| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$7,300.00 |
$4,590.00 |
$5,500.00 |
$5,000.00 |
$38,000.00 |
$20,000.00 |
$17,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,441 | CY |
$4.00 |
$3.00 |
$8.11 |
$7.00 |
$7.50 |
$7.70 |
$10.00 |
$8.00 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 1,042 | CY |
$10.00 |
$29.00 |
$39.43 |
$40.00 |
$10.00 |
$15.50 |
$15.00 |
$16.00 |
| 4 | 202(D) 0184 |
UNCLASSIFIED BORROW | 4,039 | CY |
$7.00 |
$10.00 |
$8.11 |
$8.00 |
$7.50 |
$9.90 |
$10.00 |
$10.00 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$20,000.00 |
$4,278.90 |
$6,100.00 |
$2,500.00 |
$11,000.00 |
$5,000.00 |
$10,000.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,190 | LF |
$2.00 |
$1.50 |
$1.28 |
$2.00 |
$2.00 |
$2.00 |
$2.00 |
$1.80 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 120 | LF |
$7.50 |
$7.00 |
$7.80 |
$6.00 |
$12.00 |
$12.00 |
$12.00 |
$11.00 |
| 8 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 111 | CY |
$400.00 |
$50.00 |
$48.00 |
$50.00 |
$80.00 |
$75.00 |
$85.00 |
$75.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 6,328 | SY |
$1.80 |
$1.19 |
$1.20 |
$1.55 |
$1.28 |
$1.35 |
$1.25 |
$1.50 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 1 | AC |
$500.00 |
$250.00 |
$738.12 |
$300.00 |
$750.00 |
$800.00 |
$800.00 |
$725.00 |
| 11 | 241 2832 |
MOWING | 5.5 | AC |
$50.00 |
$50.00 |
$90.24 |
$90.00 |
$90.00 |
$90.00 |
$125.00 |
$90.00 |
| 12 | 307(D) 4230 |
LIME | 90 | TON |
$145.00 |
$95.00 |
$158.91 |
$1.40 |
$155.00 |
$190.00 |
$150.00 |
$200.00 |
| 13 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 3,776 | SY |
$3.50 |
$2.50 |
$3.57 |
$0.5000 |
$2.50 |
$6.00 |
$5.00 |
$5.00 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 19 | TON |
$20.00 |
$25.00 |
$30.60 |
$25.00 |
$37.00 |
$100.00 |
$50.00 |
$32.00 |
| 15 | 407(A) 4659 |
FOG SEAL | 60 | GAL |
$10.00 |
$5.10 |
$5.10 |
$5.50 |
$5.50 |
$5.50 |
$10.00 |
$6.00 |
| 16 | 407(B) 0250 |
TACK COAT | 679 | GAL |
$3.00 |
$3.42 |
$3.42 |
$3.70 |
$3.50 |
$3.60 |
$5.00 |
$4.50 |
| 17 | 408 5774 |
PRIME COAT | 825 | GAL |
$4.00 |
$5.46 |
$5.46 |
$5.50 |
$5.50 |
$5.50 |
$7.00 |
$7.00 |
| 18 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 135 | TON |
$75.00 |
$94.10 |
$94.09 |
$101.00 |
$102.00 |
$96.86 |
$100.00 |
$123.00 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,285 | TON |
$68.00 |
$69.87 |
$69.88 |
$75.00 |
$75.00 |
$71.93 |
$75.00 |
$91.00 |
| 20 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 146 | TON |
$95.00 |
$97.72 |
$97.72 |
$105.00 |
$105.00 |
$100.59 |
$100.00 |
$128.00 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 306 | TON |
$85.00 |
$95.78 |
$95.78 |
$103.00 |
$104.00 |
$98.60 |
$100.00 |
$125.00 |
| 22 | 412 5267 |
COLD MILLING PAVEMENT | 590 | SY |
$15.00 |
$11.22 |
$11.22 |
$11.00 |
$12.00 |
$12.00 |
$15.00 |
$14.00 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$270.00 |
$225.00 |
$304.06 |
$220.00 |
$250.00 |
$300.00 |
$400.00 |
$300.00 |
| 24 | 613(B) 4819 |
96" CORR. GALV. STEEL PIPE | 256 | LF |
$110.00 |
$110.00 |
$159.90 |
$115.00 |
$175.00 |
$55.00 |
$200.00 |
$220.00 |
| 25 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$3,000.00 |
$1,500.00 |
$5,814.00 |
$4,000.00 |
$1,500.00 |
$10,000.00 |
$20,000.00 |
$20,000.00 |
| 26 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,833 | SY |
$3.00 |
$2.30 |
$2.30 |
$2.50 |
$2.50 |
$2.25 |
$3.00 |
$3.00 |
| 27 | 619(C) 0924 |
SAWING PAVEMENT | 411 | LF |
$4.00 |
$3.00 |
$3.00 |
$3.40 |
$5.00 |
$3.10 |
$2.00 |
$4.00 |
| 28 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 618 | LF |
$4.00 |
$3.16 |
$6.94 |
$8.00 |
$5.00 |
$10.00 |
$5.00 |
$9.00 |
| 29 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 3 | EA |
$100.00 |
$71.40 |
$91.80 |
$100.00 |
$75.00 |
$95.40 |
$90.00 |
$120.00 |
| 30 | 629(C) 4960 |
MAILBOX | 3 | EA |
$50.00 |
$25.50 |
$56.10 |
$55.00 |
$30.00 |
$58.30 |
$55.00 |
$70.00 |
| 31 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 3 | EA |
$25.00 |
$10.20 |
$102.00 |
$55.00 |
$15.00 |
$500.00 |
$10.00 |
$125.00 |
| 32 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$150.00 |
$112.20 |
$306.00 |
$300.00 |
$120.00 |
$318.00 |
$350.00 |
$400.00 |
| 33 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 1,976 | LF |
$0.5000 |
$1.43 |
$1.53 |
$1.60 |
$1.50 |
$1.59 |
$2.00 |
$2.00 |
| 34 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 2,800 | LF |
$0.2000 |
$0.3700 |
$0.4600 |
$0.5000 |
$0.4000 |
$0.4800 |
$0.5000 |
$0.6000 |
| 35 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 500 | LF |
$0.5000 |
$0.7100 |
$1.02 |
$1.10 |
$0.7200 |
$1.06 |
$1.00 |
$1.35 |
| 36 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 40 | EA |
$1.00 |
$1.02 |
$1.02 |
$1.10 |
$1.05 |
$1.06 |
$1.00 |
$1.35 |
| 37 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,000 | LF |
$0.2500 |
$0.2600 |
$0.5600 |
$0.6000 |
$0.2700 |
$0.5800 |
$0.7000 |
$0.7500 |
| 38 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 100 | SD |
$3.00 |
$41.82 |
$5.10 |
$5.50 |
$42.00 |
$5.30 |
$5.00 |
$7.00 |
| 39 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 460 | LF |
$20.00 |
$17.00 |
$15.30 |
$37.00 |
$25.00 |
$10.00 |
$25.00 |
$53.00 |
| 40 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,200 | SD |
$0.3000 |
$0.0200 |
$0.5100 |
$0.5500 |
$0.0400 |
$0.5300 |
$0.5000 |
$0.7000 |
| 41 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 840 | SD |
$0.5000 |
$0.5100 |
$1.02 |
$1.10 |
$0.5200 |
$1.06 |
$1.00 |
$1.35 |
| 42 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 120 | SD |
$1.00 |
$3.06 |
$3.06 |
$3.30 |
$3.10 |
$3.18 |
$3.00 |
$4.00 |
| 43 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 240 | SD |
$1.00 |
$1.53 |
$3.06 |
$3.30 |
$1.60 |
$3.18 |
$3.00 |
$4.00 |
| 44 | 880(C) 8848 |
WING BARRICADES | 240 | SD |
$1.00 |
$0.6100 |
$2.04 |
$2.20 |
$0.6400 |
$2.12 |
$2.00 |
$2.70 |
| 45 | 880(D) 8854 |
VERTICAL PANELS | 1,200 | SD |
$0.2000 |
$0.0200 |
$0.5100 |
$0.5500 |
$0.0400 |
$0.5300 |
$0.7500 |
$0.7000 |
| 46 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,080 | SD |
$0.1000 |
$0.3100 |
$0.3600 |
$0.4000 |
$0.3200 |
$0.3700 |
$0.5000 |
$0.5000 |
| 47 | 880(F) 8878 |
DRUMS | 1,140 | SD |
$0.1500 |
$0.2600 |
$0.5600 |
$0.6000 |
$0.2700 |
$0.5800 |
$0.7500 |
$0.7500 |
| 48 | 880(G) 8890 |
CHANNELIZER CONES | 300 | SD |
$0.2000 |
$0.0300 |
$0.5600 |
$0.6000 |
$0.0600 |
$0.5800 |
$0.7500 |
$0.7500 |
| 49 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 120 | SD |
$12.00 |
$30.60 |
$25.50 |
$27.00 |
$32.00 |
$26.50 |
$50.00 |
$35.00 |
| 50 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$17,000.00 |
$3,825.00 |
$5,280.00 |
$6,500.00 |
$5,280.00 |
$7,500.00 |
$10,000.00 |
$9,000.00 |
| 51 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$1,200.00 |
$2,000.00 |
$1,500.00 |
$3,500.00 |
$5,000.00 |
$7,000.00 |
| 52 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$110,000.00 |
$46,300.00 |
$32,066.00 |
$40,000.00 |
$35,000.00 |
$75,000.00 |
$50,000.00 |
$20,750.00 |
| 53 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,880 | CY |
$4.00 |
$1.00 |
$5.40 |
$5.00 |
$7.50 |
$10.00 |
$10.00 |
$10.00 |
| 54 | 202(C) 0182 |
ROCK EXCAVATION | 2,880 | CY |
$10.00 |
$29.00 |
$15.00 |
$40.00 |
$10.00 |
$15.50 |
$15.00 |
$19.00 |
| 55 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 592 | CY |
$10.00 |
$29.00 |
$16.20 |
$40.00 |
$7.50 |
$20.00 |
$10.00 |
$22.00 |
| 56 | 509(A) 1326 |
CLASS AA CONCRETE | 1,124.7 | CY |
$400.00 |
$300.00 |
$287.00 |
$270.00 |
$375.00 |
$395.00 |
$388.00 |
$545.00 |
| 57 | 511(A) 1332 |
REINFORCING STEEL | 210,890 | LB |
$0.8300 |
$0.7000 |
$0.8800 |
$0.7100 |
$1.00 |
$0.8500 |
$1.00 |
$1.00 |
| 58 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$10,000.00 |
$15,750.00 |
$5,000.00 |
$35,000.00 |
$25,000.00 |
$30,000.00 |
$18,000.00 |