Jan 19, 2018 60X59 WillDistrict 1 Intersection improvement and signal installation at the intersection of North Bolingbrook Drive and Royce Road in the Village of Bolingbrook. — Executed Nov 26 New P. T. Ferro Construction Co. $774,315 ·
Jan 19, 2018 61E30 WillDistrict 1 Reconstruct Rathje Road from Joliet Road to Corning Avenue in the Village of Peotone. — Executed Nov 26 New P. T. Ferro Construction Co. $1,623,160 ·
Jan 19, 2018 62D54 CookDuPageWillDistrict 1 Guardrail and traffic barrier terminal removal and replacement on various arterial and expressway routes. — Executed Nov 26 New Kujo, Inc. $537,608 ·
Jan 19, 2018 78592 WilliamsonDistrict 9 8.8 miles of roadway improvement including guardrail and culvert liner on IL 148. — Executed Nov 26 New E. T. Simonds Construction Company $3,348,417 ·
Jan 19, 2018 78616 WilliamsonDistrict 9 Roadway improvement on IL 37 from south of IL 148 to Pulleys Mill. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $214,032 ·
Jan 19, 2018 78621 HamiltonJeffersonWilliamsonDistrict 9 Cleaning and painting portions of 3 structures. — Executed Nov 26 New Thomas Industrial Coatings, Inc. $165,153 ·
Mar 9, 2018 60X10 WillDistrict 1 Interchange reconstruction of I-55 at Weber Road and roadway reconstruction of Weber Road from Normantown Road to Rodeo Drive in the municipalities of Bolingbrook and Romeoville. — Executed Nov 26 New Judlau Contracting, Inc. $47,970,125 ·
Mar 9, 2018 61D22 WillDistrict 1 Reconstruction, resurfacing, bike/ped path, rehabilitate the structure over over Union Ditch and construction of pedestrian structure over Union Ditch, on St. Francis Road from 88th Avenue to 80th Avenue in the Village of Frankfort. — Executed Nov 26 New Iroquois Paving Corporation $3,351,885 ·
Mar 9, 2018 61D47 WillDistrict 1 Reconstruction of Weber Road from Normantown Road to 135th Street in Romeoville. — Executed Nov 26 New R. W. Dunteman Company $20,364,790 ·
Mar 9, 2018 62A95 WillDistrict 1 Culvert replacement on US Route 45/52, approximately 1.4 miles south of US Route 52 in unincorporated Will County. — Executed Nov 26 New Iroquois Paving Corporation $644,048 ·
Mar 9, 2018 62F04 WillDistrict 1 Embankment stabilization along both sides of US 45 between I-80 and the METRA Railroad. — Executed Nov 26 New D. Construction, Inc. $1,115,027 ·
Mar 9, 2018 62F93 WillDistrict 1 Cleaning and painting existing steel structures at various locations in the villages of Monee, Peotone and the city of Joliet. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $524,711 ·
Mar 9, 2018 78580 WilliamsonDistrict 9 0.09 miles of pavement repair of the whitetopping and installation of radar detection equipment at IL 37 and Old IL 13. — Executed Nov 26 New Samron Midwest Contracting, Inc. $95,440 ·
Mar 9, 2018 78628 WilliamsonDistrict 9 Culvert replacement across six lanes of traffic on IL 148, 1.1 miles north of IL 13 near the City of Energy (SN 100-7042). — Executed Nov 26 New Sierra Bravo Contractors, LLC $179,791 ·
Apr 27, 2018 60P55 WillDistrict 1 Local centralized control and operation of the six movable bridges from Ruby Street to Brandon Road in the City of Joliet — Rejected Nov 26 New Meade Inc. $21,260,736 ·
Apr 27, 2018 60V18 WillDistrict 1 Resurfacing and pedestrian ramps on US 30 from Collins Street to I-80 in the City of Joliet. — Executed Nov 26 New D. Construction, Inc. $1,753,921 ·
Apr 27, 2018 61E47 WillDistrict 1 Intersection improvement at West 167th Street and Gougar Road in the City of Lockport. — Executed Nov 26 New D. Construction, Inc. $1,576,688 ·
Apr 27, 2018 62B45 WillDistrict 1 Shoulder widening, milled rumble strips and guardrail replacement on US 52 from Spencer Road to US 45 in the village of Manhattan and unincorporated Will County. — Executed Nov 26 New D. Construction, Inc. $1,555,085 ·
Apr 27, 2018 62D57 WillDistrict 1 Pedestrian ramp improvement on IL 53, IL 113, IL 102 and IL 1 in the cities of Beecher, Wilmington and the Village of Crete. — Executed Nov 26 New D. Construction, Inc. $370,717 ·
Apr 27, 2018 62G06 WillDistrict 1 Repair bridge SN 099-0271 carrying Wolf Road over Hickory Creek in the Village of Mokena. — Executed Nov 26 New D. Construction, Inc. $181,966 ·
Jun 15, 2018 60M88 WillDistrict 1 Repair bridge SN 099-0035 carrying I-55 Frontage Road over the I and M Canal, 1.1 miles south of I-80 in Channahon. — Executed Nov 26 New Austin Tyler Construction, Inc. $454,150 ·
Jun 15, 2018 62F67 WillDistrict 1 3P resurfacing on I-55 East Frontage Road in the cities of Wilmington and Briadwood. — Executed Nov 26 New P. T. Ferro Construction Co. $473,083 ·
Jun 15, 2018 62G24 WillDistrict 1 Repair culvert 099-0922 under US 52 between Doyle Road and Wallingford Trail. — Executed Nov 26 New Iroquois Paving Corporation $43,236 ·
Jun 15, 2018 62G33 WillDistrict 1 Resurfacing on I-80, from Will County line to the Des Plaines River, and on I-55 from the Des Plaines River to Weber Road. — Executed Nov 26 New D. Construction, Inc. $623,122 ·
Jun 15, 2018 78644 JacksonWilliamsonDistrict 9 Centerline crack routing and sealing on IL 13 from Lewis Lane to Greenbriar Road. — Executed Nov 26 New Huff Sealing Corporation $390,736 ·
Jun 15, 2018 99599 WilliamsonDistrict 9 Resurfacing with HMA shoulders and pavment marking on FAS Route 903 (Corinth Road) from the Johnston City limits to Paulton Road. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $1,222,620 ·
Aug 3, 2018 60N87 WillDistrict 1 1.4 miles of reconstruction on I-80 from 1.1 miles west of US 30 to 0.3 miles east ofUS 30; reconstruction of I-80 at US 30 interchange; reconstruction of 0.5 miles of US 30 including re-decking and partial bridge replacement of I-80 over US 30, Metra Railroad and Hickory Creek within the Village of New Lenox. — Executed Nov 26 New D. Construction, Inc. $47,130,620 ·
Aug 3, 2018 62F85 WillDistrict 1 1.3 miles of tree removal, selective clearing, grubbing and tree pruning along US 6 from Haas Road to Spring Meadows Drive in the village of Homer. — Executed Nov 26 New Clean Cut Tree Service, Inc. $92,279 ·
Aug 3, 2018 62G46 WillDistrict 1 Construction of median crossovers just north and south of the structures carrying I-55 over the Burlington Northern Santa Fe Railroad and Grant Creek. — Executed Nov 26 New D. Construction, Inc. $1,854,497 ·
Sep 21, 2018 60V28 WillDistrict 1 Replace bridge 099-0170 carrying Illinois Route 102 over Rayn's Creek with a cast in place, 3 cell culvert, in Wesley Township. — Executed Nov 26 New Austin Tyler Construction, Inc. $1,055,878 ·
Sep 21, 2018 61E00 WillDistrict 1 Reconstruction of Moen Avenue from Mound Road to Larkin Avenue in the Village of Rockdale. — Executed Nov 26 New P. T. Ferro Construction Co. $4,999,401 ·
Sep 21, 2018 78645 JohnsonUnionWilliamsonDistrict 9 Inserting culvert liners at 3 locations: 1) SN 100-7038, located 2 miles NW of I-57 near Neber Road on IL 148 in Williamson County; 2) SN 091-7089 located 0.3 miles north of exit 40 along I-57 in Johnson County; 3) SN 044-7073 located at MP 27.9 along I-57 SB in Union County. — Executed Nov 26 New Samron Midwest Contracting, Inc. $271,925 ·
Nov 9, 2018 46472 DuPageWillDistrict 1 Replacing damaged and deteriorated overhead sign structures, componenets, and supports, described in the schedule of locations. — Executed Nov 26 New Aldridge Electric, Inc. $3,199,710 ·
Nov 9, 2018 61F19 WillDistrict 1 Reconstruction and resurfacing on Sioux Drive and Dove Drive from Sunset Drive to West Eames Street and from Navajo Drive to Sunsewt Drive in the Village of Channahon. — Executed Nov 26 New P. T. Ferro Construction Co. $1,607,993 ·
Nov 9, 2018 62G91 WillDistrict 1 Resurfacing on Blodgett Road from Kelly Road to 1.8 miles east of Kelly Road in Wilmington Township. — Executed Nov 26 New Iroquois Paving Corporation $389,562 ·
Nov 9, 2018 78363 FranklinWilliamsonDistrict 9 Expand approximately 4.4 miles of I-57 to add an additional lane in each direction, install a median barrier, sresurface existing lanes, update pavement markings, upgrade guardrails, and install raised relectors and rumble strip. — Executed Nov 26 New E. T. Simonds Construction Company $14,359,766 ·
Jan 18, 2019 46485 WillDistrict 1 Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings. — Executed Nov 26 New Superior Road Striping, Inc. $371,419 ·
Jan 18, 2019 60M99 WillDistrict 1 Bridge deck repairs and thin polymer overlay of the existing bridge deck of SN 099-0263 carrying US 30 (Cass Street) over Spring Creek in the City of Joliet. — Executed Nov 26 New MYS, Incorporated $88,200 ·
Jan 18, 2019 61F12 WillDistrict 1 Rehabilitate the bridge carrying IL 7 Frontage Road over the Des Plaines River in the City of Lockport. — Rejected Nov 26 New ICC Group Inc. $2,191,000 ·
Jan 18, 2019 62G14 WillDistrict 1 Insatallation of a fiber optic line to provide local centralized control and operation of 6 moveable bridges over the Des Plaines River in Joliet. — Executed Nov 26 New John Burns Construction Company $1,900,000 ·
Jan 18, 2019 62G66 DuPageWillDistrict 1 Installation of seven truss mounted LED dynamic message signs, CCTBV, fiber optic networks and roadside bluetooth detectors at various locations. — Executed Nov 26 New John Burns Construction Company $5,592,292 ·
Jan 18, 2019 62G99 WillDistrict 1 Bridge deck overlay, joint repairs, structural repair of concrete, and drainage repairs on 099-0264 carrying US 30 over WCL RR in Joliet. — Executed Nov 26 New D. Construction, Inc. $1,673,197 ·
Jan 18, 2019 78667 WilliamsonDistrict 9 Bridge repairs and approach work on SN 100-0062 carrying Cambria Rd. over Big Muddy River, 1 mile south of Hurst. — Executed Nov 26 New E. T. Simonds Construction Company $299,154 ·
Jan 18, 2019 99610 WilliamsonDistrict 9 Pavement widening, resurfacing, and water main improvements on East Grand Avenue, from Hofer Road to Hurricane Road in Crainville. — Executed Nov 26 New Samron Midwest Contracting, Inc. $872,797 ·
Mar 8, 2019 60N00 WillDistrict 1 Bridge deck overlay and joint repairs on the bridge carrying US 52 over Forked Creek. — Executed Nov 26 New MYS, Incorporated $301,046 ·
Mar 8, 2019 61F40 WillDistrict 1 Construct an extension of Kings Road from Rodeo Drive to Hassert Boulevard in Bollingbrook. — Executed Nov 26 New K-Five Construction Corporation & Herlihy Mid-Continent Company $7,485,866 ·
Mar 8, 2019 61F44 WillDistrict 1 Replace the bridge carrying TR 68 over Lily Creek, 0.1 mil north of Caton Farm Road in Plainfield Township. — Executed Nov 26 New D. Construction, Inc. $945,717 ·
Mar 8, 2019 61F61 WillDistrict 1 Resurfacing Burville Road from stte Street to IL 394 in the Village of Crete. — Executed Nov 26 New Iroquois Paving Corporation $395,403 ·
Mar 8, 2019 62F49 CookWillDistrict 1 6.45 miles of 3P resurfacing and ADA ramps on IL 43 from north of US 30 to just north of US 6. — Executed Nov 26 New D. Construction, Inc. $5,880,439 ·
Mar 8, 2019 62G98 WillDistrict 1 Removal and replacement of bridge decks of SN 099-0286, 099-0005 and 099-0304 c carrying I-55 over BNSF Railroad and Grant Creek in Wilminton and Channahon Townships. — Executed Nov 26 New D. Construction, Inc. $7,870,946 ·
Mar 8, 2019 62H35 WillDistrict 1 Repairs on SN 099-0056 carrying I-80 over the Des Plaines River in Joliet. — Executed Nov 26 New Lakes & Rivers Contracting, Inc. $847,500 ·
Mar 8, 2019 62H55 WillDistrict 1 9.62 miles of Shoulder rumble strip installation on I-80 at various locations between the Will County line and US 30. — Executed Nov 26 New D. Construction, Inc. $277,857 ·
Mar 8, 2019 62H68 WillDistrict 1 Bridge structural steel repair and bearing replacement of the bridges carrying I-80 over Des Plaines River in Joliet — Executed Nov 26 New ICC Group Inc. $4,978,000 ·
Mar 8, 2019 78637 WilliamsonDistrict 9 Installation of sidewalks, ADA improvements and installation of pedestrian crossing signals on IL 13 from Johnson Street to Railroad Street in Marion. — Executed Nov 26 New Samron Midwest Contracting, Inc. $158,480 ·
Mar 8, 2019 78662 WilliamsonDistrict 9 Joint reconstruction, approach slab and deck slab repairs, waterproofing membrane system, HMA overlays and substructure repairs on SN 100-0032 and SN 100-0033 carrying IL 148 over the Big Muddy River and Pond Creek — Executed Nov 26 New Samron Midwest Contracting, Inc. $497,797 ·
Apr 26, 2019 60R52 WillDistrict 1 Approximately 3 miles of roadway reconstruction, resurfacing, replacement of bridge structures carrying US 6 over Marley Creek, drainage improvement, pavement markings, and aesthetic landscaping from Cedar Rd to Will-Cook Rd in Homer Glen. — Executed Nov 26 New D. Construction, Inc. $14,392,722 ·
Apr 26, 2019 60R74 WillDistrict 1 Bridge deck overlay and bridge joint repair of the bridge carrying IL 50 over rock creek in unincorporated Wilton Township. — Executed Nov 26 New Iroquois Paving Corporation $658,368 ·
Apr 26, 2019 61D48 WillDistrict 1 Construction of a multi-use path and sidewalk replacement algon the west parkway of Farrell Road from Division Street to south of 7th Street in the City of Lockport. — Executed Nov 26 New P. T. Ferro Construction Co. $334,680 ·
Apr 26, 2019 61F64 WillDistrict 1 Reconstruct the intersection of Rodeo Drive at Kings Road in Bolingbrook. — Executed Nov 26 New K-Five Construction Corporation $2,914,616 ·
Apr 26, 2019 61F67 WillDistrict 1 Resurfacing University Parkway from Steger-Monee Road to Western Avenue in the Village of University Park. — Executed Nov 26 New D. Construction, Inc. $583,358 ·
Apr 26, 2019 61F68 WillDistrict 1 Intersection improvement on US 52 at Gougar Road in the Village of Manhattan. — Executed Nov 26 New P. T. Ferro Construction Co. $874,335 ·
Apr 26, 2019 62G97 WillDistrict 1 Jack column retrofitting, repairing bascule girders, modification of center and tail lock, repairing steel grid deck and railings, and painting of Brandon Rd over the Des Plaines River in Joliet. — Executed Nov 26 New D. Construction, Inc. $3,391,575 ·
Apr 26, 2019 62H13 KendallWillDistrict 1 Clean and paint SN 099-0083 carrying US 52 over Hickory Creek in Joliet, and SN 047-0006 carrying IL 31 over BNSF RR in Oswego. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $279,700 ·
Apr 26, 2019 78694 WilliamsonDistrict 9 Single pass microsurfacing, bump removal and fiber-modified asphalt crack sealing on IL 13 eastbound lane from west of Main Street to East Crab Orchard Road. — Executed Nov 26 New Beniach Construction Company, Inc. and Pavement Maintenance Systems, LLC $456,657 ·
Apr 26, 2019 99613 WilliamsonDistrict 9 Resurfacing CH 18 from Stonefort Road to East Boundary Road north of Creal Springs. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $605,762 ·
Jun 14, 2019 46507 LakeWillDistrict 1 Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Lake and Will counties. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $593,000 ·
Jun 14, 2019 61F76 WillDistrict 1 Construction of a multi-use path adjacent to University Parkway from Steger- Monee Road to Western Avenue in the Village of University Park. — Executed Nov 26 New Iroquois Paving Corporation $525,868 ·
Jun 14, 2019 62H11 CookWillDistrict 1 Guardrail end section replacement at various locations in Cook and Will Counties. — Executed Nov 26 New Midwest Fence Corporation $559,277 ·
Jun 14, 2019 62J08 WillDistrict 1 Intermittent pavement resurfacing project located on various state maintained arterial routes. — Executed Nov 26 New P. T. Ferro Construction Co. $425,756 ·
Jun 14, 2019 62J12 CookWillDistrict 1 Intermittent resurfacing on various state maintained expressway routes in Cook and Will counties. — Executed Nov 26 New D. Construction, Inc. $826,171 ·
Jun 14, 2019 66K23 KankakeeWillDistrict 3 Radii widening at the intersection of IL 1 and E 1200N Road at the Kankakee/Will County Line. Includes new foreslopes and ditches and 0.75 mile centerline milling and resurfacing to add rumble strips. — Executed Nov 26 New Iroquois Paving Corporation $148,374 ·
Jun 14, 2019 99620 WilliamsonDistrict 9 Replace the bridge carrying Grassy Road over Little Wolf Creek, located 0.2 miles West of IL 148. — Executed Nov 26 New E. T. Simonds Construction Company $389,831 ·
Jun 14, 2019 99624 WilliamsonDistrict 9 Resurfacing Grassy Road from Spillway Road to West of Caney Branch Lane and resurfacing Spillway Road from Hayton Shcool Road to Grassy Road. — Executed Nov 26 New E. T. Simonds Construction Company $512,791 ·
Jul 12, 2019 62G13 WillDistrict 1 2.73 miles of shoulder widening and milled rumble strips with ditch regrading on IL 53 between Murphey Drive to IL 7 in Romeoville. — Executed Nov 26 New D. Construction, Inc. $1,458,014 ·
Jul 12, 2019 62H93 WillDistrict 1 1.3 miles of resurfacing along IL 50 from Cicero Avenue to Manhattan-Monee Road in Monee Township — Executed Nov 26 New Iroquois Paving Corporation $1,177,820 ·
Jul 12, 2019 78608 FranklinWilliamsonDistrict 9 2.6 miles of resurfacing on IL 148 from Maple Street in Zeigler to 0.8 miles south of Franklin/Williamson County line. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $881,036 ·
Jul 12, 2019 78639 WilliamsonDistrict 9 2.1 miles of resurfacing on Herrin Road from Christmas Tree Road to just east of I-57. — Executed Nov 26 New E. T. Simonds Construction Company $835,539 ·
Jul 12, 2019 78692 WilliamsonDistrict 9 0.8 miles of milling and resurfacing on IL 13 from IL 37 to Fair Street in Marion. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $1,005,135 ·
Aug 2, 2019 61F18 WillDistrict 1 Construction of a multi-use path from McKinley Woods road to IandM Canal and the construction of a pedestrian bridge over the IandM Canal. Project is located along US Route 6 and Bridge Street, beginning west of McKinley Drive and ending east of the IandM Canal at Bridge Street in the Village of Channahon. — Executed Nov 26 New D. Construction, Inc. $734,856 ·
Sep 20, 2019 99631 WilliamsonDistrict 9 Resurfacing Paulton Road from 0.3 miles north of Grant Brick Road to Toledo Road. — Executed Nov 26 New E. T. Simonds Construction Company $477,971 ·
Nov 8, 2019 62K13 WillDistrict 1 Surveillance camera replacement on I-55 (Lorenzo Rd to Joliet Rd) and I-80 (IL 43 to US 30). — Executed Nov 26 New Meade Inc. $482,744 ·
Nov 8, 2019 78636 WilliamsonDistrict 9 Convert existing intersection of Cambria Road and Herrin Road into a roundabout. Includes HMA surface removal, PCC pavement, HMA surfacing and storm sewers. — Executed Nov 26 New E. T. Simonds Construction Company $1,624,828 ·
Nov 8, 2019 78732 JeffersonWilliamsonDistrict 9 Inserting culvert liners at three locations: 1) SN 100-7039 on IL 148 approximately 2 miles northwest of I-57 near Neber Road in Williamson County; 2) SN 041-7075 on IL 15 approximately 0.2 miles west of Shepherd Lane in Jefferson County; 3) SN 041-7076 on IL 15 approximately 0.3 miles east of Shepherd Lane in Jefferson County. — Executed Nov 26 New Samron Midwest Contracting, Inc. $219,125 ·
Jan 17, 2020 61F81 WillDistrict 1 Resurfacing Corning avenue from Rathje Road to IL 50 in the Village of Peotone. — Executed Nov 26 New Iroquois Paving Corporation $476,339 ·
Jan 17, 2020 61F94 WillDistrict 1 Reconstruct and realign the intersection of St. Louis Street at IL 53 in the Village of Elwood. — Executed Nov 26 New P. T. Ferro Construction Co. $2,572,560 ·
Jan 17, 2020 61G21 WillDistrict 1 Replace the bridge carrying Essington Road over Rock Run Creek between Pandola Avenue and Citadel Drive in the City of Joliet. — Executed Nov 26 New Herlihy Mid-Continent Company $2,812,985 ·
Jan 17, 2020 62J42 WillDistrict 1 Removal and replacement of a weigh-in-motion scale, adjacent pavement and shoulder removal and replacement on I-80 at the westbound Frankfort weigh station scale #10. , Removal and replacement of a weigh-in-motion scale, adjacent pavement and shoulder removal and replacement on I-80 at the westbound Frankfort weigh station scale #10. — Executed Nov 26 New D. Construction, Inc. $559,193 ·
Jan 17, 2020 62J60 WillDistrict 1 Bridge deck overlay and joint repairs on IL 113 over I-55 in the City of Braidwood. (SN 099-0151) — Executed Nov 26 New D. Construction, Inc. $822,716 ·
Jan 17, 2020 62K44 CookWillDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-35 The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-355. 325 miles in length. — Rejected Nov 26 New Sewer Rat Contractors, LLC $177,600 ·
Jan 17, 2020 62K45 WillDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kend The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kendall County Line. 240 miles in length. — Rejected Nov 26 New MYS, Incorporated $193,806 ·
Jan 17, 2020 62K48 WillDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 expwy from I-355 to Reed The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 expwy from I-355 to Reed Rd. 180 miles in length. — Rejected Nov 26 New Western Remac, Inc. $345,600 ·
Jan 17, 2020 78506 WilliamsonDistrict 9 Replacement of a three-span bridge with a two-span integral abutment bridge carrying IL 148 over Wolf Creek, 1 mile south of the I-57 interchange. (SN 100-0038) — Executed Nov 26 New E. T. Simonds Construction Company $2,587,670 ·
Jan 17, 2020 78751 WilliamsonDistrict 9 Resurfacing ramps, shoulders and gore areas on I-57 northbound ramps at Exit 53. — Executed Nov 26 New Samron Midwest Contracting, Inc. $197,218 ·
Mar 6, 2020 61F15 WillDistrict 1 Replace the bridge carrying Danne Road over a Branch of Plum Creek, located 0.70 mile east of Klemme Road. — Executed Nov 26 New D. Construction, Inc. $1,359,864 ·
Mar 6, 2020 62H85 CookDuPageWillDistrict 1 This is a safety (HSIP) improvement including guardrail end section replacement and new guardrail installation on various state maintained arterial routes. — Executed Nov 26 New Copenhaver Construction, Inc. $584,674 ·
Mar 6, 2020 62K15 WillDistrict 1 3.2 miles of standard overlay and milled rumble strips on New Avenue from Long Creek to the Cook County line in the City of Lockport. — Executed Nov 26 New P. T. Ferro Construction Co. $1,163,112 ·
Mar 6, 2020 62K16 WillDistrict 1 1.7 miles of standard overlay, ADA improvments and guardrail replacement on IL 126 from the Kendall County line to Wallin Drive in the Village of Plainfield and unincorporated Plainfield Township. — Executed Nov 26 New P. T. Ferro Construction Co. $889,686 ·
Mar 6, 2020 62K32 CookWillDistrict 1 Concrete bridge deck sealing upon the entire top surface of the bridge deck, top of sidewalks, and the inside and top of parapets on structures at various locations. — Executed Nov 26 New M & M Concrete, Inc. $179,824 ·
Mar 6, 2020 78715 WilliamsonDistrict 9 Converting the IL 13 and Aurelia Drive intersection into a restricted crossing U-turn (RCUT) intersection; adding a right turn lane to the eastbound lanes for Aurelia Drive; and resurfacing from Fair Street to the bridges east of Old IL 13. — Executed Nov 26 New E. T. Simonds Construction Company $2,242,850 ·
Mar 6, 2020 78725 WilliamsonDistrict 9 Shallow joint replacement, HMA overlay, waterproofing, substructure repairs, deck and approach slab repairs to SN 100-0029 carrying IL 166 over South Fork Saline Relief, 3.3 miles south of IL 13. — Executed Nov 26 New Samron Midwest Contracting, Inc. $158,444 ·
1–100 of 402Next ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.