| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$40,000.00 |
$35,000.00 |
$82,750.00 |
$298,308.48 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 48,382 | CY |
$5.00 |
$9.60 |
$8.18 |
$18.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 35,969 | CY |
$8.00 |
$10.00 |
$8.51 |
$15.90 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$100,000.00 |
$41,700.00 |
$131,000.00 |
$282,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,900 | LF |
$2.00 |
$1.10 |
$1.15 |
$1.25 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,974 | LF |
$7.00 |
$8.20 |
$6.75 |
$7.20 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 50 | CY |
$100.00 |
$85.50 |
$85.00 |
$160.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 140,263 | SY |
$1.50 |
$1.05 |
$1.08 |
$1.20 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 58 | AC |
$350.00 |
$325.00 |
$325.00 |
$350.00 |
| 10 | 241 2832 |
MOWING | 58 | AC |
$65.00 |
$65.00 |
$49.00 |
$50.00 |
| 11 | 303(A) 2200 |
(SP)AGGREGATE BASE TYPE A, PLANT MIXED | 14,510 | CY |
$40.00 |
$46.65 |
$27.35 |
$60.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 81,822 | SY |
$4.00 |
$4.90 |
$8.00 |
$6.00 |
| 13 | 310(B) 0149 |
SUBGRADE, METHOD B | 17,981 | SY |
$1.50 |
$1.20 |
$2.50 |
$2.60 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 71,294 | SY |
$1.25 |
$0.8500 |
$0.8200 |
$1.30 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 7,116 | TON |
$25.00 |
$22.05 |
$20.00 |
$25.00 |
| 16 | 407(B) 0250 |
TACK COAT | 19,077 | GAL |
$2.50 |
$2.00 |
$3.40 |
$3.00 |
| 17 | 408 5774 |
PRIME COAT | 53,511 | GAL |
$4.00 |
$3.00 |
$3.60 |
$3.00 |
| 18 | 409(A) 4242 |
FABRIC REINFORCEMENT | 80,963 | SY |
$1.00 |
$0.6500 |
$2.03 |
$0.9800 |
| 19 | 409(B) 4268 |
BITUMINOUS BINDER | 16,193 | GAL |
$4.00 |
$2.50 |
$1.00 |
$2.60 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 38,448 | TON |
$68.00 |
$48.35 |
$60.80 |
$65.00 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 14,582 | TON |
$75.00 |
$51.95 |
$69.70 |
$70.00 |
| 22 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 500 | TON |
$135.00 |
$90.00 |
$122.20 |
$162.00 |
| 23 | 412 5267 |
COLD MILLING PAVEMENT | 60,478 | SY |
$1.50 |
$1.00 |
$0.8200 |
$3.00 |
| 24 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 199 | CY |
$15.00 |
$10.40 |
$10.00 |
$10.60 |
| 25 | 509(A) 0319 |
CLASS AA CONCRETE | 695 | CY |
$325.00 |
$312.75 |
$300.00 |
$318.00 |
| 26 | 509(D) 0325 |
CLASS C CONCRETE | 736 | CY |
$250.00 |
$255.40 |
$245.00 |
$260.00 |
| 27 | 511(A) 0332 |
REINFORCING STEEL | 104,689 | LB |
$0.9000 |
$0.9400 |
$0.9000 |
$0.9500 |
| 28 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 18 | TON |
$45.00 |
$58.90 |
$50.00 |
$53.00 |
| 29 | 609(A) 0287 |
CONCRETE CURB (4" MNTBLE-INTEGRAL) | 296 | LF |
$20.00 |
$40.50 |
$20.00 |
$10.85 |
| 30 | 609(B) 1513 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) | 737 | LF |
$18.00 |
$30.80 |
$20.00 |
$29.05 |
| 31 | 610(B) 5016 |
8" CONCRETE DRIVEWAY | 468 | SY |
$60.00 |
$63.80 |
$50.00 |
$76.10 |
| 32 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 448 | LF |
$40.00 |
$54.20 |
$55.00 |
$58.30 |
| 33 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 238 | LF |
$55.00 |
$83.40 |
$85.00 |
$90.10 |
| 34 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 70 | LF |
$70.00 |
$93.80 |
$140.00 |
$148.40 |
| 35 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 98 | LF |
$70.00 |
$109.45 |
$200.00 |
$212.00 |
| 36 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 940 | LF |
$20.00 |
$33.35 |
$25.00 |
$26.50 |
| 37 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 94 | LF |
$30.00 |
$41.70 |
$28.00 |
$29.70 |
| 38 | 613(B) 0693 |
42" CORR. GALV. STEEL PIPE | 144 | LF |
$50.00 |
$75.05 |
$48.00 |
$50.90 |
| 39 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 92 | LF |
$80.00 |
$88.60 |
$65.00 |
$68.90 |
| 40 | 613(B) 0697 |
66" CORR. GALV. STEEL PIPE | 252 | LF |
$100.00 |
$100.05 |
$85.00 |
$90.10 |
| 41 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 218 | LF |
$30.00 |
$36.50 |
$24.00 |
$25.45 |
| 42 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 406 | LF |
$30.00 |
$41.70 |
$30.00 |
$31.80 |
| 43 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 414 | LF |
$40.00 |
$54.20 |
$35.00 |
$37.10 |
| 44 | 613(B) 4531 |
49" X 33" CORR. GALV. STEEL PIPE ARCH | 128 | LF |
$60.00 |
$72.95 |
$60.00 |
$63.60 |
| 45 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$15.00 |
$23.95 |
$27.50 |
$10.60 |
| 46 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$15.00 |
$20.85 |
$27.50 |
$10.60 |
| 47 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 62 | EA |
$900.00 |
$835.00 |
$800.00 |
$848.00 |
| 48 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 22 | EA |
$1,000.00 |
$1,045.00 |
$1,000.00 |
$1,060.00 |
| 49 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 6 | EA |
$1,200.00 |
$1,250.00 |
$1,200.00 |
$1,272.00 |
| 50 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 7 | EA |
$1,500.00 |
$2,085.00 |
$2,000.00 |
$2,120.00 |
| 51 | 613(M) 7194 |
TYPE DD4 CULVERT END TREATMENT | 2 | EA |
$2,200.00 |
$2,295.00 |
$2,200.00 |
$2,332.00 |
| 52 | 613(N) 7500 |
TYPE A4 SLOPED CONCRETE END SECTION | 2 | EA |
$1,200.00 |
$840.00 |
$900.00 |
$954.00 |
| 53 | 613(N) 7501 |
TYPE B4 SLOPED CONCRETE END SECTION | 4 | EA |
$1,500.00 |
$940.00 |
$900.00 |
$954.00 |
| 54 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$84,860.00 |
$21,000.00 |
$125,000.00 |
| 55 | 619(B) 0291 |
REMOVAL OF HEADWALL | 18 | EA |
$800.00 |
$520.00 |
$500.00 |
$795.00 |
| 56 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 700 | LF |
$4.00 |
$6.25 |
$21.20 |
$8.00 |
| 57 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 39,011 | SY |
$2.00 |
$2.95 |
$4.75 |
$9.00 |
| 58 | 619(C) 0924 |
SAWING PAVEMENT | 35,000 | LF |
$2.00 |
$1.25 |
$2.30 |
$2.00 |
| 59 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 16,002 | LF |
$3.00 |
$5.40 |
$2.95 |
$5.50 |
| 60 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 3 | EA |
$2,000.00 |
$835.00 |
$500.00 |
$848.00 |
| 61 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$500.00 |
$205.00 |
$200.00 |
$212.00 |
| 62 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$1,000.00 |
$260.00 |
$250.00 |
$265.00 |
| 63 | 629(C) 4960 |
MAILBOX | 7 | EA |
$500.00 |
$30.00 |
$30.00 |
$31.80 |
| 64 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 3 | EA |
$200.00 |
$15.00 |
$15.00 |
$15.90 |
| 65 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 5 | EA |
$200.00 |
$250.00 |
$110.00 |
$0.1000 |
| 66 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,965 | CY |
$5.50 |
$10.40 |
$10.00 |
$10.60 |
| 67 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 190 | CY |
$16.00 |
$15.60 |
$15.00 |
$15.90 |
| 68 | 509(A) 1326 |
CLASS AA CONCRETE | 625.5 | CY |
$400.00 |
$312.75 |
$300.00 |
$318.00 |
| 69 | 511(A) 1332 |
REINFORCING STEEL | 95,329 | LB |
$1.00 |
$0.9400 |
$0.9000 |
$0.9500 |
| 70 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 363 | TON |
$40.00 |
$58.60 |
$40.00 |
$42.40 |
| 71 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 122 | TON |
$30.00 |
$42.70 |
$40.00 |
$42.40 |
| 72 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$18,100.00 |
$20,000.00 |
$21,200.00 |
| 73 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,550 | CY |
$5.50 |
$10.40 |
$10.00 |
$10.60 |
| 74 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 150 | CY |
$16.00 |
$15.60 |
$15.00 |
$15.90 |
| 75 | 509(A) 1326 |
CLASS AA CONCRETE | 336.6 | CY |
$400.00 |
$312.75 |
$300.00 |
$318.00 |
| 76 | 511(A) 1332 |
REINFORCING STEEL | 48,500 | LB |
$1.00 |
$0.9400 |
$0.9000 |
$0.9500 |
| 77 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 147 | TON |
$40.00 |
$66.40 |
$40.00 |
$42.40 |
| 78 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 49 | TON |
$30.00 |
$48.70 |
$40.00 |
$42.40 |
| 79 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$12,050.00 |
$15,000.00 |
$15,900.00 |
| 80 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 218,216 | LF |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0600 |
| 81 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 5,000 | EA |
$0.7500 |
$0.6400 |
$0.6400 |
$0.6800 |
| 82 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 139,166 | LF |
$0.1000 |
$0.1100 |
$0.1100 |
$0.1200 |
| 83 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 2,100 | SD |
$15.00 |
$4.00 |
$4.00 |
$4.24 |
| 84 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,350 | LF |
$25.00 |
$20.25 |
$19.10 |
$20.25 |
| 85 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 8,700 | SD |
$0.2500 |
$0.2000 |
$0.2000 |
$0.2100 |
| 86 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 27,360 | SD |
$0.3500 |
$0.2000 |
$0.2000 |
$0.2100 |
| 87 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,720 | SD |
$1.00 |
$1.00 |
$1.00 |
$1.06 |
| 88 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 15,960 | SD |
$0.2500 |
$0.7500 |
$0.7500 |
$0.8000 |
| 89 | 880(C) 8848 |
WING BARRICADES | 1,200 | SD |
$0.7500 |
$1.00 |
$1.00 |
$1.06 |
| 90 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 31,920 | SD |
$0.0500 |
$0.2500 |
$0.2500 |
$0.2700 |
| 91 | 880(F) 8878 |
DRUMS | 23,160 | SD |
$0.1500 |
$0.4300 |
$0.4300 |
$0.4600 |
| 92 | 880(G) 8890 |
CHANNELIZER CONES | 62,520 | SD |
$0.0500 |
$0.4300 |
$0.4300 |
$0.4600 |
| 93 | 880(I) 8902 |
FLAGGER | 120 | SD |
$500.00 |
$225.00 |
$550.00 |
$1,436.45 |
| 94 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 600 | SD |
$6.00 |
$15.00 |
$15.00 |
$15.90 |
| 95 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 39,850 | LF |
$0.2500 |
$0.1100 |
$0.1100 |
$0.1500 |
| 96 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 15 | EA |
$100.00 |
$165.00 |
$165.00 |
$174.90 |
| 97 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 180 | SF |
$20.00 |
$52.10 |
$50.00 |
$53.00 |
| 98 | 851(C) 8324 |
2" SQUARE TUBE POST | 254 | LF |
$10.00 |
$9.35 |
$9.00 |
$9.55 |
| 99 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 69,354 | LF |
$0.5000 |
$0.4500 |
$0.4500 |
$0.5000 |
| 100 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 783 | LF |
$1.00 |
$0.6000 |
$0.6000 |
$0.6500 |
| 101 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 978 | LF |
$2.00 |
$1.80 |
$1.80 |
$1.90 |
| 102 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 122 | LF |
$10.00 |
$4.00 |
$4.00 |
$4.25 |
| 103 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 9 | EA |
$90.00 |
$125.00 |
$125.00 |
$132.50 |
| 104 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$85,000.00 |
$148,000.00 |
$125,000.00 |
| 105 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$4,000.00 |
$30,000.00 |
$35,000.00 |
| 106 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$20,000.00 |
$7,500.00 |
$25,000.00 |
| 107 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$385,000.00 |
$324,000.00 |
$266,500.00 |
$569,000.00 |