| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,000.00 |
$6,000.00 |
$2,000.00 |
$5,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 318 | CY |
$6.00 |
$5.00 |
$9.00 |
$8.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 7,074 | CY |
$6.00 |
$6.00 |
$7.50 |
$7.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$3,000.00 |
$4,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,172 | LF |
$1.50 |
$2.00 |
$1.35 |
$2.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 80 | LF |
$4.00 |
$9.00 |
$5.00 |
$10.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 4,792 | SY |
$1.60 |
$1.65 |
$2.45 |
$1.60 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1 | AC |
$350.00 |
$350.00 |
$800.00 |
$450.00 |
| 9 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 291 | CY |
$35.00 |
$40.00 |
$54.29 |
$63.13 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 113 | TON |
$20.00 |
$17.00 |
$36.00 |
$20.00 |
| 11 | 407(B) 0250 |
TACK COAT | 88 | GAL |
$6.00 |
$2.46 |
$10.00 |
$3.00 |
| 12 | 408 5774 |
PRIME COAT | 526 | GAL |
$7.00 |
$5.79 |
$10.00 |
$6.25 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 291 | TON |
$95.00 |
$110.16 |
$100.91 |
$122.00 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 221 | TON |
$100.00 |
$116.39 |
$103.55 |
$128.00 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 31 | CY |
$250.00 |
$415.00 |
$325.00 |
$325.00 |
| 16 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 152 | LF |
$25.00 |
$23.00 |
$29.00 |
$20.00 |
| 17 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$1,000.00 |
$1,000.00 |
$900.00 |
$800.00 |
| 18 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 42 | CY |
$30.00 |
$32.00 |
$50.00 |
$50.00 |
| 19 | 613(V) 1180 |
TRENCH EXCAVATION | 89 | CY |
$8.00 |
$5.00 |
$15.00 |
$4.00 |
| 20 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$1,000.00 |
$1,500.00 |
$2,500.00 |
| 21 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,474 | SY |
$5.00 |
$2.50 |
$5.00 |
$7.25 |
| 22 | 619(C) 0924 |
SAWING PAVEMENT | 44 | LF |
$5.00 |
$4.00 |
$5.00 |
$7.00 |
| 23 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$10.00 |
$31.00 |
$15.00 |
$10.00 |
| 24 | 501(G) 6309 |
CLSM BACKFILL | 56 | CY |
$90.00 |
$95.00 |
$100.00 |
$140.00 |
| 25 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 239 | LF |
$180.00 |
$210.00 |
$225.00 |
$225.00 |
| 26 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$160.00 |
$150.00 |
$100.00 |
$165.00 |
| 27 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 217 | LF |
$60.00 |
$59.00 |
$100.00 |
$65.00 |
| 28 | 506(A) 1322 |
STRUCTURAL STEEL | 100 | LB |
$3.00 |
$8.00 |
$7.00 |
$2.40 |
| 29 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$500.00 |
$790.00 |
$1,000.00 |
$400.00 |
| 30 | 509(A) 1326 |
CLASS AA CONCRETE | 82 | CY |
$430.00 |
$475.00 |
$500.00 |
$460.00 |
| 31 | 509(B) 1328 |
CLASS A CONCRETE | 40 | CY |
$430.00 |
$475.00 |
$500.00 |
$525.00 |
| 32 | 511(A) 1332 |
REINFORCING STEEL | 22,595 | LB |
$0.8000 |
$1.00 |
$1.50 |
$0.8600 |
| 33 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 183 | LF |
$20.00 |
$33.00 |
$20.00 |
$49.00 |
| 34 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 183 | LF |
$10.00 |
$35.00 |
$10.00 |
$21.00 |
| 35 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 824 | TON |
$25.00 |
$26.00 |
$22.00 |
$27.15 |
| 36 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 118 | TON |
$20.00 |
$26.00 |
$16.70 |
$20.55 |
| 37 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 534 | SY |
$4.00 |
$2.50 |
$1.75 |
$3.00 |
| 38 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 54 | LF |
$30.00 |
$20.00 |
$45.00 |
$30.00 |
| 39 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$25.00 |
$20.00 |
$20.00 |
$30.00 |
| 40 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$3,250.00 |
$3,500.00 |
| 41 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 475 | LF |
$20.00 |
$15.80 |
$15.80 |
$21.00 |
| 42 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$1,840.00 |
$1,840.00 |
$2,750.00 |
| 43 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,680 | LF |
$0.8500 |
$0.9200 |
$1.00 |
$1.35 |
| 44 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,500.00 |
$3,801.06 |
$4,250.00 |
$2,000.00 |
| 45 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$4,000.00 |
$9,500.00 |
$4,550.00 |
$5,000.00 |
| 46 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$2,000.00 |
$2,000.00 |
$4,000.00 |
| 47 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$4,000.00 |
$3,000.00 |
$500.00 |
$5,500.00 |
| 48 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$36,508.00 |
$15,250.00 |
$16,000.00 |
$26,000.00 |