Bid tab 110307

Let Jun 16, 2011 · Division 1 · Okmulgee Sign up free

‹ Jun 2011 results

BRIDGE AND APPROACHES COUNTY ROAD (NS-398): OVER SNAKE CREEK, 0.5 MILES NORTH OF THE SH-16 JUNCTION. PROJECT LENGTH = 0.169 MILES

Let date
Thursday, June 16, 2011
Contract
110307
J/P numbers
25642(04)
District
Division 1
County
Okmulgee
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (NS-398): OVER SNAKE CREEK, 0.5 MILES NORTH OF THE SH-16 JUNCTION. PROJECT LENGTH = 0.169 MILES
Project number
BRO-156D(160)CI

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$398,314
2 SEWELL BROS., INC. $372,526 -6.5% 0.0%
3 Treas Construction Inc $377,663 -5.2% +1.4%
4 OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV) $381,601 -4.2% +2.4%
5 K & R BUILDERS, INC. $401,919 +0.9% +7.9%
6 BRIDGECO CONTRACTORS, INC. $405,122 +1.7% +8.8%
7 BELK BRIDGE, INC. $407,232 +2.2% +9.3%
8 C-GAWF CONSTRUCTION, INC. $423,775 +6.4% +13.8%

Bid tab: unit prices 41 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #2 SEWELL BROS., I…#3 Treas Construct…#4 OBC, INC./PLAIN…#5 K & R BUILDERS,…#6 BRIDGECO CONTRA…#7 BELK BRIDGE, IN…#8 C-GAWF CONSTRUC…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $5,000.00 $4,000.00 $4,300.00 $6,120.00 $4,000.00 $5,500.00 $6,000.00 $8,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION4,113CY $7.00 $5.00 $7.36 $5.10 $6.00 $6.35 $8.51 $6.00
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $7,000.00 $2,500.00 $2,890.00 $3,060.00 $3,500.00 $3,300.00 $2,000.00 $4,800.00
4221(C) 2801 TEMPORARY SILT FENCE250LF $2.00 $2.20 $2.30 $2.03 $1.50 $2.50 $2.00 $2.00
5221(F) 0100 TEMPORARY SILT DIKE150LF $10.00 $11.00 $8.10 $10.14 $6.50 $6.00 $7.20 $6.00
6230(A) 2806 SOLID SLAB SODDING7,050SY $2.00 $1.50 $1.34 $1.37 $1.50 $1.85 $1.55 $1.80
7233(A) 2817 VEGETATIVE MULCHING1.5AC $450.00 $545.00 $495.00 $505.00 $150.00 $600.00 $450.00 $275.00
8303(A) 2100 AGGREGATE BASE TYPE A412CY $40.00 $39.00 $50.84 $51.85 $67.46 $75.00 $66.00 $49.00
9402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E271TON $25.00 $25.00 $20.02 $20.42 $21.62 $27.00 $41.00 $26.00
10408 5774 PRIME COAT985GAL $6.00 $7.00 $6.36 $6.12 $5.00 $7.00 $6.00 $6.00
11411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)347TON $80.00 $100.00 $83.00 $84.66 $97.00 $93.50 $83.00 $93.00
12411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)227TON $90.00 $121.00 $103.00 $105.06 $125.00 $113.00 $103.00 $110.00
13509(D) 0325 CLASS C CONCRETE10CY $350.00 $250.00 $300.00 $287.86 $200.00 $250.00 $100.00 $220.00
14619(C) 0924 SAWING PAVEMENT40LF $10.00 $5.00 $10.00 $10.20 $7.50 $10.00 $10.00 $7.00
15850(A) 8110 SHEET ALUMINUM SIGNS10SF $20.00 $38.00 $32.00 $32.64 $32.00 $50.00 $18.00 $16.00
16501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON180CY $15.00 $7.00 $8.00 $15.30 $6.50 $10.00 $10.00 $10.00
17501(F) 6352 GRANULAR BACKFILL76CY $50.00 $60.00 $54.20 $37.48 $55.00 $66.00 $50.00 $55.00
18503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)224LF $180.00 $202.00 $207.20 $193.22 $205.00 $212.00 $205.00 $251.00
19504(B) 1305 SAW-CUT GROOVING244.63SY $5.00 $4.00 $7.35 $6.88 $7.50 $10.75 $6.75 $8.00
20504(D) 6239 CONCRETE RAIL (TR3)211.2LF $65.00 $65.00 $55.00 $54.00 $63.50 $60.00 $95.00 $65.00
21506(A) 1322 STRUCTURAL STEEL290LB $4.00 $5.00 $3.00 $2.95 $2.00 $2.95 $6.00 $3.50
22507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY3EA $1,000.00 $800.00 $867.00 $1,445.00 $1,350.00 $650.00 $800.00 $870.00
23507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY3EA $1,000.00 $800.00 $890.00 $1,466.00 $1,350.00 $670.00 $800.00 $870.00
24509(A) 1326 CLASS AA CONCRETE60.1CY $500.00 $500.00 $400.00 $449.06 $445.00 $400.00 $450.00 $500.00
25509(B) 1328 CLASS A CONCRETE66.8CY $450.00 $450.00 $400.00 $470.03 $475.00 $400.00 $450.00 $500.00
26511(A) 1332 REINFORCING STEEL23,290LB $0.8000 $0.9000 $0.8700 $0.9700 $0.8300 $1.05 $1.50 $1.10
27514(A) 6010 PILES, FURNISHED (HP 10X42)76LF $25.00 $25.00 $25.50 $28.33 $30.00 $30.00 $20.00 $40.00
28514(A) 6011 PILES, FURNISHED (HP 12X53)156LF $30.00 $29.00 $34.85 $37.28 $40.00 $36.50 $22.00 $49.00
29514(B) 6292 PILES, DRIVEN (HP 10X42)76LF $12.00 $11.00 $15.00 $10.20 $20.00 $25.00 $10.00 $13.00
30514(B) 6294 PILES, DRIVEN (HP 12X53)156LF $20.00 $13.00 $15.00 $15.30 $20.00 $25.00 $11.00 $13.00
31601(B) 1353 TYPE I-A PLAIN RIPRAP1,010TON $30.00 $33.00 $33.28 $35.40 $33.50 $33.00 $29.50 $37.00
32601(C) 1355 TYPE I-A FILTER BLANKET210TON $28.00 $28.00 $27.85 $28.99 $27.00 $32.00 $23.75 $34.00
33613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND52LF $20.00 $20.00 $20.00 $26.95 $28.00 $10.00 $50.00 $8.00
34613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.50LF $15.00 $20.00 $15.00 $11.65 $28.00 $10.00 $20.00 $8.00
35619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $8,000.00 $2,500.00 $7,500.00 $3,500.00 $4,500.00 $5,000.00 $8,000.00 $4,500.00
36623(A) 1418 BEAM GUARDRAIL W-BEAM SINGLE137.5LF $25.00 $20.00 $14.75 $15.05 $17.00 $20.00 $16.15 $20.00
37623(F) 6033 GUARDRAIL ANCHOR UNIT (TYPE II)4EA $2,500.00 $2,225.00 $1,775.00 $1,810.50 $1,900.00 $1,800.00 $1,669.00 $2,000.00
38880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $5,000.00 $2,400.00 $1,500.00 $1,530.00 $2,000.00 $2,200.00 $3,000.00 $4,000.00
39642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $5,000.00 $3,700.00 $5,400.00 $5,508.00 $3,900.00 $6,000.00 $3,550.00 $4,500.00
40220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $1,000.00 $4,000.00 $1,020.00 $2,500.00 $2,500.00 $2,000.00 $1,800.00
41641 1399 MOBILIZATION1LSUM $26,600.00 $12,000.00 $17,500.00 $20,873.00 $23,000.00 $18,000.00 $10,000.00 $21,000.00