| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 18, 2019 | 46470 | VariousDistrict 2 | Repairing or replacing damaged or deteriorated overhead sign structures, structure components, and supports at locations described in the schedule of locations. | — | Rejected | COLLINS & HERMANN, INC. $1,139,658 · | ||
| Jan 18, 2019 | 46476 | VariousDistrict 1 | Removal of existing pavement marking and placing various widths of thermoplastic pavement marking lines, letters, and symbols within the limits specified on each individual work order. | — | Executed | Superior Road Striping, Inc. $762,500 · | ||
| Jan 18, 2019 | 46481 | LakeDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. | — | Executed | Superior Road Striping, Inc. $278,325 · | ||
| Jan 18, 2019 | 46482 | DuPageDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement markeer castings. | — | Executed | Superior Road Striping, Inc. $1,114,319 · | ||
| Jan 18, 2019 | 46483 | CookDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings. | — | Executed | Superior Road Striping, Inc. $579,619 · | ||
| Jan 18, 2019 | 46484 | KaneDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings. | — | Executed | Superior Road Striping, Inc. $357,144 · | ||
| Jan 18, 2019 | 46485 | WillDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings. | — | Executed | Superior Road Striping, Inc. $371,419 · | ||
| Jan 18, 2019 | 46486 | VariousDistrict 1 | Removal of existing pavement marking and placing hot spray thrermoplastic pavement and modified urethane marking lines, letters, and sysmbols within the limits specified on individual work orders. | — | Executed | Superior Road Striping, Inc. $649,500 · | ||
| Jan 18, 2019 | 46503 | VariousDistrict 3 | Pavement marking grooving, placing thermoplastic, epoxy, polyurea, modified urethane, preformed plastic, and hot spray thermoplastic pavement marking lines, letter, numbers, and symbols and the removal of exiswting pavement markings within the limits specified. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,523,875 · | ||
| Jan 18, 2019 | 60484 | CookDistrict 1 | Removal of existing bridge structure carrying 135th Street over Ashland Avenue, also, storm sewer installation, integral retaining wall, sidewalk and concrete barrier wall construction. | — | Executed | D. Construction, Inc. $1,519,602 · | ||
| Jan 18, 2019 | 60M99 | WillDistrict 1 | Bridge deck repairs and thin polymer overlay of the existing bridge deck of SN 099-0263 carrying US 30 (Cass Street) over Spring Creek in the City of Joliet. | — | Executed | MYS, Incorporated $88,200 · | ||
| Jan 18, 2019 | 60Y68 | CookDistrict 1 | Landscaping within the following boundaries of I-90/94: Roosevelt Road to Washington Blvd. and Peoria St. to Clinton St., and I-290: Roosevelt Rd. to Van Buren St. and Ashland Ave. to Clinton St. | — | Executed | Copenhaver Construction, Inc. $131,623 · | ||
| Jan 18, 2019 | 61E15 | KaneDistrict 1 | Reconstructin of Chicago Street from Center Street to Liberty Street, in the City of Elgin. | — | Executed | Martam Construction Incorporated $7,616,826 · | ||
| Jan 18, 2019 | 61E44 | CookDistrict 1 | Replace the superstructure and repair the abutments on the structure carrying Barker Avenue over Salt Creek in the City of Rolling Meadows. | — | Executed | Martam Construction Incorporated $613,257 · | ||
| Jan 18, 2019 | 61E74 | KaneDistrict 1 | Modifications at 27 intersections in Aurora, Batavia, Geneva, North Aurora and unincorporated Kane County. | — | Rejected | H & H Electric Co. $6,338,791 · | ||
| Jan 18, 2019 | 61E97 | KaneDistrict 1 | Intersection improvement and the construction of a shared-use path at Kirk Rd. | — | Executed | D. Construction, Inc. $9,936,023 · | ||
| Jan 18, 2019 | 61F00 | CookDistrict 1 | Roadway reconstruction with drainage and lighting work on State and National Parkway from PLum Grove Road to IL Route 58 in Schaumburg. | — | Executed | Plote Construction, Inc. $5,761,331 · | ||
| Jan 18, 2019 | 61F08 | McHenryDistrict 1 | Replace the bridge carrying Union Road over the Kishwaukee River, located 0.80 mile north of IL 176. | — | Executed | Civil Constructors, Inc. $1,671,611 · | ||
| Jan 18, 2019 | 61F12 | WillDistrict 1 | Rehabilitate the bridge carrying IL 7 Frontage Road over the Des Plaines River in the City of Lockport. | — | Rejected | ICC Group Inc. $2,191,000 · | ||
| Jan 18, 2019 | 61F13 | KaneDistrict 1 | High friction surface treatment, signing, pavement markings, rumble strips and traffic signal upgrades on Kisk Road from IL 56 to Cherry Lane. | — | Executed | H & H Electric Co. $1,295,729 · | ||
| Jan 18, 2019 | 61F20 | DuPageDistrict 1 | Resurfacing west Avenue from First Street to St. Charles Road in Elmhurst. | — | Executed | K-Five Construction Corporation $310,996 · | ||
| Jan 18, 2019 | 61F21 | CookDistrict 1 | Pavement reconstruction, widening and resurfacing, traffic signal replacement at the intersection of US 6 and Van Dam Road in the Village of South Holland. | — | Executed | Gallagher Asphalt Corporation $1,793,572 · | ||
| Jan 18, 2019 | 61F22 | CookDistrict 1 | Roadway reconstructioon with sidewalk, curb and gutter, and drainage work on Walnut Lane from Schaumburg Lane to Weathersfield Way in Schaumburg. | — | Executed | Alliance Contractors, Inc. $2,692,563 · | ||
| Jan 18, 2019 | 61F23 | McHenryDistrict 1 | Pavement widening, resurfacing, traffic signal installation, street lighting, and construction of a bike/pedestrian path at the intersection of US 14 and Virginia Road in the City of Crystal Lake. | — | Executed | Curran Contracting Company $1,193,351 · | ||
| Jan 18, 2019 | 61F24 | CookDistrict 1 | Resurfacing on Lively Boulevard from Devon Avenue to Landmeier Road in the Village of Elk Grove Village. | — | Executed | K-Five Construction Corporation $1,295,822 · | ||
| Jan 18, 2019 | 61F27 | McHenryDistrict 1 | Replace the superstructure, repair abutments, reconstruct approaches to the structure carrying O'Brien Road over Nippecsink Creek, 1.5 miles west of IL 47. | — | Executed | Dunnet Bay Construction Company $717,499 · | ||
| Jan 18, 2019 | 61F28 | KaneDistrict 1 | Intersection improvement on Randall Road at Stearns Road; includes pavement widening, resurfacing, curb and gutter, street lighting and traffic signal improvements. | — | Executed | Curran Contracting Company $4,183,052 · | ||
| Jan 18, 2019 | 61F30 | DuPageDistrict 1 | Resurfacing on Lies Road from Gary Avenue to Schmale Road in Carol Stream. | — | Executed | Plote Construction, Inc. $1,031,758 · | ||
| Jan 18, 2019 | 61F31 | KaneDistrict 1 | Replace the bridge carrying TR 189A over Indian Creek, 0.10 mile west of Farnsworth. | — | Executed | D. Construction, Inc. $896,612 · | ||
| Jan 18, 2019 | 61F33 | LakeDistrict 1 | Pavement reconstruction, construction of a shared use path, and lighting improvements on 14th Street from Green Bay Road to Sheridan Road in North Chicago. | — | Executed | Berger Excavating Contractors, Inc. $16,525,114 · | ||
| Jan 18, 2019 | 61F35 | CookDistrict 1 | Sidewalk Construction and traffic signal improvement on Archer Road from 68th Street to 66th Place, and on State Road from Lavergne Avenue to Cicero Avenue in Bedford Park. | — | Executed | Triggi Construction, Inc. $191,631 · | ||
| Jan 18, 2019 | 61F38 | DuPageDistrict 1 | Resufacing on York Road from Grand Avenue to Green Street in Bensenville. | — | Executed | K-Five Construction Corporation $1,878,875 · | ||
| Jan 18, 2019 | 61F42 | McHenryDistrict 1 | Resurfacing from Silver Lake Road to South Rawson Bridge Road in Cary. | — | Executed | Curran Contracting Company $1,758,945 · | ||
| Jan 18, 2019 | 61F43 | CookDistrict 1 | Rehabilitate the bridges carrying Oak Street and Cherry Street over the UP Railroad in the Village of Winnetka. | — | Executed | Dunnet Bay Construction Company $3,345,570 · | ||
| Jan 18, 2019 | 62B68 | KendallDistrict 1 | Realignment and widening project on US 30 at the intersections with Harvey Rd. and Treasure Drive, includes intersection improvement and traffic signals. | — | Executed | D. Construction, Inc. $786,115 · | ||
| Jan 18, 2019 | 62C07 | CookDistrict 1 | Traffic signal modernization at Central Park Avenue. Channelization and traffic signal modernization at Crawford/Pulaski Road, and Kedzie Avenue. | — | Executed | Iroquois Paving Corporation $8,882,487 · | ||
| Jan 18, 2019 | 62C51 | CookDistrict 1 | Resurfacing and pedestrian ramp improvement project on IL 83 (Torrence Ave.) from Glenwood Dyer Rd. to south of I-80. | — | Executed | D. Construction, Inc. $1,892,784 · | ||
| Jan 18, 2019 | 62C77 | LakeDistrict 1 | Resurfacing on US 41 (Skokie Hwy) from 1000 feet north of IL 176 (Rockland Rd) to 100 feet north of IL 120 (Belvidere Rd.). | — | Executed | Peter Baker & Son Co. $6,097,098 · | ||
| Jan 18, 2019 | 62F03 | CookDistrict 1 | Bridge rehabilitation in Northfield. | — | Executed | Dunnet Bay Construction Company $1,994,113 · | ||
| Jan 18, 2019 | 62F23 | CookDistrict 1 | Resurfacing Palatine Road from US 12 to IL 21, and patching on Dundee Road from east of Kennicott Ave to First Street. | — | Executed | J. A. Johnson Paving Company $5,278,586 · | ||
| Jan 18, 2019 | 62F30 | CookDistrict 1 | Superstructure replacement, retaining wall modifications, approach slab replacement, HMA resurfcing and ADA ramp installation on IL 171 over CSX RR/Ingredion RR spur. | — | Executed | D. Construction, Inc. $1,337,721 · | ||
| Jan 18, 2019 | 62F48 | LakeDistrict 1 | Resurfacing, pedestrian ramp improvement, and culvert repair on US 41 from Park Ave. West to Il 176 (Rockland Rd.); and on IL 22 from Tennyson Lane to US 41. 8.29 miles. | — | Executed | Peter Baker & Son Co. and Plote Construction, Inc JV $13,226,577 · | ||
| Jan 18, 2019 | 62G07 | CookDistrict 1 | Removal and replacement of headwalls and wingwalls on either side of the existing double cell box culvert crossing Burnham Ave., 40 ft north of 202nd St. in Lynwood. | — | Executed | MYS, Incorporated $188,874 · | ||
| Jan 18, 2019 | 62G14 | WillDistrict 1 | Insatallation of a fiber optic line to provide local centralized control and operation of 6 moveable bridges over the Des Plaines River in Joliet. | — | Executed | John Burns Construction Company $1,900,000 · | ||
| Jan 18, 2019 | 62G66 | DuPageWillDistrict 1 | Installation of seven truss mounted LED dynamic message signs, CCTBV, fiber optic networks and roadside bluetooth detectors at various locations. | — | Executed | John Burns Construction Company $5,592,292 · | ||
| Jan 18, 2019 | 62G87 | CookLakeMcHenryDistrict 1 | Cleaning and painting existing steel on structures. IL 137 over US 45, IL 31 over UPRR, and Green Bay Road over North Shore Channel. | — | Executed | Eagle Painting & Maintenance Company, Inc. $302,850 · | ||
| Jan 18, 2019 | 62G88 | DuPageDistrict 1 | Cleaning and painting designated steel surfaces of I-290 bridge (SN 022-0107) at Metra (north of IL 19 - Irving Park Road) in the Village of Itasca. | — | Executed | Eagle Painting & Maintenance Company, Inc. $805,200 · | ||
| Jan 18, 2019 | 62G93 | DuPageDistrict 1 | Bridge deck overlay and approach pavement with latex concrete. Adjacent HMA pavement will be resurfaced to provide a smooth transition. | — | Executed | Martam Construction Incorporated $164,813 · | ||
| Jan 18, 2019 | 62G95 | DuPageDistrict 1 | Drainage improvement project in the median of IL 83 from 67th Street to Plainfield Road. | — | Executed | Scanlon Excavating & Concrete, Inc. $88,287 · | ||
| Jan 18, 2019 | 62G99 | WillDistrict 1 | Bridge deck overlay, joint repairs, structural repair of concrete, and drainage repairs on 099-0264 carrying US 30 over WCL RR in Joliet. | — | Executed | D. Construction, Inc. $1,673,197 · | ||
| Jan 18, 2019 | 62H31 | CookLakeDistrict 1 | Crack and joint sealing on US 12 (Rand Rd.) from Ela Road to IL 58 (Golf Rd.) | — | Executed | Freehill Asphalt, Inc. $451,265 · | ||
| Jan 18, 2019 | 62H47 | CookDistrict 1 | Resurfacing on Palatine Rd. approximately 100 feet west of the centerline of US 14 (Northwest Hwy.) to 70 feet east of centerline of US 12 (Rand Rd.). 2.93 miles. | — | Executed | Builders Paving, LLC $3,557,204 · | ||
| Jan 18, 2019 | 62H65 | VariousDistrict 1 | Expressway mowing south. | — | Executed | Lion Construction 1, LLC $224,380 · | ||
| Jan 18, 2019 | 62H66 | VariousDistrict 1 | Expressway mowing north. | — | Executed | McGinty Bros., Inc. $211,296 · | ||
| Jan 18, 2019 | 62H67 | VariousDistrict 1 | Cleaning (sweeping) various expressway and arterial highways throughout District 1. | — | Executed | Elgin Sweeping Services, Inc. $12,612,286 · | ||
| Jan 18, 2019 | 64L50 | HenryDistrict 2 | Cleaning and painting structural steel on SN 037-0117 carrying township 400A over I-80, 2.8 miles west of IL 78. | — | Executed | Eagle Painting & Maintenance Company, Inc. $195,626 · | ||
| Jan 18, 2019 | 64M21 | OgleWinnebagoDistrict 2 | 19.53 miles routing, cleaning, and sealing the centerline and shoulder joints on I-39 from the Lee County line to 0.4 miles north of Baxter Road. | — | Executed | Freehill Asphalt, Inc. $666,361 · | ||
| Jan 18, 2019 | 64N07 | HenryDistrict 2 | Cleaning and painting structural steel on SN 037-0102 carrying N 1900th Avenue over I-74, 1.0 mile south of I-80. | — | Executed | Eagle Painting & Maintenance Company, Inc. $199,110 · | ||
| Jan 18, 2019 | 64N08 | HenryDistrict 2 | Clean and paint structural steel on SN 037-0103 carrying N 1700th Avenue over I-74, 3.0 miles south of I-80. | — | Executed | Eagle Painting & Maintenance Company, Inc. $193,240 · | ||
| Jan 18, 2019 | 64N09 | HenryDistrict 2 | Cleaning and painting structrual steel on SN 037-0104 carrying N 1200th Ave. over I-74, 2.0 miles north of IL 81. | — | Executed | Eagle Painting & Maintenance Company, Inc. $193,591 · | ||
| Jan 18, 2019 | 64N16 | VariousDistrict 2 | "On-Call" guardrail and fence repairs along state maintained routes in Boone, Carroll, Jo Davies, Ogle, Stephenson and Winnebago Counties. | — | Rejected | Northern Contracting, Inc. $394,187 · | ||
| Jan 18, 2019 | 64N17 | VariousDistrict 2 | "On-Call" guardrail and fence repairs along state maintained routes in Henry, Lee, Rock Island, Whiteside, and portions of LaSalle Counties. | — | Rejected | Northern Contracting, Inc. $444,125 · | ||
| Jan 18, 2019 | 64N19 | StephensonDistrict 2 | Pavement patchingh on US 20 from Ayp Road to Browns Mill Road. | — | Executed | G. M. Sipes Construction, Inc. $286,378 · | ||
| Jan 18, 2019 | 64N21 | OgleDistrict 2 | Cold milling and HMA resurfacing on IL 2 from chestnut Street to 0.2 mile north in Byron. | — | Executed | Martin & Company Excavating $149,653 · | ||
| Jan 18, 2019 | 64N23 | WhitesideDistrict 2 | Mill and resurface I-88 bridge roadway approaches on SN 098-0084(EB), 098-0087(EB), 098-0088(WB), 098-0089(WB), and 098-0090(EB). | — | Executed | Martin & Company Excavating $210,983 · | ||
| Jan 18, 2019 | 64N24 | LeeDistrict 2 | Removal and replacement of culvert in the south leg of the intersection of IL 251 and US 30. | — | Executed | O'Brien Civil Works, Inc. $118,640 · | ||
| Jan 18, 2019 | 64N30 | WinnebagoDistrict 2 | Expansion joint replacement, beam end repairs, and bearing replacements on SN 101-0144 carrying Rotary Road over I-39. | — | Executed | Civil Constructors, Inc. $117,814 · | ||
| Jan 18, 2019 | 66C58 | LaSalleDistrict 3 | Removal and replacemnt of SN 050-0073 carrying IL 170 over the BNSF Railroad at the Village of Ransom. Work includes embankment, guardrail, landscaping, and pavement striping. | — | Executed | D. Construction, Inc. $3,144,188 · | ||
| Jan 18, 2019 | 66E75 | LaSalleDistrict 3 | Paching, milling, and resurfacing at various locations on IL 23/IL 71 from Freemont St. to 0.2 miles south of McKinley Rd., and 0.1 mile south of Lincoln Place. | — | Executed | Advanced Asphalt Company $4,638,064 · | ||
| Jan 18, 2019 | 66E99 | LaSalleDistrict 3 | 3P milling and resurfacing of US 6 from IL 178 to the west city limits of Ottawa. 7.11 miles. | — | Executed | Advanced Asphalt Company $2,864,832 · | ||
| Jan 18, 2019 | 66F57 | KankakeeDistrict 3 | Substructure widening and superstructure replacement on SN 046-0035, 0036 carrying IL 17 over Baker Creek. | — | Executed | Tobey's Construction & Cartage, Inc. $3,708,133 · | ||
| Jan 18, 2019 | 66H81 | BureauDistrict 3 | Cleaning and painting all strucutral steel of SN 006-0090 carrying IL 40 over Hennepin Canal. | — | Executed | Thomas Industrial Coatings, Inc. $99,935 · | ||
| Jan 18, 2019 | 66J04 | LaSalleDistrict 3 | Removal of the existing parking lot pavement and replacement with a new parking area. | — | Executed | Universal Asphalt & Excavating, Inc. $250,991 · | ||
| Jan 18, 2019 | 66J13 | DeKalbDistrict 3 | Install span wire mounted four-way flashing read beacon at the intersection of IL 23 and IL 72. The project includes installation of post-mounted flashing yellow beacon on the advance intersection warning signs adjacent to the north, east, and west legs. | — | Executed | William Charles Construction Co, LLC $72,000 · | ||
| Jan 18, 2019 | 66J37 | BureauDistrict 3 | Concrete deck, bearing, expansion joint, floor drain, guardrail/terminal section removal and replacement, and installing steel bridge railing to SN 006-0061 carrying US 6 over King Creek. | — | Executed | D. Construction, Inc. $426,461 · | ||
| Jan 18, 2019 | 66J42 | FordDistrict 3 | removal and replacement of a 3'x 2' concrete box culvert with 30' ERS RCCP culv ert located on IL 115, 0.7 mile south of Main Street in Cabery. | — | Executed | Scanlon Excavating & Concrete, Inc. $36,875 · | ||
| Jan 18, 2019 | 66J43 | BureauDistrict 3 | Cleaning and painting all structural steel of SN 006-0039 carrying FAI 180 over FAI 80 approximately 4 miles east of Princeton. | — | Executed | ERA-Valdivia Contractors, Inc. $424,473 · | ||
| Jan 18, 2019 | 66J46 | BureauDistrict 3 | Cleaning and painting all structural steel of SN 006-0142 carrying IL 89 over a branch of Brush Creek approximately 0.8 miles south of Arlington. | — | Executed | Thomas Industrial Coatings, Inc. $101,065 · | ||
| Jan 18, 2019 | 66J67 | GrundyLivingstonDistrict 3 | Two application of spray mixtures at designated times, once in the Spring and once in the summer, along I-80, I-55 and IL 113 in Grundy County and along I-55, IL 47, and IL 23 in Livingston County. | — | Executed | Endrizzi Contracting, Inc $126,725 · | ||
| Jan 18, 2019 | 68A91 | FultonDistrict 4 | Resurfacing on US 24 from Maple St. in Lewistown to Little America, and on IL 97 from US 24 to North Clark Rd. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,428,793 · | ||
| Jan 18, 2019 | 68D59 | TazewellDistrict 4 | Bridge repair on Washington Street (IL 40) and the Industrial Spur (IL 40). | — | Executed | Halverson Construction Co., Inc. $3,848,556 · | ||
| Jan 18, 2019 | 68D79 | WoodfordDistrict 4 | Resurfacing I-39 from the Mclean County line to 0.25 mile north of US 24, includes repair on bridges SN 102-0058 and 102-0059. | — | Executed | Rowe Construction, a div of UCM, Inc. $13,273,213 · | ||
| Jan 18, 2019 | 68E20 | PeoriaDistrict 4 | Installation of fiber optic cable, communications equipment and CCTV for a new traffic signal system in Peoria. | — | Rejected | Oberlander Electric Co. $790,000 · | ||
| Jan 18, 2019 | 68E69 | VariousDistrict 4 | Dead tree removal throughout District 4. | — | Executed | Clean Cut Tree Service, Inc. $167,467 · | ||
| Jan 18, 2019 | 68E74 | KnoxDistrict 4 | Structural steel repairs to beams on SN 048-0065 carrying Farnham Street over US 34. | — | Executed | Halverson Construction Co., Inc. $147,930 · | ||
| Jan 18, 2019 | 68E76 | TazewellDistrict 4 | Installation and removal of guardrail, inlet adjustments and miscellaneous concrete work to separate US 150 (West Jackson Street) from the adjacent multi-use trial from Beverly Avenue to Cedar Avenue, on the northwest side of Morton | — | Executed | Illinois Civil Contractors, Inc. $149,100 · | ||
| Jan 18, 2019 | 68E78 | TazewellDistrict 4 | Install communications duct, communications vaults, fiber optic cable, CCTV cameras along US 24 and Business Route 24 in and around Washington. | — | Executed | Bodine Electric of Decatur $427,439 · | ||
| Jan 18, 2019 | 70997 | ChampaignDistrict 5 | Standard overlay with ADA improvements on US 150 between Mattis Ave. and Propect Ave. in Champaign. | — | Executed | Cross Construction, Inc. $1,135,000 · | ||
| Jan 18, 2019 | 70A61 | ChampaignDistrict 5 | Replace the structure carrying Bradley Avenue over I-57, including 0.578 miles of widening and resurfacing on Bradley Avenue. | — | Executed | Stark Excavating, Inc. $4,943,503 · | ||
| Jan 18, 2019 | 70D49 | DeWittMcLeanPiattDistrict 5 | 5.88 miles of Class A patching from Champaign County line to east of Downs on I-74, and one spot location just south of Hudson on I-39. | — | Executed | G. M. Sipes Construction, Inc. $193,089 · | ||
| Jan 18, 2019 | 70D51 | ChampaignDouglasDistrict 5 | 25.51 miles of Class A (SPL) and Class B patching_on I-57 between Tuscola and Rantoul, and on I-72 from Champaign to the Piatt County Line. | — | Executed | G. M. Sipes Construction, Inc. $353,033 · | ||
| Jan 18, 2019 | 72C83 | ChristianDistrict 6 | Culvert replacement on US 51 over a ditch, 0.9 mile north of IL 16. | — | Executed | Stutz Excavating, Inc. $702,444 · | ||
| Jan 18, 2019 | 72K03 | AdamsHancockDistrict 6 | Clean 3 bridges: 1) SN 001-0019, US 24 EB over the Mississippi River in Quincy, 2) SN 001-0068, US 24 WD over the Mississippi River in Quincy, 3) SN 034-0062 US 136 over the Mississippi River near Keokuk, IA. | — | Executed | Interstate Maintenance, Incorporated $68,999 · | ||
| Jan 18, 2019 | 72K67 | AdamsDistrict 6 | 9.9 miles of micro-surfacing, cape seal on pavement and fog seal on shoulders, on IL 110/336 and north interchange ramps, and overhead roadway at the IL 61 and IL 110/336 interchange. | — | Executed | A. C. Pavement Striping Co. $2,670,026 · | ||
| Jan 18, 2019 | 72K69 | SchuylerDistrict 6 | Installing cross road pipe culver, existing pipe culvert removal and fill, and related ditch improvements on IL 99 just south of Vaughn Lane, south of Camden. | — | Executed | County Contractors, Inc. $156,000 · | ||
| Jan 18, 2019 | 72K72 | MontgomeryDistrict 6 | Paint 3 bridges on I-55 in northern Montgomery County(SN 068-0036, 0040, 0041). | — | Executed | ERA-Valdivia Contractors, Inc. $649,450 · | ||
| Jan 18, 2019 | 72K73 | LoganDistrict 6 | Painting portions of four bridges on I-55, I-155 and US 136 in Logan County (SN 054-0052, 054-0027, 054-0076, 054-0077). | — | Rejected | Venus Painting Co. $526,000 · | ||
| Jan 18, 2019 | 72K74 | SangamonDistrict 6 | Painting portions of 4 bridges on I-72, Business 55, and IL 4 in Sangamon County. | — | Rejected | Civil Coatings and Construction Inc. $434,065 · | ||
| Jan 18, 2019 | 72K91 | MontgomeryDistrict 6 | Bituminous surface treatment and resurfacing on I-55 West Frontage Road, from IL 108 to 18th Avenue, and on I-55 East Frontage Road from IL 48 to IL 108. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $907,730 · | ||
| Jan 18, 2019 | 72K94 | MorganDistrict 6 | Centerline microsurfacing on I-72 from 0.7 mile west of US 67 to 3.3 miles east of Business IL 72. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $274,398 · |
1–100 of 936Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.