| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$85,000.00 |
$125,000.00 |
$146,750.00 |
$20,000.00 |
$275,000.00 |
$272,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 67,950 | CY |
$9.00 |
$7.75 |
$5.22 |
$5.25 |
$6.00 |
$11.54 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 389 | CY |
$30.00 |
$57.75 |
$39.45 |
$18.25 |
$50.00 |
$54.42 |
| 4 | 202(D) 0184 |
UNCLASSIFIED BORROW | 146,940 | CY |
$10.00 |
$7.75 |
$5.81 |
$6.25 |
$11.00 |
$9.21 |
| 5 | 202(G) 0189 |
PRESPLITTING OF ROCK | 250 | F DR |
$350.00 |
$25.00 |
$37.80 |
$340.00 |
$110.00 |
$293.79 |
| 6 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$75,000.00 |
$115,000.00 |
$59,500.00 |
$25,000.00 |
$30,000.00 |
$156,064.00 |
| 7 | 221(C) 2801 |
TEMPORARY SILT FENCE | 9,915 | LF |
$1.50 |
$1.55 |
$3.99 |
$3.99 |
$2.00 |
$4.34 |
| 8 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 5 | EA |
$200.00 |
$500.00 |
$395.00 |
$395.00 |
$400.00 |
$430.00 |
| 9 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,589 | LF |
$7.50 |
$8.75 |
$18.95 |
$18.95 |
$10.00 |
$20.62 |
| 10 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 87 | CY |
$100.00 |
$35.00 |
$100.00 |
$25.00 |
$165.00 |
$65.30 |
| 11 | 229 4318 |
DITCH LINER PROTECTION | 3,360 | LF |
$2.50 |
$5.95 |
$5.79 |
$5.79 |
$4.00 |
$6.30 |
| 12 | 230(A) 2806 |
SOLID SLAB SODDING | 7,421 | SY |
$2.50 |
$4.95 |
$5.95 |
$5.95 |
$6.00 |
$6.48 |
| 13 | 232(B) 2814 |
SEEDING METHOD B | 31.96 | AC |
$250.00 |
$4,750.00 |
$6,450.00 |
$6,450.00 |
$1,200.00 |
$7,508.00 |
| 14 | 233(A) 2817 |
VEGETATIVE MULCHING | 31.96 | AC |
$350.00 |
$4,750.00 |
$3,950.00 |
$3,950.00 |
$1,200.00 |
$4,503.00 |
| 15 | 241 2832 |
MOWING | 11.75 | AC |
$170.00 |
$295.00 |
$349.00 |
$349.00 |
$500.00 |
$380.00 |
| 16 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 3 | EA |
$3,000.00 |
$4,750.00 |
$3,000.00 |
$2,800.00 |
$2,500.00 |
$3,628.00 |
| 17 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 8,440.1 | CY |
$45.00 |
$36.12 |
$34.00 |
$33.50 |
$39.00 |
$35.11 |
| 18 | 307(K) 4300 |
STABILIZED SUBGRADE | 46,837.4 | SY |
$5.50 |
$0.0500 |
$4.65 |
$5.15 |
$8.00 |
$5.14 |
| 19 | 325 5271 |
SEPARATOR FABRIC | 42,801.1 | SY |
$1.30 |
$6.95 |
$1.30 |
$1.75 |
$1.00 |
$1.49 |
| 20 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,955.6 | TON |
$25.00 |
$19.75 |
$18.69 |
$39.00 |
$18.00 |
$24.60 |
| 21 | 407(B) 0250 |
TACK COAT | 5,480.5 | GAL |
$4.00 |
$2.44 |
$2.20 |
$3.48 |
$2.50 |
$2.39 |
| 22 | 408 5774 |
PRIME COAT | 15,803.6 | GAL |
$5.00 |
$3.33 |
$3.00 |
$1.45 |
$1.00 |
$3.27 |
| 23 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 11,968.5 | TON |
$70.00 |
$77.00 |
$71.00 |
$73.31 |
$75.00 |
$80.77 |
| 24 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,887.5 | TON |
$80.00 |
$83.44 |
$80.25 |
$79.75 |
$80.00 |
$87.34 |
| 25 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 9,175 | LF |
$0.8000 |
$0.2500 |
$0.2000 |
$0.2000 |
$0.5000 |
$0.2300 |
| 26 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 8 | CY |
$35.00 |
$25.00 |
$35.00 |
$50.00 |
$125.00 |
$40.81 |
| 27 | 504(E) 6190 |
42" F-SHAPED PARAPET | 575 | LF |
$95.00 |
$88.00 |
$83.88 |
$125.00 |
$65.00 |
$145.93 |
| 28 | 509(A) 0319 |
CLASS AA CONCRETE | 149.1 | CY |
$600.00 |
$475.00 |
$400.00 |
$600.00 |
$600.00 |
$363.88 |
| 29 | 509(B) 0321 |
CLASS A CONCRETE | 35.7 | CY |
$600.00 |
$505.00 |
$732.35 |
$800.00 |
$600.00 |
$621.18 |
| 30 | 509(D) 0325 |
CLASS C CONCRETE | 648.5 | CY |
$380.00 |
$235.00 |
$251.55 |
$325.00 |
$400.00 |
$320.13 |
| 31 | 510(C) 6138 |
SLOPE WALL (5") | 716.5 | SY |
$120.00 |
$88.00 |
$100.00 |
$100.00 |
$85.00 |
$63.57 |
| 32 | 511(A) 0332 |
REINFORCING STEEL | 4,690 | LB |
$1.00 |
$1.35 |
$1.12 |
$1.00 |
$1.50 |
$0.7700 |
| 33 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 47,230 | LB |
$1.10 |
$1.05 |
$1.00 |
$1.00 |
$1.50 |
$0.8500 |
| 34 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 60 | TON |
$60.00 |
$100.00 |
$35.00 |
$33.00 |
$55.00 |
$59.79 |
| 35 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 26 | TON |
$40.00 |
$100.00 |
$28.00 |
$25.00 |
$45.00 |
$32.48 |
| 36 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 98 | SY |
$6.00 |
$5.00 |
$7.00 |
$5.00 |
$2.00 |
$1.28 |
| 37 | 609(B) 1524 |
2'-8" COMB. CURB & GUTTER (6" MNTBLE) | 433 | LF |
$30.00 |
$18.55 |
$32.00 |
$40.00 |
$30.00 |
$15.08 |
| 38 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 2 | EA |
$3,500.00 |
$2,642.00 |
$2,920.00 |
$2,500.00 |
$3,500.00 |
$2,621.00 |
| 39 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 324 | LF |
$65.00 |
$39.55 |
$58.70 |
$52.00 |
$75.00 |
$62.60 |
| 40 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 350 | LF |
$80.00 |
$54.66 |
$76.00 |
$57.00 |
$80.00 |
$69.25 |
| 41 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 155 | LF |
$100.00 |
$121.33 |
$183.67 |
$85.00 |
$135.00 |
$138.49 |
| 42 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 253 | LF |
$35.00 |
$35.00 |
$34.26 |
$32.00 |
$50.00 |
$51.69 |
| 43 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 73 | LF |
$40.00 |
$40.00 |
$40.31 |
$38.00 |
$55.00 |
$57.46 |
| 44 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 1,016 | LF |
$15.00 |
$18.88 |
$16.00 |
$20.00 |
$7.00 |
$11.11 |
| 45 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 23 | LF |
$20.00 |
$18.88 |
$17.00 |
$20.00 |
$7.00 |
$29.91 |
| 46 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 10 | EA |
$600.00 |
$788.00 |
$870.00 |
$475.00 |
$600.00 |
$417.00 |
| 47 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,000.00 |
$1,111.00 |
$960.50 |
$525.00 |
$700.00 |
$532.00 |
| 48 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$2,500.00 |
$3,750.00 |
$2,445.00 |
$950.00 |
$2,000.00 |
$1,799.00 |
| 49 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$1,500.00 |
$500.00 |
$500.00 |
$1,200.00 |
$1,200.00 |
$3,265.00 |
| 50 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$12,500.00 |
$41,900.00 |
$15,000.00 |
$25,000.00 |
$30,000.00 |
| 51 | 619(B) 4725 |
REMOVAL OF FENCE | 3,355 | LF |
$2.00 |
$1.54 |
$0.9500 |
$1.75 |
$4.00 |
$0.5800 |
| 52 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 21,973 | SY |
$4.00 |
$2.22 |
$6.90 |
$7.00 |
$3.00 |
$3.18 |
| 53 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 620 | LF |
$5.00 |
$3.33 |
$4.00 |
$8.00 |
$5.00 |
$4.35 |
| 54 | 619(C) 0924 |
SAWING PAVEMENT | 673 | LF |
$6.00 |
$7.00 |
$10.00 |
$10.00 |
$5.00 |
$6.41 |
| 55 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 375 | LF |
$25.00 |
$26.33 |
$20.00 |
$20.00 |
$25.00 |
$26.12 |
| 56 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$3,133.00 |
$2,525.00 |
$2,525.00 |
$3,000.00 |
$3,592.00 |
| 57 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$2,400.00 |
$1,825.00 |
$1,825.00 |
$2,500.00 |
$1,959.00 |
| 58 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,546 | LF |
$7.00 |
$6.00 |
$10.00 |
$6.15 |
$15.00 |
$9.50 |
| 59 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 3 | EA |
$150.00 |
$275.00 |
$200.00 |
$75.00 |
$80.00 |
$109.00 |
| 60 | 871(A) 8330 |
(PL) IMPACT ATTENUATOR | 2 | EA |
$25,000.00 |
$23,750.00 |
$21,450.00 |
$21,450.00 |
$25,000.00 |
$23,914.00 |
| 61 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 181.4 | CY |
$20.00 |
$25.00 |
$25.75 |
$50.00 |
$30.00 |
$43.80 |
| 62 | 501(G) 6309 |
CLSM BACKFILL | 200.2 | CY |
$160.00 |
$144.00 |
$200.64 |
$150.00 |
$110.00 |
$111.44 |
| 63 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 3,737.2 | LF |
$250.00 |
$198.23 |
$230.12 |
$250.00 |
$265.00 |
$328.78 |
| 64 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$225.00 |
$144.36 |
$214.76 |
$200.00 |
$190.00 |
$196.55 |
| 65 | 504(B) 1305 |
SAW-CUT GROOVING | 3,608 | SY |
$5.00 |
$4.01 |
$4.74 |
$3.60 |
$4.00 |
$3.92 |
| 66 | 504(C) 6250 |
SEALED EXPANSION JOINT | 129.6 | LF |
$300.00 |
$255.00 |
$247.83 |
$250.00 |
$250.00 |
$227.65 |
| 67 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,623.4 | LF |
$100.00 |
$63.25 |
$78.60 |
$110.00 |
$75.00 |
$95.98 |
| 68 | 506(A) 1322 |
STRUCTURAL STEEL | 3,710 | LB |
$4.00 |
$2.75 |
$1.98 |
$3.00 |
$10.00 |
$0.9800 |
| 69 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 30 | EA |
$1,800.00 |
$1,250.00 |
$1,306.04 |
$1,200.00 |
$1,900.00 |
$987.00 |
| 70 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 50 | EA |
$1,800.00 |
$1,250.00 |
$1,306.04 |
$1,200.00 |
$1,900.00 |
$988.00 |
| 71 | 509 6152 |
SPECIAL CONCRETE FINISH | 3,822 | SY |
$100.00 |
$16.33 |
$15.76 |
$15.30 |
$60.00 |
$16.65 |
| 72 | 509(A) 1326 |
CLASS AA CONCRETE | 890.2 | CY |
$600.00 |
$505.00 |
$593.49 |
$800.00 |
$800.00 |
$970.73 |
| 73 | 509(B) 1328 |
CLASS A CONCRETE | 424.1 | CY |
$650.00 |
$525.00 |
$593.49 |
$800.00 |
$800.00 |
$845.07 |
| 74 | 509(D) 1331 |
CLASS C CONCRETE | 13.4 | CY |
$700.00 |
$999.00 |
$515.00 |
$800.00 |
$500.00 |
$397.98 |
| 75 | 511(A) 1332 |
REINFORCING STEEL | 2,640 | LB |
$1.00 |
$1.35 |
$1.98 |
$2.00 |
$1.50 |
$1.23 |
| 76 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 361,800 | LB |
$1.10 |
$0.9800 |
$0.9900 |
$0.9500 |
$1.50 |
$0.8500 |
| 77 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 300 | SY |
$500.00 |
$10.00 |
$427.45 |
$300.00 |
$150.00 |
$72.56 |
| 78 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 300 | SY |
$700.00 |
$10.00 |
$746.75 |
$400.00 |
$200.00 |
$72.56 |
| 79 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 188 | LF |
$30.00 |
$37.50 |
$30.07 |
$35.00 |
$45.00 |
$29.80 |
| 80 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 369 | LF |
$35.00 |
$42.50 |
$36.55 |
$42.00 |
$55.00 |
$38.50 |
| 81 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 188 | LF |
$20.00 |
$10.00 |
$20.60 |
$15.50 |
$10.00 |
$137.54 |
| 82 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 369 | LF |
$20.00 |
$10.00 |
$20.60 |
$19.00 |
$10.00 |
$162.78 |
| 83 | 514(K) 6260 |
(PL)PILOT HOLES | 128 | LF |
$180.00 |
$250.00 |
$288.40 |
$255.00 |
$220.00 |
$146.25 |
| 84 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 85 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 428 | LF |
$1,600.00 |
$2,350.00 |
$1,848.52 |
$1,400.00 |
$1,900.00 |
$1,701.14 |
| 86 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 12 | EA |
$3,500.00 |
$2,000.00 |
$2,369.00 |
$5,000.00 |
$4,500.00 |
$1,179.00 |
| 87 | 523(A) 6550 |
SEALER CRACK PREPARATION | 168.8 | LF |
$5.00 |
$4.44 |
$5.15 |
$4.00 |
$4.00 |
$4.35 |
| 88 | 523(B) 6560 |
SEALER RESIN | 1.6 | GAL |
$100.00 |
$125.00 |
$118.45 |
$100.00 |
$400.00 |
$108.83 |
| 89 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,731 | TON |
$50.00 |
$34.75 |
$35.94 |
$33.00 |
$40.00 |
$41.64 |
| 90 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 435 | TON |
$40.00 |
$26.33 |
$28.55 |
$25.00 |
$30.00 |
$32.45 |
| 91 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 86 | LF |
$25.00 |
$25.00 |
$30.90 |
$40.00 |
$5.00 |
$18.98 |
| 92 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 24 | LF |
$25.00 |
$25.00 |
$30.90 |
$40.00 |
$5.00 |
$22.67 |
| 93 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$165,000.00 |
$250,000.00 |
$223,510.00 |
$250,000.00 |
$158,998.50 |
$174,621.00 |
| 94 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 550.7 | CY |
$20.00 |
$7.75 |
$7.21 |
$30.00 |
$20.00 |
$11.54 |
| 95 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 231.6 | CY |
$20.00 |
$7.75 |
$41.20 |
$10.00 |
$30.00 |
$11.56 |
| 96 | 509(A) 1326 |
CLASS AA CONCRETE | 455.8 | CY |
$600.00 |
$335.00 |
$341.32 |
$650.00 |
$800.00 |
$452.86 |
| 97 | 511(A) 1332 |
REINFORCING STEEL | 74,270 | LB |
$1.00 |
$1.35 |
$1.05 |
$1.00 |
$1.50 |
$1.09 |
| 98 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 28 | EA |
$50.00 |
$30.00 |
$25.00 |
$25.00 |
$30.00 |
$27.00 |
| 99 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 7 | EA |
$200.00 |
$250.00 |
$200.00 |
$200.00 |
$220.00 |
$218.00 |
| 100 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 301.13 | SF |
$20.00 |
$22.00 |
$18.00 |
$18.00 |
$20.00 |
$19.59 |
| 101 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 339 | LF |
$10.00 |
$13.00 |
$10.00 |
$10.00 |
$10.00 |
$10.88 |
| 102 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 310 | LF |
$11.00 |
$13.00 |
$10.00 |
$10.00 |
$11.00 |
$10.88 |
| 103 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 18 | EA |
$20.00 |
$20.00 |
$0.4000 |
$20.00 |
$20.00 |
$16.00 |
| 104 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 27,932 | LF |
$0.7000 |
$0.4500 |
$0.4000 |
$0.4000 |
$0.5000 |
$0.4400 |
| 105 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 203 | LF |
$2.50 |
$1.10 |
$1.00 |
$1.00 |
$2.00 |
$1.09 |
| 106 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 982 | LF |
$3.00 |
$3.33 |
$3.00 |
$3.00 |
$5.00 |
$3.27 |
| 107 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 12 | LF |
$20.00 |
$28.99 |
$25.00 |
$25.00 |
$30.00 |
$27.21 |
| 108 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 2 | EA |
$200.00 |
$125.00 |
$100.00 |
$100.00 |
$500.00 |
$109.00 |
| 109 | 856(B) 8880 |
TRAFFIC STRIPE(MULTI-POLY.)(WORDS) | 1 | EA |
$300.00 |
$199.00 |
$150.00 |
$150.00 |
$500.00 |
$163.00 |
| 110 | 880(C) 8845 |
BARRICADES(TYPE III) | 3 | EA |
$400.00 |
$300.00 |
$250.00 |
$250.00 |
$500.00 |
$272.00 |
| 111 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 47,120 | LF |
$0.4000 |
$0.5500 |
$0.5000 |
$0.5000 |
$0.5000 |
$0.5400 |
| 112 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 44,122 | LF |
$0.2000 |
$0.1500 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1100 |
| 113 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 2,475 | SD |
$8.00 |
$0.7500 |
$0.5000 |
$0.5000 |
$1.00 |
$0.5400 |
| 114 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,075 | LF |
$25.00 |
$23.55 |
$22.80 |
$30.00 |
$20.00 |
$37.50 |
| 115 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,538 | LF |
$4.00 |
$13.33 |
$4.00 |
$8.00 |
$10.00 |
$14.69 |
| 116 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 21,750 | SD |
$0.3000 |
$1.10 |
$1.00 |
$1.00 |
$1.10 |
$1.09 |
| 117 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 25,088 | SD |
$0.5000 |
$0.1500 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1100 |
| 118 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 13,875 | SD |
$1.00 |
$1.65 |
$1.50 |
$1.50 |
$1.50 |
$1.63 |
| 119 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 8,738 | SD |
$0.6000 |
$1.10 |
$1.00 |
$1.00 |
$1.10 |
$1.09 |
| 120 | 880(C) 8848 |
WING BARRICADES | 3,600 | SD |
$1.50 |
$0.1200 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1100 |
| 121 | 880(D) 8854 |
VERTICAL PANELS | 9,600 | SD |
$0.2000 |
$0.3000 |
$0.2500 |
$0.2500 |
$0.3000 |
$0.2700 |
| 122 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 28,913 | SD |
$0.2000 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
| 123 | 880(F) 8878 |
DRUMS | 13,238 | SD |
$0.3000 |
$0.3000 |
$0.2500 |
$0.2500 |
$0.3000 |
$0.2700 |
| 124 | 880(I) 8902 |
FLAGGER | 90 | SD |
$120.00 |
$50.00 |
$5.00 |
$450.00 |
$115.00 |
$248.00 |
| 125 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,853 | SD |
$20.00 |
$6.00 |
$5.00 |
$5.00 |
$10.00 |
$5.44 |
| 126 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$130,000.00 |
$44,000.00 |
$167,006.26 |
$28,500.00 |
$125,000.00 |
$88,536.00 |
| 127 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$7,500.00 |
$16,995.00 |
$5,000.00 |
$15,000.00 |
$5,442.00 |
| 128 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$12,500.00 |
$6,695.00 |
$12,500.00 |
$15,000.00 |
$14,747.00 |
| 129 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$512,600.00 |
$450,000.00 |
$498,277.22 |
|
$540,000.00 |
$520,000.00 |