BRIDGE AND APPROACHES I -40: OVER COUNTY ROAD (OLD TOWN TRAIL ): 0.5 MILES WEST OF US-177 NEAR SHAWNEE . PROJECT LENGTH = 0.364 MILE

Let date
Thursday, November 17, 2016
Contract
160433
J/P numbers
28928(04)
District
Division 3
County
Pottawatomie
Highway
Limits
BRIDGE AND APPROACHES I -40: OVER COUNTY ROAD (OLD TOWN TRAIL ): 0.5 MILES WEST OF US-177 NEAR SHAWNEE . PROJECT LENGTH = 0.364 MILE
Project number
NHPPI-4000-(035)SS

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 MANHATTAN ROAD & BRIDGE COMPANY, LLC Low bidder $7,097,309
2 OBC, INC. $8,390,848 +18.2%
3 SHERWOOD CONSTRUCTION CO., INC. $7,960,515 +12.2%
4 HASKELL LEMON CONSTRUCTION CO. $8,158,301 +14.9%
5 FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. $8,771,271 +23.6%
6 ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) $8,822,718 +24.3%

Bid tab: unit prices 150 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 MANHATTAN ROAD …#2 OBC, INC.#3 SHERWOOD CONSTR…#4 HASKELL LEMON C…#5 FRONTIER BRIDGE…#6 ALLEN CONTRACTI…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $25,000.00 $50,000.00 $35,000.00 $75,000.00 $13,915.00 $78,400.00 $80,290.37
2202(A) 0183 UNCLASSIFIED EXCAVATION43,274CY $7.00 $7.00 $7.59 $10.20 $10.40 $6.61 $10.00
3202(D) 0184 UNCLASSIFIED BORROW5,872CY $11.00 $10.00 $13.00 $1.00 $11.70 $8.96 $10.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $40,000.00 $11,000.00 $35,000.00 $34,122.71 $28,045.00 $74,568.48 $28,757.62
5221(C) 2801 TEMPORARY SILT FENCE2,918LF $2.00 $2.00 $1.22 $3.35 $1.25 $1.74 $1.25
6221(D) 2803 TEMPORARY SEDIMENT FILTER7EA $200.00 $55.00 $159.75 $139.55 $165.00 $112.00 $163.05
7221(F) 0100 TEMPORARY SILT DIKE1,442LF $8.00 $7.50 $7.71 $7.69 $7.95 $7.28 $7.87
8230(A) 2806 SOLID SLAB SODDING26,863SY $2.00 $1.25 $1.26 $1.48 $1.30 $1.40 $1.28
9232(A) 2813 SEEDING METHOD A5.55AC $500.00 $2,225.00 $228.97 $591.64 $2,365.00 $560.00 $2,337.00
10233(A) 2817 VEGETATIVE MULCHING5.55AC $700.00 $570.00 $585.75 $591.64 $605.00 $560.00 $597.84
11241 2832 MOWING22.2AC $60.00 $98.00 $101.18 $118.33 $104.50 $112.00 $103.26
12242 0400 (PL)STABILIZED CONSTRUCTION EXIT2EA $3,000.00 $3,250.00 $2,479.63 $2,489.53 $2,775.00 $2,800.00 $5,730.90
13303(A) 2100 AGGREGATE BASE TYPE A2,995CY $58.00 $54.00 $73.00 $59.88 $69.20 $63.53 $75.00
14307(K) 4300 STABILIZED SUBGRADE4,540SY $6.00 $5.75 $3.86 $4.67 $8.05 $6.16 $5.90
15310(B) 0149 SUBGRADE, METHOD B12,315SY $2.00 $1.65 $2.00 $1.81 $2.00 $2.24 $2.01
16326(B) 0100 GEOGRID REINFORCEMENT15,399SY $2.50 $1.84 $1.52 $1.71 $2.15 $1.31 $1.35
17402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E4,007TON $30.00 $26.50 $39.82 $27.05 $32.80 $33.29 $36.01
18407(B) 0250 TACK COAT2,944GAL $3.00 $2.10 $3.00 $5.86 $5.00 $5.54 $2.17
19408 5774 PRIME COAT8,432GAL $4.50 $2.51 $6.50 $6.00 $8.40 $6.44 $2.72
20411(B) 5935 SUPERPAVE, TYPE S3(PG 76-28 OK)2,891TON $85.00 $71.00 $79.50 $95.38 $78.00 $90.27 $74.89
21411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)3,109TON $80.00 $64.00 $70.50 $82.83 $64.20 $78.40 $67.07
22411(C) 5950 SUPERPAVE, TYPE S4(PG 76-28 OK)1,903TON $100.00 $80.00 $91.30 $106.85 $91.90 $101.14 $83.70
23411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)60TON $90.00 $83.00 $125.00 $141.99 $186.00 $134.40 $85.87
24412 5267 COLD MILLING PAVEMENT6,714SY $5.00 $3.10 $3.45 $7.22 $6.15 $5.60 $3.26
25413(A) 4861 RUMBLE STRIP-METHOD HMA-CON4,428LF $1.00 $1.25 $1.29 $0.7100 $1.65 $2.80 $1.73
26414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )3,394SY $25.00 $18.00 $20.00 $16.49 $31.80 $37.52 $23.00
27414(G) 5275 P.C. CONCRETE FOR PAVEMENT755CY $170.00 $160.00 $215.96 $133.98 $155.50 $184.80 $165.00
28509(C) 0322 CLASS A CONCRETE, SMALL STRUCTURES7CY $715.00 $380.00 $753.46 $96.53 $1,371.00 $1,074.08 $530.49
29509(D) 0325 CLASS C CONCRETE106CY $300.00 $215.00 $432.66 $318.60 $323.50 $404.73 $434.79
30610(B) 0604 6" CONCRETE DRIVEWAY66SY $60.00 $180.00 $65.00 $50.91 $130.00 $115.36 $62.59
31611(G) 6002 INLET (SMD-TYPE 2)1EA $2,500.00 $2,500.00 $1,443.24 $2,847.35 $1,964.00 $3,397.43 $1,752.40
32613(A) 0491 18" R.C.PIPE CLASS III213LF $50.00 $52.00 $83.19 $55.77 $82.30 $47.78 $62.58
33613(A) 0492 24" R.C.PIPE CLASS III10LF $90.00 $93.00 $170.07 $66.48 $70.90 $141.30 $79.21
34613(A) 4495 22" X 13" R.C.PIPE ARCH CLASS A-III154LF $55.00 $65.00 $142.40 $71.98 $108.50 $74.15 $93.80
35613(L) 4506 22" X 13" PREFAB. CULVERT END SEC., ARCH8EA $600.00 $840.00 $1,348.35 $856.69 $1,914.00 $973.73 $888.17
36613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND2EA $450.00 $800.00 $1,856.71 $811.26 $1,574.00 $1,145.98 $1,145.94
37619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $30,000.00 $4,000.00 $10,000.00 $18,567.37 $15,510.00 $22,400.00 $35,000.00
38619(B) 0291 REMOVAL OF HEADWALL2EA $1,000.00 $250.00 $1,143.72 $2,591.52 $1,656.00 $1,680.00 $2,324.66
39619(B) 4725 REMOVAL OF FENCE6,348LF $2.00 $1.00 $1.60 $1.00 $2.00 $1.12 $1.03
40619(B) 4727 REMOVAL OF CONCRETE PAVEMENT2,876SY $10.00 $4.00 $4.00 $4.98 $10.80 $11.20 $7.53
41619(B) 4728 REMOVAL OF ASPHALT PAVEMENT18,217SY $5.00 $3.00 $4.67 $6.51 $5.50 $7.28 $3.26
42619(B) 4780 REMOVAL OF GUARDRAIL2,545LF $5.00 $2.00 $3.20 $4.73 $2.20 $2.24 $7.32
43619(B) 5918 REMOVAL OF EXISTING PIPE278LF $10.00 $5.00 $13.79 $9.69 $32.90 $5.60 $17.84
44619(C) 0924 SAWING PAVEMENT4,125LF $4.00 $2.10 $1.94 $1.45 $5.50 $4.48 $9.13
45623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE2,050LF $18.00 $14.00 $16.51 $20.41 $14.90 $17.36 $18.75
46623(F) 8300 GUARDRAIL TRAIL END TURNDOWN (31")1EA $900.00 $590.00 $692.25 $887.45 $632.50 $728.00 $815.23
47623(G) 8590 GUARDRAIL END TREATMENT (31")3EA $2,300.00 $2,150.00 $2,289.75 $2,484.86 $2,310.00 $2,408.00 $2,282.65
48623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")6EA $2,000.00 $2,360.00 $1,576.20 $1,893.23 $1,595.00 $1,657.60 $1,739.17
49624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)5,794LF $6.00 $4.00 $4.10 $4.56 $4.25 $4.31 $6.36
50629(E) 5048 REMOVE AND RESET MAILBOX1EA $200.00 $70.00 $106.50 $354.98 $111.00 $728.00 $268.46
51501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON360CY $16.00 $40.00 $22.02 $15.00 $15.00 $28.00 $28.88
52501(G) 6309 CLSM BACKFILL433.8CY $180.00 $130.00 $165.89 $198.87 $158.50 $122.51 $163.15
53504(A) 1304 APPROACH SLAB649.4SY $200.00 $130.00 $134.85 $174.80 $177.50 $197.64 $190.89
54504(B) 1305 SAW-CUT GROOVING1,875.3SY $5.25 $2.90 $2.98 $3.31 $3.10 $3.14 $3.04
55504(C) 6250 SEALED EXPANSION JOINT74.2LF $3.40 $180.00 $175.81 $189.63 $266.00 $264.60 $283.18
56504(E) 6190 42" F-SHAPED PARAPET965.8LF $120.00 $68.00 $82.46 $83.30 $96.20 $83.61 $93.76
57506(A) 1322 STRUCTURAL STEEL414,990LB $2.10 $1.55 $2.60 $1.50 $1.55 $1.87 $1.80
58507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY14EA $2,100.00 $1,275.00 $1,068.18 $1,279.25 $1,318.00 $1,892.52 $1,739.63
59507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY28EA $2,300.00 $1,275.00 $1,068.18 $1,279.25 $1,318.00 $1,788.75 $1,314.05
60509(A) 1326 CLASS AA CONCRETE349.2CY $525.00 $600.00 $490.00 $673.65 $490.00 $544.91 $650.00
61509(B) 1328 CLASS A CONCRETE381.6CY $550.00 $600.00 $550.00 $666.00 $541.00 $712.91 $650.00
62510(C) 6138 SLOPE WALL (5")1,980SY $110.00 $105.00 $88.76 $98.25 $98.80 $82.73 $94.98
63511(A) 1332 REINFORCING STEEL2,820LB $1.50 $1.25 $0.8200 $1.29 $2.70 $1.18 $1.25
64511(B) 6010 EPOXY COATED REINFORCING STEEL165,840LB $1.15 $1.00 $1.02 $0.8300 $0.9500 $0.9600 $1.41
65514(A) 6010 PILES, FURNISHED (HP 10X42)196LF $37.00 $26.00 $21.46 $23.93 $35.60 $27.69 $24.35
66514(A) 6011 PILES, FURNISHED (HP 12X53)1,749LF $40.00 $34.00 $26.96 $28.11 $35.80 $32.93 $32.62
67514(B) 6292 PILES, DRIVEN (HP 10X42)196LF $13.00 $10.00 $26.26 $17.17 $22.20 $13.44 $26.64
68514(B) 6294 PILES, DRIVEN (HP 12X53)1,749LF $27.00 $11.00 $28.14 $17.17 $13.60 $11.20 $27.67
69514(G) 6310 METAL PILE SHOES42EA $113.00 $115.00 $128.40 $117.96 $112.00 $134.29 $130.31
70514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
71515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,218SY $4.00 $3.10 $3.20 $3.55 $3.30 $3.36 $3.26
72516(A) 6098 DRILLED SHAFTS 72" DIAMETER228LF $1,200.00 $1,100.00 $764.18 $966.84 $813.00 $772.49 $1,527.19
73516(C) 6200 CROSSHOLE SONIC LOGGING2EA $3,000.00 $2,000.00 $1,704.00 $3,026.21 $1,650.00 $6,272.00 $2,173.96
74523(A) 6550 SEALER CRACK PREPARATION80LF $4.00 $3.10 $3.20 $3.55 $3.30 $3.36 $3.26
75523(B) 6560 SEALER RESIN1GAL $300.00 $83.00 $85.20 $94.67 $88.00 $89.60 $86.96
76525(C) 1000 (SP)NEST PREVENTION1LSUM $6,000.00 $3,500.00 $11,069.39 $4,391.86 $1,854.00 $6,160.00 $14,122.33
77613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND469LF $20.00 $17.00 $21.89 $19.35 $31.00 $27.71 $24.94
78613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.80LF $20.00 $17.00 $12.22 $11.24 $11.60 $23.11 $27.82
79619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $83,220.00 $40,000.00 $74,594.94 $49,337.76 $61,030.00 $201,600.00 $85,000.00
80501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON360CY $16.00 $40.00 $22.02 $15.00 $15.00 $28.00 $28.88
81501(G) 6309 CLSM BACKFILL433.8CY $180.00 $130.00 $165.89 $198.87 $158.50 $122.51 $163.15
82504(A) 1304 APPROACH SLAB649.4SY $200.00 $125.00 $134.85 $174.80 $177.50 $197.64 $190.89
83504(B) 1305 SAW-CUT GROOVING1,875.3SY $5.25 $2.90 $2.98 $3.31 $3.10 $3.14 $3.04
84504(C) 6250 SEALED EXPANSION JOINT74.2LF $3.40 $205.00 $175.81 $189.63 $266.00 $236.60 $283.18
85504(E) 6190 42" F-SHAPED PARAPET967LF $120.00 $68.00 $82.47 $83.30 $96.20 $83.60 $93.81
86506(A) 1322 STRUCTURAL STEEL414,990LB $2.10 $1.55 $2.60 $1.50 $1.55 $1.93 $1.80
87507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY14EA $2,100.00 $1,275.00 $1,068.18 $1,279.25 $1,318.00 $1,904.73 $1,739.63
88507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY28EA $2,300.00 $1,275.00 $1,068.18 $1,279.25 $1,318.00 $1,848.73 $1,247.32
89509(A) 1326 CLASS AA CONCRETE349.2CY $525.00 $575.00 $490.00 $673.65 $490.00 $544.91 $650.00
90509(B) 1328 CLASS A CONCRETE329.1CY $550.00 $600.00 $550.00 $666.00 $604.50 $768.91 $650.00
91510(C) 6138 SLOPE WALL (5")1,887SY $110.00 $105.00 $88.76 $98.25 $102.00 $82.50 $95.29
92511(A) 1332 REINFORCING STEEL2,650LB $1.50 $1.25 $0.8200 $1.29 $2.85 $1.29 $1.25
93511(B) 6010 EPOXY COATED REINFORCING STEEL165,140LB $1.15 $1.00 $1.02 $0.8300 $0.9500 $0.9400 $1.41
94513(B) 6019 CLASS B BRIDGE DECK REPAIR20SY $375.00 $450.00 $116.90 $403.25 $229.50 $463.26 $602.79
95513(C) 6020 CLASS C BRIDGE DECK REPAIR40SY $550.00 $400.00 $247.91 $497.71 $229.50 $713.51 $623.61
96514(A) 6010 PILES, FURNISHED (HP 10X42)188LF $37.00 $29.00 $21.46 $23.93 $36.20 $26.64 $25.39
97514(A) 6011 PILES, FURNISHED (HP 12X53)1,673LF $40.00 $37.00 $26.96 $28.11 $36.00 $33.01 $32.40
98514(B) 6292 PILES, DRIVEN (HP 10X42)188LF $13.00 $10.50 $22.85 $17.17 $25.30 $13.44 $26.96
99514(B) 6294 PILES, DRIVEN (HP 12X53)1,673LF $27.00 $11.00 $13.45 $17.17 $16.00 $13.44 $28.05
100514(G) 6310 METAL PILE SHOES42EA $113.00 $115.00 $128.40 $117.96 $112.00 $134.29 $130.31
101514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
102515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,131SY $4.00 $3.10 $3.20 $3.55 $3.30 $3.36 $3.26
103516(A) 6098 DRILLED SHAFTS 72" DIAMETER334LF $1,200.00 $800.00 $840.09 $966.84 $796.50 $764.23 $1,485.79
104516(C) 6200 CROSSHOLE SONIC LOGGING2EA $3,000.00 $2,000.00 $1,704.00 $3,026.21 $1,650.00 $6,272.00 $2,173.96
105523(A) 6550 SEALER CRACK PREPARATION80LF $4.00 $3.10 $3.20 $3.55 $3.30 $3.36 $3.26
106523(B) 6560 SEALER RESIN1GAL $300.00 $83.00 $85.20 $94.67 $88.00 $89.60 $86.96
107525(C) 1000 (SP)NEST PREVENTION1LSUM $6,000.00 $400.00 $11,069.39 $14,254.97 $1,854.00 $5,600.00 $15,162.23
108613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND391LF $20.00 $17.00 $21.89 $19.35 $39.40 $30.95 $24.92
109613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.40LF $20.00 $17.00 $12.22 $11.24 $23.20 $25.35 $27.84
110619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $109,500.00 $40,000.00 $88,594.94 $49,337.76 $93,445.00 $257,600.00 $85,000.00
111804(A) 2915 STRUCTURAL CONCRETE4CY $450.00 $410.00 $426.00 $473.31 $203.50 $460.00 $434.79
112804(B) 2916 REINFORCING STEEL844LB $1.50 $2.05 $2.13 $2.37 $1.65 $2.30 $2.17
113850(A) 8110 SHEET ALUMINUM SIGNS27SF $25.00 $25.50 $26.63 $29.58 $30.80 $28.75 $27.17
114850(B) 8112 EXTRUDED ALUMINUM PANEL SIGNS336SF $25.00 $26.00 $26.63 $29.58 $28.60 $28.75 $27.17
115851(A) 3207 6"@15 GALV.STEEL WIDE FLANGE BEAM POST45LF $26.00 $25.00 $25.56 $28.40 $19.80 $27.60 $26.09
116851(A) 3210 8"@31 GALV.STEEL WIDE FLANGE BEAM POST62LF $50.00 $32.50 $34.08 $37.87 $37.40 $36.80 $34.78
117851(C) 8324 2" SQUARE TUBE POST110LF $10.00 $10.30 $10.65 $11.84 $6.60 $11.50 $10.87
118853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)46EA $10.00 $12.50 $10.65 $11.84 $13.20 $17.25 $10.87
119855(A) 8813 TRAFFIC STRIPE(PLASTIC)(6" WIDE)12,278LF $0.7000 $1.05 $1.07 $1.18 $0.8500 $1.15 $1.09
120855(A) 8814 TRAFFIC STRIPE(PLASTIC)(8" WIDE)1,997LF $0.8000 $1.55 $1.60 $1.78 $1.75 $1.73 $1.63
121855(A) 8818 TRAFFIC STRIPE(PLASTIC)(12" WIDE)813LF $1.00 $2.55 $2.66 $2.96 $7.70 $2.88 $2.72
122857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)69,149LF $0.1500 $0.1100 $0.1100 $0.1200 $0.2100 $0.1200 $0.1100
123857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)86,119LF $0.2000 $0.1100 $0.1100 $0.1200 $0.2400 $0.1200 $0.1100
124870(A) 8485 SAND FILLED IMPACT ATTENUATION MODULE31,160SD $0.2000 $0.3200 $0.3200 $0.3600 $0.0500 $0.3500 $0.3300
125877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER5,990LF $17.50 $20.00 $25.00 $38.88 $16.30 $37.95 $8.07
126877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER9,127LF $6.50 $2.40 $1.10 $2.86 $8.45 $5.75 $4.16
127878(B) 8487 MODULAR GLARE SCREEN (TEMPORARY)29,491SD $0.1000 $0.1600 $0.1600 $0.1800 $0.0200 $0.1700 $0.1600
128880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF5,600SD $0.2500 $1.05 $1.07 $1.18 $0.3800 $1.15 $1.09
129880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF5,920SD $0.7500 $1.05 $1.07 $1.18 $0.3800 $1.15 $1.09
130880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF16,320SD $1.25 $2.05 $2.13 $2.37 $0.3800 $2.30 $2.17
131880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)4,320SD $0.7500 $2.05 $2.13 $2.37 $5.50 $2.30 $2.17
132880(C) 8848 WING BARRICADES1,600SD $1.00 $1.05 $1.07 $1.18 $0.0500 $1.15 $1.09
133880(E) 8860 WARNING LIGHTS(TYPE A)24,960SD $0.2000 $0.1100 $0.1100 $0.1200 $0.0200 $0.1200 $0.1100
134880(F) 8878 DRUMS26,680SD $0.2000 $0.2600 $0.2700 $0.3000 $1.75 $0.2900 $0.2700
135880(L) 8911 TRAFFIC SURVEILLANCE, POLICE432HOUR $80.00 $66.50 $102.65 $70.00 $77.70 $74.75 $86.96
136882 8360 (SP)SMART WORK ZONE SYSTEM400SD $100.00 $20.75 $21.30 $23.66 $17.60 $23.00 $21.74
137882 8370 (SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN6,400SD $40.00 $5.15 $5.33 $5.92 $11.00 $5.75 $5.43
138882 8372 (SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS)5,200SD $12.50 $5.10 $5.33 $5.92 $6.60 $5.75 $5.43
139882 8374 (SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC)400SD $20.00 $10.25 $10.65 $11.84 $16.50 $11.50 $10.87
140882 8376 (SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM400SD $20.00 $26.00 $26.63 $29.58 $27.50 $28.75 $27.17
141882 8378 (PL)SMART WORK ZONE SYSTEM SETUP1EA $5,000.00 $128,000.00 $133,125.00 $147,908.80 $84,690.00 $143,750.00 $135,872.24
142882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN1,600SD $10.00 $5.20 $5.33 $5.92 $4.40 $5.75 $5.43
143509(A) 0319 CLASS AA CONCRETE15.12CY $425.00 $260.00 $532.50 $380.24 $550.00 $632.50 $597.84
144619(B) 5190 REMOVAL OF CABLE BARRIER1,641LF $3.00 $3.60 $10.65 $5.17 $10.10 $12.65 $11.96
145628 5180 INSTALLATION OF CABLE BARRIER SYSTEM1,473LF $8.00 $9.50 $21.30 $13.77 $10.20 $25.30 $23.91
146628(C) 5110 END ANCHORS4EA $1,600.00 $4,100.00 $4,260.00 $6,083.85 $11,000.00 $5,060.00 $4,782.70
147642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $65,000.00 $29,000.00 $36,116.01 $32,658.26 $47,595.00 $32,775.00 $47,038.97
148220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $1,910.00 $660.36 $2,958.17 $5,549.00 $5,980.00 $5,316.65
149640(A) 1398 FIELD OFFICE1EA $15,000.00 $10,609.00 $24,073.50 $20,115.60 $16,650.00 $23,000.00 $19,022.84
150641 1399 MOBILIZATION1LSUM $410,000.00 $325,000.00 $350,000.00 $318,132.21 $643,481.50 $411,553.86 $448,098.00