Bid tab 120363

Let Sep 20, 2012 · Division 8 · Tulsa Sign up free

‹ Sep 2012 results

INTERCHANGE US-75: AT 116TH STREET NORTH. PROJECT LENGTH = 0.365 MILES

Let date
Thursday, September 20, 2012
Contract
120363
J/P numbers
24300(04)
District
Division 8
County
Tulsa
Highway
Limits
INTERCHANGE US-75: AT 116TH STREET NORTH. PROJECT LENGTH = 0.365 MILES
Project number
NHY-014N(071)

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 SHERWOOD CONSTRUCTION CO., INC. Low bidder $5,400,126
2 BECCO CONTRACTORS, INC. $5,398,324 0.0%
3 APAC-CENTRAL, INC. $5,593,383 +3.6%
4 OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV) $5,834,831 +8.0%
5 Paragon Contractors, LLC $6,033,156 +11.7%

Bid tab: unit prices 114 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SHERWOOD CONSTR…#2 BECCO CONTRACTO…#3 APAC-CENTRAL, I…#4 OBC, INC./PLAIN…#5 Paragon Contrac…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $50,000.00 $45,069.88 $80,000.00 $140,000.00 $118,560.00 $22,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION19,043CY $10.00 $5.58 $5.00 $5.25 $6.10 $5.64
3202(D) 0184 UNCLASSIFIED BORROW144,398CY $10.00 $5.58 $6.00 $4.85 $6.37 $9.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $25,000.00 $39,675.24 $100,000.00 $91,441.39 $46,800.00 $46,500.00
5221(C) 2801 TEMPORARY SILT FENCE18,938LF $2.00 $2.51 $1.50 $1.52 $2.08 $2.14
6221(D) 2803 TEMPORARY SEDIMENT FILTER13EA $150.00 $212.56 $50.00 $223.39 $780.00 $267.92
7221(F) 0100 TEMPORARY SILT DIKE2,268LF $6.00 $6.98 $6.00 $5.90 $7.80 $10.71
8230(A) 2806 SOLID SLAB SODDING84,093SY $3.50 $1.53 $1.50 $1.56 $1.40 $1.44
9232(A) 2813 SEEDING METHOD A14AC $1,000.00 $336.55 $300.00 $489.01 $306.00 $317.42
10233(A) 2817 VEGETATIVE MULCHING14AC $500.00 $564.71 $500.00 $489.01 $514.00 $532.62
11234(A) 2824 FERTILIZING (10-20-10)9TON $600.00 $792.87 $700.00 $720.65 $722.00 $747.82
12241 2832 MOWING62AC $50.00 $67.31 $65.00 $77.21 $61.25 $63.48
13307(K) 4300 STABILIZED SUBGRADE39,681SY $3.00 $6.17 $2.00 $7.36 $5.88 $4.40
14407(B) 0250 TACK COAT7,558GAL $4.00 $3.76 $3.00 $2.60 $2.75 $3.00
15408 5774 PRIME COAT7,692GAL $6.00 $2.00 $3.00 $6.98 $7.45 $4.00
16411(B) 5940 SUPERPAVE, TYPE S3(PG 70-28 OK)3,454TON $75.00 $69.69 $60.00 $63.41 $67.60 $69.00
17411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)13,106TON $70.00 $63.93 $50.00 $53.15 $56.70 $60.00
18411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)2,666TON $80.00 $85.47 $75.00 $78.85 $84.08 $84.00
19411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)1,530TON $75.00 $62.82 $70.00 $64.72 $69.00 $69.55
20504(E) 1381 CONCRETE PARAPET140LF $100.00 $57.50 $90.00 $66.92 $144.75 $75.32
21509(A) 0319 CLASS AA CONCRETE61CY $450.00 $387.89 $600.00 $308.85 $514.50 $349.70
22509(D) 0325 CLASS C CONCRETE273CY $300.00 $228.17 $365.00 $257.37 $225.10 $269.00
23510(D) 6341 MSE RETAINING WALL802SY $495.00 $387.30 $465.00 $494.16 $562.55 $430.95
24511(A) 0332 REINFORCING STEEL562LB $1.10 $1.77 $1.25 $1.29 $1.52 $1.35
25511(B) 4269 EPOXY COATED REINFORCING STEEL8,458LB $1.25 $0.9100 $1.40 $1.13 $1.14 $1.35
26515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)80SY $4.50 $3.99 $4.00 $3.60 $3.64 $3.77
27611(G) 6006 INLET (SMD-TYPE 2B)2EA $4,000.00 $1,796.81 $5,500.00 $3,146.56 $3,224.00 $3,485.57
28613(A) 0491 18" R.C.PIPE CLASS III194LF $70.00 $52.82 $40.00 $41.94 $27.04 $38.58
29613(A) 0492 24" R.C.PIPE CLASS III466LF $75.00 $76.06 $55.00 $47.48 $36.40 $51.02
30613(A) 0493 30" R.C.PIPE CLASS III360LF $80.00 $89.35 $70.00 $57.38 $51.70 $57.72
31613(A) 0494 36" R.C.PIPE CLASS III120LF $80.00 $110.65 $100.00 $68.11 $64.80 $60.62
32613(A) 0495 42" R.C.PIPE CLASS III264LF $90.00 $140.58 $115.00 $85.76 $100.35 $77.40
33613(B) 0689 18" CORR. GALV. STEEL PIPE40LF $30.00 $120.39 $30.00 $29.83 $20.80 $28.54
34613(B) 0691 30" CORR. GALV. STEEL PIPE92LF $40.00 $133.73 $45.00 $38.09 $36.40 $42.20
35613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND1EA $1,250.00 $501.57 $850.00 $475.77 $811.20 $331.46
36613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND5EA $1,500.00 $581.82 $950.00 $552.05 $873.60 $419.57
37613(L) 5732 30" PREFAB. CULVERT END SECTION, ROUND1EA $1,750.00 $673.55 $1,000.00 $677.01 $964.08 $520.26
38613(L) 5734 36" PREFAB. CULVERT END SECTION, ROUND2EA $1,250.00 $1,033.70 $1,700.00 $839.03 $1,110.70 $696.49
39613(L) 5736 42" PREFAB. CULVERT END SECTION, ROUND4EA $2,500.00 $1,247.73 $2,100.00 $1,042.50 $1,976.00 $931.45
40613(P) 0760 18" GALV. STEEL CULVERT END SECTION ROUND2EA $375.00 $256.69 $550.00 $241.39 $332.80 $106.46
41613(P) 0762 30" GALV. STEEL CULVERT END SECTION ROUND4EA $500.00 $313.73 $750.00 $394.50 $540.80 $331.90
42613(S) 1186 STANDARD BEDDING MATERIAL, CLASS B626CY $40.00 $17.11 $35.00 $24.76 $48.90 $12.77
43613(V) 1180 TRENCH EXCAVATION850CY $6.00 $4.56 $20.00 $5.09 $12.00 $11.79
44619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $50,000.00 $13,242.40 $75,000.00 $9,972.48 $13,260.00 $11,264.08
45619(B) 4728 REMOVAL OF ASPHALT PAVEMENT9,062SY $5.00 $2.39 $2.00 $5.50 $2.34 $3.21
46619(C) 0924 SAWING PAVEMENT5,098LF $3.50 $3.61 $3.00 $2.34 $3.12 $3.82
47623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE1,725LF $15.00 $16.37 $15.00 $13.51 $14.90 $16.68
48623(F) 6030 GUARDRAIL ANCHOR UNIT (TYPE B)2EA $600.00 $564.71 $400.00 $364.06 $514.80 $484.20
49623(G) 8571 GUARDRAIL END TREATMENT (GET)6EA $4,000.00 $2,310.19 $2,500.00 $2,288.37 $2,106.00 $2,313.40
50623(I) 8675 GUARDRAIL BRIDGE CONNECTION-TYPE A5EA $2,000.00 $1,367.85 $1,600.00 $1,862.49 $1,247.00 $1,721.60
51624 4100 (PL) ORNAMENTAL FENCE835LF $35.00 $142.61 $30.00 $45.30 $104.00 $69.94
52624(A) 4281 FENCE-STYLE WWF796LF $5.00 $5.70 $5.00 $6.89 $5.20 $7.48
53628 5180 INSTALLATION OF CABLE BARRIER SYSTEM480LF $10.00 $3.76 $40.00 $36.41 $36.40 $38.56
54628(B) 5125 HIGH-TENSION CABLE BARRIER(TL-4)480LF $12.00 $45.75 $40.00 $36.41 $36.40 $38.56
55870(A) 8011 SAND FILLED IMPACT ATTENUATION MODULE38EA $350.00 $273.80 $250.00 $231.64 $249.60 $258.24
56501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON115CY $20.00 $17.11 $10.00 $102.95 $15.75 $107.60
57501(F) 6352 GRANULAR BACKFILL34CY $50.00 $34.22 $35.00 $51.47 $66.55 $53.80
58501(G) 6309 CLSM BACKFILL320CY $145.00 $110.40 $80.00 $96.77 $112.80 $107.60
59503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)1,723LF $225.00 $216.12 $210.00 $205.90 $218.80 $215.20
60504(A) 1304 APPROACH SLAB336SY $160.00 $156.25 $175.00 $144.13 $176.80 $150.64
61504(B) 1305 SAW-CUT GROOVING286.2SY $7.00 $9.97 $10.00 $60.25 $10.00 $32.28
62504(E) 6190 42" F-SHAPED PARAPET529LF $150.00 $61.56 $80.00 $66.92 $81.40 $69.94
63506(A) 1322 STRUCTURAL STEEL1,030LB $2.40 $2.52 $2.00 $3.09 $3.38 $3.23
64507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY16EA $1,150.00 $260.57 $500.00 $514.75 $704.00 $645.60
65507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY16EA $2,700.00 $1,597.61 $2,000.00 $2,316.36 $2,413.65 $2,421.00
66507(C) 6282 ELASTOMERIC BEARING PADS16EA $500.00 $735.53 $500.00 $463.27 $1,057.20 $538.00
67509(A) 1326 CLASS AA CONCRETE515.9CY $450.00 $475.60 $300.00 $411.80 $469.15 $457.30
68509(B) 1328 CLASS A CONCRETE161.4CY $450.00 $370.19 $600.00 $849.33 $505.45 $887.70
69510(C) 6138 SLOPE WALL (5")1,102.4SY $68.00 $53.27 $100.00 $66.92 $87.45 $71.28
70511(A) 1332 REINFORCING STEEL10,380LB $1.10 $0.8000 $1.00 $0.9300 $1.40 $1.02
71511(B) 6010 EPOXY COATED REINFORCING STEEL112,200LB $1.25 $0.9600 $1.10 $0.9800 $1.25 $1.02
72514(A) 6010 PILES, FURNISHED (HP 10X42)936LF $33.00 $28.31 $30.00 $36.03 $36.25 $39.01
73514(B) 6292 PILES, DRIVEN (HP 10X42)936LF $13.00 $7.90 $30.00 $10.29 $10.00 $11.03
74515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)735SY $4.00 $3.99 $4.00 $3.60 $4.00 $3.77
75516(A) 6096 DRILLED SHAFTS 60" DIAMETER44LF $650.00 $847.54 $1,000.00 $1,209.66 $1,077.75 $1,291.20
76523(A) 6550 SEALER CRACK PREPARATION130LF $5.50 $4.56 $5.00 $4.12 $4.58 $4.30
77523(B) 6560 SEALER RESIN2GAL $150.00 $114.08 $100.00 $102.95 $114.50 $107.60
78613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND331LF $25.50 $35.52 $30.00 $13.90 $43.85 $14.53
79613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.100LF $22.00 $12.29 $30.00 $13.90 $8.75 $14.53
80501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON261CY $20.00 $17.11 $10.00 $15.44 $10.40 $48.42
81509(A) 1326 CLASS AA CONCRETE152.4CY $565.00 $420.65 $600.00 $410.40 $374.20 $500.34
82511(A) 1332 REINFORCING STEEL23,175LB $1.00 $0.8000 $1.10 $0.6700 $0.9400 $1.35
83804(A) 2915 STRUCTURAL CONCRETE14.8CY $500.00 $228.17 $300.00 $257.37 $208.00 $215.20
84804(B) 2916 REINFORCING STEEL2,532LB $1.15 $1.14 $1.00 $0.8800 $1.04 $1.08
85805(A) 8700 REMOVAL OF SIGN FOOTING19EA $75.00 $57.04 $55.00 $128.69 $52.00 $63.49
86805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS17EA $50.00 $57.04 $55.00 $51.47 $52.00 $53.80
87805(D) 8760 (PL)REMOVE & RESET GROUND MOUNTED SIGN1EA $250.00 $228.08 $550.00 $514.75 $207.90 $215.11
88850(A) 8110 SHEET ALUMINUM SIGNS480.57SF $11.00 $12.55 $15.00 $14.41 $11.44 $11.84
89850(B) 8112 EXTRUDED ALUMINUM PANEL SIGNS164.5SF $20.00 $20.53 $25.00 $22.65 $18.72 $19.37
90851(A) 3209 6"@25 GALV.STEEL WIDE FLANGE BEAM POST192LF $45.00 $29.66 $44.00 $41.18 $27.00 $27.98
91851(B) 3217 2 1/2"@5.79 GALV.STEEL PIPE POST396LF $25.00 $13.69 $20.00 $18.53 $12.50 $12.91
92855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)31,905LF $0.5000 $0.3800 $0.5500 $0.5100 $0.3500 $0.3600
93855(A) 8813 TRAFFIC STRIPE(PLASTIC)(6" WIDE)2,517LF $0.8000 $0.5100 $0.8300 $0.7700 $0.4600 $0.4800
94855(A) 8814 TRAFFIC STRIPE(PLASTIC)(8" WIDE)4,789LF $1.25 $0.7400 $1.10 $1.03 $0.6700 $0.7000
95855(A) 8818 TRAFFIC STRIPE(PLASTIC)(12" WIDE)3,088LF $2.00 $1.43 $1.65 $1.54 $1.30 $1.35
96855(A) 8825 TRAFFIC STRIPE(PLASTIC)(24" WIDE)79LF $4.00 $17.11 $3.30 $3.09 $15.60 $16.14
97855(B) 8818 TRAFFIC STRIPE(PLASTIC)(ARROWS)5EA $90.00 $96.97 $110.00 $102.95 $88.40 $91.46
98855(B) 8824 TRAFFIC STRIPE(PLASTIC)(SYMBOLS)11EA $150.00 $56.03 $110.00 $102.95 $51.00 $52.84
99857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)2,835LF $0.3500 $0.2900 $0.3000 $0.2600 $0.2600 $0.2700
100857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)22,605LF $0.8000 $0.5700 $0.9500 $0.8800 $0.5200 $0.5400
101857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)16,420LF $0.3500 $0.2900 $0.5000 $0.4600 $0.2600 $0.2700
102876(A) 8482 (PL)TRUCK MOUNTED ATTENUATOR120SD $36.00 $11.41 $16.00 $15.44 $10.40 $10.76
103877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER4,500LF $30.00 $9.25 $11.00 $15.44 $16.12 $16.14
104880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF3,726SD $0.7500 $1.14 $0.6000 $0.5700 $1.04 $1.08
105880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF8,350SD $2.00 $1.71 $0.5500 $0.5100 $1.56 $1.61
106880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF7,792SD $2.50 $1.14 $1.65 $1.54 $1.04 $1.08
107880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)4,789SD $0.5500 $1.14 $2.20 $2.06 $1.04 $1.08
108880(E) 8860 WARNING LIGHTS(TYPE A)3,776SD $0.4000 $1.14 $0.4000 $0.3600 $1.04 $1.08
109880(F) 8878 DRUMS80,940SD $0.1000 $0.0300 $0.1700 $0.1500 $0.0300 $0.0300
110882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN526SD $15.00 $11.41 $30.00 $25.74 $10.40 $10.76
111642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $50,000.00 $59,973.51 $44,000.00 $125,000.00 $41,975.00 $73,000.00
112220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $10,000.00 $2,852.08 $5,000.00 $1,795.44 $9,320.00 $5,386.62
113640(A) 1426 FIELD OFFICE1EA $10,000.00 $5,704.16 $6,000.00 $12,568.07 $12,335.00 $14,811.06
114641 1552 MOBILIZATION1LSUM $325,000.00 $216,011.19 $280,000.00 $287,589.00 $253,725.00 $285,000.00