Filtered by: District: District 1 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 26, 2019 | 62H44 | CookDistrict 1 | 3.1 miles of resurfacing and pedestrian ramps on IL 62 (Algonquin Road) from IL 58 to IL 83 through Rolling Meadows, Des Plaines, Mount Prospect and Arlington Heights. | — | Executed | Arrow Road Construction Co. $3,932,574 · | ||
| Apr 26, 2019 | 62H45 | CookDistrict 1 | 2.5 miles of resurfacing and pedestrian ramps on IL 58 (Dempster Avenue) from IL 43 (Waukegan Avenue) to US 41 (Skokie Boulevard) in the Villages of Skokie and Martin Grove. | — | Executed | Plote Construction, Inc. $3,896,916 · | ||
| Apr 26, 2019 | 62H53 | VariousDistrict 1 | Repairing damaged concrete barrier wall, bridge parapet, bridge rail post, pipe handrail and wooden sound at various locations in Cook, Lake, and DuPage Counties. | — | Executed | D. Construction, Inc. $900,593 · | ||
| Apr 26, 2019 | 62H72 | CookDistrict 1 | Concrete bridge deck sealing upon the entire bridge deck surface, sidewalks, inside and top of parapets of various structures within Cook County. | — | Executed | M & M Concrete, Inc. $246,000 · | ||
| Apr 26, 2019 | 62H73 | CookDistrict 1 | Removing a portion of existing retaining wall, construction of new stem, temporary soil retention system, structural repair of concrete, pavement patching, coring weep holes and cleaning drainage structures on 1-90 in the City of Chicago. | — | Executed | Areatha Construction Co., Inc. $493,651 · | ||
| Apr 26, 2019 | 62H75 | McHenryDistrict 1 | 5.7 miles of ultra-thin bonded wearing surface on IL 31 from US 31 from US 12 to Johnsburg Road in the villages of Johnsburg, Richmond and Ringwood. | — | Executed | Curran Contracting Company $1,236,049 · | ||
| Apr 26, 2019 | 62H76 | McHenryDistrict 1 | 3 miles of ultra-thin bonded wearing course overlay on IL 176 from east of Smith Road to the Fox River in the City of Crystal Lake and Village of Prarie Grove. | — | Executed | Curran Contracting Company $702,491 · | ||
| Apr 26, 2019 | 62H80 | DuPageDistrict 1 | Substructure bridge repair on the structure carrying Highland Avenue and IL 83 (Kingery Highway) over IL 56 (Butterfield Road) in the Villages of Lombard/Downers grove and City of Oak Brook Terrace. (SN 022-0154, 0117, 0118) | — | Executed | Areatha Construction Co., Inc. $478,908 · | ||
| Apr 26, 2019 | 62H81 | LakeDistrict 1 | 1.9 miles of ultra thin wearing course and ADA upgrades on US 41 from Ferndale Street to IL 21 in the Village of Gurnee. | — | Rejected | |||
| Jun 14, 2019 | 46505 | DuPageMcHenryDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Dupage and McHenry counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $422,500 · | ||
| Jun 14, 2019 | 46506 | CookDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Cook County. | — | Executed | STF, LLC d/b/a Traffic Control Company $820,000 · | ||
| Jun 14, 2019 | 46507 | LakeWillDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Lake and Will counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $593,000 · | ||
| Jun 14, 2019 | 46508 | VariousDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, 8, 12 and 24 inches in width throughout District One. | — | Executed | STF, LLC d/b/a Traffic Control Company $699,050 · | ||
| Jun 14, 2019 | 46509 | CookDistrict 1 | Remove and replace reflectors and pavement marker castings within limits shown. | — | Executed | STF, LLC d/b/a Traffic Control Company $246,018 · | ||
| Jun 14, 2019 | 60R80 | CookDistrict 1 | Bridge deck and approach overlay, repairs and reconstruction of deck joints on structures carrying Sheridan Road over ravines in the Village of Glencoe and City of Highland Park. (SN 016-0616, 0617, 0618, 0619) | — | Executed | Copenhaver Construction, Inc. $1,624,894 · | ||
| Jun 14, 2019 | 61E01 | KaneDistrict 1 | Construction of a pedestrian tunnel under the UP Railroad to reconnect the Fox River Trail on the west side of the tracks to the Prairie Path on the east side of the tracks, in the Raymond Street Forest Preserve. | — | Executed | Martam Construction Incorporated $3,439,622 · | ||
| Jun 14, 2019 | 61F06 | CookDistrict 1 | PCC multi-use path construction with ADA ramp improvements on Shermer Road from West Lake Avenue to willow Road in the Village of Glenview. | — | Executed | M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company $999,270 · | ||
| Jun 14, 2019 | 61F37 | CookDistrict 1 | Roadway reconstruction, traffic signals, interconnection with railroad signals, curb and gutter, sidewalk and street lighting at the intersection of 95th Street and Museum Avenue in Oak Lawn. | — | Executed | Alliance Contractors, Inc. $1,728,958 · | ||
| Jun 14, 2019 | 61F76 | WillDistrict 1 | Construction of a multi-use path adjacent to University Parkway from Steger- Monee Road to Western Avenue in the Village of University Park. | — | Executed | Iroquois Paving Corporation $525,868 · | ||
| Jun 14, 2019 | 61F78 | McHenryDistrict 1 | Sidewalk and lighting improvements on Pearl Street from Illinois Route 31 to Riverside Drive in the City of McHenry. | — | Executed | Sumit Construction Co., Inc. $530,035 · | ||
| Jun 14, 2019 | 61F80 | McHenryDistrict 1 | Resurfacing Curran Road from Illinois Route 120 to Ojibwa Lane in the City of McHenry. | — | Executed | Curran Contracting Company $525,561 · | ||
| Jun 14, 2019 | 61F83 | DuPageDistrict 1 | Bridge deck scarification, bridge deck latex concrete overlay and bridge deck grooving on the structure carryi Work consists of bridge deck scarification, bridge deck latex concrete overlay and bridge deck grooving on the structure carrying 83rd Street over I-355 between Wharf Dr. and Woodward Avenue in the village of Woodridge. | — | Executed | D. Construction, Inc. $288,756 · | ||
| Jun 14, 2019 | 61F84 | CookDistrict 1 | Construction of a pedestrian path adjacent to Roselle Road from Algonquin Road to Shire Circle in the Village of Palatine. | — | Executed | A Lamp Concrete Contractors, Inc. $379,874 · | ||
| Jun 14, 2019 | 62B75 | LakeDistrict 1 | Intersection reconstruction at IL 131 and Kenosha Road in the Village of Beach Park. | — | Executed | Campanella and Sons, Inc. $3,348,311 · | ||
| Jun 14, 2019 | 62C06 | McHenryDistrict 1 | Intersection improvement, roadway realignment and traffic signal installation where IL 176 intersects with Mt. Thabor Road and Haligus Road in Crystal Lake. | — | Executed | Plote Construction, Inc. $3,852,700 · | ||
| Jun 14, 2019 | 62C08 | CookDistrict 1 | Intersection widening, traffic signal modernization and resurfacing at Kedzie Avenue and 119th Street in Merrionette. | — | Executed | D. Construction, Inc. $920,917 · | ||
| Jun 14, 2019 | 62D39 | McHenryDistrict 1 | Replace culvert, roadway reconstruction and resurfacing on IL 120 in Greenwood Township. | — | Executed | Alliance Contractors, Inc. $243,993 · | ||
| Jun 14, 2019 | 62F19 | DuPageDistrict 1 | Channelization and traffic sigal modernization at IL 59 and Army Trail Road. | — | Executed | Benchmark Construction Co., Inc. $3,488,015 · | ||
| Jun 14, 2019 | 62G30 | LakeDistrict 1 | 3.1 miles of resurfacing on IL 22 from N. Quentin Road to IL 83 in the Villages of Kildeer and Long Grove. | — | Executed | Builders Paving, LLC $1,698,888 · | ||
| Jun 14, 2019 | 62G83 | LakeDistrict 1 | 1.9 miles of resurfacing, shoulders, milled rumble strips, ADA ramps and pedestrian traffic signals at 2 locations in Gurnee, Livertyville, Waukegan and Park City: 1) IL 120 from east of I-94 to IL 43; 2)IL 21 at Red Top Drive. | — | Executed | Peter Baker & Son Co. $2,893,697 · | ||
| Jun 14, 2019 | 62H09 | CookDuPageKaneDistrict 1 | Guardrail end section replacement at various locations in Cook, DuPage and Kane Counties. | — | Executed | Midwest Fence Corporation $433,668 · | ||
| Jun 14, 2019 | 62H10 | LakeMcHenryDistrict 1 | Guardrail improvements at varous locations in McHenry and Lake Counties. | — | Executed | Kujo, Inc. $655,072 · | ||
| Jun 14, 2019 | 62H11 | CookWillDistrict 1 | Guardrail end section replacement at various locations in Cook and Will Counties. | — | Executed | Midwest Fence Corporation $559,277 · | ||
| Jun 14, 2019 | 62H18 | LakeDistrict 1 | Culvert wing wall replacement on IL 120 just west of IL 83 in Grayslake. | — | Executed | Meru Corporation $147,965 · | ||
| Jun 14, 2019 | 62H33 | VariousDistrict 1 | DRAINAGE IMPROVEMENTS ON VARIOUS STATE MAINTAINED ROUTES IN COOK, DUPAGE, AND LAKE COUNTIES. | — | Executed | Copenhaver Construction, Inc. $872,848 · | ||
| Jun 14, 2019 | 62H37 | DuPageDistrict 1 | Wing Wall and culvert repairs at the structure carrying IL 59 in Warrenville. Includes grading and shaping of the ditch on the south side of US 20, E of Garden Avenue in Roselle. | — | Executed | Lakes & Rivers Contracting, Inc. $290,571 · | ||
| Jun 14, 2019 | 62H46 | VariousDistrict 1 | Trombone mast arm replacement at various locations in District 1. | — | Executed | Home Towne Electric, Inc. $742,777 · | ||
| Jun 14, 2019 | 62H78 | VariousDistrict 1 | Concrete bridge deck sealing upon the entire top surface of the deck, top of sidewalks and inside and top of parapets at various locations throughout District 1. | — | Active | Lion Construction 1, LLC $193,434 · | ||
| Jun 14, 2019 | 62H88 | LakeDistrict 1 | Demolition and site clean-up of three single-family residences on IL 22 between Quentin Road and west of IL 83 in Long Grove and Kildeer. | — | Executed | McDonagh Demolition, Inc. $122,288 · | ||
| Jun 14, 2019 | 62H89 | CookDistrict 1 | 259 FT OF BRIDGE DECK SEALING, NEOPRENE EXPANSION JOINT REMOVAL, INSTALLING PREFORMED JOINT SEALS, CLEANING BRIDGE DRAINAGE SYSTEM, AND DECK SLAB REPAIRS ON STEVENSON EXPRESSWAY AT PULASKI RD. | — | Executed | Vixen Construction, Inc. $628,701 · | ||
| Jun 14, 2019 | 62H94 | CookDuPageDistrict 1 | Expressway sweeping on I-55 (Stevenson Expressway) from I-355 to I-90/94 and on I-94, US 41 from US 14 (Dempster Street) to IL 68 (Dundee Road). | — | Executed | Elgin Sweeping Services, Inc. $2,196,168 · | ||
| Jun 14, 2019 | 62J01 | DuPageDistrict 1 | Demolition of a single-family residence at 22W432 IL 53 in Glen Ellyn. | — | Executed | Scanlon Excavating & Concrete, Inc. $83,910 · | ||
| Jun 14, 2019 | 62J07 | CookDistrict 1 | Intermittent resurfacing project on various state maintained arterial routes in various cities. | — | Executed | J. A. Johnson Paving Company $4,887,777 · | ||
| Jun 14, 2019 | 62J08 | WillDistrict 1 | Intermittent pavement resurfacing project located on various state maintained arterial routes. | — | Executed | P. T. Ferro Construction Co. $425,756 · | ||
| Jun 14, 2019 | 62J09 | CookDuPageDistrict 1 | Intermittent resurfacing project on various expressway routes. | — | Executed | R. W. Dunteman Company $1,653,207 · | ||
| Jun 14, 2019 | 62J10 | CookDistrict 1 | Intermittent resurfacing on various state maintained arterial routes in Cook County | — | Executed | R. W. Dunteman Company $1,600,201 · | ||
| Jun 14, 2019 | 62J11 | CookKaneMcHenryDistrict 1 | Intermittent resurfacing on various routes in McHenry, Kane and Cook counties. | — | Executed | J. A. Johnson Paving Company $1,797,700 · | ||
| Jun 14, 2019 | 62J12 | CookWillDistrict 1 | Intermittent resurfacing on various state maintained expressway routes in Cook and Will counties. | — | Executed | D. Construction, Inc. $826,171 · | ||
| Jun 14, 2019 | 62J13 | DuPageKaneDistrict 1 | Intermittent resurfacing on various state maintained arterial routes in Dupage and Kane counties. | — | Executed | J. A. Johnson Paving Company $762,500 · | ||
| Jun 14, 2019 | 62J14 | LakeMcHenryDistrict 1 | Intermittent resurfacing on various routes in Lake and McHenry counties. | — | Executed | J. A. Johnson Paving Company $1,964,700 · | ||
| Jun 14, 2019 | 62J15 | CookDuPageDistrict 1 | INTRMITTENT RESURFACING PROJECT ON VARIOUS ROUTES IN VARIOUS CITIES. | — | Executed | R. W. Dunteman Company $2,872,070 · | ||
| Jun 14, 2019 | 62J22 | KaneDistrict 1 | Repairing the Hankes Road Bridge over IL 56. | — | Executed | ERA-Valdivia Contractors, Inc. $317,420 · | ||
| Jun 14, 2019 | 62J24 | VariousDistrict 1 | Impact attenuators and sand barrels on various expressways in District One. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $2,834,250 · | ||
| Jul 12, 2019 | 62B78 | CookDistrict 1 | Pump station 4 reconstruction. I-290 just west of the Des Plaines River in Forest Park. | — | Executed | IHC Construction Companies, L.L.C. $45,950,314 · | ||
| Jul 12, 2019 | 62F29 | CookDistrict 1 | Extensive repairs to SN 016-0575 carrying Sauk Trail over I-57 in Richton. | — | Executed | Lorig Construction Company $4,914,414 · | ||
| Jul 12, 2019 | 62G13 | WillDistrict 1 | 2.73 miles of shoulder widening and milled rumble strips with ditch regrading on IL 53 between Murphey Drive to IL 7 in Romeoville. | — | Executed | D. Construction, Inc. $1,458,014 · | ||
| Jul 12, 2019 | 62G29 | McHenryDistrict 1 | 1.8 miles of resurfacing and pedestrian ramps on IL 47 from State Line Road to IL 173 in the Village of Hebron. | — | Executed | Curran Contracting Company $1,266,714 · | ||
| Jul 12, 2019 | 62G59 | DuPageDistrict 1 | 1.6 miles of resurfacing and ADA sidewalk repair on IL 53 from St. Charles Road to Sidney Avenue in the Villages of Addison and Lombard. | — | Executed | R. W. Dunteman Company $1,651,036 · | ||
| Jul 12, 2019 | 62G69 | CookDistrict 1 | Standard overlay, ADA improvements, and pedestrian traffic signal on IL-58 from Lincoln St. to IL-43 in Morton Grove and Glenview. | — | Executed | Arrow Road Construction Co. $1,267,939 · | ||
| Jul 12, 2019 | 62G70 | CookDistrict 1 | Resurfacing and pedestrian ramps on Central Avenue from just south of 53rd Street to just north of 47th Street in Chicago | — | Executed | Bigane Paving Company $829,349 · | ||
| Jul 12, 2019 | 62G76 | CookDistrict 1 | 1.7745 miles of resurfacing (smart) and ADA improvements on Niles Center Road in Skokie. | — | Executed | Arrow Road Construction Co. $2,125,538 · | ||
| Jul 12, 2019 | 62G77 | CookDistrict 1 | 1.9 miles of resurfacing and pedestrian ramps on Elston Avenue in Chicago. | — | Executed | Bigane Paving Company $1,760,423 · | ||
| Jul 12, 2019 | 62H54 | CookDistrict 1 | Light tower removal and replacement, installing new light towers, light poles, foundations, conduits, cables, and site restoration at I-57 at US 30 in Matteson and I-290/IL-53 at I-90 in Rolling Meadows. | — | Executed | Meade Inc. $1,225,424 · | ||
| Jul 12, 2019 | 62H56 | CookDistrict 1 | 0.95 miles of standard overlay and pedestrian ramp improvements on Touhy Avenue from US 41 to Lawndale Avenue in Lincolnwood and Skokie. | — | Executed | Arrow Road Construction Co. $1,389,978 · | ||
| Jul 12, 2019 | 62H83 | McHenryDistrict 1 | 1.3 miles of standard overlay and ADA improvements on IL 31 from James R. Rakow Road to north of US 14 in Crystal Lake. | — | Executed | Arrow Road Construction Co. $1,542,056 · | ||
| Jul 12, 2019 | 62H92 | LakeDistrict 1 | 1.8 miles of resurfacing and pedestrian ramp improvements along US 45 from Lake Woodlawn Dr. to IL RTE 83 in Mundelein. | — | Executed | Builders Paving, LLC $2,634,888 · | ||
| Jul 12, 2019 | 62H93 | WillDistrict 1 | 1.3 miles of resurfacing along IL 50 from Cicero Avenue to Manhattan-Monee Road in Monee Township | — | Executed | Iroquois Paving Corporation $1,177,820 · | ||
| Jul 12, 2019 | 62H95 | LakeDistrict 1 | 3.56 miles of standard overlay and pedestrian ramp upgrades on IL-176 from Hilltop Terrace to De Webb Blvd. and on IL 60/83 from IL-176 to CN Railroad in Mundelein. | — | Executed | Arrow Road Construction Co. $2,064,157 · | ||
| Jul 12, 2019 | 62H98 | KaneDistrict 1 | 1.20 miles of designed overlay and improvements on IL-31 from Webster St. to Rathbone Ave. in Aurora. | — | Executed | D. Construction, Inc. $1,385,288 · | ||
| Jul 12, 2019 | 62J02 | CookDistrict 1 | 2.63 miles of standard overlay and pedestrian ramp improvements on IL-1 from US 6 to Ridge Rd. in Harvey and Homewood. | — | Executed | D. Construction, Inc. $3,229,163 · | ||
| Jul 12, 2019 | 62J03 | LakeDistrict 1 | 0.98 miles of designed overlay and pedestrian ramp improvements on IL 43 from McGaw Road / Pulaski Road to US 41 in Park City and Waukegan. | — | Executed | Peter Baker & Son Co. $1,997,757 · | ||
| Jul 12, 2019 | 62J21 | CookDistrict 1 | Lining of existing drainage structures on Vermont Street from Western Avenue to Ashland Avenue in the Village of Blue Island. | — | Executed | Benchmark Construction Co., Inc. $251,849 · | ||
| Aug 2, 2019 | 61F18 | WillDistrict 1 | Construction of a multi-use path from McKinley Woods road to IandM Canal and the construction of a pedestrian bridge over the IandM Canal. Project is located along US Route 6 and Bridge Street, beginning west of McKinley Drive and ending east of the IandM Canal at Bridge Street in the Village of Channahon. | — | Executed | D. Construction, Inc. $734,856 · | ||
| Aug 2, 2019 | 61F79 | CookDistrict 1 | Sidewalk construction on Schoenbeck Road from Willow Road to Camp McDonald Road in the City of Prospect Heights. | — | Executed | Alliance Contractors, Inc. $377,041 · | ||
| Aug 2, 2019 | 62C21 | CookDistrict 1 | Guardrail improvements along US 12/20/45 from 63rd Street to Creek Road. Project includes traffic signal modernization at US 45 and 123rd Street. | — | Executed | Lyons Electric Company, Inc. $515,400 · | ||
| Aug 2, 2019 | 62H91 | LakeDistrict 1 | Drain tile repair project, includes replacement of 18" clay pipe with 24" reinforced concrete pipe in unincorporated Avon Township on IL 120, just east of Wilson Road | — | Executed | Lion Construction 1, LLC $497,411 · | ||
| Sep 20, 2019 | 60K72 | CookDistrict 1 | BRIDGE REHAB AND PAINTING ON WESTERN AVENUE OVER CAL-SAG CHANNEL (SN 016-0777). | — | Executed | D. Construction, Inc. $10,689,369 · | ||
| Sep 20, 2019 | 61D65 | LakeDistrict 1 | Reconstruct the intersection of Hart Road at US Route 14 in the Villages of Barrington and Barrington Hills. | — | Executed | Plote Construction, Inc. $7,965,000 · | ||
| Sep 20, 2019 | 61E69 | DuPageDistrict 1 | Landscaping and sign installation along the Elgin O'Hare Western Access Corridor at Lake Street (US 20), Roselle Road, Plum Grove Road and Rohlwing Road. Project is located in the villages of Roselle, Itasca and Hanover Park. | — | Rejected | Alliance Contractors, Inc. $1,264,017 · | ||
| Sep 20, 2019 | 61F25 | LakeDistrict 1 | Pavement reconstruction and the construction of a HMA pedestrian path next to Weiland Road from Aptakisic Road to Deerfield Parkway, and on Aptakistic Road from Joseph Court to Industrial Drive in the villages of Buffalo Grove and Lincolnshire. | — | Executed | Berger Excavating Contractors, Inc. $12,469,513 · | ||
| Sep 20, 2019 | 61F58 | McHenryDistrict 1 | Reconstruct the intersection of Main Street at Crystal Lake Avenue in the city of Crystal Lake. | — | Executed | Copenhaver Construction, Inc. $4,028,645 · | ||
| Sep 20, 2019 | 61F85 | DuPageDistrict 1 | Streetscape to include sidewalk replacement, curb and gutter replacement, lighting improvements, landscaping, pavement imprinting and resurfacing. Project is located on Prospect Avenue from Ann Street to Burlington Avenue in the Village of Clarendon Hills. | — | Executed | A Lamp Concrete Contractors, Inc. $1,434,658 · | ||
| Sep 20, 2019 | 61F93 | CookDistrict 1 | Resurfacing Broadway Avenue from Division Street to North Avenue in the Village of Melrose Park. | — | Executed | J. A. Johnson Paving Company $650,700 · | ||
| Sep 20, 2019 | 61F96 | CookDistrict 1 | Construction of Poplar Creek Trail from east of the intersection of Shoe Factory Road and the CN Railroad to west of the intersection of IL Route 59. Project is located within the Forest Preserve of Cook County Arthur Janura Forest Preserve in the Village of Hoffman Estates. | — | Executed | Chicagoland Paving Contractors, Inc. $270,000 · | ||
| Sep 20, 2019 | 61F98 | McHenryDistrict 1 | Sidewalk construction and culvert replacement on Main Street from Winn Road to West of Bilvin Street in the Village of Spring Grove. | — | Executed | Alliance Contractors, Inc. $443,926 · | ||
| Sep 20, 2019 | 61G00 | LakeDistrict 1 | Reconstruction and resurfacing Rockland Road from east of the Des Plaines River bridge to St. Mary's Road, located in Libertyville Township, Lake County. | — | Executed | Berger Excavating Contractors, Inc. $1,964,385 · | ||
| Sep 20, 2019 | 62G56 | McHenryDistrict 1 | OVERLAY, NEW SHOULDERS AND MILLED RUMBLE STRIPS ON IL 31 FROM SHAMROCK LANE TO NORTH OF EDGEWOOD ROAD IN THE CITY OF MCHENRY AND VILLAGE OF PRAIRIE GROVE. | — | Executed | Peter Baker & Son Co. $988,722 · | ||
| Sep 20, 2019 | 62H74 | CookDistrict 1 | PAVEMENT MARKING ROOSEVELT RD TO US 1 2/20 (95TH ST). | — | Executed | A. C. Pavement Striping Co. & RoadSafe Traffic Systems & Marking Specialists Corp. $2,611,663 · | ||
| Sep 20, 2019 | 62J04 | CookDistrict 1 | 1.9 MILES OF OVERLAY AND PEDESTRIAN RAMP IMPROVEMENTS ON IL 58 FROM BASSWOOD STREET TO I-290 / IL 53 IN THE VILLAGE OF SCHAUMBURG. | — | Executed | Arrow Road Construction Co. $3,206,907 · | ||
| Sep 20, 2019 | 62J18 | CookDistrict 1 | SUBSTRUCTURE BRIDGE REPAIR OF SN 016-1094 CARRYING MILWAUKEE AVENUE OVER THE OHIO FEEDER IN THE CITY OF CHICAGO. | — | Executed | Areatha Construction Co., Inc. $759,728 · | ||
| Sep 20, 2019 | 62J19 | CookDistrict 1 | 11.9 MILES OF PAVEMENT MARKING REMOVAL, PAVEMENT MARKING INSTALLATION AND RAISED REFLECTIVE PAVEMENT MARKERS ON I-90/94 (DAN RYAN EXPRESSWAY) FROM ROOSEVELT ROAD TO US 12/20 (95TH STREET) WITHIN THE CITY OF CHICAGO. | — | Executed | A. C. Pavement Striping Co. & RoadSafe Traffic Systems & Marking Specialists Corp. $2,714,768 · | ||
| Sep 20, 2019 | 62J61 | VariousDistrict 1 | HIGH TENSION CABLE BARRIER REPAIRS AT VARIOUS LOCATIONS ON VARIOUS EXPRESSWAY MEDIANS THROUGHOUT DISTRICT ONE. | — | Executed | Northern Contracting, Inc. $342,330 · | ||
| Nov 8, 2019 | 60R67 | CookDistrict 1 | Bridge deck overlay, bridge deck joint repairs and traffic signal modification on Grand Avenue over Des Plaines River Road in the Village of River Grove. (SN 016-0855). | — | Executed | Lorig Construction Company $1,091,070 · | ||
| Nov 8, 2019 | 61E52 | KaneDistrict 1 | Reconstruct the intersection of Bliss Road at Illinois Route 47 in the Village of Sugar Grove. | — | Executed | D. Construction, Inc. $1,549,240 · | ||
| Nov 8, 2019 | 61F17 | CookDistrict 1 | Construction of a 10 foot wide asphalt trail, concrete sidewalks, pipe culverts, pavement markings and landscaping. Project begins on 131st Street just west of Francisco Avenue easterly on 131st Street to Francisco Avenue, then north along Francisco Avenue continuing east on Vermont Street to Chatham Street and south to Canal Street. At Canal Street the project heads east along the south side of the Cal-Sag Channel terminating at Ashland Avenue, located in the City of Blue Island. | — | Executed | D. Construction, Inc. $855,645 · | ||
| Nov 8, 2019 | 61F63 | LakeDistrict 1 | Construction of HMA path on Riverwoods Road between Daniel Wright School and Whytegate Park and construction of a sidewalk along Westminster Way from the CDW Path west for 0.07 miles, located in the Village of Lincolnshire. | — | Executed | Chicagoland Paving Contractors, Inc. $270,000 · | ||
| Nov 8, 2019 | 61F97 | CookDistrict 1 | Sidewalk removal and replacement and the installation of pedestrian signals on Ridgeland Avenue from 110th Str Work consists of sidewalk removal and replacement and the installation of pedestrian signals on Ridgeland Avenue from 110th Street to 102nd Place with an omission from 109th Street to 107th Street, located in the Village of Chicago Ridge. | — | Executed | Landmark Contractors, Inc. $1,151,034 · | ||
| Nov 8, 2019 | 61F99 | McHenryDistrict 1 | Roadway resurfacing and vertical curve corrections on Lily Lake Road from Stone Drive to Wegner Drive in Nunda Township. | — | Rejected | Curran Contracting Company $1,294,604 · | ||
| Nov 8, 2019 | 61G03 | CookDistrict 1 | Replace the superstructure and repairs to the substructure. Project is located north of Park View Drive in the City of North Lake. | — | Executed | Alliance Contractors, Inc. $469,103 · | ||
| Nov 8, 2019 | 61G04 | CookDistrict 1 | Resurfacing Nerge Road from Mitchell Trail to Devon Avenue and IL 53 from south of Huntington Drive to north of Devon Avenue in the Village of Elk Grove Village. | — | Executed | K-Five Construction Corporation $1,255,255 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.