| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$17,000.00 |
$9,750.00 |
$25,000.00 |
$15,000.00 |
$31,658.00 |
$6,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 6,801 | CY |
$6.00 |
$9.50 |
$5.41 |
$6.50 |
$8.35 |
$9.10 |
$15.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,324 | CY |
$8.00 |
$16.50 |
$8.58 |
$6.50 |
$12.23 |
$2.00 |
$10.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$31,000.00 |
$30,000.00 |
$15,268.08 |
$33,000.00 |
$12,500.00 |
$44,795.00 |
$12,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 7,733 | LF |
$2.70 |
$2.50 |
$1.88 |
$1.83 |
$1.60 |
$1.25 |
$1.80 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 13 | EA |
$245.00 |
$250.00 |
$331.60 |
$322.73 |
$330.00 |
$200.00 |
$315.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 238 | LF |
$8.00 |
$16.00 |
$7.74 |
$7.53 |
$9.90 |
$8.35 |
$7.35 |
| 8 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 53 | CY |
$120.00 |
$65.00 |
$88.43 |
$86.06 |
$110.00 |
$105.00 |
$84.00 |
| 9 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 99 | CY |
$120.00 |
$75.00 |
$165.80 |
$161.37 |
$140.00 |
$131.00 |
$157.50 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 26,717 | SY |
$2.20 |
$1.65 |
$1.66 |
$1.62 |
$1.95 |
$1.45 |
$1.60 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 6 | AC |
$455.87 |
$600.00 |
$663.20 |
$645.45 |
$880.00 |
$840.00 |
$630.00 |
| 12 | 241 2832 |
MOWING | 11 | AC |
$108.00 |
$50.00 |
$55.27 |
$53.79 |
$110.00 |
$126.00 |
$52.50 |
| 13 | 307(K) 4300 |
STABILIZED SUBGRADE | 22,221 | SY |
$6.00 |
$4.50 |
$4.50 |
$6.25 |
$5.05 |
$8.20 |
$5.50 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,074 | TON |
$29.00 |
$47.00 |
$37.00 |
$30.94 |
$28.30 |
$26.80 |
$25.00 |
| 15 | 407(B) 0250 |
TACK COAT | 950 | GAL |
$3.00 |
$2.25 |
$2.21 |
$2.40 |
$4.00 |
$4.00 |
$4.00 |
| 16 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 716 | TON |
$75.00 |
$71.00 |
$72.00 |
$76.42 |
$67.80 |
$65.50 |
$94.00 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,057 | TON |
$68.00 |
$62.00 |
$62.00 |
$61.00 |
$58.90 |
$56.90 |
$68.00 |
| 18 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 475 | TON |
$80.00 |
$73.00 |
$84.00 |
$101.98 |
$85.40 |
$82.50 |
$112.35 |
| 19 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 20,637 | SY |
$16.00 |
$14.75 |
$18.00 |
$15.00 |
$16.35 |
$15.25 |
$15.70 |
| 20 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 4,873 | CY |
$92.00 |
$97.00 |
$109.00 |
$101.00 |
$92.00 |
$90.40 |
$101.00 |
| 21 | 504(E) 6190 |
42" F-SHAPED PARAPET | 22 | LF |
$105.00 |
$230.00 |
$125.00 |
$143.78 |
$165.00 |
$84.00 |
$173.00 |
| 22 | 509(A) 1326 |
CLASS AA CONCRETE | 10 | CY |
$500.00 |
$970.00 |
$288.54 |
$471.80 |
$650.00 |
$273.00 |
$680.00 |
| 23 | 511(A) 0332 |
REINFORCING STEEL | 930 | LB |
$1.10 |
$1.00 |
$0.9900 |
$1.01 |
$1.50 |
$1.15 |
$1.60 |
| 24 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 154 | TON |
$45.00 |
$60.00 |
$58.52 |
$41.81 |
$40.00 |
$53.50 |
$53.50 |
| 25 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 49 | TON |
$27.00 |
$50.00 |
$50.72 |
$30.09 |
$45.00 |
$48.30 |
$48.00 |
| 26 | 602(A) 4154 |
GABIONS | 107 | CY |
$400.00 |
$185.00 |
$465.71 |
$181.55 |
$175.00 |
$475.00 |
$650.00 |
| 27 | 602(B) 5860 |
REVETMENT MATTRESSES | 384 | SY |
$180.00 |
$40.00 |
$104.74 |
$33.62 |
$95.00 |
$96.60 |
$98.00 |
| 28 | 602(C) 4155 |
FILTER FABRIC | 241 | SY |
$5.00 |
$2.00 |
$8.01 |
$1.80 |
$8.00 |
$4.20 |
$21.00 |
| 29 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 7,137 | LF |
$4.60 |
$3.00 |
$7.02 |
$5.00 |
$17.95 |
$4.60 |
$6.00 |
| 30 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 1,906 | SY |
$47.50 |
$45.00 |
$34.00 |
$38.00 |
$34.20 |
$41.50 |
$37.00 |
| 31 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 330 | SY |
$60.00 |
$103.00 |
$42.00 |
$40.00 |
$45.20 |
$51.50 |
$66.00 |
| 32 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 128 | SF |
$29.11 |
$20.00 |
$22.72 |
$26.56 |
$22.00 |
$16.15 |
$30.00 |
| 33 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 6 | EA |
$2,315.00 |
$1,600.00 |
$1,372.86 |
$2,351.07 |
$1,850.00 |
$2,520.00 |
$1,252.54 |
| 34 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 1 | EA |
$2,700.00 |
$2,600.00 |
$1,559.46 |
$3,123.85 |
$2,700.00 |
$2,730.00 |
$2,100.00 |
| 35 | 611(B) 2680 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 3 | VF |
$200.00 |
$100.00 |
$186.06 |
$104.21 |
$250.00 |
$105.00 |
$131.00 |
| 36 | 611(B) 2681 |
ADD'L.DEPTH IN MANHOLE (5' DIAMETER) | 1 | VF |
$250.00 |
$200.00 |
$204.00 |
$120.41 |
$350.00 |
$158.00 |
$206.00 |
| 37 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 2 | EA |
$4,132.77 |
$3,200.00 |
$2,891.35 |
$4,067.67 |
$3,000.00 |
$2,625.00 |
$2,300.00 |
| 38 | 611(G) 5113 |
INLET CI DES. 2 (B) | 3 | EA |
$4,870.56 |
$4,200.00 |
$3,402.15 |
$2,276.05 |
$3,420.00 |
$2,890.00 |
$3,100.00 |
| 39 | 611(G) 5114 |
INLET CI DES. 2 (C) | 1 | EA |
$5,437.52 |
$4,800.00 |
$3,651.67 |
$4,502.82 |
$3,635.00 |
$3,360.00 |
$3,250.00 |
| 40 | 611(G) 5119 |
INLET CI DES. 2 (2D) | 2 | EA |
$8,050.00 |
$7,700.00 |
$4,903.48 |
$6,744.60 |
$4,800.00 |
$4,725.00 |
$5,000.00 |
| 41 | 611(G) 5120 |
INLET CI DES. 3 (STD) | 2 | EA |
$7,396.00 |
$5,200.00 |
$4,065.07 |
$5,119.54 |
$5,600.00 |
$5,040.00 |
$4,200.00 |
| 42 | 611(G) 5125 |
INLET CI DES. 3 (2D) | 2 | EA |
$12,159.00 |
$10,000.00 |
$6,085.47 |
$8,710.29 |
$6,500.00 |
$6,825.00 |
$7,000.00 |
| 43 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 15 | VF |
$280.00 |
$300.00 |
$450.51 |
$196.19 |
$350.00 |
$263.00 |
$235.00 |
| 44 | 611(H) 5330 |
ADD'L DEPTH IN INLET CI DES. 3 | 15 | VF |
$450.00 |
$400.00 |
$866.69 |
$323.57 |
$350.00 |
$315.00 |
$280.00 |
| 45 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 210 | LF |
$50.00 |
$49.00 |
$31.56 |
$25.69 |
$33.76 |
$50.40 |
$49.00 |
| 46 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 1,722 | LF |
$60.00 |
$47.00 |
$42.32 |
$34.71 |
$43.23 |
$63.00 |
$54.50 |
| 47 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 88 | LF |
$250.00 |
$162.00 |
$170.85 |
$140.46 |
$192.04 |
$131.00 |
$163.00 |
| 48 | 613(A) 4501 |
65" X 40" R.C.PIPE ARCH CLASS A-III | 68 | LF |
$275.00 |
$213.00 |
$200.99 |
$176.52 |
$275.25 |
$168.00 |
$200.00 |
| 49 | 613(A) 4502 |
73" X 45" R.C.PIPE ARCH CLASS A-III | 24 | LF |
$300.00 |
$280.00 |
$240.44 |
$214.03 |
$433.72 |
$199.50 |
$235.00 |
| 50 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 58 | LF |
$40.00 |
$46.00 |
$40.72 |
$28.04 |
$20.00 |
$42.00 |
$42.50 |
| 51 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 252 | LF |
$14.00 |
$22.00 |
$13.96 |
$18.39 |
$12.00 |
$15.75 |
$20.00 |
| 52 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 84 | LF |
$13.00 |
$24.25 |
$15.15 |
$14.68 |
$15.00 |
$12.60 |
$20.00 |
| 53 | 613(L) 4546 |
58" X 36" PREFAB. CULVERT END SECTION, ARCH | 1 | EA |
$2,000.00 |
$2,600.00 |
$2,656.16 |
$2,770.95 |
$3,200.00 |
$3,675.00 |
$2,750.00 |
| 54 | 613(L) 4552 |
65" X 40" PREFAB. CULVERT END SECTION, ARCH | 1 | EA |
$2,750.00 |
$3,000.00 |
$3,544.78 |
$3,639.75 |
$4,000.00 |
$4,725.00 |
$3,275.00 |
| 55 | 613(L) 4559 |
73" X 45" PREFAB. CULVERT END SECTION, ARCH | 1 | EA |
$3,000.00 |
$3,200.00 |
$3,720.02 |
$3,812.32 |
$6,800.00 |
$7,875.00 |
$3,850.00 |
| 56 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 266 | CY |
$32.61 |
$50.00 |
$60.48 |
$70.78 |
$34.00 |
$36.75 |
$39.00 |
| 57 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 901 | CY |
$30.14 |
$25.00 |
$22.83 |
$44.77 |
$32.50 |
$36.75 |
$12.25 |
| 58 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 34 | CY |
$530.00 |
$50.00 |
$32.34 |
$60.19 |
$65.00 |
$36.75 |
$68.25 |
| 59 | 613(V) 1180 |
TRENCH EXCAVATION | 2,221 | CY |
$5.00 |
$1.00 |
$6.75 |
$12.67 |
$4.75 |
$14.70 |
$8.50 |
| 60 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$35,000.00 |
$18,432.50 |
$11,059.02 |
$8,500.00 |
$9,130.00 |
$5,000.00 |
| 61 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 216 | LF |
$6.00 |
$16.00 |
$4.78 |
$3.44 |
$10.00 |
$5.00 |
$7.00 |
| 62 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 12,030 | SY |
$3.00 |
$2.00 |
$2.21 |
$3.32 |
$3.05 |
$1.00 |
$3.00 |
| 63 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 806 | SY |
$6.62 |
$8.00 |
$10.11 |
$2.50 |
$8.00 |
$9.90 |
$7.00 |
| 64 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 401 | LF |
$3.00 |
$6.00 |
$7.18 |
$1.98 |
$10.00 |
$8.50 |
$2.10 |
| 65 | 619(C) 0924 |
SAWING PAVEMENT | 221 | LF |
$3.75 |
$3.00 |
$4.42 |
$4.86 |
$5.50 |
$3.70 |
$4.00 |
| 66 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 2 | EA |
$19,585.17 |
$20,000.00 |
$21,151.73 |
$19,363.64 |
$20,650.00 |
$20,370.00 |
$42,800.00 |
| 67 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,570 | CY |
$20.00 |
$9.00 |
$8.00 |
$14.59 |
$10.35 |
$10.50 |
$11.00 |
| 68 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 147 | CY |
$35.00 |
$9.25 |
$14.97 |
$47.47 |
$22.00 |
$21.00 |
$23.00 |
| 69 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 460 | CY |
$30.00 |
$9.25 |
$15.02 |
$34.87 |
$14.52 |
$15.75 |
$15.25 |
| 70 | 504(E) 6190 |
42" F-SHAPED PARAPET | 186.2 | LF |
$80.00 |
$127.50 |
$80.00 |
$143.78 |
$95.00 |
$84.00 |
$99.75 |
| 71 | 509(A) 1326 |
CLASS AA CONCRETE | 423.9 | CY |
$500.00 |
$484.00 |
$285.00 |
$547.17 |
$440.35 |
$273.00 |
$487.25 |
| 72 | 509(B) 1328 |
CLASS A CONCRETE | 166.3 | CY |
$450.00 |
$484.00 |
$315.00 |
$426.00 |
$440.35 |
$273.00 |
$462.50 |
| 73 | 511(A) 1332 |
REINFORCING STEEL | 91,470 | LB |
$0.9000 |
$1.00 |
$0.9500 |
$1.01 |
$0.8400 |
$0.9500 |
$0.9000 |
| 74 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 1,470 | LB |
$1.25 |
$1.25 |
$1.40 |
$1.07 |
$1.12 |
$1.15 |
$1.20 |
| 75 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 355 | SY |
$4.50 |
$5.00 |
$4.42 |
$5.39 |
$6.02 |
$4.75 |
$6.32 |
| 76 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 90 | LF |
$32.00 |
$25.00 |
$15.62 |
$8.76 |
$20.00 |
$15.50 |
$21.00 |
| 77 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$40.00 |
$25.00 |
$90.25 |
$13.74 |
$20.00 |
$27.60 |
$21.00 |
| 78 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 13,950 | LF |
$0.2000 |
$0.1600 |
$0.2200 |
$0.2100 |
$0.2000 |
$0.1500 |
$0.2000 |
| 79 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 348 | SD |
$15.00 |
$57.75 |
$22.11 |
$21.51 |
$20.00 |
$58.00 |
$21.00 |
| 80 | 871(C) 8707 |
RELOCATION OF CONSTRUCTION ZONE QUADGUARD IMPACT ATTENUATOR | 18 | EA |
$1,000.00 |
$120.00 |
$552.67 |
$537.88 |
$500.00 |
$121.00 |
$525.00 |
| 81 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,640 | LF |
$20.45 |
$16.00 |
$6.98 |
$8.00 |
$11.00 |
$15.40 |
$26.00 |
| 82 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 6,330 | LF |
$5.53 |
$3.00 |
$4.65 |
$1.19 |
$3.00 |
$0.8500 |
$2.00 |
| 83 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$34,702.47 |
$23,000.00 |
$37,028.72 |
$36,037.87 |
$35,000.00 |
$22,995.00 |
$35,000.00 |
| 84 | 804(A) 2915 |
STRUCTURAL CONCRETE | 0.82 | CY |
$469.25 |
$300.00 |
$552.67 |
$537.88 |
$500.00 |
$300.00 |
$525.00 |
| 85 | 804(B) 2916 |
REINFORCING STEEL | 48 | LB |
$1.02 |
$1.05 |
$2.21 |
$2.15 |
$2.00 |
$1.05 |
$2.10 |
| 86 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$57.06 |
$68.25 |
$276.33 |
$268.94 |
$250.00 |
$68.25 |
$262.50 |
| 87 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 54.97 | SF |
$16.86 |
$19.00 |
$17.69 |
$17.21 |
$16.00 |
$19.00 |
$16.80 |
| 88 | 851(B) 3216 |
2"@3.65 GALV.STEEL PIPE POST | 84 | LF |
$7.82 |
$9.45 |
$14.37 |
$13.98 |
$13.00 |
$9.45 |
$13.65 |
| 89 | 851(B) 3217 |
2 1/2"@5.79 GALV.STEEL PIPE POST | 26 | LF |
$13.21 |
$12.60 |
$19.90 |
$19.36 |
$18.00 |
$12.60 |
$19.00 |
| 90 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 12,480 | LF |
$0.9900 |
$0.4000 |
$0.9700 |
$0.9500 |
$0.8800 |
$0.4000 |
$0.6000 |
| 91 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,041 | LF |
$1.36 |
$1.05 |
$1.11 |
$1.08 |
$1.00 |
$1.05 |
$1.05 |
| 92 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 77 | LF |
$8.29 |
$8.40 |
$11.05 |
$10.76 |
$10.00 |
$8.40 |
$10.50 |
| 93 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 6 | EA |
$249.91 |
$90.00 |
$138.17 |
$134.47 |
$125.00 |
$89.25 |
$131.25 |
| 94 | 856(B) 8880 |
TRAFFIC STRIPE(MULTI-POLY.)(WORDS) | 2 | EA |
$300.00 |
$90.00 |
$221.07 |
$215.15 |
$200.00 |
$89.25 |
$210.00 |
| 95 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 500 | LF |
$0.2500 |
$0.8000 |
$1.11 |
$1.08 |
$1.00 |
$0.7900 |
$1.05 |
| 96 | 857(F) 8007 |
PAVEMENT MARKING REMOVAL(ARROWS) | 2 | EA |
$21.56 |
$42.00 |
$27.64 |
$26.90 |
$25.00 |
$42.00 |
$26.25 |
| 97 | 857(F) 8008 |
PAVEMENT MARKING REMOVAL(WORDS) | 1 | EA |
$0.2100 |
$42.00 |
$60.79 |
$59.17 |
$55.00 |
$42.00 |
$26.25 |
| 98 | 802(B) 8332 |
1" PVC SCH.40 PLASTIC CONDUIT BORED | 20 | LF |
$7.50 |
$14.70 |
$11.05 |
$10.76 |
$10.10 |
$10.50 |
$10.50 |
| 99 | 802(B) 8338 |
1 1/2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 130 | LF |
$3.83 |
$4.75 |
$4.42 |
$4.30 |
$4.40 |
$4.20 |
$4.20 |
| 100 | 803(A) 8065 |
PULL BOX(SIZE I) | 2 | EA |
$263.73 |
$610.00 |
$319.44 |
$310.89 |
$289.00 |
$303.00 |
$303.45 |
| 101 | 805(A) 8704 |
REMOVAL OF PULL BOX | 2 | EA |
$50.00 |
$79.00 |
$24.32 |
$23.66 |
$24.00 |
$23.00 |
$23.10 |
| 102 | 828(B) 8136 |
LOOP DETECTOR WIRE | 970 | LF |
$3.82 |
$4.20 |
$3.32 |
$3.23 |
$3.30 |
$3.20 |
$3.15 |
| 103 | 831 8252 |
1WAY 3SEC. ADJ. SIG. HD. S-9 | 1 | EA |
$462.41 |
$735.00 |
$552.67 |
$537.88 |
$550.00 |
$525.00 |
$525.00 |
| 104 | 833 3030 |
BACKPLATE | 1 | EA |
$67.11 |
$84.00 |
$55.27 |
$53.79 |
$55.00 |
$51.00 |
$52.50 |
| 105 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 75 | LF |
$1.09 |
$3.50 |
$1.38 |
$1.34 |
$1.37 |
$1.30 |
$1.30 |
| 106 | 834(B) 8220 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 130 | LF |
$1.10 |
$1.20 |
$0.8300 |
$0.8100 |
$1.00 |
$0.8000 |
$0.8000 |
| 107 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,000.00 |
$20,000.00 |
$20,034.20 |
$23,000.00 |
$32,500.00 |
$27,565.00 |
$30,000.00 |
| 108 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$1,000.00 |
$5,577.11 |
$2,366.19 |
$4,500.00 |
$6,195.00 |
$5,000.00 |
| 109 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$175,000.00 |
$50,000.00 |
$98,468.00 |
$172,000.00 |
$147,000.00 |
$261,730.67 |
$148,000.00 |
| 110 | 230(A) 2806 |
SOLID SLAB SODDING | 2,350 | SY |
$3.00 |
$1.60 |
$2.21 |
$1.62 |
$2.62 |
$1.45 |
$4.00 |
| 111 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 50 | TON |
$40.00 |
$48.00 |
$49.74 |
$52.32 |
$71.40 |
$53.50 |
$49.00 |
| 112 | 616(A) 6010 |
6" DUCTILE IRON PIPE W/POLYETHYLENE ENCASEMENT | 24 | LF |
$40.00 |
$49.00 |
$110.53 |
$81.95 |
$173.25 |
$89.25 |
$50.00 |
| 113 | 616(A) 6030 |
12" DUCTILE IRON PIPE W/POLYETHYLENE ENCASEMENT | 1,058 | LF |
$55.00 |
$90.00 |
$123.80 |
$77.01 |
$126.00 |
$100.80 |
$90.00 |
| 114 | 616(A) 6500 |
DUCTILE IRON FITTINGS | 4,494 | LB |
$6.00 |
$4.00 |
$0.0100 |
$2.82 |
$2.10 |
$4.20 |
$3.00 |
| 115 | 616(D) 1070 |
6" GATE VALVE | 1 | EA |
$1,000.00 |
$1,150.00 |
$884.27 |
$884.80 |
$761.25 |
$1,213.00 |
$1,200.00 |
| 116 | 616(D) 6000 |
12" TAP | 6 | EA |
$1,000.00 |
$580.00 |
$829.00 |
$540.65 |
$892.50 |
$1,205.00 |
$585.00 |
| 117 | 616(D) 7023 |
12" X 12" TAPPING SLEEVE | 6 | EA |
$1,500.00 |
$1,500.00 |
$4,421.34 |
$1,553.49 |
$3,150.00 |
$2,375.00 |
$1,510.00 |
| 118 | 616(D) 8060 |
12" TAPPING VALVE AND BOX | 6 | EA |
$2,500.00 |
$2,400.00 |
$2,210.67 |
$2,492.85 |
$2,415.00 |
$2,550.00 |
$2,250.00 |
| 119 | 616(I) 0125 |
12" STEEL CASING | 10 | LF |
$50.00 |
$92.00 |
$27.63 |
$84.04 |
$78.75 |
$225.00 |
$93.50 |
| 120 | 616(I) 5266 |
20" STEEL CASING | 110 | LF |
$80.00 |
$105.00 |
$55.27 |
$97.80 |
$141.75 |
$231.00 |
$106.00 |
| 121 | 616(N) 0100 |
WET CONNECTION (12") | 2 | EA |
$2,000.00 |
$185.00 |
$1,105.34 |
$105.96 |
$3,045.00 |
$1,945.00 |
$186.00 |
| 122 | 616(U) 0100 |
6" MECHANICAL JOINT RESTRAINT | 13 | EA |
$60.00 |
$75.00 |
$55.27 |
$121.65 |
$89.25 |
$105.00 |
$76.50 |
| 123 | 616(U) 0110 |
12" MECHANICAL JOINT RESTRAINT | 91 | EA |
$160.00 |
$185.00 |
$110.53 |
$214.78 |
$168.00 |
$263.00 |
$187.00 |
| 124 | 616(V) 0100 |
HYDROSTATIC PRESSURE TESTING & DISINFECTION | 1 | LSUM |
$6,000.00 |
$915.00 |
$55.27 |
$2,440.68 |
$2,100.00 |
$3,492.00 |
$925.00 |
| 125 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$100.00 |
$3,500.00 |
$276.33 |
$6,875.01 |
$3,800.00 |
$2,255.00 |
$2,250.00 |
| 126 | 619(B) 7210 |
REMOVAL OF GATE VALVE AND BOX | 1 | EA |
$500.00 |
$63.00 |
$276.33 |
$2,249.49 |
$9.97 |
$357.00 |
$64.00 |
| 127 | 619(B) 7220 |
REMOVAL OF WATER LINE | 29 | LF |
$20.00 |
$6.30 |
$5.53 |
$9.00 |
$9.97 |
$4.20 |
$6.40 |
| 128 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$3,500.00 |
$1,381.67 |
$9,000.00 |
$12,500.00 |
$1,315.00 |
$13,500.00 |