15-P4005-00-BT
- Let date
- Friday, April 27, 2018
- Contract
- 87685 · job page
- District
- District 3
- County
- Dekalb
- Highway
- Limits
- Construction of a multi-use trail along the north side of Kishwaukee River from Brickville Road to Main Street and along the west side of Main Street from the South Branch/East Branch of the Kishwaukee River north to Maplewood Drive.
- Classification
- ·
- Project number
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Elliott and Wood, Inc. Low bidder | $522,683 | ||
| 2 | Fischer Excavating, Inc. | $551,167 | +5.4% | |
| 3 | Alliance Contractors, Inc. | $706,340 | +35.1% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Elliott and Woo… | #2 Fischer Excavat… | #3 Alliance Contra… |
|---|---|---|---|---|---|---|---|---|
| 1 | XX007860 | AGG BASE CSE SPL | 7,301 | SQ YD | $9.00 | $9.00 | $14.00 | |
| 2 | X0300249 | REMOV EX GATE | 1 | EACH | $400.00 | $400.00 | $500.00 | |
| 3 | X0323013 | TUBULAR STEEL GATE | 1 | EACH | $2,705.88 | $2,706.00 | $2,705.88 | |
| 4 | X0325714 | FL BEACON P MTD SP IN | 2 | EACH | $8,630.00 | $8,630.00 | $8,630.00 | |
| 5 | X0350805 | FOLD DOWN BOLLARDS | 2 | EACH | $2,300.00 | $1,762.00 | $1,761.90 | |
| 6 | X6640200 | TEMP CH LK FENCE | 2,908 | FOOT | $5.04 | $5.04 | $5.04 | |
| 7 | Z0004002 | BOLLARDS | 4 | EACH | $475.00 | $155.00 | $154.75 | |
| 8 | Z0013797 | STAB CONSTR ENTRANCE | 162 | SQ YD | $8.00 | $24.00 | $15.00 | |
| 9 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $1,000.00 | $7,800.00 | $8,500.00 | |
| 10 | 20100110 | TREE REMOV 6-15 | 27 | UNIT | $50.00 | $45.00 | $45.00 | |
| 11 | 20100210 | TREE REMOV OVER 15 | 24 | UNIT | $75.00 | $80.00 | $80.00 | |
| 12 | 20101000 | TEMPORARY FENCE | 2,423 | FOOT | $4.03 | $4.05 | $1.50 | |
| 13 | 20101300 | TREE PRUN 1-10 | 1 | EACH | $150.00 | $40.00 | $40.00 | |
| 14 | 20200100 | EARTH EXCAVATION | 2,060 | CU YD | $24.00 | $28.00 | $15.00 | |
| 15 | 20201200 | REM & DISP UNS MATL | 1,220 | CU YD | $25.00 | $24.00 | $15.00 | |
| 16 | 21001000 | GEOTECH FAB F/GR STAB | 6,936 | SQ YD | $1.30 | $2.00 | $5.00 | |
| 17 | 21101505 | TOPSOIL EXC & PLAC | 1,201 | CU YD | $24.00 | $15.00 | $15.00 | |
| 18 | 25000110 | SEEDING CL 1A | 0.75 | ACRE | $2,200.00 | $2,200.00 | $2,200.00 | |
| 19 | 25000210 | SEEDING CL 2A | 1.75 | ACRE | $2,000.00 | $2,000.00 | $2,000.00 | |
| 20 | 25000312 | SEEDING CL 4A | 0.25 | ACRE | $5,000.00 | $5,000.00 | $5,000.00 | |
| 21 | 25000314 | SEEDING CL 4B | 0.25 | ACRE | $5,500.00 | $5,500.00 | $5,500.00 | |
| 22 | 25100630 | EROSION CONTR BLANKET | 14,520 | SQ YD | $1.15 | $1.15 | $1.15 | |
| 23 | 28000250 | TEMP EROS CONTR SEED | 1,000 | POUND | $2.75 | $2.75 | $2.75 | |
| 24 | 28000400 | PERIMETER EROS BAR | 10,607 | FOOT | $1.95 | $1.95 | $1.95 | |
| 25 | 28000500 | INLET & PIPE PROTECT | 11 | EACH | $160.00 | $160.00 | $160.00 | |
| 26 | 28100105 | STONE RIPRAP CL A3 | 142 | SQ YD | $61.88 | $30.00 | $55.00 | |
| 27 | 30300112 | AGG SUBGRADE IMPR 12 | 3,468 | SQ YD | $10.75 | $12.00 | $20.00 | |
| 28 | 35101600 | AGG BASE CSE B 4 | 9 | SQ YD | $20.00 | $18.00 | $25.00 | |
| 29 | 40600275 | BIT MATLS PR CT | 16,468 | POUND | $0.0100 | $0.0100 | $0.0100 | |
| 30 | 40600290 | BIT MATLS TACK CT | 1,647 | POUND | $0.0100 | $0.0100 | $0.0100 | |
| 31 | 40603310 | HMA SC "C" N50 | 1,084 | TON | $94.15 | $96.65 | $94.15 | |
| 32 | 42400300 | PC CONC SIDEWALK 6 | 80 | SQ FT | $24.00 | $17.00 | $13.00 | |
| 33 | 42400800 | DETECTABLE WARNINGS | 36 | SQ FT | $30.00 | $33.00 | $30.00 | |
| 34 | 44000100 | PAVEMENT REM | 2,056 | SQ YD | $7.20 | $4.00 | $50.00 | |
| 35 | 44000600 | SIDEWALK REM | 170 | SQ FT | $2.25 | $2.00 | $5.00 | |
| 36 | 54213657 | PRC FLAR END SEC 12 | 17 | EACH | $1,000.00 | $814.00 | $1,275.00 | |
| 37 | 54213663 | PRC FLAR END SEC 18 | 1 | EACH | $3,000.00 | $915.00 | $1,500.00 | |
| 38 | 550B0050 | STORM SEW CL B 1 12 | 296 | FOOT | $42.50 | $55.00 | $80.00 | |
| 39 | 550B0090 | STORM SEW CL B 1 18 | 97 | FOOT | $49.00 | $65.00 | $100.00 | |
| 40 | 60207605 | CB TC T8G | 3 | EACH | $1,515.00 | $1,796.00 | $1,000.00 | |
| 41 | 60220200 | MAN TA 4 DIA | 1 | EACH | $1,940.00 | $3,370.00 | $4,785.00 | |
| 42 | 60255800 | MAN ADJ NEW T1F CL | 1 | EACH | $590.00 | $1,180.00 | $750.00 | |
| 43 | 67100100 | MOBILIZATION | 1 | L SUM | $12,000.00 | $33,000.00 | $33,636.00 | |
| 44 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $1,900.00 | $3,800.00 | $3,800.00 | |
| 45 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $995.00 | $100.00 | $100.00 | |
| 46 | 72000100 | SIGN PANEL T1 | 60 | SQ FT | $32.00 | $45.00 | $45.00 | |
| 47 | 72900100 | METAL POST TY A | 66 | FOOT | $17.00 | $12.50 | $12.50 | |
| 48 | 72900200 | METAL POST TY B | 54 | FOOT | $21.00 | $15.00 | $15.00 | |
| 49 | 78001110 | PAINT PVT MK LINE 4 | 5,749 | FOOT | $0.4000 | $0.4000 | $0.5000 | |
| 50 | 78001150 | PAINT PVT MK LINE 12 | 160 | FOOT | $1.20 | $1.20 | $2.00 |