Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jul 31, 2020 66L08 GrundyDistrict 3 Placing an aggregate wedge shoulder adjacent to existing paved shoulders on FAP 326 (IL 47) beginning at the intersection of IL 47 and Rte 113 and ending at the intersection of IL 47 and Scully Rd in Grundy County. — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $91,591 ·
Jul 31, 2020 66L16 BureauDistrict 3 Scour mitigation measures (riprap) at SN 006-0114 carrying FAS 248 (Tiskilwa Spur) over Big Bureau Creek 0.3 mi N of Tiskilwa in Bureau County. — Executed Nov 26 New D. Construction, Inc. $40,542 ·
Jul 31, 2020 87727 LaSalleDistrict 3 Replace the bridge carrying CH 5 over Wolf Creek, 2.3 miles east of IL 23. — Executed Nov 26 New Riber Construction, Inc. $922,301 ·
Sep 18, 2020 66K51 IroquoisDistrict 3 3P milling and resurfacing from IL 54 in Onarga to North St in Buckley according to TAMP designed overlay policy. Other work includes culvert work, grading and shaping ditches, stabilization, shoulder stone, pavement marking, and raised reflectors. — Executed Nov 26 New Iroquois Paving Corporation $4,263,411 ·
Sep 18, 2020 66L09 BureauDistrict 3 Installing a 36" ERS concrete Pipe culvert adjacent to the box culvert This work is located on FAS Route 1279 (US 34) carrying US 34 adjacent to a concrete Box culvert, Structure No. 006-2569, Station 428+72 in Bureau County. This project consists of installing a 36" ERS concrete Pipe culvert adjacent to the box culvert. — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $54,859 ·
Sep 18, 2020 66L11 BureauDeKalbDistrict 3 The removal and replacement of traffic signal "Controller Cabinets This work is located at various intersections on US 6 in Bureau County and IL 38 in DeKalb County. This work consists of the removal and replacement of traffic signal "Controller Cabinets." — Executed Nov 26 New H & H Electric Co. $429,688 ·
Sep 18, 2020 66L27 LaSalleDistrict 3 Removing and replacing two wing walls of the structure This work is located at Structure No. 050-2539 carrying IL 170 over Armstrong Run. Approximately 3.86 miles south of US 6 in LaSalle County. This project consists of removing and replacing two wing walls of the structure. — Executed Nov 26 New D. Construction, Inc. $93,370 ·
Nov 6, 2020 66959 IroquoisDistrict 3 The removal and replacement of the existing structure, guardrail and terminal removal and replacement, HMA mil This project is located on FAP 332 (IL 1) 0.15 mile north of US 52 in lroquois County. The work consists of the removal and replacement of the existing structure, guardrail and terminal removal and replacement, HMA milling and resurfacing, pavement marking, and reflectors. — Executed Nov 26 New Iroquois Paving Corporation $1,546,600 ·
Nov 6, 2020 66K20 FordDistrict 3 The project is located on IL 9/IL 47/IL 54 from IL 47 (N) in Gibson City to Baltimore Drive in Paxton for length of 14.01 miles. Project includes 3 3/4" mill and resurface from beginning of project to IL 115 and 2" mill and RS to end of projects. Work includes guardrail updates, drainage work and ADA updates and patching in Gibson City. — Executed Nov 26 New Cross Construction, Inc. $8,756,556 ·
Nov 6, 2020 66K54 IroquoisDistrict 3 3P Milling and Resurfancing (Designed overlay) and ADA improvements on FAP 332 (IL 1) from 0.1 miles North of US 52 to US 24 in Watseka for a total length of 8.2 miles. — Executed Nov 26 New Iroquois Paving Corporation $5,298,767 ·
Nov 6, 2020 87731 KendallDistrict 3 Extension of Eldamain Road on new alignment from River Road to West Highpoint Road (south of IL 71), includes a new bridge over Fox River and a roundabout at the new Eldamain and Fox Road. Project is 2.0 miles west of IL 47 between River Road and West Highpoint Road in Yorkville. — Executed Nov 26 New Plote Construction Inc. & Dunnet Bay Construction Company__DO NOT USE $34,558,327 ·
Nov 6, 2020 87737 BureauDistrict 3 Replace the bridge carrying CH 8 over Maple Creek, 2 miles north of Wyanet. — Executed Nov 26 New D. Construction, Inc. $961,533 ·
Jan 15, 2021 46560 VariousDistrict 3 "On-Call" Pavement Marking with various materials including, thermoplastic, paint, preformed plastic, polyurea, modified urethane, pavement marking removal, hot-spray thermoplastic, grooving for pavement marking, and aerial mk. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,394,950 ·
Jan 15, 2021 66E45 GrundyDistrict 3 The replacement of bridge deck on SN 032-0075 carrying US 6 and over CSX Transportation Railroad The work consists of the replacement of bridge deck on SN 032-0075 carrying US 6 and over CSX Transportation Railroad. Additional work includes substructure repairs, structural steel painting, tree removal, landscaping,grading ditches, and resurfacing pavement. The project length is 0.4 miles and is located 5.3 miles East of Morris in Grundy Co. — Executed Nov 26 New P. T. Ferro Construction Co. $2,077,263 ·
Jan 15, 2021 66K95 BureauDistrict 3 The removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert This work is located on FAP 698 (IL 89) 0.3 miles north of E. Walnut St. in Ladd at station 564+45 in Bureau County. This work consists of the removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert with guardrail removal. — Executed Nov 26 New R & R Landscaping & Irrigation $75,446 ·
Jan 15, 2021 66L00 LaSalleDistrict 3 Latex overlay, cleaning and painting structural steel and expansion joint repair of SN 050-0171 carrying US 52 over 1-39 in Troy Grove. — Executed Nov 26 New D. Construction, Inc. $1,200,540 ·
Jan 15, 2021 66L24 BureauDistrict 3 Bridge painting This work is located at Structure No. 006-0153, IL 92 over a stream, approximately 3.3 miles West of US 34 in Bureau County. This work consists of bridge painting. — Executed Nov 26 New Three Star Painting, Inc. $145,136 ·
Jan 15, 2021 66L25 BureauDistrict 3 Bridge painting This work is located at Structure No. 006-0128, TR 333 over 1-180, approximately 3.3 miles West of US 34 in Bureau County. This work consists of bridge painting. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $208,017 ·
Jan 15, 2021 66L26 BureauDistrict 3 Bridge painting This work is located at Structure No. 006-0041 (SB), 006-0042 (NB), approximately 2.54 miles North of IL 26 and Structure No. 006-0043 (NB), 006-0044 (SB), approximately 2.04 miles North of IL 26 in Bureau County. This work consists of bridge painting. — Executed Nov 26 New Three Star Painting, Inc. $651,622 ·
Jan 15, 2021 66L40 LivingstonDistrict 3 Removing existing HMA and aggregate subbase surfaces, repair and preparation of base course and placing a poly This work is located at the Illinois Department of Transportation, District 3, Pontiac Maintenance Facility in Livingston County. This work consists of removing existing HMA and aggregate subbase surfaces, repair and preparation of base course and placing a polymer HMA binder cse (2¼" lift) and a polymer HMA surface cse (1 ¼" lift). — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $427,351 ·
Jan 15, 2021 66L44 BureauLivingstonDistrict 3 The work consists on performing Bridge Deck Concrete sealing at various bare concrete bridge decks in Bureau and Livingston counties. — Executed Nov 26 New All States Painting, Inc. $177,640 ·
Jan 15, 2021 87744 LivingstonDistrict 3 Replace the bridge carrying TR 4B over Ditch Mole Creek, located 2.5 miles northwest of Flanagan. — Executed Nov 26 New Riber Construction, Inc. $335,279 ·
Jan 15, 2021 87745 BureauDistrict 3 Resurfacing CH 19 from Angling Road to US 6. — Executed Nov 26 New Advanced Asphalt Company $1,111,251 ·
Jan 15, 2021 87755 LivingstonDistrict 3 Replace the bridge carrying TR 118 over Mud Creek, 3.5 miles northeast of Cornell. — Executed Nov 26 New Riber Construction, Inc. $380,342 ·
Mar 5, 2021 66B07 LaSalleDistrict 3 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on FAS FAP 603 (US 52 and IL 23) from 0.5 miles West of 1-39 to IL 23 (S) in LaSalle County IL 23. — Executed Nov 26 New Advanced Asphalt Company $3,842,156 ·
Mar 5, 2021 66D55 VariousDistrict 3 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on FAP 649 (IL i 7) from IL 251 in Wenona to IL 23 S of Streator. — Executed Nov 26 New Advanced Asphalt Company $4,463,026 ·
Mar 5, 2021 66F09 KankakeeDistrict 3 8.426 miles of 3R Resurfacing (Standard Overlay) and Structure Repairs from 0.7 mi North of the Iroquois County Line to 0.8 mi les north of the Kankakee River Bridge. — Executed Nov 26 New Kankakee Valley Construction Co., Inc. & Gallagher Asphalt Corporation $20,058,764 ·
Mar 5, 2021 66H15 GrundyDistrict 3 BRIDGE REPLACEMENT (032-0079) IL 47 OVER 1-55, AND RECONSTRUCTION OF IL 47 FROM NORTHBROOK AVE TO THE SOUTH ABUTMENT OF SN 032-0110, ALONG WITH ADJACENT LIGHTING. — Executed Nov 26 New D. Construction, Inc. $9,396,853 ·
Mar 5, 2021 66K56 IroquoisDistrict 3 6 miles of milling, resurfacing, and ADA improvements on US 45 from North Street in Buckley to Jefferson Street in Loda. 1 foot saftey shoulders will be added to the rural section between Buckley and Loda. — Executed Nov 26 New Iroquois Paving Corporation $3,034,581 ·
Mar 5, 2021 66K61 FordDistrict 3 Milling and resurfacing 3 Project is located in Piper City, Ford County. The job length is 1.09 miles and consists of milling and resurfacing 3.75" of HMA on the mainline pavement. The work also includes several ADA improvements. — Executed Nov 26 New Iroquois Paving Corporation $747,230 ·
Mar 5, 2021 66L17 LaSalleDistrict 3 Removing and replacing the expansion joints and approach slabs This work is located at two sets of structures, SN 050-0210 and SN 050-0211 carrying FAI 39 Over the Nor-Folk Southern Railway, 1.48 miles north of IL Rte 18 and SN 050-0212 and SN 050-0213 carrying FAI 39 over Sandy creek, 1.23 mi. north of IL Rte. 18. This project consists of removing and replacing the expansion joints and approach slabs. — Executed Nov 26 New Gensini Excavating, Inc. $1,393,416 ·
Mar 5, 2021 66L23 LaSalleDistrict 3 Bridge painting This work is located at Structure No. 050-0011 (EB) and 050-0012 (WB) over Illinois Railway, approximately 2.0 miles East of IL 23 in LaSalle County. This work consists of bridge painting. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $389,847 ·
Mar 5, 2021 66L46 LaSalleDistrict 3 Regrading a failed slope along IL 251 and stabilizing the area with soldier piles and retaining walls The project is located 2.1 mi south of I-80 with a length of 450 ft. The work consists of regrading a failed slope along IL 251 and stabilizing the area with soldier piles and retaining walls. These will be built into existing box culvert (050-2524) with some drainage items. The final graded slope will be seeded. — Executed Nov 26 New D. Construction, Inc. $764,122 ·
Mar 5, 2021 87735 LivingstonDistrict 3 Resurfcing CH 6/CH 1 from Chestnut Street in Fairbury (Livingston County) to north of the railroad in McLean County. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $2,589,198 ·
Mar 5, 2021 87765 DeKalbDistrict 3 Resurfacing, sidewalks, curb and gutter, pavement markings on East Hill Street from Sycamore Street to IL 23 in Genoa. — Executed Nov 26 New Curran Contracting Company $408,408 ·
Apr 23, 2021 66B52 LaSalleDistrict 3 The reconstruction of the existing intersection into a PCC roundabout The project is located in the intersection of US 6 and IL 178, north of Utica in LaSalle county and consists of the reconstruction of the existing intersection into a PCC roundabout. The project also includes earthwork, seeding, drainage improvements, permanent lighting and removal of existing traffic equipment. The project length is 0.42 miles. — Executed Nov 26 New R. W. Dunteman Company $2,442,377 ·
Apr 23, 2021 66E14 BureauDistrict 3 3P mill and resurface. — Executed Nov 26 New Advanced Asphalt Company $4,496,640 ·
Apr 23, 2021 66K60 BureauDistrict 3 7.3 miles of milling and resurfacing, ADA improvements. — Executed Nov 26 New Advanced Asphalt Company $2,816,475 ·
Apr 23, 2021 66L01 LaSalleDistrict 3 0.71 mile. Latex overlay, cleaning and painting of structural steel and expansion joint replacement. SN 050-0200 IL 251 over 1-39; 0.5 Miles north of IL 71. — Executed Nov 26 New D. Construction, Inc. $1,921,508 ·
Apr 23, 2021 66L22 IroquoisDistrict 3 Bridge painting This work is located at Structure No. 038-0130, TR 95 over 1-57, approximately 3.48 miles South of IL 116 and Structure No. 038-0131 carrying TR 109 over 1-57, approximately 5.59 miles South of IL 116 in Iroquois. This work consists of bridge painting. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $384,278 ·
Apr 23, 2021 66L28 KankakeeDistrict 3 Signal Mast Arm Removal and Replacement - at River St and Station St in Kankakee. — Executed Nov 26 New Van-Mack Electric Co. $210,000 ·
Apr 23, 2021 66L30 IroquoisKankakeeDistrict 3 This project consists of 3.85 miles of shoulder widening and rumble strip installation on IL 1 from 150 feet west of W Circle Dr in St Anne in Kankakee County to E 3100N Rd in Iroquois County. — Executed Nov 26 New Iroquois Paving Corporation $1,088,767 ·
Apr 23, 2021 66L32 BureauDistrict 3 The installation of approximately 5 This project consists of the installation of approximately 5.24 miles of high tension cable median barrier from the Henry/Bureau County Line to 0.42 miles West of 600E Rd. — Executed Nov 26 New Advanced Asphalt Company $1,112,433 ·
Apr 23, 2021 66L33 LaSalleDistrict 3 The installation of approximately 5 This project consists of the installation of approximately 5.92 miles of high tension cable median barrier from 1.09 miles South of N 36th Rd to 0.88 miles South of N 42nd Rd in LaSalle County. — Executed Nov 26 New Advanced Asphalt Company $1,322,328 ·
Apr 23, 2021 66L41 IroquoisDistrict 3 Removing existing HMA and aggregate subbase surfaces, repair and preparation of base course, and placing a pol This work is located at the Illinois Department of Transpiration, District 3, Buckley Maintenance Facility in Iroquois County. This work consists of removing existing HMA and aggregate subbase surfaces, repair and preparation of base course, and placing a polymer HMA asphalt binder cse. (2¼" lift) and a polymer HMA surface *See Remarks*. — Executed Nov 26 New Iroquois Paving Corporation $333,002 ·
Apr 23, 2021 66L52 GrundyDistrict 3 This pollinator project is located at Three Rivers Rest Areas on I-80 west of Minooka. This work will include herbicide, seeding, planting, landscaping and maintenance. — Executed Nov 26 New Nettle Creek Nursery, Inc. $377,962 ·
Apr 23, 2021 66L54 DeKalbDistrict 3 The removal and replacement of expansion joints and deck patching on SN 019-0036 This work is located at FAP 573 on US 30 on SN 019-0036 at Little Rock Creek 0.5 miles West of Hinckley in Dekalb County. This work consists of the removal and replacement of expansion joints and deck patching on SN 019-0036. — Executed Nov 26 New Martin & Company Excavating $250,265 ·
Apr 23, 2021 66L56 LaSalleLivingstonDistrict 3 Placing aggregate wedge shoulder This work is located on FAP 786 (IL 170) beginning at the intersection of IL 170 and N 21st Rd in LaSalle County and ending at the intersection of IL 170 and IL 17 in Livingston County (+/- 12.0 miles). This work consists of placing aggregate wedge shoulder. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $135,304 ·
Apr 23, 2021 66L61 KendallLaSalleDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kendall and LaSalle Counties. — Executed Nov 26 New H & H Electric Co. $49,983 ·
Apr 23, 2021 66L62 BureauLaSalleDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Bureau and LaSalle Counties. — Executed Nov 26 New Laser Electric, Inc. $71,890 ·
Apr 23, 2021 66L63 GrundyDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Grundy County. — Executed Nov 26 New Outsen Electric, Incorporated $51,970 ·
Apr 23, 2021 66L64 VariousDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Livingston, Ford, Grundy, and Iroquois Counties. — Executed Nov 26 New Leo P. Kelly Electric, Incorporated $50,340 ·
Apr 23, 2021 66L65 IroquoisKankakeeDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kankakee and Iroquois Counties. — Executed Nov 26 New Outsen Electric, Incorporated $65,170 ·
Apr 23, 2021 66L66 DeKalbDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in DeKalb County. — Executed Nov 26 New H & H Electric Co. $54,015 ·
Apr 23, 2021 66L70 BureauDistrict 3 Weed spraying to aid in weed control This project is located along FAI 80 (I-80) in Bureau county. The work consists of weed spraying to aid in weed control. — Executed Nov 26 New Endrizzi Contracting, Inc $99,891 ·
Apr 23, 2021 87660 FordDistrict 3 Replace the bridge carrying CH 23 over Crane Creek, 0.75 mile east of Cabery. — Rejected Nov 26 New Tobey's Construction & Cartage, Inc. $426,709 ·
Apr 23, 2021 87662 DeKalbDistrict 3 Replace the bridge carrying Suydam Road over Indian Creek, 7 miles south of Shabbona. — Executed Nov 26 New Martin & Company Excavating $1,041,745 ·
Apr 23, 2021 87739 DeKalbDistrict 3 Replace the bridge carrying TR 175 over Battle Creek, 0.3 mile east of Hinckley Road. — Executed Nov 26 New Riber Construction, Inc. $693,852 ·
Apr 23, 2021 87740 FordDistrict 3 Replace the bridge carrying CH 18 over the West Branch of Horse Creek, 2 miles southeast of Cabery. — Rejected Nov 26 New Tobey's Construction & Cartage, Inc. $419,682 ·
Apr 23, 2021 87743 LaSalleDistrict 3 Replace the bridge carrying N. 33rd Road over Pecumsaugan Creek, 0.2 mile east of E. 9th Road. — Executed Nov 26 New Riber Construction, Inc. $332,516 ·
Apr 23, 2021 87746 DeKalbDistrict 3 Resurfacing Suydam Road from IL 23 to the city limits of Sandwich. — Executed Nov 26 New Curran Contracting Company $1,104,983 ·
Apr 23, 2021 87757 KankakeeDistrict 3 Resurfacing CH9 from 5000 West Road to US 45. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $1,218,902 ·
Apr 23, 2021 87764 BureauDistrict 3 Replace the bridge carrying CH 24 over a branch of Pond Creek, 2 miles south of Wyanet. — Executed Nov 26 New D. Construction, Inc. $338,614 ·
Apr 23, 2021 87766 LaSalleDistrict 3 Resurfacing Crosat Street from 11th Street to US 6 in the City of LaSalle. — Executed Nov 26 New Universal Asphalt & Excavating, Inc. $230,520 ·
Jun 11, 2021 46567 VariousDistrict 3 Installing and replacement of raised reflective pavement markers and reflectors This work is located at various locations in Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. Work shall consist of installing and replacement of raised reflective pavement markers and reflectors. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $422,606 ·
Jun 11, 2021 46568 VariousDistrict 3 Raised reflective pavement marker removal, installing raised reflective pavement markers and replacement of ra This work is located on various interstate, multi-lane non-interstate and 2L-2W routes in Bureau, LaSalle, Dekalb, and Kendall Counties. This work shall consist of raised reflective pavement marker removal, installing raised reflective pavement markers and replacement of raised reflective pavement marker reflectors. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $461,546 ·
Jun 11, 2021 66A96 BureauDistrict 3 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on US 6 from IL 26 South in Princeton to IL 89 North in Spring Valley. — Executed Nov 26 New Advanced Asphalt Company $5,946,378 ·
Jun 11, 2021 66B93 DeKalbLaSalleDistrict 3 This is a 3P milling and resurfacing project of 3 3/4" on US 34 from IL 23 to East of Somonauk Road in Somonauk. This will also address ADA sidewalk ramps. Other work will include shoulder stone, pavement marking and raised reflectors. — Executed Nov 26 New Curran Contracting Company $2,242,143 ·
Jun 11, 2021 66D51 KendallDistrict 3 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on FAP 607 (US 52) from Townhouse road north to IL 47. — Executed Nov 26 New D. Construction, Inc. $2,440,250 ·
Jun 11, 2021 66D68 LaSalleDistrict 3 Milling and resurfacing 3 Work consists of milling and resurfacing 3.75" HMA on mainline of FAP 619 (IL 351/IL 71) in Oglesby and FAP 627 (IL 71) in Jonesville in LaSalle County. The work includes ADA improvements in Oglesby and guardrail replacement in Jonesville. The job length is 1.2 miles. — Executed Nov 26 New Advanced Asphalt Company $1,122,141 ·
Jun 11, 2021 66F88 KankakeeDistrict 3 Bridge Replacement (SN 046-0030) at Granary Creek, 1.3 miles East of Essex Rd. and Bridge Replacement (SN 046-0032) at E Branch of Horse Creek, 0.2 mile East of Herscher Road. — Executed Nov 26 New P. T. Ferro Construction Co. $2,850,474 ·
Jun 11, 2021 66H91 LaSalleDistrict 3 Deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, str This work is located at SN 050-0096 carrying IL 178 over the Vermilion River approximately 3.7 mi. South of IL Route 71 in LaSalle County. This work consists of deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, striping, pavement markers, curb and gutter removal and replacement, pavement widening removal and replacement, and other related construction items. — Executed Nov 26 New D. Construction, Inc. $671,375 ·
Jun 11, 2021 66K19 LaSalleDistrict 3 This project consists of 5.86 miles of shoulder widening and rumble strip installation on_US 34 from E 12th Rd to 0.18 miles West of IL 23 (South leg) in LaSalle County. — Executed Nov 26 New Curran Contracting Company $742,928 ·
Jun 11, 2021 66K40 IroquoisDistrict 3 3P MILLING AND RESURFACING (DESIGNED OVERLAY) EXTENDING 6.41 MILES FROM THE FORD CO LINE TO 0.2 MI E OF I-57 IN GILMAN. — Executed Nov 26 New Iroquois Paving Corporation $3,355,377 ·
Jun 11, 2021 66K46 LaSalleDistrict 3 The work is 2.79 miles long, extending from 0.4 miles south of I-80 to South of Canal St in LaSalle, consisting of 3P Milling and Resurfacing (Designed Overlay), also including ADA ramps. — Executed Nov 26 New Advanced Asphalt Company $3,223,912 ·
Jun 11, 2021 66K86 LivingstonDistrict 3 3P Milling and Resurfacing (SMART Overlay) ADA improvement and minor drainage improvement, from IL 116 in Saunemin to US 24 in Forrest. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $2,744,546 ·
Jun 11, 2021 66L02 LaSalleDistrict 3 Spot improvement. Latex overlay and expansion joint replacement on SN 050-0165 carrying US 34 over I-39 in LaSalle county. — Executed Nov 26 New D. Construction, Inc. $1,081,507 ·
Jun 11, 2021 66L31 KendallDistrict 3 This project consists of 3.94 miles of shoulder widening and rumble strip installation on_US 52 from 0.16 miles East of IL 17 to Grove Rd in Kendall County. — Executed Nov 26 New D. Construction, Inc. $688,542 ·
Jun 11, 2021 66L38 LaSalleDistrict 3 This project includes 5400' of milling and resurfacing and reconstruction of curves of the Mattheissen State Park main entrance and parking lot area off IL 178 South of the IL 71 and IL 178 intersection. — Rejected Nov 26 New Advanced Asphalt Company $1,362,759 ·
Jun 11, 2021 66L42 DeKalbLaSalleDistrict 3 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement drainage improvement on FAP 68 (IL 23) from US 30 in Waterman to US 34. — Executed Nov 26 New Curran Contracting Company $3,486,053 ·
Jun 11, 2021 66L55 LaSalleDistrict 3 Expansion joint replacement, deck patching, parapet patching, structural steel repairs This work is located at Structure No. 050-0180 carrying FAP 68 (IL 23/71) over the Illinois River and access road and at Structure No. 050-0182 carrying LaSalle St. over a parking lot, 1.0 mile South of US 6 in Ottawa. This work consists of expansion joint replacement, deck patching, parapet patching, structural steel repairs. — Executed Nov 26 New D. Construction, Inc. $2,603,832 ·
Jun 11, 2021 66L59 GrundyDistrict 3 Pavement Patching on IL 47 located 3.5 miles South of Minooka Road (SN 032-0123) and 0.4 miles North of Nelson Road (SN 032-0122) North of Morris. — Executed Nov 26 New G. M. Sipes Construction, Inc. $124,463 ·
Jun 11, 2021 66L60 BureauDistrict 3 Class B pavement patching and pavement striping This work is location on FAI 80 ( I-80) beginning at the I -80 and I -180 Interchange and ending at the I -80 and IL 89 Interchange. This work consists of Class B pavement patching and pavement striping. — Executed Nov 26 New G. M. Sipes Construction, Inc. $294,924 ·
Jun 11, 2021 66L68 IroquoisKankakeeDistrict 3 Tree Removal at Chabanse interchange as describe in the plans and special provisions. — Executed Nov 26 New CSD Environmental Services, Inc. $83,632 ·
Jun 11, 2021 66L69 VariousDistrict 3 Tree Removal at various locations as described in the plans and special provisions. — Executed Nov 26 New Nettle Creek Nursery, Inc. $40,720 ·
Jun 11, 2021 66L71 LaSalleDistrict 3 Class A Pavement Patching, Subbase removal and replacement and subgrade removal and replacement This work is located at M.M. 42.6 and M.M. 42.9 in the northbound and southbound lanes of FAI Route 39 ( I -39) approximately 1.25 mi. and 1.55 mi. North of IL Route 18 (near Lostant ) in LaSalle County. This project consists of Class A Pavement Patching, Subbase removal and replacement and subgrade removal and replacement. — Executed Nov 26 New D. Construction, Inc. $350,229 ·
Jun 11, 2021 66L76 GrundyLivingstonDistrict 3 Class A pavement patching and pavement striping This work is located on FAI 55 ( I-55) beginning at M.M. 17 ( just south of IL 17) in Livingston County and ending at M.M. 221 (1.0 mi. NE of IL 47) in Grundy County. This project consists of Class A pavement patching and pavement striping. — Executed Nov 26 New G. M. Sipes Construction, Inc. $354,303 ·
Jun 11, 2021 66L77 GrundyDistrict 3 Class A, Class B Pavement Patching, Subgrade removal and replacement, pavement striping and other related item This work is located on FAI Route 80 beginning at the LaSalle/Grundy County Line and ending at the Grundy/Will County Line. This project consists of Class A, Class B Pavement Patching, Subgrade removal and replacement, pavement striping and other related items to complete this work. — Executed Nov 26 New D. Construction, Inc. $703,404 ·
Jun 11, 2021 66L78 DeKalbKendallDistrict 3 Class B pavement patching and pavement striping on FAP 591 (US 34) within the City limits of Sandwich beginning at Pearl St. in Dekalb County and ending at Duvick Ave. in Kendall County. — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $226,114 ·
Jun 11, 2021 66L80 VariousDistrict 3 One-year contract repair damaged High Tension Cable Median Barrier, Guard Rail, Attenuators, etc., along various routes in Bureau, LaSalle, DeKalb, Kendall, Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. — Executed Nov 26 New COLLINS & HERMANN, INC. $1,588,946 ·
Jun 11, 2021 66L85 LivingstonDistrict 3 Bridge Deck Overlay (SN 053-0149), bridge carrying IL 23 over Vermillion River and AT and SF RR, located 0.2 miles south of Adams street south of Streator. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $115,095 ·
Jun 11, 2021 66L86 KankakeeDistrict 3 Milling and resurfacing 3.75" of HMA on the EB lanes of IL 17 and US 45/US 52 intersection in Kankakee at night. Existing intersection will be re-striped with new pavement marking. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $101,311 ·
Jun 11, 2021 87725 IroquoisDistrict 3 Replace the bridge carrying CH 4 over Pike Creek, 3.3 miles west of IL Rt 1. — Rejected Nov 26 New Iroquois Paving Corporation $1,016,600 ·
Jun 11, 2021 87741 GrundyDistrict 3 Replace the bridge carrying Grand Ridge Road over Murry Slough, 2 miles east of Mazon. — Executed Nov 26 New D. Construction, Inc. $897,148 ·
Jun 11, 2021 87747 IroquoisDistrict 3 Resurfacing CH 4 from the Ford County line to 500 E Road. — Executed Nov 26 New Iroquois Paving Corporation $2,188,307 ·
Jun 11, 2021 87748 KankakeeDistrict 3 Resurfacing CH 47 from CH 6 to IL 17. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $466,200 ·
Jun 11, 2021 87751 LivingstonDistrict 3 PCC pavement reconstruction, storm sewers, curb and gutter, sidewalks and pavement markings on Indiana Avenue from Illini Avenue to the east corporate limits of Pontiac. — Executed Nov 26 New Opperman Construction Co. $1,268,954 ·
Jun 11, 2021 87762 BureauDistrict 3 Replace the bridge carrying TR 130 over Silver Creek, 7.0 miles southeast of Buda. — Executed Nov 26 New Curnyn Construction Co. $311,681 ·
Jul 30, 2021 46584 GrundyKendallDistrict 3 Removing and replacing existing centerline striping on FAI 80 (I-80) in Grundy County, FAP 591 (US 34) and FAP 311 (US 34 and IL 71) in Kendall County. — Executed Nov 26 New Maintenance Coatings Co. $264,008 ·
Jul 30, 2021 66K47 LaSalleDistrict 3 3P milling and resurfacing project of 3 3/4" on US 52 / IL 251 from US 52 (N) to 0.3 mile South of the BNSF Railroad overpass in Mendota. This will also address ADA sidewalk ramps. Other work will include shoulder stone, pavement marking, and raised reflectors. — Executed Nov 26 New Advanced Asphalt Company $1,959,861 ·
301–400 of 1,128‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.