IDOT Jobs

All dates · 1,128 jobs · $1,342,730,000 Sign up free
★ My Jobs

Filtered by: District: District 3 Clear all

1,128 jobs · $1,342,730,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Apr 25, 2025 87881 LaSalleDistrict 3 Sidewalk removal and replacement at various locations in Mendota. — Executed Nov 25 New D. Construction, Inc. $247,455 ·
Jun 13, 2025 46937 LaSalleDistrict 3 Roadway improvements (HMA resurfacing, A3 oil and chip, drainage improvements and other work) within Illini State Park (IDNR) in LaSalle County, IL. 1.6 miles gross length. — Executed Nov 25 New D. Construction, Inc. $1,632,707 ·
Jun 13, 2025 46941 LaSalleDistrict 3 PCC concrete patching of the parking lot at the lodge at Starved Rock State Park (IDNR) in LaSalle County, IL. — Executed Nov 25 New Advanced Asphalt Company $513,534 ·
Jun 13, 2025 66B58 FordDistrict 3 Spot improvement, drainage ditch approximately 3.7 miles south of IL 116 on IL 115. — Executed Nov 25 New Riber Construction, Inc. $1,643,145 ·
Jun 13, 2025 66F94 IroquoisDistrict 3 Bridge Deck Replacement for SN 038-0048 carrying IL 54 over I 57 at the interchange in Onarga. — Executed Nov 25 New Iroquois Paving Corporation $5,007,493 ·
Jun 13, 2025 66H59 IroquoisDistrict 3 7.7 gross miles of HMA milling and resurfacing, pavement patching, structure repairs, rest area repairs including: ADA ramps, curb and gutter repairs, pavement joint repairs, pavement marking, and raised reflectors on I-57 from the Buckley Interchange to the Ford County Line. — Executed Nov 25 New Iroquois Paving Corporation $30,611,903 ·
Jun 13, 2025 66K63 DeKalbDistrict 3 1370 ft of Superstructure Replacement (SN 019-0030) over Owens Creek, 1.3 miles west of Kirkland. — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $3,866,805 ·
Jun 13, 2025 66K71 BureauDistrict 3 Bridge replacement of SN 006-0089 and interchange lighting at IL-40 (overhead), 3.4 miles north of Buda. — Executed Nov 25 New D. Construction, Inc. $9,911,953 ·
Jun 13, 2025 66M23 IroquoisDistrict 3 Bridge replacements of SN 038-0151 and SN 038-0152 on FAI 57(I-57) over Louis Creek, 0.7 miles north of Buckley interchange. — Executed Nov 25 New Iroquois Paving Corporation $5,792,936 ·
Jun 13, 2025 66N05 LaSalleDistrict 3 Cleaning and painting all structural steel of two structures, Location 1: SN 050-0195 carrying US 6 over I-39, 2.7 mi. east of IL 351 near LaSalle; Location 2: SN 053-0181 carrying CH 19 (F.A.S. 270) over I-39, 2.3 mi. north of US 52. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $946,914 ·
Jun 13, 2025 66N36 LaSalleDistrict 3 Latex Overlay, Expansion Joints, and Deck Repairs to SN 050-0177/-0178 on I-39 at SN 050-0177/0178 carrying I-39 over I-80, 2.6 miles west of IL 178. — Executed Nov 25 New D. Construction, Inc. $3,715,629 ·
Jun 13, 2025 66P52 GrundyDistrict 3 Bridge Repairs TR 110 (SN 032-0077) over I-55 0.3 MI N of the Livingston County Line. — Executed Nov 25 New D. Construction, Inc. $952,217 ·
Jun 13, 2025 66P53 LaSalleDistrict 3 Bridge deck repairs,bridge deck latex overlay, pavement patching, and pavement marking replacement_on IL 23 in Ottawa. — Executed Nov 25 New D. Construction, Inc. $1,897,015 ·
Jun 13, 2025 66P54 LaSalleDistrict 3 Milling and resurfacing designed overlay of Il 251 including 4' safety shoulders, shoulder rumble strips, and centerline rumble strips from US 52 to the north limit. 10.99 miles gross. — Executed Nov 25 New Advanced Asphalt Company $6,445,788 ·
Jun 13, 2025 66R18 KankakeeDistrict 3 Centerline joint sealing, microsurfacing, shoulder widening and rumble strips on IL Route 17 at two locations, 1: beginning at the east approach of SN 046-0027 and ending 0.5 mi. east of 19000W Rd; 2: beginning 0.01 mi. west of 12000W Rd. and ending 0.11 mi. east of 5000W Rd. — Executed Nov 25 New Kankakee Valley Construction Company, Inc. $1,599,488 ·
Jun 13, 2025 66R32 BureauDistrict 3 Staged construction of 13.54 miles of 2" milling and stone matrix asphalt surface paving on the I-80 driving and passing lanes between Princeton and Ladd. — Executed Nov 25 New Advanced Asphalt Company $17,962,555 ·
Jun 13, 2025 66R42 KankakeeDistrict 3 Traffic Signal Mast Arm Replacement at the intersections of US 45/US 52 and River Road and at US 45/ US 52 and South Tec Drive. — Active Nov 25 New Van-Mack Electric Co. $689,984 ·
Jun 13, 2025 66R45 VariousDistrict 3 Installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic control systems completed on a work order basis for repairs and maintenance activities. — Executed Nov 25 New Traffic Control and Protection LLC dba High Star Traffic $676,713 ·
Jun 13, 2025 66R47 LaSalleDistrict 3 Class A Pavement Patching and Cross Stitching on I-39 at US-52 interchange ramps. — Executed Nov 25 New G. M. Sipes Construction, Inc. $456,512 ·
Jun 13, 2025 66R51 BureauDistrict 3 Pollinator project will include herbicide, seeding, landscaping, and maintenance at the Great Sauk Trail Rest Area EB and WB on I-80 near mm 51. — Rejected Nov 25 New Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $468,223 ·
Jun 13, 2025 66R52 IroquoisDistrict 3 Class B pavement patching and other related construction work on Il Route 1 at the intersection of IL Route 1 and US Route 24 near Watseka and ending at the Vermilion County Line. — Executed Nov 25 New G. M. Sipes Construction, Inc. $680,867 ·
Jun 13, 2025 66R53 FordDistrict 3 Class B pavement patching and other related construction work on IL Route 47 beginning at the Champaign County Line to the intersection of IL Route 9/54 in Gibson City. 4.02 miles gross length. — Executed Nov 25 New G. M. Sipes Construction, Inc. $567,919 ·
Jun 13, 2025 66R54 FordDistrict 3 6.43 gross miles of Class A pavement patching and other related construction work on FAI 57 (I-57) beginning at the Champaign County Line to the Iroquois County Line. — Executed Nov 25 New G. M. Sipes Construction, Inc. $385,485 ·
Jun 13, 2025 66R57 FordDistrict 3 5.51 gross miles of Class B pavement patching and other related construction work on FAP 71A (IL 54) beginning at the Champaign County Line to the Intersection of IL Route 9/47. — Executed Nov 25 New G. M. Sipes Construction, Inc. $479,131 ·
Jun 13, 2025 66R71 VariousDistrict 3 One year contract to repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. — Executed Nov 25 New Northern Contracting, Inc. $1,878,255 ·
Jun 13, 2025 87855 BureauDistrict 3 HMA resurfacing with aggregate shoulders on CH 24 from US 34 to CH 9. — Executed Nov 25 New Advanced Asphalt Company $2,426,250 ·
Jun 13, 2025 87858 IroquoisDistrict 3 HMA Resurfacing with aggregate shoulders on CH 4 from the west village limits of Clifton to CH 24. — Executed Nov 25 New Iroquois Paving Corporation $1,783,862 ·
Jun 13, 2025 87860 KankakeeDistrict 3 Resurfacing CH 41 from the Will County line to South Street. — Executed Nov 25 New Kankakee Valley Construction Company, Inc. $580,188 ·
Jun 13, 2025 87863 DeKalbDistrict 3 Asphalt resurfacing of Barber Green Road, and four (4) multi-use trails at various locations in DeKalb County. Includes aggregate shoulders and PCC sidewalk. — Executed Nov 25 New Curran Contracting Company $868,058 ·
Jun 13, 2025 87874 KankakeeDistrict 3 Streetscaping improvements at various locations in Grank Park. — Executed Nov 25 New M & J Underground Inc. $2,806,802 ·
Jun 13, 2025 87882 LaSalleDistrict 3 Construction of a single-span PPC deck beam bridge to carry River Road over a drainage ditch, 0.7 miles west of IL 170 in Seneca. — Executed Nov 25 New D. Construction, Inc. $535,667 ·
Jun 13, 2025 87883 KankakeeDistrict 3 Construction of shared-use paths at various location in Bradley. — Executed Nov 25 New M & J Underground Inc. $327,924 ·
Jun 13, 2025 87884 LivingstonDistrict 3 Sidewalk construction at various locations in Dwight. — Rejected Nov 25 New D. Construction, Inc. $230,453 ·
Jun 13, 2025 87885 DeKalbDistrict 3 HMA resurfacing with 3' HMA safety shoulds on Somonauk Road from Chicago Road to US 30. — Executed Nov 25 New Curran Contracting Company $881,892 ·
Aug 1, 2025 66R72 VariousDistrict 3 Vegetation management control along various routes in DeKalb, Grundy, Iroquois, Kendall, LaSalle, Livingston, and Ford Counties. — Executed Nov 25 New Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $328,314 ·
Aug 1, 2025 66R73 VariousDistrict 3 Tree removal at various locations throughout the District. — Executed Nov 25 New Clean Cut Tree Service, Inc. $530,912 ·
Aug 1, 2025 87864 DeKalbDistrict 3 Traffic signal modernization at various locations in DeKalb County. — Executed Nov 25 New Helm Electric Facility Solutions, Inc. d/b/a Helm Electric $624,037 ·
Aug 1, 2025 87904 LaSalleDistrict 3 Construct PCC sidewalk at various locations in La Salle. Includes; ADA ramps, curb and gutter, and driveways. — Executed Nov 25 New Gensini Excavating, Inc. $340,268 ·
Sep 19, 2025 66295 GrundyDistrict 3 Railroad Separation Structure Replacement at WCL Railroad over I-80 (SN 032-9906) and Bridge Repair at Wabena Rd. over I-80 (SN 032-0065 in Kendall and Grundy Counties. — Executed Nov 25 New D. Construction, Inc. $14,268,635 ·
Sep 19, 2025 66R59 LaSalleDistrict 3 Scour mitigation by placing stone dumped riprap at both ends of the culvert and other related construction items at SN 050-2006 carrying IL 18 over Eagle Creek approximately 1.7 miles west of IL Route 23 near Streator. — Executed Nov 25 New D. Construction, Inc. $27,740 ·
Sep 19, 2025 66R60 BureauDistrict 3 Shoulder removal and replacement, concrete removal, remove and replace expansion bearings, expansion joint replacement at SN 006-0116 carrying Backbone Rd. over I-80, 1.8 miles west of IL Route 26 near Princeton. — Executed Nov 25 New Martin & Company Excavating $373,944 ·
Sep 19, 2025 66R62 LivingstonDistrict 3 Deck slab repairs (patching on the bridge deck and approach slabs) included in this work is structural concrete repairs to piers and debris removal on SN 053-0150 carrying IL Route 17 over the east branch of the Mazon River approximately 6.1 miles east of IL Route 47 in Livingston County. — Executed Nov 25 New Tobey's Construction & Cartage, Inc. $255,575 ·
Sep 19, 2025 66R70 LivingstonDistrict 3 Scour mitigation by placing stone dumped riprap and other related construction items at SN 053-0011 carrying OR 66 over Wolf Creek approximately 5.15 miles northeast of IL Route 23 near Pontiac. — Executed Nov 25 New Tobey's Construction & Cartage, Inc. $64,451 ·
Sep 19, 2025 87846 KendallDistrict 3 Convert the intersecton of Wolf's Crossing Road and Douglas Road to a roundabout. Includes; full depth HMA paving, drainage improvements, detention pond grading, culverts, multi-use path and sidewalks. — Executed Nov 25 New D. Construction, Inc. $10,727,441 ·
Sep 19, 2025 87871 LaSalleDistrict 3 Sidewalk construction at various locations in Oglesby. — Executed Nov 25 New D. Construction, Inc. $283,773 ·
Nov 7, 2025 87843 DeKalbDistrict 3 Construction of HMA multi-use trail from Old Mill Park to Pleasant Street in Sycamore. Includes a prefabricated pedestrian bridge with boardwalk and concrete approach pavement, storm sewer, and signage. — Executed Nov 25 New Martin & Company Excavating $1,580,482 ·
Nov 7, 2025 87889 DeKalbDistrict 3 Construct a three-span PPC deck beam bridge to carry Pratt Road over Somonauk Creek in Sandwich. — Executed Nov 25 New D. Construction, Inc. $1,441,346 ·
Nov 7, 2025 87890 FordDistrict 3 Replace the bridge carrying Clarence Road over Sugar Creek, 0.01 mile south of IL 9 — Executed Nov 25 New Tobey's Construction & Cartage, Inc. $679,036 ·
Nov 7, 2025 87891 FordDistrict 3 Replace the bridge carrying Gallahue Road over an un-named stream, 0.1 mile northeast of N 1200 E Road. — Executed Nov 25 New Tobey's Construction & Cartage, Inc. $637,458 ·
Jan 16, 2026 66D52 LivingstonDistrict 3 8.78 miles gross of HMA designed overlay and installation of four foot HMA safety shoulders along with edge line rumble strips on IL 17 in Livingston County. — Executed Nov 25 New Kankakee Valley Construction Company, Inc. $7,195,925 ·
Jan 16, 2026 66N78 BureauDistrict 3 5.8 miles of milling and resurfacing 3 3/4" (designed overlay) for IL 29/26 and milling 3 1/2", resurfacing 3 3/4" (designed overlay) for SBI 29; additional work includes ditch cleaning, pipe culvert replacement, guardrail as applicable, pavement marking, and raised reflective pavement markers. This is located on FAS 318 (IL 29), SBI 29 A (IL 29), FAS 2245 (IL 29/26), starting at the Putnam County line and_ending south of Kansas St. in Bureau Junction, and on SBI 29 (OR 29), from IL 29 to dead e — Executed Nov 25 New Advanced Asphalt Company $4,503,804 ·
Jan 16, 2026 66R21 LaSalleDistrict 3 Bridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures: SN's 050-0077 and 050-0078 carrying IL Route 251 over I-80 in LaSalle County. — Executed Nov 25 New D. Construction, Inc. $1,801,296 ·
Jan 16, 2026 66R58 LivingstonDistrict 3 Removing existing dual CMP culverts at three locations and replacement with a precast concrete box culvert, ditch cleaning, pavement removal and replacement, landscaping and other related construction work on IL Route 116 beginning approximately 138 feet west of N. 1450 Rd and ending approximately 170 feet east of 1304 W. Reynolds St. in Pontiac. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $686,220 ·
Jan 16, 2026 66R74 VariousDistrict 3 Application of growth regulator and broadleaf herbicide chemicals to vegetation within the "Safety Zone" along_shoulders of District 3 Interstate Routes and ramps, including I-80, I-180, I-55, I-39, and I-57 within the counties of Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford. — Executed Nov 25 New ALLEN CHASE ENTERPRISES INC. $147,145 ·
Jan 16, 2026 66R77 VariousDistrict 3 Bridge Deck Concrete Sealing with the parapets/curbs on various routes at various locations throughout Dekalb, Grundy, Kendall and Lasalle Counties. — Executed Nov 25 New M & M Concrete, Inc. $195,933 ·
Jan 16, 2026 66R83 LaSalleDistrict 3 Milling and resurfacing, patching, pavement striping, pavment markers, and other related construction work on FAU_Route 6081 north of I-80 in Peru beginning at Il Route 251 and ending at Airport Rd; also on Charles St adjacent to east 3rd Rd in Lasalle County. — Executed Nov 25 New Advanced Asphalt Company $836,744 ·
Jan 16, 2026 66R85 LaSalleDistrict 3 Filling existing shoulder inlets, paved shoulder removal and replacement with PCC shoulders and concrete curbs, pipe drain removal, riprap installation Class A Patching (Special) and other related construction work on FAI 39 north and south of SNs 050-0167 and 050-0168 over the Chicago and Northwestern Railroad. — Executed Nov 25 New D. Construction, Inc. $333,979 ·
Jan 16, 2026 66R89 KendallDistrict 3 Cleaning and painting steel bridge, pavement striping, and traffic control at SN 047-0052 carrying US Route 52 over Roods Creek in Kendall County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $118,285 ·
Jan 16, 2026 66R90 DeKalbDistrict 3 Cleaning and painting steel bridge, pavement striping, and traffic control at SN 019-0012 carrying IL Route 64 over S. Branch Kishwaukee River in Dekalb County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $132,665 ·
Jan 16, 2026 66R91 BureauDistrict 3 Cleaning and painting all structural steel, pavement striping, and traffic control of SN 019-0012 carrying IL Route 92 over a branch of Masters Creek in Bureau County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $118,396 ·
Jan 16, 2026 66T16 GrundyDistrict 3 0.60 miles of seeding, Minooka Rd to Aux Sable Creek. — Executed Nov 25 New Central Landscaping, LP $117,275 ·
Feb 27, 2026 66N22 KendallDistrict 3 Plug and abandon existing culvert (SN 047-2514) carrying IL 71 over a stream located 0.1 miles SW of Fennel Rd in Newark, IL and replace nearby side road culvert, culvert lining, and ditch re-grading. — Executed Nov 25 New D. Construction, Inc. $199,416 ·
Feb 27, 2026 66P67 LaSalleDistrict 3 Milling and resurfacing 3 3/4" (designed overlay)_on FAP 587 (US 34) beginning 0.6 mile east of I-39 and ending at E 12th Road in Earlville. Additional work includes micro-surface with high friction aggregate and sinusoidal rumble strips in the curves, ditch cleaning, culvert cleaning, and end section replacements, pavement marking, and raised reflective pavement markers. 7.07 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $3,606,240 ·
Feb 27, 2026 66R39 KankakeeDistrict 3 Routing and filling primarily longitudinal but includes transverse as needed from the intersection of IL 17 and IL 1 continuing south on IL 1 to the north city limits of St. Anne, IL. 6.76 gross miles. — Executed Nov 25 New Freehill Asphalt, Inc. $39,585 ·
Feb 27, 2026 66R41 FordDistrict 3 Crack sealing on ILL 47 in Gibson City to 900E Rd, and IL 115 to Baltimore Dr in Paxton. 7.97 gross miles. — Executed Nov 25 New Freehill Asphalt, Inc. $57,066 ·
Feb 27, 2026 66R92 BureauDistrict 3 Cleaning and painting structural steel, pavement striping, and traffic control at SN's 006-0055, 006-0057, and 006-0058 on I-180 in Bureau County. — Executed Nov 25 New Venus Painting Co. $1,595,710 ·
Feb 27, 2026 66R93 LivingstonDistrict 3 Cleaning and painting all structural steel and_non- structural steel components of Structure No. 053-0164 carrying IL Route 170 over Mud Creek approximately 0.95 mi north of IL Route 23 in Livingston County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $114,382 ·
Feb 27, 2026 66R94 GrundyDistrict 3 Cleaning and painting all structural steel and non-structure_steel components on Structure No. 032-0092 carrying Carbon Hill Rd. over I-55 approximately 4.8 miles south of Reed Rd in Grundy County. — Rejected Nov 25 New Civil Coatings and Construction Inc. $356,186 ·
Feb 27, 2026 66R95 BureauDistrict 3 cleaning and painting all structural steel and non-structural steel components of Structure No. 006-0135 carrying US-34 over Burlington Northern Railroad approximately 1.1 mi. northeast of ILL 26 in Bureau County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $389,686 ·
Feb 27, 2026 66T02 IroquoisDistrict 3 Cleaning and painting all structural steel and_non-structural steel components of Structure No. 038-0198 carrying IL Route 49 over Little Mud Creek approximately 2.6 mi. north of Cissna Park in Iroquois County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $133,444 ·
Feb 27, 2026 66T06 BureauDistrict 3 Cleaning and painting all structural steel and non-structural steel of SN's: 006-0156 carrying IL 40 over Hickory Creek, 3.5 mi. north of I-80, and 006-0157 carrying IL 40 over a drainage ditch, 3.0 mi. north of I-80. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $181,661 ·
Feb 27, 2026 87886 BureauDistrict 3 A-1 Bituminous Surface Treatment on Cleveland Street from IL 89 to the BNSF Railroad in the Village of Ladd. — Executed Nov 25 New Universal Asphalt & Excavating, Inc. $137,248 ·
Feb 27, 2026 87910 LaSalleDistrict 3 HMA resurfacing of CH 29 from IL 18 to CH 64 in LaSalle County. Additionally includes HMA shoulders, aggregate shoulders and other required work. — Executed Nov 25 New Advanced Asphalt Company $1,225,765 ·
Apr 24, 2026 46671 VariousDistrict 3 Repairing various widths of pavement marking including lines, letters, numbers, and symbols on various highways, freeways, and expressways throughout District 3. — Executed Nov 25 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,689,828 ·
Apr 24, 2026 66M03 BureauDistrict 3 Bridge Deck Replacement (SN 006-0090) over the Hennepin Canal 0.4 Mi south of I-80 in Bureau County. — Executed Nov 25 New D. Construction, Inc. $1,719,727 ·
Apr 24, 2026 66M55 LaSalleDistrict 3 Bridge Replacement (SN 050-0033) over the Fox River in Ottawa IL and milling and resurfacing to US 6. 1.75 miles gross length. — Executed Nov 25 New D. Construction, Inc. $20,377,827 ·
Apr 24, 2026 66N58 GrundyDistrict 3 Rehabilitation of SN 032-0025, carrying US 6 over Aux Sable Creek in Grundy County. — Executed Nov 25 New D. Construction, Inc. $1,596,194 ·
Apr 24, 2026 66P68 IroquoisDistrict 3 A SMART resurfacing along with an experimental mix design of the eastbound lane 6.04 mi of 1.5" milling and hot-mix asphalt surface course pavement rehabilitation and minor drainage repairs including culvert work on Old Route 24 and ADA sidewalk ramp improvements. Project consists of a SMART resurfacing along with an experimental mix design of the eastbound lane. — Executed Nov 25 New Iroquois Paving Corporation $2,884,241 ·
Apr 24, 2026 66P86 BureauDistrict 3 5.75 miles of milling and HMA resurfacing of US 6/34 with 3-4 foot aggregate wedge shoulders when curb and gutter is not present, ADA ramp, and other minor drainage improvements. Located on US 6/34 from 175 ft. east of Hazelwood Dr. in Wyanet to 90 ft. west of Main St. in Princeton, within Bureau County. — Executed Nov 25 New Advanced Asphalt Company $4,400,787 ·
Apr 24, 2026 66R50 IroquoisDistrict 3 Milling and resurfacing (designed overlay) with new shoulders and rumble strip. Additional work includes patching, ditch cleaning, drainage improvements, pavement marking, and rest area milling and resurfacing on US-52 from approximately 200' east of US-45 and IL-49 to approximately 1 mile west of IL-1 in Iroquois County. 5.98 miles gross length. — Executed Nov 25 New Iroquois Paving Corporation $6,694,992 ·
Apr 24, 2026 66R61 IroquoisDistrict 3 Scour repair, Deck/Approach, patching, Joint replacement, Slope wall repair and extending deck drains at structure No. 038-0037 carrying US Route 24 over Raymond Creek 2.65 miles east of IL 1 in Iroquois County. — Executed Nov 25 New Iroquois Paving Corporation $434,116 ·
Apr 24, 2026 66R63 BureauDistrict 3 Joint replacement, Deck patch, approach repairs, Beam end repairs, bearing retainer and paint, substructure and parapet repairs at structure SN 006-0149 carrying IL 92 over Bureau creek 1.6 miles west of US 34 in Bureau County. — Executed Nov 25 New D. Construction, Inc. $497,866 ·
Apr 24, 2026 66R64 LaSalleDistrict 3 Joint replacement, Deck patch, approach repairs, bearing retainer and paint, substructure repairs, Anti- Graffiti at structure No. 050-0218 carrying IL 351 over Lone Star Cement Railroad and structure No. 050-0019 carrying IL 351 over Lone Star Cement Railroad 2.0 miles South of US 6 in La Salle County. — Executed Nov 25 New D. Construction, Inc. $660,277 ·
Apr 24, 2026 66R66 FordDistrict 3 Joint replacement, deck patch, substructure repairs_at structure No: SN 027-0082 carrying IL 115 over Trib. Spring Creek 7.76 miles north of IL 9 and at structure No. 027-0083 carrying IL 115 E. Branch Vermilion_River in Ford County. — Executed Nov 25 New Iroquois Paving Corporation $483,342 ·
Apr 24, 2026 66R68 KankakeeDistrict 3 Joint replacement, bearing replacement, deck and approach patch, HMA shoulder and concrete repairs at structure No. 046-0021 carrying IL 1 over Trim Creek 0.2 miles west of Grant Park in Kankakee County. — Executed Nov 25 New Tobey's Construction & Cartage, Inc. $591,428 ·
Apr 24, 2026 66R69 BureauDistrict 3 Joint replacement, deck and approach patching at structure No. 006-0084 carrying IL 29 over Big Bureau Creek 0.1 miles south of IL 26 in Bureau County. — Executed Nov 25 New Gensini Excavating, Inc. $421,787 ·
Apr 24, 2026 66T17 KankakeeDistrict 3 Intermittent HMA milling and resurfacing, pavement marking, raised reflective markers, and detector loops on F Work consists of intermittent HMA milling and resurfacing, pavement marking, raised reflective markers, and detector loops on FAP 840 (IL-50) from north of US 45/52 to south of Brookmont Blvd and Indiana Ave to Fair St in Kankakee. 4.09 miles gross length. — Executed Nov 25 New Kankakee Valley Construction Company, Inc. $2,380,597 ·
Apr 24, 2026 66T25 BureauDistrict 3 Replacing the existing high mast tower lighting with 45 ft. light poles at I-180 and IL 26 interchanges of Exit 7 and Exit 12. — Executed Nov 25 New Helm Electric Facility Solutions, Inc. d/b/a Helm Electric $511,814 ·
Apr 24, 2026 66T58 LaSalleDistrict 3 Routing and filling the cracks along the centerline, significant transverse cracks and pavement markings along US 34 from 12th Rd. west of Earlville to west of the US 34 and IL 23 junction in LaSalle County. 6.44 miles gross length. — Executed Nov 25 New Complete Asphalt Service Co. $49,800 ·
Apr 24, 2026 87893 GrundyDistrict 3 Construct a three-span PPC deck beam bridge to carry Rice Road over East Fork Mazon River. Includes HMA approach, patching, guardrail and HMA Shoulders. — Executed Nov 25 New D. Construction, Inc. $2,879,699 ·
Apr 24, 2026 87899 KendallDistrict 3 Reconstruction of Ridge Road to an HMA four-lane from Holt Road to Black Road. Includes; curb and gutter, raised median, driveways, drainage improvements, traffic signals, and a shared-use path. — Executed Nov 25 New Austin Tyler Construction, Inc. $32,828,299 ·
Apr 24, 2026 87900 LivingstonDistrict 3 Resurfacing Kangley Road from the LaSalle County line to IL 17. — Executed Nov 25 New Kankakee Valley Construction Company, Inc. $805,843 ·
Apr 24, 2026 87907 GrundyDistrict 3 Sidewalk construction along East North Street, North Jackson Street, and East Washington Street in Gardner. — Executed Nov 25 New D. Construction, Inc. $163,783 ·
Apr 24, 2026 87909 LaSalleDistrict 3 Sidewalk construction and ADA ramps on various routes near Marseilles Elementary School in Marseilles. — Executed Nov 25 New Davis Concrete Construction Co. $274,017 ·
Jun 12, 2026 66A91 LaSalleDistrict 3 Pavement resurfacing on the I-80 and I-39 interchange entrance/exit ramps with minor rehabilitation and repair work at select structures, improvements to existing pipe and box culverts, slope and ditch grading, upgrading guardrails, impact attenuators, high tension cable barriers, and superelevation on FAI 80(I-80) from 0.1 miles east of IL-351 to 0.3 miles west of IL-178. Approximately 4.13 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $19,753,741 ·
Jun 12, 2026 66C06 GrundyDistrict 3 Milling and resurfacing 3 3/4 inches (designed overlay), class D patching, pipe culvert end section_replacements and cleaning, detector loop replacement, pavement marking, and raised reflective pavement markers on US 6 beginning at IL 47 in Morris, and ends 0.7 miles west of Nigas Road._Approximately 6.81 miles gross length. — Executed Nov 25 New D. Construction, Inc. $4,185,244 ·
Jun 12, 2026 66K39 FordDistrict 3 Improvements to a dual structure (SN 027-0052 and 027-0053) which carries Interstate 57 (I-57) over Big Four Ditch about 2.4 miles south of IL 9 in Ford County. — Executed Nov 25 New Stark Excavating, Inc. $19,725,609 ·
Jun 12, 2026 66M84 LaSalleDistrict 3 Removal of the existing box culvert (SN 050-2546) and replacement with 2-42" EQRS 42" culverts on US 34 over Mendota Creek Tributary, approximately 4.1 miles west of I-39 in Mendota in LaSalle County. Approximately 259 feet gross length. — Executed Nov 25 New D. Construction, Inc. $443,941 ·
Jun 12, 2026 66M92 LivingstonDistrict 3 Culvert replacements (SN 053-2588 and -2589) over an Indian Creek Tributary 1 miles north of Ford County Line and 0.2 mile north of N200N Rd in Strawn. — Executed Nov 25 New Iroquois Paving Corporation $705,367 ·
Jun 12, 2026 66N45 BureauDistrict 3 Superstructure replacement (SN 006-0112) at CH 8 (Overhead), 2 miles north of US 6 on I-80. — Executed Nov 25 New D. Construction, Inc. $2,414,143 ·
801–900 of 1,128‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.