15Let jobs
$35,290,565Total low bids
$34,679,894Total estimates
+1.8%Low bids vs estimates
Jun 2011 results
Bid tabs (Excel) ExcelCSV| Let date | Contract | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jun 16, 2011 | 110301SEC1702Y-145B(153)SS | Mccurtain Division 2 |
GRADE, DRAIN, SURFACE , AND BRIDGE SH-3: FROM 4.5 MILES EAST OF THE PUSHMATAHA COUNTY LINE , EXTEND EAST. PROJECT LENGTH = 5.778 MILES · | $11,990,948 | $12,154,401 | THE CUMMINS CONSTRUCTION CO., INC. | +1.4% | 5 |
| Jun 16, 2011 | 110291STPY-132B(071) | Hughes Division 3 |
GRADE, DRAIN, SURFACE , AND BRIDGE US-75: FROM GRAND AVE IN THE CITY OF WETUMKA , EXTEND NORTHEAST . PROJECT LENGTH = 2.727 MILES · | $8,627,410 | $8,521,068 | SEWELL BROS., INC. | -1.2% | 4 |
| Jun 16, 2011 | 110316NHY-017N(057) | Woodward Division 6 |
GRADE, DRAIN, SURFACE , AND BRIDGE SH-3: FROM 3.0 MILES SOUTH OF THE SH -50 JUNCTION, EXTEND SOUTHEAST. PROJECT LENGTH = 1.723 MILES · | $6,069,079 | $5,801,859 | OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV) | -4.4% | 6 |
| Jun 16, 2011 | 110012STP-155B(412)AG | Oklahoma Division 4 |
GRADE, DRAIN, AND SURFACE CITY STREET (15TH STREET): FROM VICKIE DRIVE, EXTEND EAST IN DEL CITY . PROJECT LENGTH = 0.63 MILES · | — | $2,576,117 | SCHWARZ PAVING CO., INC. | 2 | |
| Jun 16, 2011 | 110284SBR-120C(168)SB | Custer Division 5 |
BRIDGE REHABILITATION SH -33: OVER THE WASHITA RIVER AND THE WASHITA OVERFLOW , 5.3 MILES EAST OF THE SH -34 JUNCTION. · | $2,025,233 | $1,519,752 | OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV) | -25.0% | 9 |
| Jun 16, 2011 | 110310BRFY-162B(121) | Pontotoc |
BRIDGE AND APPROACHES SH -99: OVER BOIS D' ARC CREEK, 4.57 MILES SOUTH OF THE SH -3 JUNCTION. PROJECT LENGTH = 0.064 MILES · | $1,170,697 | $1,020,063 | WITTWER CONSTRUCTION CO., INC. | -12.9% | 7 |
| Jun 16, 2011 | 110311SEC117-167B(189)SG | Seminole Division 3 |
INTERSECTION MODIFICATION US -270: FROM 4.5 MILES EAST OF THE SH -99 JUNCTION, EXTEND EAST. PROJECT LENGTH = 0.85 MILES · | $954,413 | $997,641 | THE CUMMINS CONSTRUCTION CO., INC. | +4.5% | 2 |
| Jun 16, 2011 | 110281MC-108C(298) PART 1 | Part 2 |
CADDO, CANADIAN RESURFACE (ASPHALT ) SH-37: FROM THE SH -152 JUNCTION, EXTEND NORTH . PROJECT LENGTH = 5.99 MILES · | $877,149 | $856,409 | HASKELL LEMON CONSTRUCTION CO. | -2.4% | 4 |
| Jun 16, 2011 | 110283BRO-112D(059)CI | Choctaw Division 2 |
BRIDGE AND APPROACHES COUNTY ROAD (EW-206): OVER BOKCHITO CREEK , 4.1 MILES EAST OF THE US-70 JUNCTION. PROJECT LENGTH = 0.265 MILES · | $551,073 | $534,936 | HUB Construction, Inc. | -2.9% | 4 |
| Jun 16, 2011 | 110305STPG-155B(803)AG | Oklahoma Division 4 |
STRIPING AND PAVEMENT MARKING CITY STREETS : AT VARIOUS LOCATIONS IN THE CITY OF EDMOND. · | $573,527 | $497,707 | Direct Traffic Control, Inc. | -13.2% | 2 |
| Jun 16, 2011 | 110277BRO-103D(109)CI | Atoka Division 2 |
GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (NS-394): FROM 1.1 MILES NORTH OF THE SH-131 JUNCTION, EXTEND NORTH . PROJECT LENGTH = 0.245 MILES · | $479,157 | $378,060 | Treas Construction Inc | -21.1% | 7 |
| Jun 16, 2011 | 110312BRFY-169C(190) | Caddo, Carter, Stephens |
BRIDGE JOINT SEAL/REPAIR US-70/US-281/SH-7: AT MULTIPLE LOCATIONS IN DIVISION VII. · | $408,858 | $327,455 | PBX Corporation | -19.9% | 5 |
| Jun 16, 2011 | 110313MC-172N(506) | Mc-172n(507) |
TULSA SOUND BARRIER WALL US -169: PANEL REPLACEMENTS 0.30 MILES NORTH OF 41ST STREET IN THE CITY OF TULSA . · | $125,470 | $105,095 | JLT Contracting, LLC | -16.2% | 1 |
| Jun 16, 2011 | 110307BRO-156D(160)CI | Okmulgee Division 1 |
BRIDGE AND APPROACHES COUNTY ROAD (NS-398): OVER SNAKE CREEK, 0.5 MILES NORTH OF THE SH-16 JUNCTION. PROJECT LENGTH = 0.169 MILES · | $398,314 | — | 7 | ||
| Jun 16, 2011 | 110308BRO-158D(172)CO | Ottawa Division 8 |
BRIDGE AND APPROACHES COUNTY ROAD (NS-460): OVER BEE CREEK, 2.8 MILES SOUTH OF THE US-60 JUNCTION. PROJECT LENGTH = 0.126 MILES · | $428,567 | — | 3 |
1–15 of 15
Source: ODOT bid tabulations for each letting on Contracts and Proposals, read from ODOT's published bid tab reports, including the engineer's estimate. Bid Potato loads new lettings as ODOT posts them and backfills the last two years. Confirm against ODOT's official tabulations.