| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$12,000.00 |
$5,000.00 |
$10,000.00 |
$6,000.00 |
$12,500.00 |
$30,000.00 |
$50,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$42,000.00 |
$32,000.00 |
$26,000.00 |
$33,500.00 |
$35,054.00 |
$47,500.00 |
$60,000.00 |
$50,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,700 | LF |
$2.00 |
$2.00 |
$3.00 |
$1.40 |
$1.55 |
$2.00 |
$1.80 |
$3.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 250 | LF |
$6.00 |
$7.00 |
$6.00 |
$4.00 |
$9.75 |
$7.00 |
$10.00 |
$10.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 5,500 | SY |
$2.00 |
$1.60 |
$2.00 |
$1.50 |
$1.38 |
$1.80 |
$1.50 |
$2.00 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 2 | AC |
$500.00 |
$500.00 |
$300.00 |
$150.00 |
$590.00 |
$500.00 |
$600.00 |
$1,500.00 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 700 | TON |
$35.00 |
$19.15 |
$25.00 |
$23.65 |
$22.50 |
$25.00 |
$30.00 |
$50.00 |
| 8 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$300.00 |
$295.00 |
$200.00 |
$250.00 |
$350.00 |
$220.00 |
$200.00 |
$400.00 |
| 9 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 240 | TON |
$40.00 |
$32.75 |
$35.00 |
$34.25 |
$37.00 |
$36.00 |
$45.00 |
$125.00 |
| 10 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 439 | SY |
$4.50 |
$4.00 |
$30.00 |
$3.00 |
$3.00 |
$3.25 |
$50.00 |
$3.00 |
| 11 | 613(B) 0696 |
60" CORR. GALV. STEEL PIPE | 210 | LF |
$60.00 |
$72.00 |
$75.00 |
$125.00 |
$73.25 |
$110.00 |
$70.00 |
$100.00 |
| 12 | 613(C) 5221 |
35" X 24" PRECOATED CORR. STL. PIPE ARCH | 68 | LF |
$50.00 |
$46.00 |
$45.00 |
$80.00 |
$40.50 |
$56.00 |
$45.00 |
$100.00 |
| 13 | 613(C) 5285 |
57" X 38" PRECOATED CORR. STL. PIPE ARCH | 92 | LF |
$80.00 |
$100.00 |
$90.00 |
$160.00 |
$80.75 |
$110.00 |
$100.00 |
$150.00 |
| 14 | 613(L) 4522 |
35" X 24" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$300.00 |
$350.00 |
$275.00 |
$300.00 |
$425.00 |
$620.00 |
$225.00 |
$2,000.00 |
| 15 | 613(L) 4544 |
57" X 38" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$400.00 |
$1,200.00 |
$900.00 |
$950.00 |
$1,000.00 |
$1,200.00 |
$1,000.00 |
$2,000.00 |
| 16 | 613(L) 5742 |
60" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,000.00 |
$1,800.00 |
$1,800.00 |
$1,800.00 |
$2,000.00 |
$2,040.00 |
$2,000.00 |
$2,500.00 |
| 17 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$10.00 |
$7.00 |
$10.00 |
$6.00 |
$26.00 |
$10.00 |
$10.00 |
$8.00 |
| 18 | 501(G) 6309 |
CLSM BACKFILL | 88 | CY |
$150.00 |
$122.00 |
$125.00 |
$125.00 |
$125.00 |
$110.00 |
$160.00 |
$100.00 |
| 19 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 269 | LF |
$200.00 |
$220.00 |
$218.00 |
$215.00 |
$232.00 |
$238.00 |
$220.00 |
$300.00 |
| 20 | 504(C) 6250 |
SEALED EXPANSION JOINT | 29.17 | LF |
$250.00 |
$225.00 |
$250.00 |
$240.00 |
$350.00 |
$265.00 |
$340.00 |
$200.00 |
| 21 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 246.4 | LF |
$60.00 |
$53.00 |
$65.00 |
$60.00 |
$60.00 |
$70.00 |
$55.00 |
$80.00 |
| 22 | 506(A) 1322 |
STRUCTURAL STEEL | 600 | LB |
$3.00 |
$2.90 |
$2.00 |
$1.75 |
$3.75 |
$3.50 |
$2.50 |
$5.00 |
| 23 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$2,000.00 |
$750.00 |
$625.00 |
$1,300.00 |
$1,250.00 |
$1,000.00 |
$700.00 |
$150.00 |
| 24 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$2,000.00 |
$750.00 |
$625.00 |
$1,300.00 |
$1,250.00 |
$1,000.00 |
$700.00 |
$150.00 |
| 25 | 509(A) 1326 |
CLASS AA CONCRETE | 71.9 | CY |
$450.00 |
$400.00 |
$400.00 |
$445.00 |
$515.00 |
$500.00 |
$400.00 |
$700.00 |
| 26 | 509(B) 1328 |
CLASS A CONCRETE | 70.4 | CY |
$450.00 |
$390.00 |
$400.00 |
$465.00 |
$515.00 |
$475.00 |
$400.00 |
$400.00 |
| 27 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 23,650 | LB |
$1.50 |
$0.9100 |
$0.9700 |
$0.9300 |
$1.10 |
$1.25 |
$1.00 |
$1.20 |
| 28 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 630 | LF |
$40.00 |
$23.75 |
$35.00 |
$27.00 |
$30.00 |
$30.00 |
$25.00 |
$40.00 |
| 29 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 630 | LF |
$10.00 |
$10.00 |
$10.00 |
$11.00 |
$16.00 |
$11.00 |
$10.00 |
$60.00 |
| 30 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 460 | TON |
$40.00 |
$32.75 |
$35.00 |
$32.25 |
$36.25 |
$36.00 |
$45.00 |
$100.00 |
| 31 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 567 | SY |
$5.00 |
$4.00 |
$30.00 |
$3.00 |
$3.50 |
$3.25 |
$45.00 |
$1.00 |
| 32 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$3,000.00 |
$5,000.00 |
$3,800.00 |
$3,000.00 |
$5,000.00 |
$3,000.00 |
$30,000.00 |
| 33 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,500.00 |
$2,050.00 |
$2,200.00 |
$2,250.00 |
$2,220.00 |
$2,300.00 |
$2,500.00 |
$2,500.00 |
| 34 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,200.00 |
$3,500.00 |
$2,550.00 |
$2,445.00 |
$5,000.00 |
$4,200.00 |
$5,000.00 |
| 35 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$4,400.00 |
$3,000.00 |
$4,900.00 |
$7,000.00 |
$5,000.00 |
$6,000.00 |
$3,000.00 |
| 36 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,000.00 |
$4,000.00 |
$1,500.00 |
$2,500.00 |
$3,500.00 |
$2,000.00 |
$1,000.00 |
$1,000.00 |
| 37 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$20,000.00 |
$17,500.00 |
$10,000.00 |
$17,000.00 |
$29,500.00 |
$21,500.00 |
$30,000.00 |
$32,500.00 |