| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jul 31, 2020 | 66L08 | GrundyDistrict 3 | Placing an aggregate wedge shoulder adjacent to existing paved shoulders on FAP 326 (IL 47) beginning at the intersection of IL 47 and Rte 113 and ending at the intersection of IL 47 and Scully Rd in Grundy County. | — | Executed | Scanlon Excavating & Concrete, Inc. $91,591 · | ||
| Jul 31, 2020 | 66L16 | BureauDistrict 3 | Scour mitigation measures (riprap) at SN 006-0114 carrying FAS 248 (Tiskilwa Spur) over Big Bureau Creek 0.3 mi N of Tiskilwa in Bureau County. | — | Executed | D. Construction, Inc. $40,542 · | ||
| Jul 31, 2020 | 87727 | LaSalleDistrict 3 | Replace the bridge carrying CH 5 over Wolf Creek, 2.3 miles east of IL 23. | — | Executed | Riber Construction, Inc. $922,301 · | ||
| Sep 18, 2020 | 66K51 | IroquoisDistrict 3 | 3P milling and resurfacing from IL 54 in Onarga to North St in Buckley according to TAMP designed overlay policy. Other work includes culvert work, grading and shaping ditches, stabilization, shoulder stone, pavement marking, and raised reflectors. | — | Executed | Iroquois Paving Corporation $4,263,411 · | ||
| Sep 18, 2020 | 66L09 | BureauDistrict 3 | Installing a 36" ERS concrete Pipe culvert adjacent to the box culvert This work is located on FAS Route 1279 (US 34) carrying US 34 adjacent to a concrete Box culvert, Structure No. 006-2569, Station 428+72 in Bureau County. This project consists of installing a 36" ERS concrete Pipe culvert adjacent to the box culvert. | — | Executed | Scanlon Excavating & Concrete, Inc. $54,859 · | ||
| Sep 18, 2020 | 66L11 | BureauDeKalbDistrict 3 | The removal and replacement of traffic signal "Controller Cabinets This work is located at various intersections on US 6 in Bureau County and IL 38 in DeKalb County. This work consists of the removal and replacement of traffic signal "Controller Cabinets." | — | Executed | H & H Electric Co. $429,688 · | ||
| Sep 18, 2020 | 66L27 | LaSalleDistrict 3 | Removing and replacing two wing walls of the structure This work is located at Structure No. 050-2539 carrying IL 170 over Armstrong Run. Approximately 3.86 miles south of US 6 in LaSalle County. This project consists of removing and replacing two wing walls of the structure. | — | Executed | D. Construction, Inc. $93,370 · | ||
| Nov 6, 2020 | 66959 | IroquoisDistrict 3 | The removal and replacement of the existing structure, guardrail and terminal removal and replacement, HMA mil This project is located on FAP 332 (IL 1) 0.15 mile north of US 52 in lroquois County. The work consists of the removal and replacement of the existing structure, guardrail and terminal removal and replacement, HMA milling and resurfacing, pavement marking, and reflectors. | — | Executed | Iroquois Paving Corporation $1,546,600 · | ||
| Nov 6, 2020 | 66K20 | FordDistrict 3 | The project is located on IL 9/IL 47/IL 54 from IL 47 (N) in Gibson City to Baltimore Drive in Paxton for length of 14.01 miles. Project includes 3 3/4" mill and resurface from beginning of project to IL 115 and 2" mill and RS to end of projects. Work includes guardrail updates, drainage work and ADA updates and patching in Gibson City. | — | Executed | Cross Construction, Inc. $8,756,556 · | ||
| Nov 6, 2020 | 66K54 | IroquoisDistrict 3 | 3P Milling and Resurfancing (Designed overlay) and ADA improvements on FAP 332 (IL 1) from 0.1 miles North of US 52 to US 24 in Watseka for a total length of 8.2 miles. | — | Executed | Iroquois Paving Corporation $5,298,767 · | ||
| Nov 6, 2020 | 87731 | KendallDistrict 3 | Extension of Eldamain Road on new alignment from River Road to West Highpoint Road (south of IL 71), includes a new bridge over Fox River and a roundabout at the new Eldamain and Fox Road. Project is 2.0 miles west of IL 47 between River Road and West Highpoint Road in Yorkville. | — | Executed | Plote Construction Inc. & Dunnet Bay Construction Company__DO NOT USE $34,558,327 · | ||
| Nov 6, 2020 | 87737 | BureauDistrict 3 | Replace the bridge carrying CH 8 over Maple Creek, 2 miles north of Wyanet. | — | Executed | D. Construction, Inc. $961,533 · | ||
| Jan 15, 2021 | 46560 | VariousDistrict 3 | "On-Call" Pavement Marking with various materials including, thermoplastic, paint, preformed plastic, polyurea, modified urethane, pavement marking removal, hot-spray thermoplastic, grooving for pavement marking, and aerial mk. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,394,950 · | ||
| Jan 15, 2021 | 66E45 | GrundyDistrict 3 | The replacement of bridge deck on SN 032-0075 carrying US 6 and over CSX Transportation Railroad The work consists of the replacement of bridge deck on SN 032-0075 carrying US 6 and over CSX Transportation Railroad. Additional work includes substructure repairs, structural steel painting, tree removal, landscaping,grading ditches, and resurfacing pavement. The project length is 0.4 miles and is located 5.3 miles East of Morris in Grundy Co. | — | Executed | P. T. Ferro Construction Co. $2,077,263 · | ||
| Jan 15, 2021 | 66K95 | BureauDistrict 3 | The removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert This work is located on FAP 698 (IL 89) 0.3 miles north of E. Walnut St. in Ladd at station 564+45 in Bureau County. This work consists of the removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert with guardrail removal. | — | Executed | R & R Landscaping & Irrigation $75,446 · | ||
| Jan 15, 2021 | 66L00 | LaSalleDistrict 3 | Latex overlay, cleaning and painting structural steel and expansion joint repair of SN 050-0171 carrying US 52 over 1-39 in Troy Grove. | — | Executed | D. Construction, Inc. $1,200,540 · | ||
| Jan 15, 2021 | 66L24 | BureauDistrict 3 | Bridge painting This work is located at Structure No. 006-0153, IL 92 over a stream, approximately 3.3 miles West of US 34 in Bureau County. This work consists of bridge painting. | — | Executed | Three Star Painting, Inc. $145,136 · | ||
| Jan 15, 2021 | 66L25 | BureauDistrict 3 | Bridge painting This work is located at Structure No. 006-0128, TR 333 over 1-180, approximately 3.3 miles West of US 34 in Bureau County. This work consists of bridge painting. | — | Executed | ERA-Valdivia Contractors, Inc. $208,017 · | ||
| Jan 15, 2021 | 66L26 | BureauDistrict 3 | Bridge painting This work is located at Structure No. 006-0041 (SB), 006-0042 (NB), approximately 2.54 miles North of IL 26 and Structure No. 006-0043 (NB), 006-0044 (SB), approximately 2.04 miles North of IL 26 in Bureau County. This work consists of bridge painting. | — | Executed | Three Star Painting, Inc. $651,622 · | ||
| Jan 15, 2021 | 66L40 | LivingstonDistrict 3 | Removing existing HMA and aggregate subbase surfaces, repair and preparation of base course and placing a poly This work is located at the Illinois Department of Transportation, District 3, Pontiac Maintenance Facility in Livingston County. This work consists of removing existing HMA and aggregate subbase surfaces, repair and preparation of base course and placing a polymer HMA binder cse (2¼" lift) and a polymer HMA surface cse (1 ¼" lift). | — | Executed | Kankakee Valley Construction Company, Inc. $427,351 · | ||
| Jan 15, 2021 | 66L44 | BureauLivingstonDistrict 3 | The work consists on performing Bridge Deck Concrete sealing at various bare concrete bridge decks in Bureau and Livingston counties. | — | Executed | All States Painting, Inc. $177,640 · | ||
| Jan 15, 2021 | 87744 | LivingstonDistrict 3 | Replace the bridge carrying TR 4B over Ditch Mole Creek, located 2.5 miles northwest of Flanagan. | — | Executed | Riber Construction, Inc. $335,279 · | ||
| Jan 15, 2021 | 87745 | BureauDistrict 3 | Resurfacing CH 19 from Angling Road to US 6. | — | Executed | Advanced Asphalt Company $1,111,251 · | ||
| Jan 15, 2021 | 87755 | LivingstonDistrict 3 | Replace the bridge carrying TR 118 over Mud Creek, 3.5 miles northeast of Cornell. | — | Executed | Riber Construction, Inc. $380,342 · | ||
| Mar 5, 2021 | 66B07 | LaSalleDistrict 3 | 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on FAS FAP 603 (US 52 and IL 23) from 0.5 miles West of 1-39 to IL 23 (S) in LaSalle County IL 23. | — | Executed | Advanced Asphalt Company $3,842,156 · | ||
| Mar 5, 2021 | 66D55 | VariousDistrict 3 | 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on FAP 649 (IL i 7) from IL 251 in Wenona to IL 23 S of Streator. | — | Executed | Advanced Asphalt Company $4,463,026 · | ||
| Mar 5, 2021 | 66F09 | KankakeeDistrict 3 | 8.426 miles of 3R Resurfacing (Standard Overlay) and Structure Repairs from 0.7 mi North of the Iroquois County Line to 0.8 mi les north of the Kankakee River Bridge. | — | Executed | Kankakee Valley Construction Co., Inc. & Gallagher Asphalt Corporation $20,058,764 · | ||
| Mar 5, 2021 | 66H15 | GrundyDistrict 3 | BRIDGE REPLACEMENT (032-0079) IL 47 OVER 1-55, AND RECONSTRUCTION OF IL 47 FROM NORTHBROOK AVE TO THE SOUTH ABUTMENT OF SN 032-0110, ALONG WITH ADJACENT LIGHTING. | — | Executed | D. Construction, Inc. $9,396,853 · | ||
| Mar 5, 2021 | 66K56 | IroquoisDistrict 3 | 6 miles of milling, resurfacing, and ADA improvements on US 45 from North Street in Buckley to Jefferson Street in Loda. 1 foot saftey shoulders will be added to the rural section between Buckley and Loda. | — | Executed | Iroquois Paving Corporation $3,034,581 · | ||
| Mar 5, 2021 | 66K61 | FordDistrict 3 | Milling and resurfacing 3 Project is located in Piper City, Ford County. The job length is 1.09 miles and consists of milling and resurfacing 3.75" of HMA on the mainline pavement. The work also includes several ADA improvements. | — | Executed | Iroquois Paving Corporation $747,230 · | ||
| Mar 5, 2021 | 66L17 | LaSalleDistrict 3 | Removing and replacing the expansion joints and approach slabs This work is located at two sets of structures, SN 050-0210 and SN 050-0211 carrying FAI 39 Over the Nor-Folk Southern Railway, 1.48 miles north of IL Rte 18 and SN 050-0212 and SN 050-0213 carrying FAI 39 over Sandy creek, 1.23 mi. north of IL Rte. 18. This project consists of removing and replacing the expansion joints and approach slabs. | — | Executed | Gensini Excavating, Inc. $1,393,416 · | ||
| Mar 5, 2021 | 66L23 | LaSalleDistrict 3 | Bridge painting This work is located at Structure No. 050-0011 (EB) and 050-0012 (WB) over Illinois Railway, approximately 2.0 miles East of IL 23 in LaSalle County. This work consists of bridge painting. | — | Executed | ERA-Valdivia Contractors, Inc. $389,847 · | ||
| Mar 5, 2021 | 66L46 | LaSalleDistrict 3 | Regrading a failed slope along IL 251 and stabilizing the area with soldier piles and retaining walls The project is located 2.1 mi south of I-80 with a length of 450 ft. The work consists of regrading a failed slope along IL 251 and stabilizing the area with soldier piles and retaining walls. These will be built into existing box culvert (050-2524) with some drainage items. The final graded slope will be seeded. | — | Executed | D. Construction, Inc. $764,122 · | ||
| Mar 5, 2021 | 87735 | LivingstonDistrict 3 | Resurfcing CH 6/CH 1 from Chestnut Street in Fairbury (Livingston County) to north of the railroad in McLean County. | — | Executed | Kankakee Valley Construction Company, Inc. $2,589,198 · | ||
| Mar 5, 2021 | 87765 | DeKalbDistrict 3 | Resurfacing, sidewalks, curb and gutter, pavement markings on East Hill Street from Sycamore Street to IL 23 in Genoa. | — | Executed | Curran Contracting Company $408,408 · | ||
| Apr 23, 2021 | 66B52 | LaSalleDistrict 3 | The reconstruction of the existing intersection into a PCC roundabout The project is located in the intersection of US 6 and IL 178, north of Utica in LaSalle county and consists of the reconstruction of the existing intersection into a PCC roundabout. The project also includes earthwork, seeding, drainage improvements, permanent lighting and removal of existing traffic equipment. The project length is 0.42 miles. | — | Executed | R. W. Dunteman Company $2,442,377 · | ||
| Apr 23, 2021 | 66E14 | BureauDistrict 3 | 3P mill and resurface. | — | Executed | Advanced Asphalt Company $4,496,640 · | ||
| Apr 23, 2021 | 66K60 | BureauDistrict 3 | 7.3 miles of milling and resurfacing, ADA improvements. | — | Executed | Advanced Asphalt Company $2,816,475 · | ||
| Apr 23, 2021 | 66L01 | LaSalleDistrict 3 | 0.71 mile. Latex overlay, cleaning and painting of structural steel and expansion joint replacement. SN 050-0200 IL 251 over 1-39; 0.5 Miles north of IL 71. | — | Executed | D. Construction, Inc. $1,921,508 · | ||
| Apr 23, 2021 | 66L22 | IroquoisDistrict 3 | Bridge painting This work is located at Structure No. 038-0130, TR 95 over 1-57, approximately 3.48 miles South of IL 116 and Structure No. 038-0131 carrying TR 109 over 1-57, approximately 5.59 miles South of IL 116 in Iroquois. This work consists of bridge painting. | — | Executed | ERA-Valdivia Contractors, Inc. $384,278 · | ||
| Apr 23, 2021 | 66L28 | KankakeeDistrict 3 | Signal Mast Arm Removal and Replacement - at River St and Station St in Kankakee. | — | Executed | Van-Mack Electric Co. $210,000 · | ||
| Apr 23, 2021 | 66L30 | IroquoisKankakeeDistrict 3 | This project consists of 3.85 miles of shoulder widening and rumble strip installation on IL 1 from 150 feet west of W Circle Dr in St Anne in Kankakee County to E 3100N Rd in Iroquois County. | — | Executed | Iroquois Paving Corporation $1,088,767 · | ||
| Apr 23, 2021 | 66L32 | BureauDistrict 3 | The installation of approximately 5 This project consists of the installation of approximately 5.24 miles of high tension cable median barrier from the Henry/Bureau County Line to 0.42 miles West of 600E Rd. | — | Executed | Advanced Asphalt Company $1,112,433 · | ||
| Apr 23, 2021 | 66L33 | LaSalleDistrict 3 | The installation of approximately 5 This project consists of the installation of approximately 5.92 miles of high tension cable median barrier from 1.09 miles South of N 36th Rd to 0.88 miles South of N 42nd Rd in LaSalle County. | — | Executed | Advanced Asphalt Company $1,322,328 · | ||
| Apr 23, 2021 | 66L41 | IroquoisDistrict 3 | Removing existing HMA and aggregate subbase surfaces, repair and preparation of base course, and placing a pol This work is located at the Illinois Department of Transpiration, District 3, Buckley Maintenance Facility in Iroquois County. This work consists of removing existing HMA and aggregate subbase surfaces, repair and preparation of base course, and placing a polymer HMA asphalt binder cse. (2¼" lift) and a polymer HMA surface *See Remarks*. | — | Executed | Iroquois Paving Corporation $333,002 · | ||
| Apr 23, 2021 | 66L52 | GrundyDistrict 3 | This pollinator project is located at Three Rivers Rest Areas on I-80 west of Minooka. This work will include herbicide, seeding, planting, landscaping and maintenance. | — | Executed | Nettle Creek Nursery, Inc. $377,962 · | ||
| Apr 23, 2021 | 66L54 | DeKalbDistrict 3 | The removal and replacement of expansion joints and deck patching on SN 019-0036 This work is located at FAP 573 on US 30 on SN 019-0036 at Little Rock Creek 0.5 miles West of Hinckley in Dekalb County. This work consists of the removal and replacement of expansion joints and deck patching on SN 019-0036. | — | Executed | Martin & Company Excavating $250,265 · | ||
| Apr 23, 2021 | 66L56 | LaSalleLivingstonDistrict 3 | Placing aggregate wedge shoulder This work is located on FAP 786 (IL 170) beginning at the intersection of IL 170 and N 21st Rd in LaSalle County and ending at the intersection of IL 170 and IL 17 in Livingston County (+/- 12.0 miles). This work consists of placing aggregate wedge shoulder. | — | Executed | Phoenix Corporation of the Quad Cities $135,304 · | ||
| Apr 23, 2021 | 66L61 | KendallLaSalleDistrict 3 | The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kendall and LaSalle Counties. | — | Executed | H & H Electric Co. $49,983 · | ||
| Apr 23, 2021 | 66L62 | BureauLaSalleDistrict 3 | The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Bureau and LaSalle Counties. | — | Executed | Laser Electric, Inc. $71,890 · | ||
| Apr 23, 2021 | 66L63 | GrundyDistrict 3 | The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Grundy County. | — | Executed | Outsen Electric, Incorporated $51,970 · | ||
| Apr 23, 2021 | 66L64 | VariousDistrict 3 | The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Livingston, Ford, Grundy, and Iroquois Counties. | — | Executed | Leo P. Kelly Electric, Incorporated $50,340 · | ||
| Apr 23, 2021 | 66L65 | IroquoisKankakeeDistrict 3 | The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kankakee and Iroquois Counties. | — | Executed | Outsen Electric, Incorporated $65,170 · | ||
| Apr 23, 2021 | 66L66 | DeKalbDistrict 3 | The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in DeKalb County. | — | Executed | H & H Electric Co. $54,015 · | ||
| Apr 23, 2021 | 66L70 | BureauDistrict 3 | Weed spraying to aid in weed control This project is located along FAI 80 (I-80) in Bureau county. The work consists of weed spraying to aid in weed control. | — | Executed | Endrizzi Contracting, Inc $99,891 · | ||
| Apr 23, 2021 | 87660 | FordDistrict 3 | Replace the bridge carrying CH 23 over Crane Creek, 0.75 mile east of Cabery. | — | Rejected | Tobey's Construction & Cartage, Inc. $426,709 · | ||
| Apr 23, 2021 | 87662 | DeKalbDistrict 3 | Replace the bridge carrying Suydam Road over Indian Creek, 7 miles south of Shabbona. | — | Executed | Martin & Company Excavating $1,041,745 · | ||
| Apr 23, 2021 | 87739 | DeKalbDistrict 3 | Replace the bridge carrying TR 175 over Battle Creek, 0.3 mile east of Hinckley Road. | — | Executed | Riber Construction, Inc. $693,852 · | ||
| Apr 23, 2021 | 87740 | FordDistrict 3 | Replace the bridge carrying CH 18 over the West Branch of Horse Creek, 2 miles southeast of Cabery. | — | Rejected | Tobey's Construction & Cartage, Inc. $419,682 · | ||
| Apr 23, 2021 | 87743 | LaSalleDistrict 3 | Replace the bridge carrying N. 33rd Road over Pecumsaugan Creek, 0.2 mile east of E. 9th Road. | — | Executed | Riber Construction, Inc. $332,516 · | ||
| Apr 23, 2021 | 87746 | DeKalbDistrict 3 | Resurfacing Suydam Road from IL 23 to the city limits of Sandwich. | — | Executed | Curran Contracting Company $1,104,983 · | ||
| Apr 23, 2021 | 87757 | KankakeeDistrict 3 | Resurfacing CH9 from 5000 West Road to US 45. | — | Executed | Kankakee Valley Construction Company, Inc. $1,218,902 · | ||
| Apr 23, 2021 | 87764 | BureauDistrict 3 | Replace the bridge carrying CH 24 over a branch of Pond Creek, 2 miles south of Wyanet. | — | Executed | D. Construction, Inc. $338,614 · | ||
| Apr 23, 2021 | 87766 | LaSalleDistrict 3 | Resurfacing Crosat Street from 11th Street to US 6 in the City of LaSalle. | — | Executed | Universal Asphalt & Excavating, Inc. $230,520 · | ||
| Jun 11, 2021 | 46567 | VariousDistrict 3 | Installing and replacement of raised reflective pavement markers and reflectors This work is located at various locations in Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. Work shall consist of installing and replacement of raised reflective pavement markers and reflectors. | — | Executed | STF, LLC d/b/a Traffic Control Company $422,606 · | ||
| Jun 11, 2021 | 46568 | VariousDistrict 3 | Raised reflective pavement marker removal, installing raised reflective pavement markers and replacement of ra This work is located on various interstate, multi-lane non-interstate and 2L-2W routes in Bureau, LaSalle, Dekalb, and Kendall Counties. This work shall consist of raised reflective pavement marker removal, installing raised reflective pavement markers and replacement of raised reflective pavement marker reflectors. | — | Executed | STF, LLC d/b/a Traffic Control Company $461,546 · | ||
| Jun 11, 2021 | 66A96 | BureauDistrict 3 | 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on US 6 from IL 26 South in Princeton to IL 89 North in Spring Valley. | — | Executed | Advanced Asphalt Company $5,946,378 · | ||
| Jun 11, 2021 | 66B93 | DeKalbLaSalleDistrict 3 | This is a 3P milling and resurfacing project of 3 3/4" on US 34 from IL 23 to East of Somonauk Road in Somonauk. This will also address ADA sidewalk ramps. Other work will include shoulder stone, pavement marking and raised reflectors. | — | Executed | Curran Contracting Company $2,242,143 · | ||
| Jun 11, 2021 | 66D51 | KendallDistrict 3 | 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on FAP 607 (US 52) from Townhouse road north to IL 47. | — | Executed | D. Construction, Inc. $2,440,250 · | ||
| Jun 11, 2021 | 66D68 | LaSalleDistrict 3 | Milling and resurfacing 3 Work consists of milling and resurfacing 3.75" HMA on mainline of FAP 619 (IL 351/IL 71) in Oglesby and FAP 627 (IL 71) in Jonesville in LaSalle County. The work includes ADA improvements in Oglesby and guardrail replacement in Jonesville. The job length is 1.2 miles. | — | Executed | Advanced Asphalt Company $1,122,141 · | ||
| Jun 11, 2021 | 66F88 | KankakeeDistrict 3 | Bridge Replacement (SN 046-0030) at Granary Creek, 1.3 miles East of Essex Rd. and Bridge Replacement (SN 046-0032) at E Branch of Horse Creek, 0.2 mile East of Herscher Road. | — | Executed | P. T. Ferro Construction Co. $2,850,474 · | ||
| Jun 11, 2021 | 66H91 | LaSalleDistrict 3 | Deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, str This work is located at SN 050-0096 carrying IL 178 over the Vermilion River approximately 3.7 mi. South of IL Route 71 in LaSalle County. This work consists of deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, striping, pavement markers, curb and gutter removal and replacement, pavement widening removal and replacement, and other related construction items. | — | Executed | D. Construction, Inc. $671,375 · | ||
| Jun 11, 2021 | 66K19 | LaSalleDistrict 3 | This project consists of 5.86 miles of shoulder widening and rumble strip installation on_US 34 from E 12th Rd to 0.18 miles West of IL 23 (South leg) in LaSalle County. | — | Executed | Curran Contracting Company $742,928 · | ||
| Jun 11, 2021 | 66K40 | IroquoisDistrict 3 | 3P MILLING AND RESURFACING (DESIGNED OVERLAY) EXTENDING 6.41 MILES FROM THE FORD CO LINE TO 0.2 MI E OF I-57 IN GILMAN. | — | Executed | Iroquois Paving Corporation $3,355,377 · | ||
| Jun 11, 2021 | 66K46 | LaSalleDistrict 3 | The work is 2.79 miles long, extending from 0.4 miles south of I-80 to South of Canal St in LaSalle, consisting of 3P Milling and Resurfacing (Designed Overlay), also including ADA ramps. | — | Executed | Advanced Asphalt Company $3,223,912 · | ||
| Jun 11, 2021 | 66K86 | LivingstonDistrict 3 | 3P Milling and Resurfacing (SMART Overlay) ADA improvement and minor drainage improvement, from IL 116 in Saunemin to US 24 in Forrest. | — | Executed | Kankakee Valley Construction Company, Inc. $2,744,546 · | ||
| Jun 11, 2021 | 66L02 | LaSalleDistrict 3 | Spot improvement. Latex overlay and expansion joint replacement on SN 050-0165 carrying US 34 over I-39 in LaSalle county. | — | Executed | D. Construction, Inc. $1,081,507 · | ||
| Jun 11, 2021 | 66L31 | KendallDistrict 3 | This project consists of 3.94 miles of shoulder widening and rumble strip installation on_US 52 from 0.16 miles East of IL 17 to Grove Rd in Kendall County. | — | Executed | D. Construction, Inc. $688,542 · | ||
| Jun 11, 2021 | 66L38 | LaSalleDistrict 3 | This project includes 5400' of milling and resurfacing and reconstruction of curves of the Mattheissen State Park main entrance and parking lot area off IL 178 South of the IL 71 and IL 178 intersection. | — | Rejected | Advanced Asphalt Company $1,362,759 · | ||
| Jun 11, 2021 | 66L42 | DeKalbLaSalleDistrict 3 | 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement drainage improvement on FAP 68 (IL 23) from US 30 in Waterman to US 34. | — | Executed | Curran Contracting Company $3,486,053 · | ||
| Jun 11, 2021 | 66L55 | LaSalleDistrict 3 | Expansion joint replacement, deck patching, parapet patching, structural steel repairs This work is located at Structure No. 050-0180 carrying FAP 68 (IL 23/71) over the Illinois River and access road and at Structure No. 050-0182 carrying LaSalle St. over a parking lot, 1.0 mile South of US 6 in Ottawa. This work consists of expansion joint replacement, deck patching, parapet patching, structural steel repairs. | — | Executed | D. Construction, Inc. $2,603,832 · | ||
| Jun 11, 2021 | 66L59 | GrundyDistrict 3 | Pavement Patching on IL 47 located 3.5 miles South of Minooka Road (SN 032-0123) and 0.4 miles North of Nelson Road (SN 032-0122) North of Morris. | — | Executed | G. M. Sipes Construction, Inc. $124,463 · | ||
| Jun 11, 2021 | 66L60 | BureauDistrict 3 | Class B pavement patching and pavement striping This work is location on FAI 80 ( I-80) beginning at the I -80 and I -180 Interchange and ending at the I -80 and IL 89 Interchange. This work consists of Class B pavement patching and pavement striping. | — | Executed | G. M. Sipes Construction, Inc. $294,924 · | ||
| Jun 11, 2021 | 66L68 | IroquoisKankakeeDistrict 3 | Tree Removal at Chabanse interchange as describe in the plans and special provisions. | — | Executed | CSD Environmental Services, Inc. $83,632 · | ||
| Jun 11, 2021 | 66L69 | VariousDistrict 3 | Tree Removal at various locations as described in the plans and special provisions. | — | Executed | Nettle Creek Nursery, Inc. $40,720 · | ||
| Jun 11, 2021 | 66L71 | LaSalleDistrict 3 | Class A Pavement Patching, Subbase removal and replacement and subgrade removal and replacement This work is located at M.M. 42.6 and M.M. 42.9 in the northbound and southbound lanes of FAI Route 39 ( I -39) approximately 1.25 mi. and 1.55 mi. North of IL Route 18 (near Lostant ) in LaSalle County. This project consists of Class A Pavement Patching, Subbase removal and replacement and subgrade removal and replacement. | — | Executed | D. Construction, Inc. $350,229 · | ||
| Jun 11, 2021 | 66L76 | GrundyLivingstonDistrict 3 | Class A pavement patching and pavement striping This work is located on FAI 55 ( I-55) beginning at M.M. 17 ( just south of IL 17) in Livingston County and ending at M.M. 221 (1.0 mi. NE of IL 47) in Grundy County. This project consists of Class A pavement patching and pavement striping. | — | Executed | G. M. Sipes Construction, Inc. $354,303 · | ||
| Jun 11, 2021 | 66L77 | GrundyDistrict 3 | Class A, Class B Pavement Patching, Subgrade removal and replacement, pavement striping and other related item This work is located on FAI Route 80 beginning at the LaSalle/Grundy County Line and ending at the Grundy/Will County Line. This project consists of Class A, Class B Pavement Patching, Subgrade removal and replacement, pavement striping and other related items to complete this work. | — | Executed | D. Construction, Inc. $703,404 · | ||
| Jun 11, 2021 | 66L78 | DeKalbKendallDistrict 3 | Class B pavement patching and pavement striping on FAP 591 (US 34) within the City limits of Sandwich beginning at Pearl St. in Dekalb County and ending at Duvick Ave. in Kendall County. | — | Executed | Scanlon Excavating & Concrete, Inc. $226,114 · | ||
| Jun 11, 2021 | 66L80 | VariousDistrict 3 | One-year contract repair damaged High Tension Cable Median Barrier, Guard Rail, Attenuators, etc., along various routes in Bureau, LaSalle, DeKalb, Kendall, Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. | — | Executed | COLLINS & HERMANN, INC. $1,588,946 · | ||
| Jun 11, 2021 | 66L85 | LivingstonDistrict 3 | Bridge Deck Overlay (SN 053-0149), bridge carrying IL 23 over Vermillion River and AT and SF RR, located 0.2 miles south of Adams street south of Streator. | — | Executed | Kankakee Valley Construction Company, Inc. $115,095 · | ||
| Jun 11, 2021 | 66L86 | KankakeeDistrict 3 | Milling and resurfacing 3.75" of HMA on the EB lanes of IL 17 and US 45/US 52 intersection in Kankakee at night. Existing intersection will be re-striped with new pavement marking. | — | Executed | Kankakee Valley Construction Company, Inc. $101,311 · | ||
| Jun 11, 2021 | 87725 | IroquoisDistrict 3 | Replace the bridge carrying CH 4 over Pike Creek, 3.3 miles west of IL Rt 1. | — | Rejected | Iroquois Paving Corporation $1,016,600 · | ||
| Jun 11, 2021 | 87741 | GrundyDistrict 3 | Replace the bridge carrying Grand Ridge Road over Murry Slough, 2 miles east of Mazon. | — | Executed | D. Construction, Inc. $897,148 · | ||
| Jun 11, 2021 | 87747 | IroquoisDistrict 3 | Resurfacing CH 4 from the Ford County line to 500 E Road. | — | Executed | Iroquois Paving Corporation $2,188,307 · | ||
| Jun 11, 2021 | 87748 | KankakeeDistrict 3 | Resurfacing CH 47 from CH 6 to IL 17. | — | Executed | Kankakee Valley Construction Company, Inc. $466,200 · | ||
| Jun 11, 2021 | 87751 | LivingstonDistrict 3 | PCC pavement reconstruction, storm sewers, curb and gutter, sidewalks and pavement markings on Indiana Avenue from Illini Avenue to the east corporate limits of Pontiac. | — | Executed | Opperman Construction Co. $1,268,954 · | ||
| Jun 11, 2021 | 87762 | BureauDistrict 3 | Replace the bridge carrying TR 130 over Silver Creek, 7.0 miles southeast of Buda. | — | Executed | Curnyn Construction Co. $311,681 · | ||
| Jul 30, 2021 | 46584 | GrundyKendallDistrict 3 | Removing and replacing existing centerline striping on FAI 80 (I-80) in Grundy County, FAP 591 (US 34) and FAP 311 (US 34 and IL 71) in Kendall County. | — | Executed | Maintenance Coatings Co. $264,008 · | ||
| Jul 30, 2021 | 66K47 | LaSalleDistrict 3 | 3P milling and resurfacing project of 3 3/4" on US 52 / IL 251 from US 52 (N) to 0.3 mile South of the BNSF Railroad overpass in Mendota. This will also address ADA sidewalk ramps. Other work will include shoulder stone, pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $1,959,861 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.