Bid tab 110310

Let Jun 16, 2011 · · Pontotoc Sign up free

‹ Jun 2011 results

BRIDGE AND APPROACHES SH -99: OVER BOIS D' ARC CREEK, 4.57 MILES SOUTH OF THE SH -3 JUNCTION. PROJECT LENGTH = 0.064 MILES

Let date
Thursday, June 16, 2011
Contract
110310
J/P numbers
21843(04)
District
County
Pontotoc
Highway
Limits
BRIDGE AND APPROACHES SH -99: OVER BOIS D' ARC CREEK, 4.57 MILES SOUTH OF THE SH -3 JUNCTION. PROJECT LENGTH = 0.064 MILES
Project number
BRFY-162B(121)

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,170,697
1 WITTWER CONSTRUCTION CO., INC. Low bidder $1,020,063 -12.9%
2 OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV) $1,033,560 -11.7% +1.3%
3 C-GAWF CONSTRUCTION, INC. $1,046,646 -10.6% +2.6%
4 SEWELL BROS., INC. $1,146,591 -2.1% +12.4%
5 Redlands Contracting, LLC $1,245,325 +6.4% +22.1%
6 EARTH BUILDERS, L.P. $1,288,189 +10.0% +26.3%
7 Cimarron Construction Company, LLC $1,497,334 +27.9% +46.8%

Bid tab: unit prices 58 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 WITTWER CONSTRU…#2 OBC, INC./PLAIN…#3 C-GAWF CONSTRUC…#4 SEWELL BROS., I…#5 Redlands Contra…#6 EARTH BUILDERS,…#7 Cimarron Constr…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $10,000.00 $7,300.00 $4,590.00 $5,500.00 $5,000.00 $38,000.00 $20,000.00 $17,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION3,441CY $4.00 $3.00 $8.11 $7.00 $7.50 $7.70 $10.00 $8.00
3202(C) 0182 ROCK EXCAVATION1,042CY $10.00 $29.00 $39.43 $40.00 $10.00 $15.50 $15.00 $16.00
4202(D) 0184 UNCLASSIFIED BORROW4,039CY $7.00 $10.00 $8.11 $8.00 $7.50 $9.90 $10.00 $10.00
5205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $10,000.00 $20,000.00 $4,278.90 $6,100.00 $2,500.00 $11,000.00 $5,000.00 $10,000.00
6221(C) 2801 TEMPORARY SILT FENCE1,190LF $2.00 $1.50 $1.28 $2.00 $2.00 $2.00 $2.00 $1.80
7221(F) 0100 TEMPORARY SILT DIKE120LF $7.50 $7.00 $7.80 $6.00 $12.00 $12.00 $12.00 $11.00
8221(G) 0153 TEMPORARY ROCK FILTER DAM TYPE 4111CY $400.00 $50.00 $48.00 $50.00 $80.00 $75.00 $85.00 $75.00
9230(A) 2806 SOLID SLAB SODDING6,328SY $1.80 $1.19 $1.20 $1.55 $1.28 $1.35 $1.25 $1.50
10233(A) 2817 VEGETATIVE MULCHING1AC $500.00 $250.00 $738.12 $300.00 $750.00 $800.00 $800.00 $725.00
11241 2832 MOWING5.5AC $50.00 $50.00 $90.24 $90.00 $90.00 $90.00 $125.00 $90.00
12307(D) 4230 LIME90TON $145.00 $95.00 $158.91 $1.40 $155.00 $190.00 $150.00 $200.00
13307(H) 4270 LIME STABILIZED SUBGRADE3,776SY $3.50 $2.50 $3.57 $0.5000 $2.50 $6.00 $5.00 $5.00
14402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E19TON $20.00 $25.00 $30.60 $25.00 $37.00 $100.00 $50.00 $32.00
15407(A) 4659 FOG SEAL60GAL $10.00 $5.10 $5.10 $5.50 $5.50 $5.50 $10.00 $6.00
16407(B) 0250 TACK COAT679GAL $3.00 $3.42 $3.42 $3.70 $3.50 $3.60 $5.00 $4.50
17408 5774 PRIME COAT825GAL $4.00 $5.46 $5.46 $5.50 $5.50 $5.50 $7.00 $7.00
18411(B) 5940 SUPERPAVE, TYPE S3(PG 70-28 OK)135TON $75.00 $94.10 $94.09 $101.00 $102.00 $96.86 $100.00 $123.00
19411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)1,285TON $68.00 $69.87 $69.88 $75.00 $75.00 $71.93 $75.00 $91.00
20411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)146TON $95.00 $97.72 $97.72 $105.00 $105.00 $100.59 $100.00 $128.00
21411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)306TON $85.00 $95.78 $95.78 $103.00 $104.00 $98.60 $100.00 $125.00
22412 5267 COLD MILLING PAVEMENT590SY $15.00 $11.22 $11.22 $11.00 $12.00 $12.00 $15.00 $14.00
23509(D) 0325 CLASS C CONCRETE20CY $270.00 $225.00 $304.06 $220.00 $250.00 $300.00 $400.00 $300.00
24613(B) 4819 96" CORR. GALV. STEEL PIPE256LF $110.00 $110.00 $159.90 $115.00 $175.00 $55.00 $200.00 $220.00
25619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $3,000.00 $1,500.00 $5,814.00 $4,000.00 $1,500.00 $10,000.00 $20,000.00 $20,000.00
26619(B) 4728 REMOVAL OF ASPHALT PAVEMENT2,833SY $3.00 $2.30 $2.30 $2.50 $2.50 $2.25 $3.00 $3.00
27619(C) 0924 SAWING PAVEMENT411LF $4.00 $3.00 $3.00 $3.40 $5.00 $3.10 $2.00 $4.00
28624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)618LF $4.00 $3.16 $6.94 $8.00 $5.00 $10.00 $5.00 $9.00
29629(A) 4958 MAILBOX INSTALLATION-SINGLE3EA $100.00 $71.40 $91.80 $100.00 $75.00 $95.40 $90.00 $120.00
30629(C) 4960 MAILBOX3EA $50.00 $25.50 $56.10 $55.00 $30.00 $58.30 $55.00 $70.00
31629(D) 4961 REMOVAL OF MAILBOX INSTALLATION3EA $25.00 $10.20 $102.00 $55.00 $15.00 $500.00 $10.00 $125.00
32805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS2EA $150.00 $112.20 $306.00 $300.00 $120.00 $318.00 $350.00 $400.00
33855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)1,976LF $0.5000 $1.43 $1.53 $1.60 $1.50 $1.59 $2.00 $2.00
34857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)2,800LF $0.2000 $0.3700 $0.4600 $0.5000 $0.4000 $0.4800 $0.5000 $0.6000
35857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)500LF $0.5000 $0.7100 $1.02 $1.10 $0.7200 $1.06 $1.00 $1.35
36857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-140EA $1.00 $1.02 $1.02 $1.10 $1.05 $1.06 $1.00 $1.35
37857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)1,000LF $0.2500 $0.2600 $0.5600 $0.6000 $0.2700 $0.5800 $0.7000 $0.7500
38871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.100SD $3.00 $41.82 $5.10 $5.50 $42.00 $5.30 $5.00 $7.00
39877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER460LF $20.00 $17.00 $15.30 $37.00 $25.00 $10.00 $25.00 $53.00
40880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF1,200SD $0.3000 $0.0200 $0.5100 $0.5500 $0.0400 $0.5300 $0.5000 $0.7000
41880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF840SD $0.5000 $0.5100 $1.02 $1.10 $0.5200 $1.06 $1.00 $1.35
42880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF120SD $1.00 $3.06 $3.06 $3.30 $3.10 $3.18 $3.00 $4.00
43880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)240SD $1.00 $1.53 $3.06 $3.30 $1.60 $3.18 $3.00 $4.00
44880(C) 8848 WING BARRICADES240SD $1.00 $0.6100 $2.04 $2.20 $0.6400 $2.12 $2.00 $2.70
45880(D) 8854 VERTICAL PANELS1,200SD $0.2000 $0.0200 $0.5100 $0.5500 $0.0400 $0.5300 $0.7500 $0.7000
46880(E) 8860 WARNING LIGHTS(TYPE A)1,080SD $0.1000 $0.3100 $0.3600 $0.4000 $0.3200 $0.3700 $0.5000 $0.5000
47880(F) 8878 DRUMS1,140SD $0.1500 $0.2600 $0.5600 $0.6000 $0.2700 $0.5800 $0.7500 $0.7500
48880(G) 8890 CHANNELIZER CONES300SD $0.2000 $0.0300 $0.5600 $0.6000 $0.0600 $0.5800 $0.7500 $0.7500
49882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN120SD $12.00 $30.60 $25.50 $27.00 $32.00 $26.50 $50.00 $35.00
50642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $17,000.00 $3,825.00 $5,280.00 $6,500.00 $5,280.00 $7,500.00 $10,000.00 $9,000.00
51220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $2,000.00 $1,200.00 $2,000.00 $1,500.00 $3,500.00 $5,000.00 $7,000.00
52641 1399 MOBILIZATION1LSUM $110,000.00 $46,300.00 $32,066.00 $40,000.00 $35,000.00 $75,000.00 $50,000.00 $20,750.00
53202(A) 1301 UNCLASSIFIED EXCAVATION2,880CY $4.00 $1.00 $5.40 $5.00 $7.50 $10.00 $10.00 $10.00
54202(C) 0182 ROCK EXCAVATION2,880CY $10.00 $29.00 $15.00 $40.00 $10.00 $15.50 $15.00 $19.00
55501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED592CY $10.00 $29.00 $16.20 $40.00 $7.50 $20.00 $10.00 $22.00
56509(A) 1326 CLASS AA CONCRETE1,124.7CY $400.00 $300.00 $287.00 $270.00 $375.00 $395.00 $388.00 $545.00
57511(A) 1332 REINFORCING STEEL210,890LB $0.8300 $0.7000 $0.8800 $0.7100 $1.00 $0.8500 $1.00 $1.00
58619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $30,000.00 $10,000.00 $15,750.00 $5,000.00 $35,000.00 $25,000.00 $30,000.00 $18,000.00