IDOT Jobs

All dates · 1,128 jobs · $1,342,730,000 Sign up free
★ My Jobs

Filtered by: District: District 3 Clear all

1,128 jobs · $1,342,730,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 18, 2019 66H81 BureauDistrict 3 Cleaning and painting all strucutral steel of SN 006-0090 carrying IL 40 over Hennepin Canal. — Executed Nov 26 New Thomas Industrial Coatings, Inc. $99,935 ·
Jan 18, 2019 66J04 LaSalleDistrict 3 Removal of the existing parking lot pavement and replacement with a new parking area. — Executed Nov 26 New Universal Asphalt & Excavating, Inc. $250,991 ·
Jan 18, 2019 66J13 DeKalbDistrict 3 Install span wire mounted four-way flashing read beacon at the intersection of IL 23 and IL 72. The project includes installation of post-mounted flashing yellow beacon on the advance intersection warning signs adjacent to the north, east, and west legs. — Executed Nov 26 New William Charles Construction Co, LLC $72,000 ·
Jan 18, 2019 66J37 BureauDistrict 3 Concrete deck, bearing, expansion joint, floor drain, guardrail/terminal section removal and replacement, and installing steel bridge railing to SN 006-0061 carrying US 6 over King Creek. — Executed Nov 26 New D. Construction, Inc. $426,461 ·
Jan 18, 2019 66J42 FordDistrict 3 removal and replacement of a 3'x 2' concrete box culvert with 30' ERS RCCP culv ert located on IL 115, 0.7 mile south of Main Street in Cabery. — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $36,875 ·
Jan 18, 2019 66J43 BureauDistrict 3 Cleaning and painting all structural steel of SN 006-0039 carrying FAI 180 over FAI 80 approximately 4 miles east of Princeton. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $424,473 ·
Jan 18, 2019 66J46 BureauDistrict 3 Cleaning and painting all structural steel of SN 006-0142 carrying IL 89 over a branch of Brush Creek approximately 0.8 miles south of Arlington. — Executed Nov 26 New Thomas Industrial Coatings, Inc. $101,065 ·
Jan 18, 2019 66J67 GrundyLivingstonDistrict 3 Two application of spray mixtures at designated times, once in the Spring and once in the summer, along I-80, I-55 and IL 113 in Grundy County and along I-55, IL 47, and IL 23 in Livingston County. — Executed Nov 26 New Endrizzi Contracting, Inc $126,725 ·
Jan 18, 2019 87710 GrundyDistrict 3 Pavement reconstruction, storm sewers, curb and gutter, sidewalk and roadway lighting, on Broadway Street from IL 113 to Park Street in Coal City. — Executed Nov 26 New D. Construction, Inc. $4,631,410 ·
Mar 8, 2019 66J11 IroquoisDistrict 3 4.96 miles of shoulder widening and rumble strip installation on IL 49 from just north of E 4300 Rd to 200' south of Mud Creek. — Executed Nov 26 New Iroquois Paving Corporation $1,187,960 ·
Mar 8, 2019 66J44 LaSalleDistrict 3 Clean and paint structural steel and steel components on SN 050-0188 carrying IL 71 over Covel Creek. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $231,505 ·
Mar 8, 2019 66J45 DeKalbDistrict 3 Cleaning and painting all structural steel and other related steel components of SN 019-0030 carrying IL 72 over Owens Creek. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $156,660 ·
Mar 8, 2019 66J50 LaSalleDistrict 3 Class B pavement patching, curb and gutter, and concrete median removal and replacement on IL 23 from Grace Community Church North of Streator to the intersection of IL 23 and N. 17th Rd. (Richards Road) — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $85,394 ·
Mar 8, 2019 66J53 LivingstonDistrict 3 Microsurfacing full-width existing pavement on IL 116 from Pearl Street in Pontiac to IL 47. The project is 10.61 miles — Executed Nov 26 New Beniach Construction Co., Inc. $537,261 ·
Mar 8, 2019 66J54 LaSalleDistrict 3 crack and joint sealing on IL 251 from 0.3 mile south of N 31st Rd. to I-80, and 1-pass full-width microsurfacing on IL 251 from I-80 to US 6 in Peru. — Executed Nov 26 New Asphalt Stone Company $692,705 ·
Mar 8, 2019 66J55 LaSalleDistrict 3 9.76 miles of crack and joint sealing on IL 71 from north of I-80 to US 52. — Executed Nov 26 New Complete Asphalt Service Co. $32,347 ·
Mar 8, 2019 66J59 KankakeeDistrict 3 Removal and replacement of a cross road culvert located 0.4 miles north of 5000S RD at STA. 870+00. — Executed Nov 26 New Misfits Construction Company $32,945 ·
Mar 8, 2019 66J61 KendallDistrict 3 Adding aggregate shoulders to US-52 from LaSalle County Line to Will County Line. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $175,911 ·
Mar 8, 2019 66J75 KendallLaSalleDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders — Executed Nov 26 New H & H Electric Co. $46,600 ·
Mar 8, 2019 66J76 BureauLaSalleDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. — Executed Nov 26 New Laser Electric, Inc. $75,883 ·
Mar 8, 2019 66J77 GrundyDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. — Executed Nov 26 New Van-Mack Electric Co. $49,650 ·
Mar 8, 2019 66J78 VariousDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. — Executed Nov 26 New Leo P. Kelly Electric, Incorporated $56,560 ·
Mar 8, 2019 66J79 IroquoisKankakeeDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. — Executed Nov 26 New Van-Mack Electric Co. $64,110 ·
Mar 8, 2019 66J80 DeKalbDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. — Executed Nov 26 New H & H Electric Co. $46,600 ·
Mar 8, 2019 87622 LivingstonDistrict 3 Resurfacing CH 16 from Long Point Road to IL 17. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $824,223 ·
Mar 8, 2019 87694 LivingstonDistrict 3 Replace the bridge carrying TR 97 over Deer Creek, 4 miles northeast of Pontiac. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $347,256 ·
Mar 8, 2019 87700 DeKalbDistrict 3 Construction of a right turn lane with safety shoulders on Barber Greene from Peace Road to Somonauk Road. — Executed Nov 26 New Curran Contracting Company $159,355 ·
Mar 8, 2019 87707 LivingstonDistrict 3 Replace the bridge carrying TR 108 over a tributary of Baker Run, located 3 miles northwest of Pontiac. — Executed Nov 26 New H. J. Eppel & Co. $259,317 ·
Apr 26, 2019 66879 IroquoisDistrict 3 Replace SN 038-0165 with a double box culvert (SN 038-2023) carrying IL 1 over Gay Creek, 2.3 miles south of Wellington. — Executed Nov 26 New Iroquois Paving Corporation $768,521 ·
Apr 26, 2019 66E67 KankakeeDistrict 3 3.43 miles of 3R resurfacing, patching, and bridge repairs on I-57 from north of the Kankakee River bridge to south of the IL 50 interchange in Bourbonnais. — Rejected Nov 26 New Kankakee Valley Construction Co., Inc. & Gallagher Asphalt Corporation $10,429,101 ·
Apr 26, 2019 66J07 KankakeeDistrict 3 Installation of approximately 2.37 miles of high tension cable median barrier from 6000N RD to 0.7 mile south of 9000N Rd. — Executed Nov 26 New Lion Construction 1, LLC $412,968 ·
Apr 26, 2019 66J09 IroquoisDistrict 3 2.91 miles of shoulder widening and rumble strips on US 24 from IL 1 to 2580E Road. — Executed Nov 26 New Iroquois Paving Corporation $595,879 ·
Apr 26, 2019 66J10 IroquoisDistrict 3 3.97 miles of shoulder widening and rumble strips on IL 49 from E 2600 Rd to E 2200N Rd. — Executed Nov 26 New Iroquois Paving Corporation $996,392 ·
Apr 26, 2019 66J66 GrundyLaSalleDistrict 3 Intermittent milling and resurfacing on IL 47 from Illinois Ave. to south of Jefferson Street in Morris and on IL 170 from US 6 to just south of the CSX Railroad crossing in Seneca. — Executed Nov 26 New D. Construction, Inc. $426,301 ·
Apr 26, 2019 66J68 IroquoisLivingstonDistrict 3 Installing back up generators at 2 pump stations, and removal and replacement of all electrical, plumbing, HVAC, and mechanical equipment at the Reading pump station. — Active Nov 26 New D. Construction, Inc. $1,953,400 ·
Apr 26, 2019 87689 DeKalbDistrict 3 Replace the bridge carrying Base Line Road over Coon Creek, located 0.25 mile west of the Kane County Line. — Executed Nov 26 New Civil Constructors, Inc. $552,219 ·
Apr 26, 2019 87698 BureauDistrict 3 Replace the bridge carrying TR 281 over East Bureau Creek, 3.5 miles west of Depue. — Executed Nov 26 New Stark Excavating, Inc. $1,004,126 ·
Apr 26, 2019 87699 LivingstonDistrict 3 Replace the bridge carrying TR 245A over the south fork of Vermilion River, 4 miles south of chatsworth. — Executed Nov 26 New Riber Construction, Inc. $309,930 ·
Apr 26, 2019 87704 DeKalbDistrict 3 Reconstruct the intersection of Peace Road at IL 64. — Executed Nov 26 New William Charles Construction Company, LLC $2,164,846 ·
Apr 26, 2019 87705 DeKalbDistrict 3 Shoulder widening, resurfacing, extend a culvert and street lighting on Plank Road from Lindgren Road to East County Line Road. — Executed Nov 26 New William Charles Construction Company, LLC $1,758,430 ·
Apr 26, 2019 87708 LaSalleDistrict 3 Replace the bridges carrying TR 469 and TR 382 over Covel Creek, 6 miles east of Grand Ridge. — Executed Nov 26 New Riber Construction, Inc. $726,079 ·
Apr 26, 2019 87714 LaSalleDistrict 3 Resurfacing and intersection improvements on FAS Route 263 (CH 5) at Illinois Route 23. — Executed Nov 26 New Advanced Asphalt Company $216,236 ·
Jun 14, 2019 46511 VariousDistrict 3 REPLACING REFLECTORIZED GUARDRAIL MARKERS, TERMINAL MARKERS, AND PLACING LINEAR DELINEATOR PANELS WITHIN THE LIMITS OF THE CONTRACT. — Executed Nov 26 New Northern Contracting, Inc. $202,126 ·
Jun 14, 2019 46512 VariousDistrict 3 REMOVING REFLECTORS, PLACING NEW REFLECTORS, REMOVING DAMAGED RAISED RFLECTIVE PAVEMENT MARKER CASTINGS AND REPLACING WITH NEW WITHIN THE LIMITS SHOWN. — Executed Nov 26 New P & P Construction Co. $125,347 ·
Jun 14, 2019 46513 VariousDistrict 3 REMOVING AND REPLACING REFLCTORS, AND RAISED REFLECTIVE PAVEMENT MARKER CASTINGS WITHIN THE LIMITS SHOWN. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $202,445 ·
Jun 14, 2019 46514 VariousDistrict 3 Remove and replace reflectors, remove and replace damaged raised reflective pavement marker castings within limits shown. — Executed Nov 26 New P & P Construction Co. $153,496 ·
Jun 14, 2019 46917 BureauDistrict 3 2 miles of resurfacing park roads and parking lots with A-2 Oil and Chip at Mautino State Fish and Wildlife Area. Project includes some roadway widening, culvert replacement and drainage improvements. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $476,639 ·
Jun 14, 2019 66428 KankakeeDistrict 3 6.530 miles of 3P milling and resurfacing from IL 17 to the north city limits of St. Anne; and traffic signal improvements at the intersection of IL 17 and IL 1. — Executed Nov 26 New Gallagher Asphalt Corporation & Kankakee Valley Construction Company, Inc. JV $2,938,460 ·
Jun 14, 2019 66A03 FordDistrict 3 3.9 MILES OF MILLING AND RESURFACING 2.5 INCHES ON IL 165 MAINLINE FROM THE MCLEAN CO LINE TO IL 47 IN SIBLEY, IL. — Executed Nov 26 New Iroquois Paving Corporation $893,506 ·
Jun 14, 2019 66E21 BureauDistrict 3 4.34 MILES OF 3P MILLING AND RESURFACING 2.25" OF MAINLINE FROM 0.2 MILES N OF COUNTY ROAD 1500N ON US 6 TO ST MARY AND FROM US 6 TO W ILLINOIS ST. IT INCLUDES PAVEMENT MARKINGS AND REPLACING EXISTING DETECTOR LOOPS. — Executed Nov 26 New Advanced Asphalt Company $3,128,659 ·
Jun 14, 2019 66H03 DeKalbDistrict 3 2.72 MILES OF 3P RESURFACING WORK WITH PAVEMENT PATCHING AND ADA RAMP IMPROVEMENTS FROM STATE ST. IN GENOA TO THE JUNCTION WITH IL 23 (N). — Executed Nov 26 New Curran Contracting Company $1,578,679 ·
Jun 14, 2019 66J12 DeKalbDistrict 3 2.51 MILES OF SHOULDER WIDENING AND RUMBLE STRIP INSTALLATION ON IL72 FROM E OF IRENE RD TO JUST W OF MALTA RD. — Executed Nov 26 New Curran Contracting Company $442,521 ·
Jun 14, 2019 66J23 DeKalbDistrict 3 1.596 MILES OF RESURFACING AND ADA IMPROVEMENTS FROM LITTLE ROCK CREEK TO 0.3 MILES E OF REES ST. IN HINCKLEY. — Executed Nov 26 New Builders Paving, LLC $866,688 ·
Jun 14, 2019 66J51 VariousDistrict 3 One year contract to repair damaged high tension cable median barrier, guardrail, attenuators, etc., caused by motorists along various routes. — Executed Nov 26 New COLLINS & HERMANN, INC. $1,188,019 ·
Jun 14, 2019 66J56 KendallDistrict 3 2.39 MILES OF 3P MILLING AND RESURFACING OF 2.25" FOR MAINLINE PAVEMENT AND SHOULDER FROM S OF GALENA RD TO S KENNEDY DR IN YORKVILLE. — Executed Nov 26 New D. Construction, Inc. $1,160,355 ·
Jun 14, 2019 66J74 LaSalleDistrict 3 MEDIAN CROSSOVER and SHOULDER RECONSTRUCTION 0.5 MILES W OF SN 050-0228/0228 TO 0.5 MILES E OF SN 050-0220/0221 IN LASALLE. — Executed Nov 26 New Advanced Asphalt Company $744,730 ·
Jun 14, 2019 66J81 IroquoisDistrict 3 Weed spraying and seeding for prairie grass at various areas along IL 1 near Milford. — Executed Nov 26 New F & W Lawn Care and Landscaping Company $54,611 ·
Jun 14, 2019 66J83 KankakeeDistrict 3 Centerline and longitudinal joint crack sealing on various routes and centerline joint microsurfacing on FAP 330 from Will County line to Manteno- Deselm Road. — Executed Nov 26 New SKC Construction, Inc. $298,715 ·
Jun 14, 2019 66J84 LaSalleDistrict 3 8.5 miles of intermittent Class A Patching, longitudinal partial depth patching on mainline pavement, and intermittent pavement striping and crack sealing on I-39 from Marshall co Line to 0.4 miles north of CH 54 west of Tonica. — Executed Nov 26 New Beniach Construction Co., Inc. $667,472 ·
Jun 14, 2019 66J85 LaSalleDistrict 3 6.5 miles of intermittent Class A Patching, longitudinal partial depth patching on mainline pavement, and intermittent pavement striping and crack sealing on I-39 from US 34 to 0.3 mile south of Lee County line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $1,030,963 ·
Jun 14, 2019 66J87 BureauDistrict 3 10.5 MILES OF ROUTING AND SEALING TRANSVERSE AND PRIMARY LONGITUDINAL CRACKS GREATER THAN 0.25" WIDE AS WELL AS CLEANING AND SEALING SECONDARY CRACKS GREATER THAN 0.25" WIDE ON IL 26 FROM I-80 TO THE SOUTH OF RAILROAD AVE IN PRINCETON. MICROSURFACING THE CENTERLINE FROM 0.1 MILES N OF 2600N RD TO I-80. — Executed Nov 26 New A. C. Pavement Striping Co. $328,924 ·
Jun 14, 2019 66J88 LaSalleLivingstonDistrict 3 12.4 miles of routing and sealing on IL 23 from just north of Oakley Avenue to Grove Street in Streator, and on IL 23 from 1 mile south of the LaSalle County Line to 9th Street in Cornell. — Executed Nov 26 New Denler, Inc. $73,110 ·
Jun 14, 2019 66J89 DeKalbDistrict 3 7.011 MILES OF ROUTING AND SEALING TRANSVERSE AND PRIMARY LONGITUDINAL CRACKS GREATER THAN 0.25" WIDE AS WELL AS CLEANING AND SEALING SECONDARY CRACKS GREATER THAN 0.25" WIDE ON US 30 FROM 0.2 MILES E OF HICKORY ST IN WATERMAN TO LITTLE ROCK CREEK, AND FROM 0.3 MILES E OF REES ST. IN HINCKLEY TO THE KANE CO LINE. — Executed Nov 26 New Complete Asphalt Service Co. $42,438 ·
Jun 14, 2019 66J97 LaSalleDistrict 3 Class B pavement patching on US 6 and IL 251 mainline and I-39 ramps at the US 6 and IL 251 interchange. — Executed Nov 26 New G. M. Sipes Construction, Inc. $230,890 ·
Jun 14, 2019 66J98 DeKalbDistrict 3 Class B pavement patching on IL 64 from Peace Road in Sycamore to the Kane County line. — Executed Nov 26 New Lorusso Cement Contractors, Inc. $405,300 ·
Jun 14, 2019 66J99 DeKalbDistrict 3 Class B pavement patching on IL 38 from Peace Road to Somonauk Road in Cortland. — Executed Nov 26 New Lorusso Cement Contractors, Inc. $149,997 ·
Jun 14, 2019 66K01 LaSalleDistrict 3 Class B pavement patching on US 34 from the IL 23 north intersection to the IL 23 south intersection. — Executed Nov 26 New Beniach Construction Co., Inc. $303,402 ·
Jun 14, 2019 66K02 FordDistrict 3 Class B pavement patching on IL 54 from the Champaign County line to Church Street in Gibson City. — Executed Nov 26 New G. M. Sipes Construction, Inc. $285,429 ·
Jun 14, 2019 66K03 FordDistrict 3 Class B pavement patching on IL 54 from Church Street in Gibson City to East Main Street in Melvin. — Executed Nov 26 New G. M. Sipes Construction, Inc. $517,414 ·
Jun 14, 2019 66K04 FordDistrict 3 Class B pavement patching on IL 54 from East Main Street in Melvin to the Iroquois County line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $457,550 ·
Jun 14, 2019 66K06 IroquoisDistrict 3 Class B pavement patching on IL 1 from US 52 to the Vermilion County line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $471,138 ·
Jun 14, 2019 66K07 IroquoisDistrict 3 Class A and Class B patching on IL 24 from 2800E Road to the Indiana State line. — Executed Nov 26 New Iroquois Paving Corporation $337,214 ·
Jun 14, 2019 66K09 LivingstonDistrict 3 2.337 MILES OF 2' WIDE CENTERLINE MILLING AND RESURFACING FROM 2NS ST. IN STRAWN TO THE FORD COUNTY LINE. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $99,007 ·
Jun 14, 2019 66K10 GrundyLaSalleDistrict 3 BRIDGE WASHING AT VARIOUS STRUCTURES OVER THE ILLINOIS RIVER. — Executed Nov 26 New All States Painting, Inc. $169,700 ·
Jun 14, 2019 66K11 GrundyDistrict 3 6 MILES OF CLASS A PAVEMENT PATCHING 16" ON PORTLAND CEMENT CONCRETE (PCC) PAVEMENT, PCC SHOULDER REPAIR AND INTERMITTNT PAVEMENT STRIPPING ON I-80 FROM 0.4 MILES N OF SENECA TO 0.4 MILES WOF IL 47 IN MORRIS. — Executed Nov 26 New D. Construction, Inc. $298,147 ·
Jun 14, 2019 66K12 LivingstonDistrict 3 REMOVING AND REPLACING HIGH MAST LIGHT TOWERS AT THE I-55 AND IL 17 EXCHANGE. — Executed Nov 26 New Bodine Electric of Decatur $540,782 ·
Jun 14, 2019 66K13 DeKalbDistrict 3 CLEANING AND PAINTING ALL STRUCTURAL STEEL COMPONENTS OF SN 019-0026 CARRYING IL 72 OVER THE SOUTH BRANCH OF THE KISHWAUKEE RIVER. — Executed Nov 26 New Three Star Painting, Inc. $200,000 ·
Jun 14, 2019 66K16 LaSalleDistrict 3 RAISING BRIDGE APPROACH SLAB SN 05-0211 (50' OF THE NORTH APPROACH) ON I-39 NORTHBOUND WITH EXPANDING POLYURETHANE HIGH DENSITY FOAM. — Executed Nov 26 New D. Construction, Inc. $103,332 ·
Jun 14, 2019 66K23 KankakeeWillDistrict 3 Radii widening at the intersection of IL 1 and E 1200N Road at the Kankakee/Will County Line. Includes new foreslopes and ditches and 0.75 mile centerline milling and resurfacing to add rumble strips. — Executed Nov 26 New Iroquois Paving Corporation $148,374 ·
Jun 14, 2019 66K24 IroquoisDistrict 3 4.5 MILES OF INTERMITTENT MILLING AND RESURFACING 2" AT VARIOUS LOCATIONS FROM MILE POST 265 TO MILE POST 280. THE PROJECT ALSO INCLUDES PAVEMENT MARKING, SHOULDER REPAIRS (2" WIDE, 6" DEEP RESURFACING), AND SETTING UP TRAFFIC CONTROL. — Executed Nov 26 New Iroquois Paving Corporation $888,875 ·
Jun 14, 2019 66K26 KankakeeDistrict 3 CLEANING AND PAINTING ALL STRUCTURAL STEEL COMPONENTS OF SN 046-0052 CARRYING US 45/52 AND I-57 INTERCHANGE SOUTH OF KANKAKEE. — Executed Nov 26 New Three Star Painting, Inc. $350,000 ·
Jun 14, 2019 87691 IroquoisDistrict 3 Replace the bridge carrying TR74 over Spring Creek, 1.5 miles southeast of Onarga. — Executed Nov 26 New Iroquois Paving Corporation $735,366 ·
Jun 14, 2019 87697 DeKalbDistrict 3 Pavement widening to add right turn lanes on Peace Road at Freed Road and Brickville Road. — Executed Nov 26 New Curran Contracting Company $166,009 ·
Jun 14, 2019 87715 KankakeeDistrict 3 Resurfacing CH 9 from IL Route 50 to IL Route 1. — Executed Nov 26 New Kankakee Valley Construction Co., Inc. & Gallagher Asphalt Corporation $2,358,766 ·
Jul 12, 2019 66A81 FordDistrict 3 6 miles of milling and resurfacing of US 24 from Livingston county line to the Iroquois county line. — Executed Nov 26 New Iroquois Paving Corporation $2,795,668 ·
Jul 12, 2019 66A84 IroquoisDistrict 3 8.09 miles of 3.75 milling and resurfacing from US 24 to US 45/52. — Executed Nov 26 New Iroquois Paving Corporation $3,777,848 ·
Jul 12, 2019 66B06 LaSalleDistrict 3 10.9 miles of 3P milling and resurfacing on mainline pavement and pavement striping on IL-18 from IL-251 to WCL of Streator. — Executed Nov 26 New Advanced Asphalt Company $4,990,242 ·
Jul 12, 2019 66D54 LaSalleDistrict 3 6.3 miles of milling and resurfacing 3.75" of HMA at US-34 mainline and shoulders. Including removing and resurfacing 1" of HMA surface at bridge decks. — Executed Nov 26 New Curran Contracting Company $2,407,407 ·
Jul 12, 2019 66D59 KankakeeLivingstonDistrict 3 1.954 miles of 3P milling and resurfacing W of Reddick to 0.3 mile W of TR 48. It also includes centerline and shoulder rumble strips. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $1,002,537 ·
Jul 12, 2019 66F25 LivingstonDistrict 3 10.2 miles of 3P milling and resurfacing of 3.75" on or 66 from IL-23 to Prairie St. on Odell. Other work included is shoulder stone, pavement marking and raised reflective pavement markers. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $4,643,509 ·
Jul 12, 2019 66F86 IroquoisDistrict 3 8.948 miles of 3P milling and resurfacing on IL-1 in Watseka to the Indiana St line. — Executed Nov 26 New Iroquois Paving Corporation $5,596,979 ·
Jul 12, 2019 66H58 BureauDistrict 3 9.9 miles of 3P 3.75" milling and resurfacing on IL-26 from N of IL-92 to S of red covered bridge road according to tamp designed overlay policy. Other work includes shoulder stone, pavement marking, and raised reflective pavement markers. — Executed Nov 26 New Advanced Asphalt Company $4,128,627 ·
Aug 2, 2019 66A92 BureauDistrict 3 6.03 miles of 3P milling and resurfacing on IL 40 from the Burlington Northern Santa Fe Railroad south of Buda to the Stark County line. Includes approach work on SN 006-0145, guardrail with shoulder stabilization, aggregate ditch checks, intermittent resurfacing, shoulder stone, pavement marking and raised reflectors. — Executed Nov 26 New Advanced Asphalt Company $3,084,437 ·
Aug 2, 2019 66H92 KendallDistrict 3 Installation of flashing red and yellow beacons at each approach to the intersection of US 52 and Grove Road. — Executed Nov 26 New Van-Mack Electric Co. $59,096 ·
Aug 2, 2019 66J58 FordDistrict 3 Removal and replacement of an 18" diameter pipe culvert south of the railroad tracks in Roberts and a and a 2' x 1.5'concrete box culvert on the north side of the 1300N Rd intersection with IL 115. — Executed Nov 26 New G. M. Sipes Construction, Inc. $131,005 ·
Aug 2, 2019 66K05 FordDistrict 3 3.4 miles of milling, resurfacting and intermittent patching on US 45 from Dawn Avenue in Paxton to the Champaign County line. — Executed Nov 26 New Iroquois Paving Corporation $1,379,136 ·
Aug 2, 2019 66K25 GrundyDistrict 3 0.9 miles of milling and resurfacing on both NB and SB lanes of I-55 at MP 232.6, milling and resurfacing Reed Road interchange ramps, and building two PCC crosssovers. — Executed Nov 26 New D. Construction, Inc. $3,956,040 ·
Aug 2, 2019 87703 LaSalleDistrict 3 Reconstruct the intersection of CH43 and CH33, located 4.0 miles north of Utica. — Executed Nov 26 New Advanced Asphalt Company $680,493 ·
Sep 20, 2019 66K34 IroquoisDistrict 3 DRAINAGE REPAIRS 0.27 MI N OF CR 700 N ROAD. — Executed Nov 26 New Iroquois Paving Corporation $208,524 ·
Sep 20, 2019 87695 GrundyDistrict 3 Pavement widening and reconstruction of Ridge Road from a two-lane to a four-lane with bi-directional turn lane, includes bridge rehabilitation and the construction of a new bridge span to carry the Wisconsin Central Ltd. Railway over Ridge Road. Project runs from south of McEvilly Road to Minooka Road in the village of Minooka. — Rejected Nov 26 New D. Construction, Inc. $11,963,320 ·
101–200 of 1,128‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.