| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$125,312.50 |
$128,750.00 |
$125,000.00 |
$131,250.00 |
$131,466.98 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 314,512 | CY |
$2.60 |
$4.85 |
$4.89 |
$4.84 |
$4.99 |
$5.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 40,715 | CY |
$5.00 |
$5.00 |
$5.15 |
$5.00 |
$5.25 |
$5.26 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$71,000.00 |
$66,950.00 |
$65,000.00 |
$68,250.00 |
$68,362.83 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 14,950 | LF |
$2.50 |
$2.00 |
$0.8400 |
$0.8000 |
$0.8400 |
$0.8600 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$200.00 |
$251.00 |
$246.19 |
$235.43 |
$247.20 |
$252.66 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 770 | LF |
$7.50 |
$5.00 |
$4.44 |
$4.25 |
$4.46 |
$4.56 |
| 8 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 256 | CY |
$200.00 |
$80.20 |
$64.83 |
$62.00 |
$65.10 |
$66.54 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 611,362 | SY |
$1.10 |
$0.9900 |
$1.00 |
$0.9600 |
$1.00 |
$1.03 |
| 10 | 230(F) 2812 |
WATERING | 24,455 | KGAL |
$6.50 |
$11.00 |
$1.83 |
$1.75 |
$1.84 |
$1.88 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 121 | AC |
$450.00 |
$296.00 |
$221.69 |
$212.00 |
$222.60 |
$227.52 |
| 12 | 234(A) 2824 |
FERTILIZING (10-20-10) | 62 | TON |
$650.00 |
$697.00 |
$413.05 |
$395.00 |
$414.75 |
$423.91 |
| 13 | 234(A) 4409 |
FERTILIZING (18-46-0) | 6 | TON |
$750.00 |
$902.25 |
$927.00 |
$900.00 |
$210.00 |
$214.64 |
| 14 | 241 2832 |
MOWING | 121 | AC |
$65.00 |
$54.15 |
$51.24 |
$49.00 |
$51.45 |
$52.59 |
| 15 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 32,548 | CY |
$26.00 |
$33.65 |
$35.47 |
$33.00 |
$27.40 |
$49.64 |
| 16 | 325 5271 |
SEPARATOR FABRIC | 133,280 | SY |
$1.50 |
$1.50 |
$1.34 |
$1.50 |
$2.28 |
$1.16 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 23,996 | TON |
$20.00 |
$15.25 |
$15.70 |
$16.00 |
$14.56 |
$15.77 |
| 18 | 407(B) 0250 |
TACK COAT | 26,011 | GAL |
$2.50 |
$2.75 |
$3.16 |
$2.50 |
$4.20 |
$4.00 |
| 19 | 408 5774 |
PRIME COAT | 49,657 | GAL |
$3.75 |
$4.70 |
$4.51 |
$2.50 |
$5.77 |
$6.00 |
| 20 | 409(A) 4242 |
FABRIC REINFORCEMENT | 19,511 | SY |
$2.50 |
$2.20 |
$1.27 |
$1.28 |
$1.82 |
$1.72 |
| 21 | 409(B) 4268 |
BITUMINOUS BINDER | 4,878 | GAL |
$3.00 |
$2.00 |
$3.91 |
$5.74 |
$8.49 |
$8.07 |
| 22 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 15,100 | TON |
$64.00 |
$64.35 |
$67.99 |
$70.00 |
$68.25 |
$62.00 |
| 23 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 34,241 | TON |
$62.00 |
$56.90 |
$58.56 |
$68.00 |
$57.75 |
$56.00 |
| 24 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 9,046 | TON |
$72.00 |
$79.35 |
$77.67 |
$80.00 |
$89.25 |
$82.00 |
| 25 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,277 | TON |
$68.00 |
$72.65 |
$63.45 |
$78.00 |
$75.60 |
$74.00 |
| 26 | 412 5267 |
COLD MILLING PAVEMENT | 58,538 | SY |
$2.00 |
$1.65 |
$1.33 |
$1.50 |
$0.8700 |
$1.18 |
| 27 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 123 | CY |
$17.00 |
$10.00 |
$10.30 |
$20.00 |
$21.00 |
$22.72 |
| 28 | 509(A) 0319 |
CLASS AA CONCRETE | 240 | CY |
$450.00 |
$451.15 |
$463.50 |
$575.00 |
$421.85 |
$456.35 |
| 29 | 509(D) 0325 |
CLASS C CONCRETE | 3,867 | CY |
$225.00 |
$190.50 |
$231.75 |
$196.00 |
$182.52 |
$197.46 |
| 30 | 511(A) 0332 |
REINFORCING STEEL | 30,645 | LB |
$0.8500 |
$0.8500 |
$0.8800 |
$0.7500 |
$0.9900 |
$1.07 |
| 31 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 138 | LF |
$70.00 |
$54.10 |
$55.58 |
$53.96 |
$56.66 |
$56.75 |
| 32 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 164 | LF |
$80.00 |
$70.60 |
$72.49 |
$70.38 |
$73.90 |
$74.02 |
| 33 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 286 | LF |
$95.00 |
$93.00 |
$95.54 |
$92.76 |
$97.40 |
$97.56 |
| 34 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 748 | LF |
$105.00 |
$118.00 |
$121.16 |
$117.63 |
$123.50 |
$123.72 |
| 35 | 613(A) 0497 |
54" R.C.PIPE CLASS III | 38 | LF |
$150.00 |
$153.20 |
$157.36 |
$152.78 |
$160.42 |
$160.68 |
| 36 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 811 | LF |
$35.00 |
$30.25 |
$31.06 |
$30.16 |
$31.67 |
$31.72 |
| 37 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 369 | LF |
$40.00 |
$31.00 |
$31.77 |
$30.84 |
$32.38 |
$32.44 |
| 38 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 608 | LF |
$9.00 |
$10.05 |
$10.30 |
$10.00 |
$10.50 |
$10.52 |
| 39 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 202 | LF |
$8.00 |
$9.00 |
$9.27 |
$9.00 |
$9.45 |
$9.47 |
| 40 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$600.00 |
$687.40 |
$706.23 |
$685.66 |
$719.94 |
$721.07 |
| 41 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$700.00 |
$996.45 |
$1,023.76 |
$993.94 |
$1,043.64 |
$1,045.36 |
| 42 | 613(L) 5736 |
42" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$800.00 |
$1,455.00 |
$1,493.97 |
$1,450.46 |
$1,522.98 |
$1,525.50 |
| 43 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 12 | EA |
$1,000.00 |
$1,642.00 |
$1,686.13 |
$1,637.02 |
$1,718.87 |
$1,721.71 |
| 44 | 613(L) 5740 |
54" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,200.00 |
$2,205.00 |
$2,264.07 |
$2,198.12 |
$2,308.00 |
$2,311.84 |
| 45 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 38 | EA |
$600.00 |
$902.25 |
$1,133.00 |
$831.00 |
$881.16 |
$953.24 |
| 46 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 3 | EA |
$700.00 |
$501.25 |
$515.00 |
$500.00 |
$526.85 |
$569.94 |
| 47 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 1,182 | CY |
$25.00 |
$15.30 |
$15.70 |
$15.24 |
$16.00 |
$16.03 |
| 48 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 180 | CY |
$26.00 |
$24.30 |
$24.98 |
$24.25 |
$25.46 |
$25.50 |
| 49 | 613(V) 1180 |
TRENCH EXCAVATION | 1,596 | CY |
$16.00 |
$4.55 |
$4.65 |
$4.51 |
$4.74 |
$4.74 |
| 50 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$5,013.00 |
$5,150.00 |
$5,000.00 |
$5,250.00 |
$5,258.68 |
| 51 | 619(B) 0291 |
REMOVAL OF HEADWALL | 9 | EA |
$500.00 |
$902.25 |
$927.00 |
$765.00 |
$840.00 |
$1,577.60 |
| 52 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 58,061 | SY |
$3.50 |
$1.10 |
$2.84 |
$4.50 |
$3.76 |
$3.92 |
| 53 | 619(C) 0924 |
SAWING PAVEMENT | 55,066 | LF |
$3.00 |
$1.00 |
$1.89 |
$0.0100 |
$2.10 |
$1.05 |
| 54 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,063 | LF |
$16.00 |
$15.50 |
$14.58 |
$14.16 |
$14.70 |
$14.89 |
| 55 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 6 | EA |
$2,000.00 |
$2,507.00 |
$1,895.20 |
$1,840.00 |
$1,916.25 |
$1,935.19 |
| 56 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$1,700.00 |
$1,584.00 |
$1,308.10 |
$1,270.00 |
$1,312.50 |
$1,335.71 |
| 57 | 624(A) 4281 |
FENCE-STYLE WWF | 215 | LF |
$4.50 |
$3.81 |
$7.73 |
$3.80 |
$3.99 |
$7.89 |
| 58 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 3,880 | LF |
$4.50 |
$3.50 |
$4.12 |
$3.48 |
$3.65 |
$4.21 |
| 59 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 4 | EA |
$80.00 |
$65.15 |
$66.95 |
$65.00 |
$68.25 |
$68.36 |
| 60 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$120.00 |
$100.25 |
$103.00 |
$100.00 |
$105.00 |
$105.17 |
| 61 | 629(C) 4960 |
MAILBOX | 6 | EA |
$25.00 |
$20.05 |
$20.60 |
$20.00 |
$21.00 |
$21.04 |
| 62 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 5 | EA |
$20.00 |
$10.05 |
$10.30 |
$10.00 |
$10.50 |
$10.52 |
| 63 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 31 | EA |
$7.50 |
$25.05 |
$25.75 |
$25.00 |
$26.25 |
$26.29 |
| 64 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$17.50 |
$10.05 |
$10.30 |
$10.00 |
$21.00 |
$22.72 |
| 65 | 501(G) 6309 |
CLSM BACKFILL | 186.4 | CY |
$100.00 |
$125.35 |
$128.75 |
$125.00 |
$127.00 |
$137.38 |
| 66 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 656 | LF |
$180.00 |
$195.50 |
$200.85 |
$195.00 |
$199.30 |
$215.60 |
| 67 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$155.00 |
$150.40 |
$154.50 |
$150.00 |
$120.20 |
$130.03 |
| 68 | 504(B) 1305 |
SAW-CUT GROOVING | 1,007.5 | SY |
$4.50 |
$9.05 |
$9.27 |
$9.00 |
$4.25 |
$5.26 |
| 69 | 504(C) 6250 |
SEALED EXPANSION JOINT | 43.17 | LF |
$220.00 |
$250.65 |
$257.50 |
$250.00 |
$294.21 |
$318.28 |
| 70 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 453.4 | LF |
$55.00 |
$65.20 |
$66.95 |
$65.00 |
$50.13 |
$54.23 |
| 71 | 506(A) 1322 |
STRUCTURAL STEEL | 1,340 | LB |
$1.65 |
$2.25 |
$2.32 |
$2.25 |
$2.00 |
$2.16 |
| 72 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,885.00 |
$1,955.00 |
$2,008.50 |
$1,950.00 |
$2,250.00 |
$2,434.19 |
| 73 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,895.00 |
$1,955.00 |
$2,008.50 |
$1,950.00 |
$2,250.00 |
$2,434.19 |
| 74 | 509(A) 1326 |
CLASS AA CONCRETE | 190.2 | CY |
$400.00 |
$451.15 |
$463.50 |
$450.00 |
$369.50 |
$420.69 |
| 75 | 509(B) 1328 |
CLASS A CONCRETE | 157.6 | CY |
$395.00 |
$451.15 |
$463.50 |
$450.00 |
$394.50 |
$426.74 |
| 76 | 511(A) 1332 |
REINFORCING STEEL | 760 | LB |
$0.8500 |
$0.8500 |
$0.8800 |
$0.8500 |
$1.58 |
$1.71 |
| 77 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 72,800 | LB |
$0.9500 |
$1.00 |
$1.03 |
$1.00 |
$0.9900 |
$1.07 |
| 78 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 807 | SY |
$3.50 |
$4.00 |
$4.12 |
$4.00 |
$3.41 |
$5.26 |
| 79 | 516(A) 6089 |
DRILLED SHAFTS 18" DIAMETER | 88 | LF |
$250.00 |
$190.50 |
$195.70 |
$190.00 |
$209.11 |
$226.21 |
| 80 | 516(A) 6091 |
DRILLED SHAFTS 30" DIAMETER | 148 | LF |
$320.00 |
$326.00 |
$334.75 |
$325.00 |
$286.15 |
$309.55 |
| 81 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 62 | LF |
$700.00 |
$527.00 |
$540.75 |
$525.00 |
$728.86 |
$788.48 |
| 82 | 523(A) 6550 |
SEALER CRACK PREPARATION | 170 | LF |
$4.50 |
$4.00 |
$4.12 |
$4.00 |
$5.04 |
$4.21 |
| 83 | 523(B) 6560 |
SEALER RESIN | 1.2 | GAL |
$120.00 |
$100.25 |
$103.00 |
$100.00 |
$210.00 |
$131.47 |
| 84 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 490 | TON |
$35.00 |
$35.10 |
$36.05 |
$35.00 |
$32.97 |
$35.67 |
| 85 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 90 | TON |
$30.00 |
$30.10 |
$30.90 |
$30.00 |
$24.72 |
$26.74 |
| 86 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 86 | LF |
$6.50 |
$20.05 |
$20.60 |
$20.00 |
$26.57 |
$28.74 |
| 87 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 36 | LF |
$6.50 |
$20.05 |
$20.60 |
$20.00 |
$26.57 |
$28.74 |
| 88 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$32,000.00 |
$35,100.00 |
$36,050.00 |
$35,000.00 |
$121,000.00 |
$22,717.49 |
| 89 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,060 | CY |
$5.75 |
$5.00 |
$5.15 |
$2.00 |
$8.40 |
$9.10 |
| 90 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 145 | CY |
$18.50 |
$20.05 |
$20.60 |
$20.00 |
$15.75 |
$17.09 |
| 91 | 509(A) 1326 |
CLASS AA CONCRETE | 397.7 | CY |
$400.00 |
$326.00 |
$346.78 |
$370.00 |
$316.85 |
$342.76 |
| 92 | 511(A) 1332 |
REINFORCING STEEL | 48,420 | LB |
$0.8500 |
$0.8500 |
$0.8800 |
$0.7500 |
$0.8900 |
$0.9700 |
| 93 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$12,500.00 |
$8,525.00 |
$8,755.00 |
$3,500.00 |
$10,500.00 |
$11,358.75 |
| 94 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 37,600 | LF |
$0.1300 |
$0.1000 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.1100 |
| 95 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 470 | EA |
$0.6200 |
$1.00 |
$1.07 |
$1.00 |
$1.05 |
$1.05 |
| 96 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,900 | LF |
$0.1200 |
$0.5500 |
$0.5900 |
$0.5500 |
$0.5800 |
$0.5800 |
| 97 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 1,800 | SD |
$11.69 |
$3.05 |
$3.22 |
$3.00 |
$3.15 |
$3.16 |
| 98 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 24,300 | SD |
$0.2200 |
$0.1500 |
$0.1600 |
$0.1500 |
$0.1600 |
$0.1600 |
| 99 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 13,050 | SD |
$0.5400 |
$0.2000 |
$0.2100 |
$0.2000 |
$0.2100 |
$0.2100 |
| 100 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 12,600 | SD |
$0.8600 |
$1.00 |
$1.07 |
$1.00 |
$1.05 |
$1.05 |
| 101 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 14,850 | SD |
$0.4700 |
$0.2500 |
$0.2700 |
$0.2500 |
$0.2600 |
$0.2600 |
| 102 | 880(C) 8848 |
WING BARRICADES | 900 | SD |
$0.9200 |
$1.00 |
$1.07 |
$1.00 |
$1.05 |
$1.05 |
| 103 | 880(D) 8854 |
VERTICAL PANELS | 25,650 | SD |
$0.0500 |
$0.1000 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.1100 |
| 104 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 28,800 | SD |
$0.1000 |
$0.2000 |
$0.2100 |
$0.2000 |
$0.2100 |
$0.2100 |
| 105 | 880(F) 8878 |
DRUMS | 108,000 | SD |
$0.1000 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0500 |
| 106 | 880(G) 8890 |
CHANNELIZER CONES | 101,700 | SD |
$0.1200 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0500 |
| 107 | 804(A) 2915 |
STRUCTURAL CONCRETE | 1.5 | CY |
$474.32 |
$401.00 |
$429.00 |
$400.00 |
$420.00 |
$420.69 |
| 108 | 804(B) 2916 |
REINFORCING STEEL | 216 | LB |
$1.44 |
$2.00 |
$2.14 |
$2.00 |
$2.10 |
$2.10 |
| 109 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$186.91 |
$501.25 |
$536.26 |
$500.00 |
$525.00 |
$525.87 |
| 110 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 270.95 | SF |
$14.60 |
$15.55 |
$16.62 |
$15.50 |
$16.28 |
$16.30 |
| 111 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 26 | LF |
$18.62 |
$24.10 |
$2,362.56 |
$24.00 |
$25.20 |
$25.24 |
| 112 | 851(B) 3219 |
3 1/2"@9.11 GALV.STEEL PIPE POST | 57 | LF |
$19.00 |
$26.10 |
$494.14 |
$26.00 |
$27.30 |
$27.35 |
| 113 | 851(C) 8324 |
2" SQUARE TUBE POST | 394 | LF |
$6.76 |
$9.05 |
$9.65 |
$9.00 |
$9.45 |
$9.47 |
| 114 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 121,397 | LF |
$0.4400 |
$0.3500 |
$0.3800 |
$0.3500 |
$0.3700 |
$0.3700 |
| 115 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$151,700.00 |
$71,405.00 |
$113,452.75 |
$71,225.00 |
$74,800.00 |
$125,000.00 |
| 116 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$12,360.00 |
$1,545.00 |
$4,500.00 |
$5,250.00 |
$5,000.00 |
| 117 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$7,210.00 |
$37,544.32 |
$15,000.00 |
$21,000.00 |
$2,500.00 |
| 118 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$550,000.00 |
$292,005.00 |
$391,483.59 |
$461,800.00 |
$570,000.00 |
$250,000.00 |