| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$75,000.00 |
$75,000.00 |
$75,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 519,458 | CY |
$4.50 |
$3.52 |
$3.75 |
$3.75 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 43,177 | CY |
$6.50 |
$4.07 |
$4.15 |
$0.2500 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$543,432.00 |
$462,000.00 |
$385,000.00 |
$255,616.95 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,965 | LF |
$2.25 |
$1.36 |
$3.00 |
$2.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 812 | LF |
$8.25 |
$8.15 |
$12.00 |
$7.18 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 60 | CY |
$50.00 |
$70.05 |
$125.00 |
$74.99 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 815,415 | SY |
$1.50 |
$1.35 |
$1.15 |
$1.19 |
| 9 | 230(F) 2812 |
WATERING | 32,617 | KGAL |
$10.00 |
$5.26 |
$7.00 |
$7.68 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 168.47 | AC |
$525.00 |
$664.00 |
$400.00 |
$427.02 |
| 11 | 234(A) 2824 |
FERTILIZING (10-20-10) | 82 | TON |
$732.00 |
$721.00 |
$800.00 |
$910.97 |
| 12 | 241 2832 |
MOWING | 168.47 | AC |
$85.00 |
$126.00 |
$50.00 |
$51.24 |
| 13 | 307(A) 4200 |
FLY ASH | 8,391 | TON |
$75.00 |
$49.15 |
$66.00 |
$59.13 |
| 14 | 307(D) 4230 |
LIME | 751 | TON |
$150.00 |
$154.50 |
$100.00 |
$178.63 |
| 15 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 155,394 | SY |
$2.50 |
$2.00 |
$1.50 |
$1.43 |
| 16 | 307(G) 4260 |
LIME PRETREATMENT | 52,173 | SY |
$2.00 |
$1.55 |
$1.00 |
$0.9600 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,186 | TON |
$25.00 |
$28.45 |
$29.00 |
$30.32 |
| 18 | 407(B) 0250 |
TACK COAT | 39,761 | GAL |
$3.00 |
$4.00 |
$2.50 |
$2.88 |
| 19 | 408 5774 |
PRIME COAT | 66,508 | GAL |
$4.25 |
$4.30 |
$3.50 |
$4.04 |
| 20 | 409(A) 4242 |
FABRIC REINFORCEMENT | 15,016 | SY |
$1.25 |
$1.05 |
$4.00 |
$4.62 |
| 21 | 409(B) 4268 |
BITUMINOUS BINDER | 3,630 | GAL |
$4.05 |
$4.00 |
$5.00 |
$5.77 |
| 22 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 17,067 | TON |
$71.00 |
$68.65 |
$69.75 |
$80.53 |
| 23 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 57,157 | TON |
$67.00 |
$56.20 |
$61.00 |
$70.42 |
| 24 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 11,518 | TON |
$80.00 |
$83.65 |
$83.00 |
$95.83 |
| 25 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 13,570 | TON |
$75.00 |
$73.00 |
$67.25 |
$77.65 |
| 26 | 412 5267 |
COLD MILLING PAVEMENT | 41,296 | SY |
$3.50 |
$1.55 |
$0.8000 |
$0.9200 |
| 27 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 119 | CY |
$20.00 |
$12.50 |
$35.00 |
$40.10 |
| 28 | 509(A) 0319 |
CLASS AA CONCRETE | 380 | CY |
$375.00 |
$268.00 |
$400.00 |
$448.49 |
| 29 | 509(D) 0325 |
CLASS C CONCRETE | 4,688 | CY |
$250.00 |
$194.00 |
$180.00 |
$206.62 |
| 30 | 511(A) 0332 |
REINFORCING STEEL | 54,433 | LB |
$0.9000 |
$0.8000 |
$0.9000 |
$1.03 |
| 31 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 2 | EA |
$2,500.00 |
$3,200.00 |
$3,200.00 |
$3,700.80 |
| 32 | 611(B) 2681 |
ADD'L.DEPTH IN MANHOLE (5' DIAMETER) | 14 | VF |
$515.00 |
$194.00 |
$200.00 |
$222.05 |
| 33 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 194 | LF |
$55.00 |
$44.50 |
$45.00 |
$48.81 |
| 34 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 151 | LF |
$60.00 |
$57.05 |
$58.00 |
$68.02 |
| 35 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 334 | LF |
$80.00 |
$74.65 |
$76.00 |
$100.03 |
| 36 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 128 | LF |
$60.00 |
$52.75 |
$54.00 |
$83.38 |
| 37 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 202 | LF |
$65.00 |
$66.35 |
$67.00 |
$104.44 |
| 38 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 4,398 | LF |
$28.00 |
$22.45 |
$22.00 |
$42.00 |
| 39 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 952 | LF |
$35.00 |
$28.15 |
$28.00 |
$56.00 |
| 40 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 948 | LF |
$35.00 |
$40.85 |
$41.00 |
$78.00 |
| 41 | 613(B) 0693 |
42" CORR. GALV. STEEL PIPE | 60 | LF |
$45.00 |
$45.00 |
$45.00 |
$74.02 |
| 42 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 1,384 | LF |
$45.00 |
$22.00 |
$22.00 |
$49.00 |
| 43 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 966 | LF |
$28.00 |
$30.00 |
$30.00 |
$59.00 |
| 44 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 264 | LF |
$48.00 |
$47.35 |
$48.00 |
$91.00 |
| 45 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 2,735 | LF |
$8.00 |
$6.30 |
$6.50 |
$27.32 |
| 46 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 912 | LF |
$10.00 |
$6.30 |
$6.50 |
$12.59 |
| 47 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$800.00 |
$794.00 |
$800.00 |
$492.55 |
| 48 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$800.00 |
$900.00 |
$900.00 |
$547.81 |
| 49 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$900.00 |
$2,000.00 |
$2,000.00 |
$99.71 |
| 50 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,100.00 |
$2,130.00 |
$2,200.00 |
$1,556.94 |
| 51 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 74 | EA |
$700.00 |
$1,010.00 |
$675.00 |
$777.85 |
| 52 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 33 | EA |
$1,000.00 |
$1,030.00 |
$775.00 |
$899.39 |
| 53 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 6 | EA |
$900.00 |
$1,340.00 |
$900.00 |
$1,030.65 |
| 54 | 613(M) 7203 |
TYPE CC6 CULVERT END TREATMENT | 3 | EA |
$3,500.00 |
$1,855.00 |
$2,400.00 |
$2,728.56 |
| 55 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 495 | CY |
$30.00 |
$70.25 |
$70.00 |
$95.77 |
| 56 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 92 | CY |
$20.00 |
$62.60 |
$84.00 |
$34.16 |
| 57 | 613(V) 1180 |
TRENCH EXCAVATION | 1,577 | CY |
$8.00 |
$9.80 |
$10.00 |
$2.00 |
| 58 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$30,000.00 |
$66,000.00 |
$70,000.00 |
$15,028.10 |
| 59 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$800.00 |
$1,550.00 |
$2,000.00 |
$2,423.50 |
| 60 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 129,104 | SY |
$2.50 |
$1.51 |
$1.50 |
$1.73 |
| 61 | 619(C) 0924 |
SAWING PAVEMENT | 58,981 | LF |
$3.00 |
$2.00 |
$1.75 |
$2.86 |
| 62 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 700 | LF |
$18.00 |
$16.50 |
$14.00 |
$15.37 |
| 63 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$2,300.00 |
$1,600.00 |
$1,708.06 |
| 64 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,700.00 |
$2,010.00 |
$950.00 |
$1,024.84 |
| 65 | 624(A) 4281 |
FENCE-STYLE WWF | 11,499 | LF |
$4.50 |
$4.90 |
$3.85 |
$4.15 |
| 66 | 624(B) 4466 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 4 | EA |
$750.00 |
$515.00 |
$800.00 |
$910.97 |
| 67 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 23,279 | LF |
$5.00 |
$3.35 |
$3.60 |
$3.93 |
| 68 | 624(E) 4292 |
FENCE-STYLE CLF (6'HIGH, CLASS A) | 194 | LF |
$10.00 |
$14.45 |
$39.00 |
$42.70 |
| 69 | 624(F) 5964 |
GATES-STYLE CLF (6'HIGH X 16'LONG) | 1 | EA |
$690.00 |
$825.00 |
$1,000.00 |
$1,138.71 |
| 70 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 13 | EA |
$75.00 |
$72.00 |
$73.00 |
$84.94 |
| 71 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$160.00 |
$180.00 |
$185.00 |
$212.35 |
| 72 | 629(C) 4960 |
MAILBOX | 15 | EA |
$28.00 |
$26.00 |
$26.00 |
$30.34 |
| 73 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 15 | EA |
$15.75 |
$16.00 |
$16.00 |
$45.55 |
| 74 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 3,050 | CY |
$10.00 |
$1.50 |
$1.60 |
$1.82 |
| 75 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 142 | CY |
$20.00 |
$12.50 |
$35.00 |
$40.10 |
| 76 | 509(A) 1326 |
CLASS AA CONCRETE | 432.1 | CY |
$400.00 |
$286.00 |
$350.00 |
$407.16 |
| 77 | 511(A) 1332 |
REINFORCING STEEL | 63,210 | LB |
$1.00 |
$0.8000 |
$0.9000 |
$1.03 |
| 78 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$18,000.00 |
$4,000.00 |
$5,000.00 |
$5,773.12 |
| 79 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,910 | CY |
$10.00 |
$1.50 |
$1.60 |
$1.82 |
| 80 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 149 | CY |
$20.00 |
$12.50 |
$35.00 |
$40.10 |
| 81 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$5,300.00 |
$6,198.49 |
| 82 | 509(A) 1326 |
CLASS AA CONCRETE | 514.6 | CY |
$400.00 |
$268.00 |
$360.00 |
$418.09 |
| 83 | 511(A) 1332 |
REINFORCING STEEL | 93,560 | LB |
$1.00 |
$0.8000 |
$0.9000 |
$1.03 |
| 84 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$6,000.00 |
$8,300.00 |
$9,601.60 |
| 85 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 690 | CY |
$10.00 |
$1.50 |
$1.60 |
$1.82 |
| 86 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 110 | CY |
$20.00 |
$12.50 |
$35.00 |
$40.10 |
| 87 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$2,500.00 |
$3,099.25 |
| 88 | 509(A) 1326 |
CLASS AA CONCRETE | 256.5 | CY |
$400.00 |
$298.00 |
$450.00 |
$516.54 |
| 89 | 511(A) 1332 |
REINFORCING STEEL | 53,730 | LB |
$1.00 |
$0.8000 |
$0.9000 |
$1.03 |
| 90 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$6,000.00 |
$5,000.00 |
$6,350.42 |
| 91 | 504(A) 1304 |
APPROACH SLAB | 417.6 | SY |
$165.00 |
$308.00 |
$290.00 |
$347.70 |
| 92 | 504(E) 1381 |
CONCRETE PARAPET | 165.6 | LF |
$100.00 |
$372.00 |
$315.00 |
$208.62 |
| 93 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 126.3 | LF |
$25.00 |
$41.25 |
$42.00 |
$151.73 |
| 94 | 504(H) 6389 |
ELASTOMERIC MORTAR | 15.8 | CF |
$570.00 |
$825.00 |
$840.00 |
$1,074.72 |
| 95 | 505(B) 6070 |
REMOVING EXISTING OVERLAY | 587 | SY |
$30.00 |
$15.45 |
$20.00 |
$11.39 |
| 96 | 505(D) 6080 |
ASPHALT MEMBRANE OVERLAY | 1,005 | SY |
$20.00 |
$26.00 |
$26.00 |
$25.29 |
| 97 | 509 6386 |
SILICONE CONSTRUCTION JOINT | 126.3 | LF |
$15.00 |
$21.00 |
$21.00 |
$37.93 |
| 98 | 509(D) 1331 |
CLASS C CONCRETE | 16.9 | CY |
$300.00 |
$1,340.00 |
$1,400.00 |
$1,264.37 |
| 99 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 60 | SY |
$320.00 |
$361.00 |
$370.00 |
$316.09 |
| 100 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 68 | SY |
$5.00 |
$25.75 |
$26.00 |
$11.39 |
| 101 | 619(B) 2505 |
REMOVAL OF BRIDGE ITEMS | 4 | EA |
$4,000.00 |
$15,000.00 |
$12,000.00 |
$284.68 |
| 102 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 120 | SD |
$124.59 |
$191.00 |
$200.00 |
$224.49 |
| 103 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 160,000 | LF |
$0.1200 |
$0.5000 |
$0.5000 |
$0.5800 |
| 104 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 5,000 | EA |
$0.7700 |
$1.05 |
$1.00 |
$1.21 |
| 105 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 101,584 | LF |
$0.1700 |
$0.1500 |
$0.1500 |
$0.1800 |
| 106 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 120 | SD |
$13.95 |
$6.20 |
$6.00 |
$7.29 |
| 107 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 425 | LF |
$18.12 |
$25.75 |
$26.00 |
$51.24 |
| 108 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 425 | LF |
$3.16 |
$3.10 |
$3.00 |
$6.83 |
| 109 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,300 | SD |
$0.2200 |
$0.2100 |
$0.2000 |
$0.2400 |
| 110 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 64,800 | SD |
$0.8000 |
$0.2100 |
$0.2000 |
$0.2400 |
| 111 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 25,650 | SD |
$1.22 |
$0.2100 |
$0.2000 |
$0.2400 |
| 112 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 60,750 | SD |
$0.4100 |
$0.0500 |
$0.0300 |
$0.0200 |
| 113 | 880(C) 8848 |
WING BARRICADES | 1,800 | SD |
$1.04 |
$1.05 |
$1.00 |
$1.21 |
| 114 | 880(D) 8854 |
VERTICAL PANELS | 20,250 | SD |
$0.1000 |
$0.0300 |
$0.0300 |
$0.0200 |
| 115 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 143,100 | SD |
$0.1500 |
$0.0300 |
$0.0300 |
$0.0200 |
| 116 | 880(F) 8878 |
DRUMS | 101,250 | SD |
$0.1100 |
$0.0300 |
$0.0300 |
$0.0200 |
| 117 | 880(G) 8890 |
CHANNELIZER CONES | 144,000 | SD |
$0.1700 |
$0.0300 |
$0.0300 |
$0.0200 |
| 118 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 3,600 | SD |
$15.10 |
$5.15 |
$5.00 |
$6.06 |
| 119 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 76,215 | LF |
$0.0800 |
$0.1000 |
$0.2000 |
$0.1100 |
| 120 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 10 | EA |
$160.61 |
$88.00 |
$90.00 |
$103.15 |
| 121 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 157.59 | SF |
$15.96 |
$22.65 |
$23.00 |
$26.70 |
| 122 | 851(C) 8324 |
2" SQUARE TUBE POST | 377.5 | LF |
$6.72 |
$8.25 |
$8.00 |
$9.71 |
| 123 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 131,294 | LF |
$0.4100 |
$0.4100 |
$0.3000 |
$0.3500 |
| 124 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 272 | LF |
$4.11 |
$9.00 |
$8.00 |
$9.71 |
| 125 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$190,000.00 |
$137,500.00 |
$150,000.00 |
$69,075.91 |
| 126 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$15,000.00 |
$5,000.00 |
$2,846.77 |
| 127 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$10,000.00 |
$15,000.00 |
$6,832.25 |
| 128 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$801,375.00 |
$615,000.00 |
$450,000.00 |
$700,970.17 |