 31, 2026 | 91669 | EdgarDistrict 5 | HMA resurfacing of CH 4 from southeast of the city of Paris to E. 575th Rd. in Edgar County. | — | Executed | Evergreen Roadworks, LLC $2,189,996 · | ||
| Jul 31, 2026 | 92621 | SangamonDistrict 6 | 3.1 miles of additional lanes, noise wall, bridge demolition and pedestrian overpass on IL 97 / Jefferson Street from east of Lincoln Trail / North Old Covered Bridge Lane to 0.2 miles west of IL 4 (Veterans Parkway) in Springfield. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $36,568,681 · | ||
| Jul 31, 2026 | 93856 | MacoupinDistrict 6 | Construction of a three-span PPC deck beam bridge carrying CH 33 over Joe's Creek in Macoupin County. | — | Executed | C-Hill Civil Contractors, Inc. $1,021,148 · | ||
| Jul 31, 2026 | 93860 | MasonDistrict 6 | Cape seal resurfacing with an A-1 Bituminous Surface Treatment on CH 4 and CH 13 from Mason St. to the north city limit of Forest City. | — | Executed | A. C. Pavement Striping Co. $586,823 · | ||
| Jul 31, 2026 | 97866 | MonroeDistrict 8 | HMA roadway reconstruction of Ghent Rd. from Main St. to Christina Ct. in the city of Columbia. | — | Executed | Mayer Landscaping, Inc. $1,072,824 · | ||
| Jul 31, 2026 | 97878 | St. ClairDistrict 8 | Construction of a shared-use path along IL 4 from Onyx Dr. to Harnett St. in the city of Mascoutah. | — | Active | |||
| Jul 31, 2026 | 97902 | MarionDistrict 8 | HMA resurfacing from Westgate Ave. from US 50 to Whitaker St., Whitaker St. from Westgate Ave. to Delmar Ave. and Westgate Ave. from Whitaker St. to Mitchell St. in the city of Salem. | — | Executed | Howell Paving, Inc. $436,089 · | ||
| Jul 31, 2026 | 99774 | PerryDistrict 9 | Pipe culvert replacement and patching the roadway on Kathleen Rd. 1.1 miles south of IL 152. | — | Rejected | |||
| Jul 31, 2026 | 99775 | WilliamsonDistrict 9 | Resurfacing Bandyville Rd. from Stotlar Rd. to Crenshaw Rd. and Crenshaw Rd. from 0.3 mile west of Bandyville Rd. to Bandyville Rd. in the city of Herrin. | — | Executed | Samron Midwest Contracting, Inc. $693,605 · |
1–73 of 73
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.