| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 8, 2019 | 61G07 | CookDistrict 1 | Sidewalk construction, covered bicycle shelter, bike racks and bike repair stations on Burlington Avenue west of Dubois Avenue (Congress Park Metra Station) and on Forest Avenue north of Burlington Avenue (Brookfield Metra Station) on the Village of Brookfield. | — | Executed | Landmark Contractors, Inc. $130,549 · | ||
| Nov 8, 2019 | 62F95 | CookDistrict 1 | Superstructure replacement, substructure rehabilitation, roadway lighting, underdeck lighting and drainage improvements on I-94 at Montrose Avenue. (SN 016-0852) | — | Executed | Kenny Construction Company_DO NOT USE $16,233,644 · | ||
| Nov 8, 2019 | 62G94 | CookDistrict 1 | Bridge overlay and joint repair on the structure carrying IL 72 westbound over the EJandJ Railroad in the Village of Hoffman Estates. (SN 016-0502) | — | Executed | Martam Construction Incorporated $387,419 · | ||
| Nov 8, 2019 | 62H21 | CookDistrict 1 | 6.9 miles of overlay, patching with precast concrete slabs and pedestrian ramp improvements on IL 72 (Higgins Road) from Commonwealth Drive to Glen Lake Road in the Villages of Hoffman Estates, Schaumburg and South Barrington. | — | Executed | Plote Construction, Inc. $7,881,258 · | ||
| Nov 8, 2019 | 62J31 | CookDistrict 1 | Construction of a concrete retaining wall on the west side of I-290 between Van Buren and Jackson; mainline pavement near southbound I-90/94 to westbound I-290 ramp; demolition of existing Jackson Boulevard Bridge at I-90/94. (SN 016-0588). | — | Executed | Lorig Construction Company $9,989,152 · | ||
| Nov 8, 2019 | 62J37 | McHenryDistrict 1 | Pavement replacement at the culvert carrying US 14 over the ditch south of Oak Grove Road in the City of Harvard. (SN 056-0263) | — | Executed | Alliance Contractors, Inc. $148,753 · | ||
| Nov 8, 2019 | 62J56 | VariousDistrict 1 | Temporary traffic control setup on various state-maintained expressway and arterial routes throughout District 1 on a work order basis. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $2,556,000 · | ||
| Nov 8, 2019 | 62J58 | VariousDistrict 1 | Sweeping various expressway and arterial highways throughout District 1. | — | Rejected | |||
| Nov 8, 2019 | 62J76 | CookDistrict 1 | 3.2 miles of tree removal, selective clearing, grubbing, tree pruning, chain link and wood fence removal, sign removal and metal structure removal along Wood Street from south of 159th Street to north of 138th Street within the City of Harvey and Villages of Dixmoor and Riverdale. | — | Executed | D. Construction, Inc. $374,062 · | ||
| Nov 8, 2019 | 62K13 | WillDistrict 1 | Surveillance camera replacement on I-55 (Lorenzo Rd to Joliet Rd) and I-80 (IL 43 to US 30). | — | Executed | Meade Inc. $482,744 · | ||
| Jan 17, 2020 | 60L88 | CookDistrict 1 | Designed overlay and ADA pedestrian ramps on Bryn Mawr Avenue beginning just east of IL 43 and extending 2.14 miles to the east, in the City of Chicago. | — | Executed | J. A. Johnson Paving Company $2,124,700 · | ||
| Jan 17, 2020 | 60M68 | CookDistrict 1 | Bridge deck and approach overlay, bridge deck and approach repairs, reconstruction of deck joints, substructure repairs and pavement patching and overlay on existing structure no. 016-0811. | — | Executed | Martam Construction Incorporated $2,794,215 · | ||
| Jan 17, 2020 | 60Y74 | CookDistrict 1 | Intersection improvement, channelization, and traffic signal modernization project on Golf Rd from Overlook Dr to Harms Rd in Morton Grove and Cook County Forest Preserve. | — | Executed | Capitol Cement Co., Inc. $1,293,582 · | ||
| Jan 17, 2020 | 61E86 | CookDistrict 1 | Reconstruct the intersection of US 12/US 45 at Forest Avenue in Des Plaines. | — | Executed | Berger Excavating Contractors, Inc. $2,524,434 · | ||
| Jan 17, 2020 | 61F32 | KaneDistrict 1 | Reconstruction of Main Street from Van Nortwick Avenue to Water Street and IL 31 from Elm Street to First Street in the City of Batavia. | — | Executed | Acqua Contractors Corp $6,900,000 · | ||
| Jan 17, 2020 | 61F36 | CookDistrict 1 | Reconstruction of Lake Street from Harlan Avenue to Euclid Avenue in Oak Park. | — | Executed | R. W. Dunteman Company $10,557,782 · | ||
| Jan 17, 2020 | 61F74 | DuPageDistrict 1 | Construction of a shared use path adjacent to Gary Avenue from Great Western Trail (St. charles Road) to Army Trail Road in Carol Stream. | — | Executed | R. W. Dunteman Company $2,023,958 · | ||
| Jan 17, 2020 | 61F81 | WillDistrict 1 | Resurfacing Corning avenue from Rathje Road to IL 50 in the Village of Peotone. | — | Executed | Iroquois Paving Corporation $476,339 · | ||
| Jan 17, 2020 | 61F86 | CookDistrict 1 | Reconstruction of 151st Street from West Avenue to Ravinia Avenue and the contruction of a roundabout at West Avenue in Orland Park. | — | Executed | P. T. Ferro Construction Co. $4,647,786 · | ||
| Jan 17, 2020 | 61F91 | CookDistrict 1 | Resurfacing 175th Street from Ashland Avenue to Halsted Avenue in the Village of Homewood. | — | Executed | D. Construction, Inc. $464,570 · | ||
| Jan 17, 2020 | 61F94 | WillDistrict 1 | Reconstruct and realign the intersection of St. Louis Street at IL 53 in the Village of Elwood. | — | Executed | P. T. Ferro Construction Co. $2,572,560 · | ||
| Jan 17, 2020 | 61G08 | CookDistrict 1 | Resurfacing, bike path contruction and traffic signal improvment on Howard Street from Milwaukee Avenue to Lehigh Avenue in Niles. | — | Executed | Capitol Cement Co., Inc. $6,976,099 · | ||
| Jan 17, 2020 | 61G13 | CookDistrict 1 | Resurfacing Joliet Avenue from 47th Street to 39th Street in the Village of Lyons. | — | Executed | Lindahl Brothers, Inc. $911,086 · | ||
| Jan 17, 2020 | 61G14 | DuPageDistrict 1 | Sidewalk construction and the construction of multi-use paths at various locations in the Village of Itasca. | — | Executed | A Lamp Concrete Contractors, Inc. $834,549 · | ||
| Jan 17, 2020 | 61G21 | WillDistrict 1 | Replace the bridge carrying Essington Road over Rock Run Creek between Pandola Avenue and Citadel Drive in the City of Joliet. | — | Executed | Herlihy Mid-Continent Company $2,812,985 · | ||
| Jan 17, 2020 | 62A26 | CookDistrict 1 | Pavement widening on IL 53 / IL 68 to provide a new southbound right turn lane at the intersection of Rand Road and Dundee Road; includes new median, patching, resurfacing, traffic and lighting modifications and sewer installation. | — | Executed | R. W. Dunteman Company $5,247,345 · | ||
| Jan 17, 2020 | 62G17 | CookDistrict 1 | 3.1 miles of designed overlay and ADA ramp improvements on Northwest Highway from US 14 (Miner Street) to Merrill Street in Maine Township. | — | Executed | J. A. Johnson Paving Company $4,016,610 · | ||
| Jan 17, 2020 | 62G27 | McHenryDistrict 1 | 2 miles of standard overlay and ADA ramp improvements on US 12 (Main Street) IL 173 (Kenosha Street) to Tryon Grove Road in the Village of Richmond. | — | Executed | Payne & Dolan, Inc. $1,469,929 · | ||
| Jan 17, 2020 | 62H96 | CookDistrict 1 | Overlay and pedestrian ramps on US 41; bridge deck repair on the I-94 off ramp to US 41 from I-94 to North of Old Orchard Rd. in Willmette and Skokie. | — | Rejected | Peter Baker & Son Co. $2,297,777 · | ||
| Jan 17, 2020 | 62J05 | LakeDistrict 1 | Traffic signal modernization that includes going protected on for the NB/SB left turns and pedestrian improvements at the intersection of Il Rte 131 at IL Rte 120 in Waukegan. | — | Executed | Home Towne Electric, Inc. $269,491 · | ||
| Jan 17, 2020 | 62J33 | CookDistrict 1 | Bridge overlay and joint repair on SN 016-2036 carrying Halsted Street over I-57 in Bellwood. | — | Executed | D. Construction, Inc. $496,790 · | ||
| Jan 17, 2020 | 62J42 | WillDistrict 1 | Removal and replacement of a weigh-in-motion scale, adjacent pavement and shoulder removal and replacement on I-80 at the westbound Frankfort weigh station scale #10. , Removal and replacement of a weigh-in-motion scale, adjacent pavement and shoulder removal and replacement on I-80 at the westbound Frankfort weigh station scale #10. | — | Executed | D. Construction, Inc. $559,193 · | ||
| Jan 17, 2020 | 62J45 | CookDistrict 1 | 0.48 miles of designed overlay and pedestrian ramp improvements on Avondale Avenue from Pulaski Road to Addison Street in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $643,197 · | ||
| Jan 17, 2020 | 62J46 | DuPageDistrict 1 | Designed overlay and pedestrian ramp project begins at the intersection of West Westgate Rd and I-55 South Frontage Rd and proceeds East for 2.44 miles to the West leg of the intersection of I-55 South Frontage Rd and Cass Ave. | — | Executed | P. T. Ferro Construction Co. $1,082,324 · | ||
| Jan 17, 2020 | 62J48 | CookDistrict 1 | Resurfacing (3R) ADA improvements on OR 309a (Old Western Ave) from Broadway Street to Western Avenue. | — | Executed | Gallagher Asphalt Corporation $197,238 · | ||
| Jan 17, 2020 | 62J49 | KaneDistrict 1 | Standard overlay, pedestrian ramps on IL 25/Liberty St from Page Ave to Dwight St in Elgin. | — | Executed | J. A. Johnson Paving Company $1,937,211 · | ||
| Jan 17, 2020 | 62J51 | CookDistrict 1 | Cleaning and painting designated steel surfaces of bridge structures carrying 1) Chicago Heights Glenwood Road over Butterfield Creek; 2) 183rd Street over I-57; 3) IL 50 over I-57; in the City of Country Club Hills and the Village of Glenwood. (SN 016-0793, 016-0583, 016-1014) | — | Executed | Capital Industrial Services $1,113,633 · | ||
| Jan 17, 2020 | 62J52 | CookDistrict 1 | Cleaning and painting designated steel surfaces of bridge structures carrying Touhy Ave over Des Plaines River, and Wolf Rd over Weller Ditch in Des Plaines. | — | Executed | Eagle Painting & Maintenance Company, Inc. $392,220 · | ||
| Jan 17, 2020 | 62J53 | CookDistrict 1 | Cleaning and sealing longitudinal cracks in the existing concrete pavement between traffic lanes and curb and gutter, restriping with modified urethane pavement marking in Ford Heights, Lynwood, and Sauk Village. | — | Executed | Denler, Inc. $200,433 · | ||
| Jan 17, 2020 | 62J54 | CookDistrict 1 | 4.6 miles of designed overlay and ADA pedestrian ramp improvements on Golf road from IL 43 (Waukegan Road) to McCormick Boulevard in the Villages of Glenview, Golf, Morton Grove, Skokie and City of Evanston. | — | Executed | Builders Paving, LLC $5,648,000 · | ||
| Jan 17, 2020 | 62J57 | CookDistrict 1 | 0.8 miles of standard overlay and ADA improvements on Butterfield Road in the Village of Bellwood. | — | Executed | Plote Construction, Inc. $814,877 · | ||
| Jan 17, 2020 | 62J60 | WillDistrict 1 | Bridge deck overlay and joint repairs on IL 113 over I-55 in the City of Braidwood. (SN 099-0151) | — | Executed | D. Construction, Inc. $822,716 · | ||
| Jan 17, 2020 | 62K07 | VariousDistrict 1 | Expressway mowing North. | — | Rejected | |||
| Jan 17, 2020 | 62K08 | VariousDistrict 1 | Expressway mowing South. | — | Rejected | |||
| Jan 17, 2020 | 62K14 | McHenryDistrict 1 | Bridge deck overlay and joint repairs of IL 62 (Algonquin Rd) over the Fox River in Algonquin. , Bridge deck overlay and joint repairs to IL 62 (Algonquin Rd) over the Fox River in Algonquin. | — | Executed | Martam Construction Incorporated $1,184,616 · | ||
| Jan 17, 2020 | 62K36 | CookDuPageDistrict 1 | Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expr The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expressway. 200 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $288,000 · | ||
| Jan 17, 2020 | 62K37 | CookDuPageDistrict 1 | Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 ( The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 (Kingery Hwy) to Austin Blvd. 135 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $192,000 · | ||
| Jan 17, 2020 | 62K38 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290/IL 110 Expressway from The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290/IL 110 Expressway from Austin Blvd to Wells St. 253 miles in length. | — | Rejected | 10x Contractors LLC $197,600 · | ||
| Jan 17, 2020 | 62K39 | CookLakeDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (S The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy). 147 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $211,200 · | ||
| Jan 17, 2020 | 62K40 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-90 The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-90; I-90/94 expressways from W of US 12/45 Mannheim Rd to Congress Pkwy. 185 miles in length. | — | Rejected | 10x Contractors LLC $214,500 · | ||
| Jan 17, 2020 | 62K41 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-90/94 (Dan Ryan Expy) from The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-90/94 (Dan Ryan Expy) from Congress Pkwy to I-57/I-94 Bishop Ford Expy). 360 miles in length. | — | Rejected | 10x Contractors LLC $280,800 · | ||
| Jan 17, 2020 | 62K42 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-57 expressway from I 94 (Da The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-57 expressway from I 94 (Dan Ryan Expwy) to I-80. 275 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $230,400 · | ||
| Jan 17, 2020 | 62K43 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on 1) FAI 94: I-94 from I-90/94 The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on 1) FAI 94: I-94 from I-90/94 (Dan Ryan Expwy) to I-80; 2) FAP 341: Stony Island from I-94 to US 12(95th St); 3) FAU 1574: 103rd St from Cottage Groove to Stony Island. 175 miles in length. | — | Rejected | 10x Contractors LLC $214,500 · | ||
| Jan 17, 2020 | 62K44 | CookWillDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-35 The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-355. 325 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $177,600 · | ||
| Jan 17, 2020 | 62K45 | WillDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kend The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kendall County Line. 240 miles in length. | — | Rejected | MYS, Incorporated $193,806 · | ||
| Jan 17, 2020 | 62K46 | CookDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expwy from L The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expwy from Lake Shore Dr to IL 43 (Harlem Ave). 250 miles of total length. | — | Rejected | 10x Contractors LLC $195,000 · | ||
| Jan 17, 2020 | 62K47 | CookDuPageDistrict 1 | Litter/debris removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expressway from IL 43 (Harlem Ave) to I-355._150 miles in length. | — | Rejected | Viridian Enterprises, Inc. $119,250 · | ||
| Jan 17, 2020 | 62K48 | WillDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 expwy from I-355 to Reed The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 expwy from I-355 to Reed Rd. 180 miles in length. | — | Rejected | Western Remac, Inc. $345,600 · | ||
| Mar 6, 2020 | 60M90 | CookDistrict 1 | 0.049 miles of bridge repair, bridge joint repair, and bridge deck overlay on the structure carrying US 14 over IL 58. | — | Executed | Martam Construction Incorporated $474,343 · | ||
| Mar 6, 2020 | 60R66 | CookDistrict 1 | Bridge deck overlay and joint repairs of Chicago Ave over the Des Plaines River. | — | Executed | MYS, Incorporated $573,893 · | ||
| Mar 6, 2020 | 60R72 | CookDistrict 1 | Bridge deck scarification and replacement with latex concrete overlay, resufacing of both approaches and deck repairs on the structure carrying Central Rd over the Des Plaines River in Maine and Northfield Townships. | — | Executed | Martam Construction Incorporated $593,744 · | ||
| Mar 6, 2020 | 60T05 | CookDistrict 1 | 1.5 miles of reconstruction and ADA improvements on Wolf Road from IL 21 (Milwaukee Road) to north of Hintz Road in the Village of Wheeling. | — | Executed | Acura Inc. $12,538,085 · | ||
| Mar 6, 2020 | 61F15 | WillDistrict 1 | Replace the bridge carrying Danne Road over a Branch of Plum Creek, located 0.70 mile east of Klemme Road. | — | Executed | D. Construction, Inc. $1,359,864 · | ||
| Mar 6, 2020 | 61F34 | DuPageDistrict 1 | Construction of a shared used path from Army Trail Road to Conerstone Lakes Park. Project is located in the Village of Wayne. | — | Executed | A Lamp Concrete Contractors, Inc. $874,861 · | ||
| Mar 6, 2020 | 61F95 | CookDistrict 1 | Pavement marking removal, new pavement markings and the installation of signs on Pratt Avenue from Lawndale Avenue to McCormick Boulevard in the Village of Lincolnwood. | — | Rejected | Marking Specialists Corporation $53,296 · | ||
| Mar 6, 2020 | 61G16 | DuPageDistrict 1 | Reconstruct the intersection of Harger Road at North York Road, and the construction of an underpass to carry the Salt Creek Trail under Harger Road in Oak Brook. | — | Executed | Martam Construction Incorporated $7,365,297 · | ||
| Mar 6, 2020 | 61G17 | KaneDistrict 1 | Resurfacing Bolcum Road from Burlington Road to Fairwy Drive in the Village of Campton Hills. | — | Executed | Geneva Construction Company $704,630 · | ||
| Mar 6, 2020 | 61G18 | DuPageDistrict 1 | Pavement reconstruction and traffic signal modernization on 75th Street from Lyman Avenue to Exner Road/Williams Street, located in the Village of Downers Grove and the City of Darien | — | Executed | R. W. Dunteman Company $4,921,983 · | ||
| Mar 6, 2020 | 61G23 | DuPageDistrict 1 | Resurfacing Manchester Road from County Farm Road to Gables Boulevard in the City of Wheaton. | — | Executed | Plote Construction, Inc. $665,109 · | ||
| Mar 6, 2020 | 61G24 | KaneDistrict 1 | Resurfacing South 7th Avenue from IL 64 to Division Street in St. Charles. | — | Executed | J. A. Johnson Paving Company $910,061 · | ||
| Mar 6, 2020 | 61G25 | DuPageDistrict 1 | Resurfacing President Street from Harrison Avenue to Geneva Road in the City of Wheaton. | — | Executed | Plote Construction, Inc. $677,196 · | ||
| Mar 6, 2020 | 61G27 | DuPageDistrict 1 | Resurfacing Woodward Avenue from 75th Street to the north village limits of Woodridge. | — | Executed | K-Five Construction Corporation $981,870 · | ||
| Mar 6, 2020 | 61G29 | DuPageDistrict 1 | Resurfacing Main Street from St Charles Road to Wilson Avenue in Lombard. | — | Executed | R. W. Dunteman Company $1,307,899 · | ||
| Mar 6, 2020 | 61G30 | CookDistrict 1 | Resurfacing, sidewalk construction, curb and gutter, watermain replacement, roadway lighting and traffic signal modernization on Howard Street from Sacramento Avenue to Cellan Avenue in Evanston. | — | Executed | Acura Inc. $10,088,928 · | ||
| Mar 6, 2020 | 61G31 | LakeDistrict 1 | Roadway reconstruction on Thompson Boulevard from Brandywyn Lane to Buffalo Grove Road, and on Brandywyn Lane from Thompson Blvd. to Aptakisic Road in Buffalo Grove. | — | Executed | A Lamp Concrete Contractors, Inc. $3,224,076 · | ||
| Mar 6, 2020 | 61G34 | KaneDistrict 1 | Pavement reconstruction on Prairie Street from Wilson Street to Pine Street in Batavia. | — | Executed | Pir Tano Construction Company, Inc. $2,962,380 · | ||
| Mar 6, 2020 | 61G37 | DuPageDistrict 1 | Resurfacing 83rd Street from IL 53 to Janes Avenue in the Village of Woodridge. | — | Executed | K-Five Construction Corporation $896,777 · | ||
| Mar 6, 2020 | 62F91 | McHenryDistrict 1 | Overlay Smart, ADA improvements, and milled rumble strips on IL 120 from IL 47 to Martin Rd. | — | Executed | Curran Contracting Company $3,512,337 · | ||
| Mar 6, 2020 | 62G01 | CookDistrict 1 | Turn lane and median repair, ADA improvments and traffic signal modernization at the intersection of IL 50 and 115th Street and traffic signal improvements on IL 50 at 122nd Street within the Village of Alsip. | — | Executed | D. Construction, Inc. $736,313 · | ||
| Mar 6, 2020 | 62G86 | LakeDistrict 1 | Cleaning and painting designated steel surfaces of bridge structures carrying IL 120 (Belvidere Rd) over Greenleaf St and CPRR in Gurnee, Waukegan, and Park City. | — | Executed | Eagle Painting & Maintenance Company, Inc. $498,300 · | ||
| Mar 6, 2020 | 62G92 | CookDistrict 1 | Removal and replacement of the existing box culvert on Chicago Rd over Thorn Creek Tributary in Chicago Heights. | — | Executed | Dunnet Bay Construction Company $2,208,417 · | ||
| Mar 6, 2020 | 62H40 | VariousDistrict 1 | Drainage improvements at various locations on IL 56, I-55, 79th Street and 131st Street within unincorporated DuPage County, City of Chicago, Village of Justice and Village of Palos Park. | — | Executed | Copenhaver Construction, Inc. $879,187 · | ||
| Mar 6, 2020 | 62H85 | CookDuPageWillDistrict 1 | This is a safety (HSIP) improvement including guardrail end section replacement and new guardrail installation on various state maintained arterial routes. | — | Executed | Copenhaver Construction, Inc. $584,674 · | ||
| Mar 6, 2020 | 62H86 | VariousDistrict 1 | This is a safety (HSIP) improvement including guardrail end section replacement and new guardrail installation on various state maintained arterial routes. | — | Executed | Copenhaver Construction, Inc. $686,402 · | ||
| Mar 6, 2020 | 62J20 | KaneDistrict 1 | Resurfacing/Pedestrian ramp (ADA) improvements along 47th St from Finley Rd to Baseline Rd spanning a gross length of 7.005 miles in Sugar Grove. | — | Executed | Curran Contracting Company $5,280,083 · | ||
| Mar 6, 2020 | 62J34 | KaneDistrict 1 | Bridge deck repair, joint repair, and bridge deck overlay to the structure carrying IL 38 over the Fox River in Geneva. | — | Executed | Lorig Construction Company $571,665 · | ||
| Mar 6, 2020 | 62J38 | DuPageDistrict 1 | Bridge repair, bridge joint repair, and bridge deck overlay on the structure carrying Chicago Ave over IL 83. | — | Executed | P. T. Ferro Construction Co. $172,877 · | ||
| Mar 6, 2020 | 62J44 | CookDistrict 1 | 3.01 miles of designed overlay, pedestrian ramp, and drainage improvements on McCormick Blvd from Dempster St to Devon Ave. | — | Executed | Builders Paving, LLC $4,038,000 · | ||
| Mar 6, 2020 | 62J55 | CookDistrict 1 | 1.826 miles of designed overlay/pedestrian ramp (ADA) improvements along 106th ST from Torrence Ave to US 12/41 (Indianapolis Ave). | — | Executed | Gallagher Asphalt Corporation $2,478,606 · | ||
| Mar 6, 2020 | 62J66 | CookDistrict 1 | 0.5 miles of designed overlay and ADA improvments on Canal Street from Archer Avenue to W 28th Street in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $467,338 · | ||
| Mar 6, 2020 | 62J71 | CookDistrict 1 | 1.62 miles of resurfacing improvements and ADA ramp improvements along US 14 (Northwest Highway) from E of Smith St to S Hicks Rd. | — | Executed | Arrow Road Construction Co. $2,317,789 · | ||
| Mar 6, 2020 | 62J77 | CookDistrict 1 | 1.3 miles of designed overlay on 5th Avenue from IL 64 (North Avenue) to Lake Street in the Villages of Melrose Park and Maywood. | — | Executed | Arrow Road Construction Co. $1,417,367 · | ||
| Mar 6, 2020 | 62J85 | CookDistrict 1 | 2.09 miles of designed overlay from S of IL 171 (Archer Ave) to 107th in Willow Springs. | — | Executed | K-Five Construction Corporation $1,026,000 · | ||
| Mar 6, 2020 | 62J86 | CookDistrict 1 | 0.70 miles of standard overlay and ADA improvements on Palatine Rd - South Frontage Rd, N Verde Ave to Palatine Rd in Arlington Heights. | — | Executed | J. A. Johnson Paving Company $539,293 · | ||
| Mar 6, 2020 | 62J88 | CookDistrict 1 | 4.4 miles of HMA surface removal, patching, resurfacing, ADA sidewalk repairs, HMA shoulders and drainage improvements on Des Plaines River Road from Foster Avenue to IL 171 (1st Avenue) and Lawrence Avenue from East River Road to Ridgewood Avenue within the Villages of Schiller Park, Norridge, Franklin Park and River Grove. | — | Executed | R. W. Dunteman Company $4,948,861 · | ||
| Mar 6, 2020 | 62J97 | CookDistrict 1 | 0.41 miles of designed overlay and pedestrian ramp upgrades on Lincoln Ave approximately 100 ft S of Main St E to approximately 50 ft N of Niles Center Rd. | — | Executed | Arrow Road Construction Co. $511,357 · | ||
| Mar 6, 2020 | 62J99 | LakeDistrict 1 | 2.6 miles of designed overlay, new shoulders and pedestrian ramp improvements on IL 176 from Crescent Knoll Drive to west of US 41 in the Village of Libertyville. | — | Executed | Peter Baker & Son Co. $3,498,734 · | ||
| Mar 6, 2020 | 62K01 | CookDistrict 1 | Structure improvements to SN 016-0141 carrying the CTA RR over the Dan Ryan Expressway, approximately 0.5 miles south of 55th Street. | — | Executed | Kiewit Infrastructure Co. $654,013 · | ||
| Mar 6, 2020 | 62K09 | VariousDistrict 1 | Weed spraying at various locations within District One. | — | Rejected | McGinty Bros., Inc. $694,500 · | ||
| Mar 6, 2020 | 62K11 | VariousDistrict 1 | Repair and installation of guardrail along various expressway and arterial highways. | — | Executed | Northern Contracting, Inc. $1,547,667 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.