| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 18, 2019 | 72K97 | MacoupinDistrict 6 | Replacing expansion joints, placing microsilica overlay, performing substructure repairs and painting beam ends on SN 059-0035 carrying IL 108 over Lick Creek. | — | Executed | RCS Construction, Inc. $365,553 · | ||
| Jan 18, 2019 | 74177 | LawrenceDistrict 7 | Replacement of two structures on US 50 over an abandoned railroad and Otter Pond Ditch; and replacement of two superstructures on US 50 over IL 1 and CH 12 north of Lawrenceville (SN 051-0012, 0013, 0014, 0015). | — | Executed | Sangamo Construction Company $10,061,291 · | ||
| Jan 18, 2019 | 74261 | ColesDistrict 7 | 3.1 miles of pavement patching, HMA milling and resurfacing, rehab of 2 bridges 3 culvert extensions and guardrail on IL 16 from Ashmore to the Edgar County line. | — | Executed | Howell Paving, Inc. $2,177,289 · | ||
| Jan 18, 2019 | 74432 | CumberlandDistrict 7 | Removing and replacing concrete deck beams with a PCC slab superstructure, Bridge approach pavements, HMA resurfacing and guardrail on Montrose Blacktop approximately 1.5 miles south of IL 121 (SN 018-0056). | — | Executed | White Construction, Inc. $633,093 · | ||
| Jan 18, 2019 | 74561 | ColesDistrict 7 | Superstructure replacement on SN 015-0070 carrying 900 N/IL 316 over Riley Creek Branch, 0.8 miles northwest of Loxa. | — | Executed | County Contractors, Inc. $511,648 · | ||
| Jan 18, 2019 | 74849 | MaconDistrict 7 | Culvert removal and replacement on Old US 36 over an unnamed stream approximately 0.1 mile west of US 36. | — | Executed | Otto Baum Company, Inc. $509,397 · | ||
| Jan 18, 2019 | 74863 | VariousDistrict 7 | Sealing the bridge decks on 114 structures throughout District 7. | — | Executed | All States Painting, Inc. $118,898 · | ||
| Jan 18, 2019 | 74868 | ColesDistrict 7 | 7.8 miles of microsurfacing on Old IL 316 from 0.2 mile north of IL 16 to D Street in Charleston. | — | Executed | A. C. Pavement Striping Co. $494,881 · | ||
| Jan 18, 2019 | 74869 | MoultrieDistrict 7 | 8.1 miles of bituminous surface treatment on Cadwell Road from IL 121 to IL 133. | — | Executed | Beniach Construction Co., Inc. $313,710 · | ||
| Jan 18, 2019 | 74888 | RichlandDistrict 7 | 8.3 miles of base repair, pot hole patching and application of bituminous surface treatment at 2 locations on Old US 50; 1) from just west of the Lawrenceville Correctional Center (CR 2100 E) to the intersection of US 50/IL 250; 2) from 1100 North (IL 250 to 1400 East (St. Marie Road). | — | Executed | Mt. Carmel Stabilization Group, Inc. $328,966 · | ||
| Jan 18, 2019 | 74889 | ColesShelbyDistrict 7 | 10.5 miles of bituminous surface treatment at 3 locations in Coles County and 4 locations in Shelby County. | — | Executed | Earl Walker Company, Inc. $418,569 · | ||
| Jan 18, 2019 | 74892 | ClayDistrict 7 | Placing aggregate wedge shoulders on the Kinmundy/Louisville Blacktop from the Marion County line to US 45 in Louisville. | — | Executed | Phoenix Corporation of the Quad Cities $163,597 · | ||
| Jan 18, 2019 | 76J12 | MadisonDistrict 8 | Replace bridge 060-2454 carrying IL 157 over Silver Creek Tributary south of Hamel. | — | Executed | Baxmeyer Construction, Inc. $644,578 · | ||
| Jan 18, 2019 | 76K30 | MadisonDistrict 8 | Bridge joint replacement at south abutment and other repairs on Clark Bridge (US 67 over the Mississippi River (SN 060-0255). | — | Executed | Keeley & Sons, Inc. $567,212 · | ||
| Jan 18, 2019 | 76L35 | MadisonDistrict 8 | Crack and joint sealing on I-55 from 1.3 miles north of Il 140 to the Macoupin County line. | — | Executed | Freehill Asphalt, Inc. $96,445 · | ||
| Jan 18, 2019 | 76L99 | MadisonDistrict 8 | Bridge painting SN 060-0238 and 060-0239 on I-255 over Collinsville Road. | — | Executed | ERA-Valdivia Contractors, Inc. $397,725 · | ||
| Jan 18, 2019 | 76M03 | ClintonDistrict 8 | Bridge and jooint repair on SN 014-0031 on Old US 50 approximately 1.2 miles east of Aviston. | — | Executed | Keller Construction, Inc. $305,388 · | ||
| Jan 18, 2019 | 76M04 | St. ClairDistrict 8 | Bridge and joint repair on Sn 082-0267 carryingh Bond Avenue over Alton and Southern Railroad. | — | Executed | Keeley & Sons, Inc. $249,557 · | ||
| Jan 18, 2019 | 76M05 | MadisonDistrict 8 | Bridge repair and guardrail improvements on SN 060-0177 carrying I-55 over Maple Grove Road. | — | Executed | Keeley & Sons, Inc. $357,463 · | ||
| Jan 18, 2019 | 76M06 | BondDistrict 8 | Patching on IL 127 from Montgomery County line to IL 140. | — | Executed | G. M. Sipes Construction, Inc. $419,131 · | ||
| Jan 18, 2019 | 76M08 | GreeneDistrict 8 | Patching on US 67 from Pine Street to Walnut Street in Carrolton. | — | Executed | Kinney Contractors, Inc. $53,955 · | ||
| Jan 18, 2019 | 78455 | JeffersonDistrict 9 | Removal and replacement SN 041-055 carrying CH 42 over I-57 at Ina. | — | Executed | Sierra Bravo Contractors, LLC $2,683,572 · | ||
| Jan 18, 2019 | 78502 | MassacDistrict 9 | Removal and replacement of the existing structures (SN 064-0024 and SN 064-0028) carrying I-24 over CH13 (Country Club Road) near Metropolis. | — | Executed | E. T. Simonds Construction Company $4,921,275 · | ||
| Jan 18, 2019 | 78596 | UnionDistrict 9 | 1.3 miles of patching, resurfacing and sidewalk ramps along IL 146 in Anna. | — | Executed | E. T. Simonds Construction Company $1,235,395 · | ||
| Jan 18, 2019 | 78617 | UnionDistrict 9 | Scour repair below SN 091-0068 carrying IL 127 over Clear Creek south of Alto Pass. | — | Executed | Pinoy Construction Inc. $47,537 · | ||
| Jan 18, 2019 | 78630 | WhiteDistrict 9 | Inlaying 1.5" HMA, deck repairs, joint replacement and bearing replacement on SN 097-000 and 097-0004 carrying I-64 over the Wabash River into Indiana. | — | Executed | E. T. Simonds Construction Company $763,012 · | ||
| Jan 18, 2019 | 78650 | VariousDistrict 9 | Steel, bearing and joint repairs on 11 structures in Alexander, Hamilton and Jefferson Counties. (SN 041-0007, 0087, 0088, 0077, 0078, 002-0032, 033-0038, 0041-0041, 0042, 0097) | — | Executed | Sangamo Construction Company $1,642,481 · | ||
| Jan 18, 2019 | 78658 | FranklinDistrict 9 | 0.66 miles of HMA partial depth patching over existing PCC pavement on IL 149 from Ken Grey Boulevard to Joiner Street | — | Executed | E. T. Simonds Construction Company $134,883 · | ||
| Jan 18, 2019 | 78659 | FranklinDistrict 9 | 5.6 miles of replacing aggregate shoulder with a 2' safety shoulder consisting of 8" HMA on IL 14 from Mt. Zion Road to Ewing Road. | — | Executed | E. T. Simonds Construction Company $534,970 · | ||
| Jan 18, 2019 | 78667 | WilliamsonDistrict 9 | Bridge repairs and approach work on SN 100-0062 carrying Cambria Rd. over Big Muddy River, 1 mile south of Hurst. | — | Executed | E. T. Simonds Construction Company $299,154 · | ||
| Jan 18, 2019 | 78677 | VariousDistrict 9 | Cleaning and painting portions of 14 structures: 1 in Alexander County, 2 in Franklin County, 1 in Hamilton County, 8 in Jefferson County, 1 in Massac County, and 2 in White County. (SN 041-0039, 0040, 0041, 0042, 0077, 0078, 0087, 0088, 002-0032, 028-0038, 0041, 033-0012, 064-0003, 097-0024) | — | Executed | Venus Painting Co. $1,130,680 · | ||
| Jan 18, 2019 | 78693 | UnionDistrict 9 | 2.4 miles of milling and resurfacing of I-57 southbound from 0.5 miles south of IL 146 to 0.5 miles north of the rest area near the Cache River. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,121,786 · | ||
| Jan 18, 2019 | 87710 | GrundyDistrict 3 | Pavement reconstruction, storm sewers, curb and gutter, sidewalk and roadway lighting, on Broadway Street from IL 113 to Park Street in Coal City. | — | Executed | D. Construction, Inc. $4,631,410 · | ||
| Jan 18, 2019 | 89712 | PeoriaDistrict 4 | Pavement reconstruction, PCC pavement, curb and gutter, storm sewers, PCC multi-use path, street lighting and pedestrian signals, on Dirksen Parkway from Middle Road to Airport Road. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $5,449,818 · | ||
| Jan 18, 2019 | 89732 | PeoriaDistrict 4 | Construction of 4' HMA shoulders with rumble strips, 2' aggregate shoulders and the reconstruction of ditches on Kickapoo-Edwards Road from Shamrock Lane to Countryside Lane. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,175,654 · | ||
| Jan 18, 2019 | 91568 | ChampaignDistrict 5 | Construct 7" PCC pavement, aggregate shoulder and culvert replacment on Sunny Acres Road from South Mahomet Road to US 150 in the Village of Mahomet. | — | Executed | Beniach Construction Co., Inc. $796,767 · | ||
| Jan 18, 2019 | 91569 | ChampaignDistrict 5 | Pavement reconstruction, PCC pavement, curb and gutter, storm sewer, street lighting and traffic signals on Prospect Avenue from Curtis Road to Windsor Rd. in the City of Champaign. | — | Executed | Feutz Contractors, Inc. $4,531,726 · | ||
| Jan 18, 2019 | 91575 | VermilionDistrict 5 | Replace the bridge carrying TR 54 over Baum Branch, 3 miles southwest of Jamaica. | — | Executed | Newell Construction Co., Inc. $284,521 · | ||
| Jan 18, 2019 | 93722 | BrownDistrict 6 | Resurfacing, lighting, and sidewalk improvements on Main Street, from Cross Street to Capitol Street in Mt. Sterling. | — | Executed | Rees Construction Company of Quincy $1,965,321 · | ||
| Jan 18, 2019 | 95841 | MaconDistrict 7 | Rehabilitate 058-3035 and 058-3036 carrying Mound Road over Spring Creek in the City of Decatur. | — | Executed | Sangamo Construction Company $2,504,685 · | ||
| Jan 18, 2019 | 95842 | FayetteDistrict 7 | Resurfacing on CH 28 from IL 37 to the Effingham County line. | — | Executed | Howell Paving, Inc. $1,613,463 · | ||
| Jan 18, 2019 | 97682 | JerseyDistrict 8 | County-wide guardrail replacement and/or repair at various locations in Jersey County. | — | Executed | Clevenger Contractors, Inc. $884,774 · | ||
| Jan 18, 2019 | 97686 | MadisonDistrict 8 | Construction of roundabouts at Broadway/St. Rose Road, and at Iberg Road/ Veterans Honor Parkway, in the City of Highland. | — | Executed | Stutz Excavating, Inc. $1,070,995 · | ||
| Jan 18, 2019 | 99584 | UnionDistrict 9 | Replace the bridge carrying TR 203 (Nash Road) over Big Creek, located 3 miles southeast of Anna. | — | Executed | Samron Midwest Contracting, Inc. $254,345 · | ||
| Jan 18, 2019 | 99610 | WilliamsonDistrict 9 | Pavement widening, resurfacing, and water main improvements on East Grand Avenue, from Hofer Road to Hurricane Road in Crainville. | — | Executed | Samron Midwest Contracting, Inc. $872,797 · | ||
| Mar 8, 2019 | 60M72 | CookDistrict 1 | Bridge deck overlay, joint repairs, structural repair of concrete and steel to I-94 at IL 68 (Dundee Road). | — | Executed | Rausch Infrastructure, LLC $1,199,708 · | ||
| Mar 8, 2019 | 60M75 | DuPageDistrict 1 | Bridge deck overlay and bridge joint repair improvement of Emroy Ave over I-290. | — | Executed | Martam Construction Incorporated $396,588 · | ||
| Mar 8, 2019 | 60N00 | WillDistrict 1 | Bridge deck overlay and joint repairs on the bridge carrying US 52 over Forked Creek. | — | Executed | MYS, Incorporated $301,046 · | ||
| Mar 8, 2019 | 60N83 | CookDistrict 1 | Rehabilitation and widening on SN 016-0533 carrying Willow Road over Lehigh and SOO line in Glenview. | — | Executed | Lorig Construction Company $8,661,763 · | ||
| Mar 8, 2019 | 60P68 | DuPageDistrict 1 | Resurfacing on IL-56 from Naperville Rd. to IL 53; includes retrofitting sidewalks to comply with ADA and Signal modernaization at the intersection with Park Ave. | — | Executed | K-Five Construction Corporation $3,038,712 · | ||
| Mar 8, 2019 | 60R65 | CookDistrict 1 | Overlay 016-2525 bridge deck with thin polymer in the City of Harvey. | — | Executed | MYS, Incorporated $116,107 · | ||
| Mar 8, 2019 | 60R68 | LakeDistrict 1 | Bridge deck scarification and latex concrete overlay, retrofitting bridge parapets, and reconstruction of transverse bridge joints to IL 43 over IL 120. | — | Executed | Areatha Construction Co., Inc. $1,777,994 · | ||
| Mar 8, 2019 | 60R69 | CookDistrict 1 | Deck patching, deck scarification, latex concrete overlay abutment repairs, joint repairs, slab repairs and debris removal on Golf Road over the East and West Fork N. Branch Chicago River (SN 016-0355, 016-0356, 016-1256 and 016-1257) | — | Executed | Martam Construction Incorporated $973,368 · | ||
| Mar 8, 2019 | 60R75 | CookDistrict 1 | Bridge deck scarification and latex concrete overlay, reconstruction of transverse bridge joints, and substructure repairs on US 30 over Thorn Creek. | — | Executed | MYS, Incorporated $380,278 · | ||
| Mar 8, 2019 | 60T49 | CookDistrict 1 | Resurfacing and pedestrian ramp improvements on US 14 (Northwest Highway) through the Village of Arlington Heights, Village of Mount Prospect and the city of Des Plaines | — | Executed | Arrow Road Construction Co. $4,073,824 · | ||
| Mar 8, 2019 | 60W87 | CookDistrict 1 | Surface preparation and painting of structrual steel, containment and disposal of lead waste and maintenance of traffic at 5 bridge structures located on IL 171 and on I-55 in Villages of McCook and Summit. | — | Executed | Eagle Painting & Maintenance Company, Inc. $2,284,150 · | ||
| Mar 8, 2019 | 61F40 | WillDistrict 1 | Construct an extension of Kings Road from Rodeo Drive to Hassert Boulevard in Bollingbrook. | — | Executed | K-Five Construction Corporation & Herlihy Mid-Continent Company $7,485,866 · | ||
| Mar 8, 2019 | 61F41 | CookDistrict 1 | Roadway reconstruction on Irving Park Road from east of IL 59 to Bartlett Road in Streamwood. | — | Executed | Plote Construction, Inc. $6,796,581 · | ||
| Mar 8, 2019 | 61F44 | WillDistrict 1 | Replace the bridge carrying TR 68 over Lily Creek, 0.1 mil north of Caton Farm Road in Plainfield Township. | — | Executed | D. Construction, Inc. $945,717 · | ||
| Mar 8, 2019 | 61F45 | KaneDistrict 1 | Replace the bridge carrying Silver Glen Road over Otter Creek. | — | Executed | D. Construction, Inc. $2,118,804 · | ||
| Mar 8, 2019 | 61F47 | LakeDistrict 1 | Resurfacing Greenwood Avenue from Wilmot Road to Waukegan Road in Deerfield. | — | Executed | A Lamp Concrete Contractors, Inc. $1,668,129 · | ||
| Mar 8, 2019 | 61F48 | CookDistrict 1 | Sidewalk construction adjacent to 79th Street from Garden Lane to Oak Grove Avenue in the Village of Justice. | — | Executed | A Lamp Concrete Contractors, Inc. $113,944 · | ||
| Mar 8, 2019 | 61F49 | CookDistrict 1 | Reconstruction of Northfield Road from Winnetka Road to Willow Road in the Village of Northfield. | — | Executed | A Lamp Concrete Contractors, Inc. $1,588,343 · | ||
| Mar 8, 2019 | 61F54 | CookDistrict 1 | Resurfacing Schick Road from Petersdorf Road to Fairfax Lane, and resurfacing Petersdorf Road from Schick Road to Army Trial Road in the Village of Bartlett. | — | Executed | Plote Construction, Inc. $1,214,960 · | ||
| Mar 8, 2019 | 61F57 | KaneDistrict 1 | construction of a dedicated entrance ramp from northbound Randall Road to eastbound US 20, removal of the Weld Road connection to Randall Road, creation of a cul-de-sac on Weld Road and the reconfiguration of Randall Road, in the City of Elgin. | — | Executed | Curran Contracting Company $6,244,244 · | ||
| Mar 8, 2019 | 61F59 | KaneDistrict 1 | Trffic signal interconnect along Indian Trail between Aurora Avenue and Pennsbury Lane in Aurora. | — | Executed | H & H Electric Co. $826,220 · | ||
| Mar 8, 2019 | 61F60 | CookDistrict 1 | Construction of a multi-use path along Brainard Avenue from Joliet Road to 55th Street in the City of Countryside. | — | Executed | K-Five Construction Corporation $964,375 · | ||
| Mar 8, 2019 | 61F61 | WillDistrict 1 | Resurfacing Burville Road from stte Street to IL 394 in the Village of Crete. | — | Executed | Iroquois Paving Corporation $395,403 · | ||
| Mar 8, 2019 | 61F62 | DuPageDistrict 1 | Roadway reconstruction on Washington Street from Town Road to Arbor Avenue in the city of West Chicago. | — | Executed | Schroeder Asphalt Services, Inc. $1,120,972 · | ||
| Mar 8, 2019 | 62C14 | KaneDistrict 1 | Bridge deck replacement with widened roadway, new expansion joints, and approach slab replacement on IL 38 over UPRR. | — | Executed | Herlihy Mid-Continent Company $2,789,910 · | ||
| Mar 8, 2019 | 62D38 | LakeDistrict 1 | Remove and replace original section of the culvert (approximately 40 ft) in the center portion of the culvert carrying IL 21 (Milwaukee Ave.) over a ditch in the village of Vernon Hills (SN 049-0599) | — | Executed | Martam Construction Incorporated $377,924 · | ||
| Mar 8, 2019 | 62F35 | McHenryDistrict 1 | Bridge joint repairs and deck overlay on SN 056-0007 carrying US 14/IL 173 (Division Street) over UPRR in the City of Harvard. | — | Executed | Sjostrom & Sons, Inc. $1,257,790 · | ||
| Mar 8, 2019 | 62F37 | CookDistrict 1 | Repairs on Bridge SN 016-0225 carrying US 34 (Ogden Avenue) over IHB Railroad in the Village of LaGrange. | — | Executed | D. Construction, Inc. $513,202 · | ||
| Mar 8, 2019 | 62F49 | CookWillDistrict 1 | 6.45 miles of 3P resurfacing and ADA ramps on IL 43 from north of US 30 to just north of US 6. | — | Executed | D. Construction, Inc. $5,880,439 · | ||
| Mar 8, 2019 | 62F54 | DuPageDistrict 1 | 2.5 miles of resurfacing and ADA sidewalk improvements on IL 64 (North Avenue) from Villa Avenue to the Cook County line in the Village of Villa Park and the City of Elmhurst. | — | Executed | R. W. Dunteman Company $2,773,288 · | ||
| Mar 8, 2019 | 62F66 | CookDistrict 1 | 1.91 miles of HMA resurfcing, pavement patching, removal and replacement of curb and gutter, sidewalk removal and replacement and placement of thermoplastic markings along Avondale Avenue from Ogallah Avenue to Bryn Mawr Avenue in Chicago. | — | Executed | Arrow Road Construction Co. $1,771,483 · | ||
| Mar 8, 2019 | 62G21 | CookDistrict 1 | Resurfacing and pedestrian ramp improvements on US 12/20/41 (Indianapolis Ave) from S. Ewing Ave. to 106th Street in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $1,035,977 · | ||
| Mar 8, 2019 | 62G47 | CookDistrict 1 | 7.33 miles of resurfacing and pedestrian ramp projects on IL 171 (First Ave.) from 43rd Street to Des Plaines River Road. | — | Executed | R. W. Dunteman Company $7,076,939 · | ||
| Mar 8, 2019 | 62G48 | McHenryDistrict 1 | Removal and replacement of culvert SN 056-0227 on IL 31 in the City of McHenry. | — | Executed | Alliance Contractors, Inc. $1,033,397 · | ||
| Mar 8, 2019 | 62G50 | CookDistrict 1 | Deck overlay, joint repair and structural steel repair on SN 016-0344 carrying US 45 over the Cal Sag Channel in Palos Township. | — | Executed | MYS, Incorporated $474,229 · | ||
| Mar 8, 2019 | 62G58 | LakeDistrict 1 | 2 miles of resurfacing on IL 137 (Amstutz Expressway) from IL 120 (Belvidere Street) to just south of IL 137 (Greenwood Avenue) in the City of Waukegan. | — | Executed | J. A. Johnson Paving Company $2,327,169 · | ||
| Mar 8, 2019 | 62G62 | DuPageDistrict 1 | 6 miles of resurfacing on US 34 (Ogden Avenue) from Ivanhoe Ave to east of IL 83 (Kingery Highway in the Villages of Lisle, Downers Grove, Westmont and Clarendon Hills. | — | Executed | R. W. Dunteman Company $7,098,580 · | ||
| Mar 8, 2019 | 62G64 | DuPageDistrict 1 | 2.4 miles of resurfacing and pedestrian ramp improvements on US 20 (W. Lake Street) from west of Summerfield Drive to west of I-355 (Veterans Memorial Tollway) in the Villages of Addison and Bloomingdale. | — | Executed | K-Five Construction Corporation $3,428,345 · | ||
| Mar 8, 2019 | 62G67 | CookDistrict 1 | Resurfacing and ADA pedestrian ramp improvements on vincennes Avenue from 119th Street to 127th Street in Blue Island. | — | Executed | K-Five Construction Corporation $827,549 · | ||
| Mar 8, 2019 | 62G80 | CookDistrict 1 | 3P resurfacing and median rehabilitation with pedestrian ramps along 127th Street/Burr Oak Ave from east of I-294 to Atesian Avenue in Blue Island. | — | Executed | Gallagher Asphalt Corporation $3,053,618 · | ||
| Mar 8, 2019 | 62G90 | LakeDistrict 1 | Sheet pile retaining wall and parking improvement at Illinois Beach State Park | — | Executed | Alliance Contractors, Inc. $953,418 · | ||
| Mar 8, 2019 | 62G98 | WillDistrict 1 | Removal and replacement of bridge decks of SN 099-0286, 099-0005 and 099-0304 c carrying I-55 over BNSF Railroad and Grant Creek in Wilminton and Channahon Townships. | — | Executed | D. Construction, Inc. $7,870,946 · | ||
| Mar 8, 2019 | 62H01 | DuPageDistrict 1 | Bridge deck overlay, joint repair, structural repair of concrete, drainage structure adjustment and concrete repair of beam ends for the structures carrying IL 83 of US 34 and the BNSF Railroad in the Villages of Hinsdale, Clarendon Hills and Westmont. | — | Executed | Herlihy Mid-Continent Company $2,269,678 · | ||
| Mar 8, 2019 | 62H04 | DuPageDistrict 1 | Bridge deck scarification, latex overlay, joint repairs, structural concrete and steel repairs on IL 38 (Roosevelt Road) over Salt Creek, also Bridge deck scarification, latex overlay, and joint repairs on IL 38 Frontage Road over Salt Creek. | — | Executed | Martam Construction Incorporated $1,330,256 · | ||
| Mar 8, 2019 | 62H07 | CookDistrict 1 | 0.5 miles of HMA resurfacing, pavement patching, milled shoulder rumble strips and pavement marking on IL 19 from Taft Avenue to Seymour Avenue in Chicago. | — | Executed | Plote Construction, Inc. $673,920 · | ||
| Mar 8, 2019 | 62H14 | VariousDistrict 1 | Vegetation management on various expressway and primary routes along Historic US Route 66 | — | Executed | Endrizzi Contracting, Inc $422,930 · | ||
| Mar 8, 2019 | 62H17 | CookDistrict 1 | Structural repairs of concrete on the structure carrying Joliet Road over the BandOCT RR in the Village of McCook | — | Executed | D. Construction, Inc. $262,345 · | ||
| Mar 8, 2019 | 62H19 | CookDistrict 1 | Bridge joint replacement and bridge deck sealing on SN 016-0273 carrying Torrence Avenue over I-80/I-94 in the Village of Lansing | — | Executed | D. Construction, Inc. $272,594 · | ||
| Mar 8, 2019 | 62H24 | DuPageDistrict 1 | 2.4 miles of resurfacing and pedestrian ramp work on IL 56 (Butterfield Road) from the Kane County line to the CNRR overpass in Aurora. | — | Executed | Geneva Construction Company $1,241,694 · | ||
| Mar 8, 2019 | 62H27 | CookDistrict 1 | Routing, cleaning, and sealing longitudinal cracks in the existing HMA pavement, and longitudinal joints between existing pavement and Curb and gutter and restriping with hot spray thermoplastic pavement marking. | — | Executed | Denler, Inc. $252,444 · | ||
| Mar 8, 2019 | 62H30 | DuPageDistrict 1 | Routing, cleaning, and sealing longitudinal cracks in the existing HMA pavement; longitudinal joints between the existing HMA pavement and curb and gutter; and restriping with hot spray thermoplastic pavement marking. | — | Executed | Freehill Asphalt, Inc. $285,968 · | ||
| Mar 8, 2019 | 62H32 | KaneDistrict 1 | 7.55 miles of Resurfacing (SMART) and pedestrian ramp project on IL 64 from IL 47 to Randall Road. | — | Executed | Curran Contracting Company $2,608,470 · | ||
| Mar 8, 2019 | 62H35 | WillDistrict 1 | Repairs on SN 099-0056 carrying I-80 over the Des Plaines River in Joliet. | — | Executed | Lakes & Rivers Contracting, Inc. $847,500 · | ||
| Mar 8, 2019 | 62H39 | LakeDistrict 1 | Demolition of a single-family home in Mundelein and an auto repair building in Grayslake. | — | Executed | Lima Contractors $158,946 · | ||
| Mar 8, 2019 | 62H41 | CookDistrict 1 | 2.4 miles of resurfacing and pedestrian ramp upgrades on IL 171 (Archer Ave.) from west of Ashland Avenue to State Street in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $1,424,366 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.