Filtered by: District: District 3 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 66C84 | FordDistrict 3 | Bridge Replacement (SN 027-0012) over Big Four Ditch, 3.0 miles south of IL 9. | — | Executed | Tobey's Construction & Cartage, Inc. $1,511,121 · | ||
| Jan 19, 2018 | 66D34 | FordDistrict 3 | Removal of existing double box culvert to be replaced by a double 8'x5' precast box culvert located on IL 47, 1.6 miles north of IL 9 in Gibson City. | — | Executed | Tobey's Construction & Cartage, Inc. $327,585 · | ||
| Jan 19, 2018 | 66H10 | BureauLaSalleDistrict 3 | "On Call" repair and maintenance of traffic signals, flashing beacons and roadway lighting throughout District 3. | — | Executed | Meade Inc. $88,323 · | ||
| Jan 19, 2018 | 66H60 | GrundyDistrict 3 | Remove Ash trees for Emerald Ash Borer control along I-80 and I-55 in Grundy County. | — | Executed | LaJobie Mosley d/b/a Lion Construction 1 LLC $107,383 · | ||
| Jan 19, 2018 | 66H69 | VariousDistrict 3 | Sealing Bridge decks parapets/curbs on numerous structures on various routes throughout DeKalb, Kendall, Grundy, and LaSalle Counties. | — | Executed | All States Painting, Inc. $196,850 · | ||
| Jan 19, 2018 | 66H74 | BureauDistrict 3 | Cleaning and painting bridge SN 006-0115 carrying CH 10 over I-80, 1.25 miles east of the Henry County line. | — | Executed | ERA-Valdivia Contractors, Inc. $271,374 · | ||
| Jan 19, 2018 | 66H75 | BureauDistrict 3 | Cleaning and painting bridge SN 006-0124 carrying TR 188 over I-80, 4.3 miles west of IL 26 in Bureau County. | — | Executed | ERA-Valdivia Contractors, Inc. $211,120 · | ||
| Jan 19, 2018 | 66H77 | BureauDistrict 3 | Cleaning and painting bridge SN 006-0131 carrying CH 27 over I-80, 0.5 mile west of I-180. | — | Executed | ERA-Valdivia Contractors, Inc. $212,380 · | ||
| Jan 19, 2018 | 66H78 | BureauDistrict 3 | Cleaning and painting bridge SN 006-0132 carrying East Road/CH 19 over I-80, 3 miles east of I-180. | — | Executed | ERA-Valdivia Contractors, Inc. $211,130 · | ||
| Jan 19, 2018 | 66H79 | BureauDistrict 3 | Cleaning and painting structural steel on SN 006-0097 carrying IL 92 over Green River, 1.4 miles west of IL 40. | — | Executed | ERA-Valdivia Contractors, Inc. $197,620 · | ||
| Jan 19, 2018 | 66H84 | GrundyDistrict 3 | Washing and concrete sealing bridge SN 032-0099 carrying IL 47 over the Illinois River and the I and M canal, 1.2 mies south of US 6. | — | Executed | M & M Concrete, Inc. $53,993 · | ||
| Jan 19, 2018 | 66H85 | LaSalleDistrict 3 | Washing and concrete sealing bridge SN 050-0246 carrying IL 170 over the Illinois River and River Road, 1.4 miles south of US 6. | — | Executed | M & M Concrete, Inc. $43,989 · | ||
| Jan 19, 2018 | 66H86 | LaSalleDistrict 3 | Washing and concrete sealing bridge SN 050-0219 carrying CH 15 over the Illinois River, 0.41 miles south of US 6. | — | Executed | M & M Concrete, Inc. $43,996 · | ||
| Jan 19, 2018 | 66H87 | LaSalleDistrict 3 | Washing and concrete sealing bridge SN 050-0180 carrying IL 23/71 over the Illinois River and Access Rd., 1 mile south of US 6. | — | Executed | M & M Concrete, Inc. $49,999 · | ||
| Jan 19, 2018 | 66H89 | LaSalleDistrict 3 | Washing and concrete sealing bridge SN 050-0237 carrying IL 351 over the Illinois River, 1.2 miles south of US 6. | — | Executed | M & M Concrete, Inc. $42,999 · | ||
| Jan 19, 2018 | 66H90 | LaSalleDistrict 3 | Washing and concrete sealing bridge SN 050-0079 carrying IL 251 over the Illinois River, Water Street, Iowa Interstate Railroad and Illinois Railway, 0.26 mile south of US 6. | — | Executed | M & M Concrete, Inc. $48,000 · | ||
| Jan 19, 2018 | 66H94 | IroquoisDistrict 3 | Routing and crack sealing 15.94 miles on I-57 from Gilman to Ashkum. | — | Executed | Freehill Asphalt, Inc. $65,778 · | ||
| Jan 19, 2018 | 66H99 | KankakeeLivingstonDistrict 3 | Removal, replacement and rewiring of light towers, light poles and their foundations at 2 locations in Livingston County and at 1 location in Kankakee County. | — | Executed | Bodine Electric of Decatur $770,899 · | ||
| Jan 19, 2018 | 87675 | BureauDistrict 3 | Resurfacing from the Henry County line to the corporate limits of New Bedford. | — | Executed | Advanced Asphalt Company $1,194,338 · | ||
| Jan 19, 2018 | 87681 | LivingstonDistrict 3 | Cleaning and repainting of the soffit, fascia, and exterior wood parts, and cleaning and tuck pointing on the historic Dwight train depot in the Village of Dwight. | — | Rejected | D. Construction, Inc. $103,093 · | ||
| Mar 9, 2018 | 66H18 | LaSalleDistrict 3 | 4.29 miles of shoulder widening and rumble strips on IL 71 from just east of the Vermilion River in Jonesville to E 950th Road. | — | Executed | Advanced Asphalt Company $788,416 · | ||
| Mar 9, 2018 | 66H76 | IroquoisDistrict 3 | Clean and paint bridge SN 038-0132 carrying CR 1100 North over I-57, 4.67 miles south of the Onarga interchange. | — | Executed | Venus Painting Co. $190,690 · | ||
| Mar 9, 2018 | 66H82 | BureauDistrict 3 | Clean and paint bridge SN 006-0138 carrying IL 40 over BNSF Railway, 2.7 miles south of US 6/34 | — | Executed | ERA-Valdivia Contractors, Inc. $96,405 · | ||
| Mar 9, 2018 | 66H95 | BureauDistrict 3 | Centerline crack and joint sealing on I-80 from 0.7 mile east of I-180 to west of IL 89. | — | Executed | Complete Asphalt Service Co. $65,466 · | ||
| Mar 9, 2018 | 66H96 | LaSalleDistrict 3 | Centerline crack and joint sealing on I-80 from the Fox River Bridge, north of Ottawa to west of CH 15 interchange north of Marseilles. | — | Executed | Countryman, Inc. $52,145 · | ||
| Mar 9, 2018 | 66H97 | IroquoisDistrict 3 | Microsurfacing along centerline on northbound and southbound lanes of I-57 from 0.6 mile north of IL 116 to north of Clifton. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $224,654 · | ||
| Mar 9, 2018 | 66J03 | LaSalleDistrict 3 | Intermittent class A patching on I-39 from I-80 to 0.3 mile south of Lee County Line. | — | Executed | G. M. Sipes Construction, Inc. $356,097 · | ||
| Mar 9, 2018 | 87611 | GrundyDistrict 3 | New sidewalk construction and replacing existing sidewalks at various locations in the Village of South Wilmington. | — | Rejected | D. Construction, Inc. $284,602 · | ||
| Mar 9, 2018 | 87672 | BureauDistrict 3 | Bridge replacement located 3.5 miles northwest of Sheffield over Smith Ditch. | — | Executed | Curnyn Construction Co. $231,566 · | ||
| Mar 9, 2018 | 87677 | DeKalbDistrict 3 | Resurfacing with median replacement, sidewalk and ADA curb ramps on Barber Green Road from Illinois Route 23 to Peace Road. | — | Executed | William Charles Construction Company, LLC $1,070,502 · | ||
| Mar 9, 2018 | 87679 | LaSalleDistrict 3 | Reconstruction of FAU 6031 (4H Road) from 370 feet west of Ashbury Way to Adams Street in the City of Ottawa. | — | Executed | Advanced Asphalt Company $985,152 · | ||
| Mar 9, 2018 | 87683 | LaSalleDistrict 3 | Remove and replace both piers underneath the structure carrying CH 3 over the Fox River, 0.1 miles northwest of Millington. | — | Executed | D. Construction, Inc. $1,521,358 · | ||
| Mar 9, 2018 | 87684 | DeKalbDistrict 3 | Resurfacing with shoulder work and pavement markings on Rich Road from Glidden Road to North 1st Street, Coltonville Road from North 1st Street to IL 23, North 1st Street at Coltonville Road, and Bethany Road from 0.3 mile west of IL 23 to IL 23, within the cities of Dekalb and Sycamore. | — | Executed | William Charles Construction Company, LLC $890,772 · | ||
| Apr 27, 2018 | 66D65 | KankakeeDistrict 3 | 1.88 miles of 3P milling and resurfacing, 0.5 mile north of St George Road to 0.2 mile north of I-57 in Bradley. | — | Executed | Gallagher Asphalt Corporation $1,776,000 · | ||
| Apr 27, 2018 | 66E24 | IroquoisDistrict 3 | Replace bridge SN 038-0116 carrying Us 45/52 over Langan Creek Tributary, 3 miles east of Clifton. | — | Rejected | Iroquois Paving Corporation $1,085,786 · | ||
| Apr 27, 2018 | 66H70 | BureauDistrict 3 | Intall 6.1 miles of high tensin cable median barrier on I-80 from 0.42 mile west of 600 E Street to the 1200 E Street overpass. | — | Executed | Access Control Company, Inc. $700,595 · | ||
| Apr 27, 2018 | 66H80 | DeKalbDistrict 3 | Clean and paint bridge SN 019-0012 carrying IL-64 over the Kishwaukee River, 1.5 miles west of IL 23 near Sycamore. | — | Rejected | |||
| Apr 27, 2018 | 66H93 | DeKalbDistrict 3 | Install flashing red beacon at each Stop Controlled Approach to the intersection of IL 23 and Chicago Road, and install flashing yellow beacon at the Advanced Intersection Warning Signs on the free flow state route. | — | Executed | Thorne Electric, Inc. $46,345 · | ||
| Apr 27, 2018 | 66H98 | KankakeeDistrict 3 | Microsurfacing along centerline on northbound and southbound lanes of I-57 from north of IL 50 interchange to the Will County line. | — | Executed | A. C. Pavement Striping Co. $464,795 · | ||
| Apr 27, 2018 | 66J18 | GrundyLivingstonDistrict 3 | 2 applications of spary mixtures, spring and summer of 2018, along various routes in Grundy and Livingston /counties. | — | Executed | Endrizzi Contracting, Inc $109,840 · | ||
| Apr 27, 2018 | 87664 | DeKalbDistrict 3 | Widening, traffic signals and intersection lighting on Annie Glidden Road at Fairview Drive in the City of DeKalb. | — | Executed | Curran Contracting Company $1,112,234 · | ||
| Apr 27, 2018 | 87676 | KankakeeDistrict 3 | Resurfacing on CH 37 from 2500 East Road to 4000 East Road. | — | Executed | Kankakee Valley Construction Company, Inc. $280,860 · | ||
| Apr 27, 2018 | 87678 | LaSalleDistrict 3 | Resurfacing Commercial Street from Walbridge Creek to Spicer Street in the City of Marseilles. | — | Executed | Advanced Asphalt Company $133,812 · | ||
| Apr 27, 2018 | 87685 | DeKalbDistrict 3 | Construction of a multi-use trail along the north side of Kishwaukee River from Brickville Road to Main Street and along the west side of Main Street from the South Branch/East Branch of the Kishwaukee River north to Maplewood Drive. | — | Executed | Elliott and Wood, Inc. $522,683 · | ||
| Jun 15, 2018 | 46490 | BureauLaSalleDistrict 3 | Remove and replace Raised Reflective pavement markers and reflectors on various routes in District 3. | — | Executed | P & P Construction Co. $125,628 · | ||
| Jun 15, 2018 | 46491 | DeKalbKendallLaSalleDistrict 3 | Remove and replace raised reflective pavement markers and reflectors on various routes in District 3. | — | Executed | Countryman, Inc. $129,404 · | ||
| Jun 15, 2018 | 46501 | FordIroquoisLivingstonDistrict 3 | Remove and replace raised reflective pavement markers and reflectors on various routes in District 3 | — | Rejected | ROADSAFE TRAFFIC SYSTEMS, INC. $257,475 · | ||
| Jun 15, 2018 | 66838 | KendallDistrict 3 | 14,902 feet of milling and resurfacing on IL 25 from Kane County line to Waubon see Creek in Oswego. Includes mailbox turnouts, entrances, ADA improvements, and incidental HMA. | — | Executed | D. Construction, Inc. $706,092 · | ||
| Jun 15, 2018 | 66A21 | BureauDistrict 3 | Remove structure SN 006-0106 and replace with a 70' 3-span structure to carry IL 89 over Brush Creek, 1.2 miles south of Arlington. | — | Executed | D. Construction, Inc. $1,045,173 · | ||
| Jun 15, 2018 | 66B64 | LivingstonDistrict 3 | 6.01 miles of rubblization, pavement reconstruction and structure repairs on I-55 from 1.7 miles south of IL 116 to 0.6 mile north of IL 23 at Pontiac. | — | Executed | Kankakee Valley Construction Company, Inc. $40,969,992 · | ||
| Jun 15, 2018 | 66D24 | KendallDistrict 3 | Reconstruct IL 71 to 4 lanes with a 22' median from IL 47 to IL 126 (1.7 miles) includes replacement of all drainage structures, installation of traffic signals and relocation of water main and sanitary sewer. | — | Executed | D. Construction, Inc. $12,531,371 · | ||
| Jun 15, 2018 | 66D75 | LaSalleDistrict 3 | 9.518 miles of 3P milling and resurfacing on IL 23, from south of McKinley Road to north of Richards Road near Streator. | — | Executed | Advanced Asphalt Company $4,570,417 · | ||
| Jun 15, 2018 | 66E52 | KendallDistrict 3 | 8,997 feet of 3P milling and resurfacing on IL 31, including sideroads, entrances and ADA work, 0.9 miles south of the Kane county line to US 34 in Oswego. | — | Executed | D. Construction, Inc. $891,868 · | ||
| Jun 15, 2018 | 66H25 | GrundyDistrict 3 | Repair SN 032-0082 and 0083 carrying I-55 over Gooseberry Creek, 1 mile east of IL 47. | — | Executed | D. Construction, Inc. $729,600 · | ||
| Jun 15, 2018 | 66H28 | LivingstonDistrict 3 | Repair SN 053-0120 and 0121 carrying I-55 over Rooks Creek, 1.1 miles north of the McLean County Line. | — | Executed | Tobey's Construction & Cartage, Inc. $764,029 · | ||
| Jun 15, 2018 | 66H61 | LaSalleDistrict 3 | 7,541 feet of milling and resurfacing, mailbox turnouts and entrances on IL 71 south of I-80 overpass to 0.2 mile north of US 6. | — | Executed | Advanced Asphalt Company $448,901 · | ||
| Jun 15, 2018 | 66H67 | VariousDistrict 3 | One year contract to furnish all labor, equipment and materials necessary to repair damaged guardrail, fence, attenuators, high tension cable median barriers, and other incidentals on work order basis throughout District 3. | — | Executed | Northern Contracting, Inc. $1,392,064 · | ||
| Jun 15, 2018 | 66H68 | DeKalbKendallDistrict 3 | Guardrail end section replacement on various routes in DeKalb and Kendall Counties. | — | Rejected | Curran Contracting Company $1,677,677 · | ||
| Jun 15, 2018 | 66H71 | KankakeeDistrict 3 | 2 miles of shoulder widening and rumble strips on IL 50 fr 0.45 mile north of 6000N Road to 0.11 mile north of 2000E Road. | — | Executed | Kankakee Valley Construction Company, Inc. $606,504 · | ||
| Jun 15, 2018 | 66H73 | FordDistrict 3 | 4.67 miles of shoulder widening and rumble strips on IL 9 from N 2300E Road to N 2800E Road. | — | Executed | Iroquois Paving Corporation $1,025,141 · | ||
| Jun 15, 2018 | 66J02 | LivingstonDistrict 3 | Various repairs to SN 053-0066 carrying IL 116 over Turdey Creek, 1.1 miles east of I-55. | — | Executed | Tobey's Construction & Cartage, Inc. $374,127 · | ||
| Jun 15, 2018 | 66J05 | BureauDistrict 3 | Installation of 5.82 miles of high tension cable median barrier on I-80, from the 2750E Road overpass to the IL 89 overpass. | — | Executed | COLLINS & HERMANN, INC. $763,936 · | ||
| Jun 15, 2018 | 66J06 | KankakeeDistrict 3 | Installation of 4.05 miles of high tension cable median barrier on I-57 from just north of Minnie Creek to 0.2 miles north of River Road. | — | Executed | COLLINS & HERMANN, INC. $603,044 · | ||
| Jun 15, 2018 | 66J16 | BureauDistrict 3 | 6.16 miles of CL microsurfacing joint repair located 1.0 mile west of IL 26 to 0.6 mile east of I-80. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $374,648 · | ||
| Jun 15, 2018 | 66J17 | LaSalleDistrict 3 | Intermittent milling and resurfacing in various locations in LaSalle County. | — | Executed | Advanced Asphalt Company $980,140 · | ||
| Jun 15, 2018 | 66J21 | KankakeeDistrict 3 | 7.51 miles of intermittent resurfacing on I-57, from 0.7 mile north of Iroquois County line to south of the Kankakee River bridge. | — | Executed | Gallagher Asphalt Corporation $2,078,000 · | ||
| Jun 15, 2018 | 66J22 | BureauDistrict 3 | 8,606.4 feet of milling resurfacing and paving existing shoulders on IL 40 from I-80 to US 34/US 6. | — | Executed | Advanced Asphalt Company $393,341 · | ||
| Jun 15, 2018 | 66J25 | KankakeeDistrict 3 | Removal of 150 large trees and ground restoration along I-57. | — | Executed | Clean Cut Tree Service, Inc. $212,350 · | ||
| Jun 15, 2018 | 66J26 | BureauDeKalbDistrict 3 | Removal of 22 medium trees and 56 large trees, and ground restoration along I-80, IL 92, US 6, IL 72 and US 30. | — | Executed | Clean Cut Tree Service, Inc. $104,195 · | ||
| Jun 15, 2018 | 66J29 | BureauGrundyLaSalleDistrict 3 | Class A and Class B pavement patching and pavement marking on I-80 from the Henry/Bureau County line to the Grundy/Will County line. | — | Executed | D. Construction, Inc. $323,732 · | ||
| Jun 15, 2018 | 66J30 | LaSalleDistrict 3 | Class A pavement patching and pavement marking on I-39 from the Marshall/LaSalle County line to south of the Illinois River. | — | Executed | G. M. Sipes Construction, Inc. $200,881 · | ||
| Jun 15, 2018 | 66J31 | GrundyLivingstonDistrict 3 | Class A pavement patching and pavement marking from the McLean/Livingston County line to the Grundy/Will County line. | — | Executed | G. M. Sipes Construction, Inc. $722,218 · | ||
| Jun 15, 2018 | 66J32 | IroquoisKankakeeDistrict 3 | Class A, B and C pavement patching and pavement marking on I-57 from the Ford/Iroquois County line to the Kankakee/Will County line. | — | Executed | G. M. Sipes Construction, Inc. $1,023,232 · | ||
| Jun 15, 2018 | 87646 | FordDistrict 3 | Resurfacing FAS Route 1346 (CH 5) from 1200 E. Road to US 45. | — | Executed | Iroquois Paving Corporation $1,015,301 · | ||
| Jun 15, 2018 | 87654 | BureauDistrict 3 | Roadway reconstruction on FAU Route 5647 (Euclid Avenue) from Elm Place to Central Avenue in the city of Princeton. | — | Executed | Advanced Asphalt Company $2,350,963 · | ||
| Jun 15, 2018 | 87690 | BureauDistrict 3 | Crack filling on various routes in Bureau County. | — | Executed | Complete Asphalt Service Co. $96,600 · | ||
| Jun 15, 2018 | 87701 | LaSalleDistrict 3 | Widening and resurfacing CH32 from 0.25 mile west of East 27th Street Road to 0.25 mile east of East 27th Road. | — | Executed | D. Construction, Inc. $299,738 · | ||
| Aug 3, 2018 | 66H27 | BureauDistrict 3 | Repair SN 006-0045 and 006-0046 carrying I-180 over IL 26. | — | Executed | D. Construction, Inc. $535,864 · | ||
| Aug 3, 2018 | 66J33 | GrundyDistrict 3 | Class B patching on IL 47 and Class A and B patching on the entrance and exit ramps of the I-80 and IL 47 interchange. | — | Executed | D. Construction, Inc. $136,744 · | ||
| Aug 3, 2018 | 66J35 | LivingstonDistrict 3 | Class B patching on IL 17 from Waupansie Street to IL 47. | — | Executed | G. M. Sipes Construction, Inc. $94,034 · | ||
| Aug 3, 2018 | 66J39 | LaSalleDistrict 3 | 36.5 miles of weed spraying from the Marshall County line to the Lee County line. | — | Executed | Endrizzi Contracting, Inc $35,624 · | ||
| Aug 3, 2018 | 66J40 | BureauPutnamDistrict 3 | HMA wearing surface removal and replacement, and deck patching on the east bound lane of SN 078-001 carrying I-180 over the Illinois River. | — | Executed | D. Construction, Inc. $556,692 · | ||
| Aug 3, 2018 | 87642 | GrundyDistrict 3 | Rahabilitate the structure carrying Braceville Road over the Mazon river, 0.2 mile east of Gorman Road. | — | Executed | D. Construction, Inc. $984,309 · | ||
| Aug 3, 2018 | 87643 | GrundyDistrict 3 | Replace the bridge carrying Grand Ridge Road over Johnny Run, 0.65 mile east of Illinois Route 47. | — | Executed | Riber Construction, Inc. $793,264 · | ||
| Sep 21, 2018 | 66J47 | VariousDistrict 3 | On-Call tree removal along state maintained routes, district wide. | — | Executed | Homer Tree Service, Inc. $40,500 · | ||
| Nov 9, 2018 | 66956 | KankakeeDistrict 3 | Bridge replacement of SN 046-0081 with Sn 046-0150, CH8 (St. George Road) over I-57. | — | Executed | D. Construction, Inc. $4,251,258 · | ||
| Nov 9, 2018 | 66A57 | LaSalleDistrict 3 | Bridge replacement of SN 050-0052 with SN 050-0259 over the Little Vermilion River, 3.1 miles east of IL 251. | — | Executed | D. Construction, Inc. $1,569,242 · | ||
| Nov 9, 2018 | 66F12 | LaSalleDistrict 3 | Regrading a failed slope along IL 251 and stabilizing it with a soldier pile retaining wall. Work includes repairs to existing box culvert SN 050-8802. Project is located 2.1 miles south of I-80. | — | Executed | Rausch Infrastructure LLC_DO NOT USE $1,218,205 · | ||
| Nov 9, 2018 | 66H31 | LivingstonDistrict 3 | Class B patching (SPECIAL) and partial depth concrete and hot mix asphalt patching of historic concrete pavement on Old Route 66 from IL 116 to the Mclean County line. | — | Executed | Kinney Contractors, Inc. $640,392 · | ||
| Nov 9, 2018 | 66H50 | LivingstonDistrict 3 | 0.318 mile of pavement reconstruction, 1.7 miles south of IL 17 to 1.4 miles south of IL 17. | — | Executed | D. Construction, Inc. $2,821,316 · | ||
| Nov 9, 2018 | 66J49 | LivingstonDistrict 3 | Remove existing paved shoulders with curbs (HMA), earth excavation, granular subbase, contructing combination concrete curb and gutter, removal and replacement of all steel plate beam guardrail including terminals, erosion repairs, and other miscellaneous work. | — | Executed | Iroquois Paving Corporation $258,840 · | ||
| Nov 9, 2018 | 66J52 | VariousDistrict 3 | Sealing bridge decks with the parapets/curbs on numerous structures throughout LaSalle and Putnam Counties. | — | Executed | M & M Concrete, Inc. $143,000 · | ||
| Nov 9, 2018 | 66J60 | LaSalleDistrict 3 | Sparaying weeks along I-39 from the Marshal County line to the Lee County line. | — | Executed | The Daltons Inc. $34,988 · | ||
| Nov 9, 2018 | 87665 | KendallDistrict 3 | Replace the bridge carrying East Main Street over Big Rock Creek, located 0.20 miles north of US 34 in the City of Plano. | — | Executed | Riber Construction, Inc. $1,162,974 · | ||
| Nov 9, 2018 | 87686 | BureauDistrict 3 | Remove deteriorated wingwalls of the three-barrel box culvert and a portion of the box culvert ends and replace with permanent steel sheet pile wingwalls along with replacing the concrete on the culvert ends, located on FAS 247 (CH 31) at Crow Creek, 6.0 miles east of Bradford | — | Executed | Miller Trucking & Excavating Company $1,092,510 · | ||
| Jan 18, 2019 | 46503 | VariousDistrict 3 | Pavement marking grooving, placing thermoplastic, epoxy, polyurea, modified urethane, preformed plastic, and hot spray thermoplastic pavement marking lines, letter, numbers, and symbols and the removal of exiswting pavement markings within the limits specified. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,523,875 · | ||
| Jan 18, 2019 | 66C58 | LaSalleDistrict 3 | Removal and replacemnt of SN 050-0073 carrying IL 170 over the BNSF Railroad at the Village of Ransom. Work includes embankment, guardrail, landscaping, and pavement striping. | — | Executed | D. Construction, Inc. $3,144,188 · | ||
| Jan 18, 2019 | 66E75 | LaSalleDistrict 3 | Paching, milling, and resurfacing at various locations on IL 23/IL 71 from Freemont St. to 0.2 miles south of McKinley Rd., and 0.1 mile south of Lincoln Place. | — | Executed | Advanced Asphalt Company $4,638,064 · | ||
| Jan 18, 2019 | 66E99 | LaSalleDistrict 3 | 3P milling and resurfacing of US 6 from IL 178 to the west city limits of Ottawa. 7.11 miles. | — | Executed | Advanced Asphalt Company $2,864,832 · | ||
| Jan 18, 2019 | 66F57 | KankakeeDistrict 3 | Substructure widening and superstructure replacement on SN 046-0035, 0036 carrying IL 17 over Baker Creek. | — | Executed | Tobey's Construction & Cartage, Inc. $3,708,133 · |
1–100 of 1,128Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.