GRADE, DRAIN, SURFACE , AND BRIDGE SH-3: FROM 3.0 MILES SOUTH OF THE SH -50 JUNCTION, EXTEND SOUTHEAST. PROJECT LENGTH = 1.723 MILES

Let date
Thursday, June 16, 2011
Contract
110316
J/P numbers
17457(14)
District
Division 6
County
Woodward
Highway
Limits
GRADE, DRAIN, SURFACE , AND BRIDGE SH-3: FROM 3.0 MILES SOUTH OF THE SH -50 JUNCTION, EXTEND SOUTHEAST. PROJECT LENGTH = 1.723 MILES
Project number
NHY-017N(057)

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$6,069,079
1 OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV) Low bidder $5,801,859 -4.4%
2 SEWELL BROS., INC. $5,969,269 -1.6% +2.9%
3 THE CUMMINS CONSTRUCTION CO., INC. $6,112,761 +0.7% +5.4%
4 DOBSON BROTHERS CONSTRUCTION CO. $6,443,516 +6.2% +11.1%
5 Venture Corporation dba VCO Paving $6,490,551 +6.9% +11.9%
6 King Construction CO., INC. $6,813,519 +12.3% +17.4%

Bid tab: unit prices 93 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 OBC, INC./PLAIN…#2 SEWELL BROS., I…#3 THE CUMMINS CON…#4 DOBSON BROTHERS…#5 Venture Corpora…#6 King Constructi…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $25,000.00 $12,120.00 $10,000.00 $12,180.00 $26,838.81 $45,000.00 $20,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION57,269CY $3.00 $3.03 $2.55 $2.70 $3.36 $3.20 $3.00
3202(D) 0184 UNCLASSIFIED BORROW69,476CY $5.00 $4.04 $2.70 $2.75 $4.03 $3.90 $4.50
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $100,000.00 $25,250.00 $60,000.00 $65,975.00 $26,838.81 $45,000.00 $20,000.00
5221(C) 2801 TEMPORARY SILT FENCE2,600LF $2.00 $1.11 $2.00 $2.05 $1.50 $2.50 $1.40
6221(D) 2803 TEMPORARY SEDIMENT FILTER6EA $175.00 $126.50 $150.00 $406.00 $161.03 $450.00 $150.00
7221(F) 0100 TEMPORARY SILT DIKE594LF $6.00 $5.80 $10.00 $8.15 $7.46 $10.00 $6.95
8230(A) 2806 SOLID SLAB SODDING109,925SY $1.50 $1.31 $1.46 $1.47 $1.56 $1.50 $1.45
9241 2832 MOWING46AC $75.00 $60.60 $80.00 $40.60 $53.68 $40.00 $50.00
10307(A) 4200 FLY ASH2,269TON $60.00 $66.58 $70.00 $71.05 $84.85 $65.00 $65.00
11307(E) 4240 CEMENTITIOUS STABILIZED SUBGRADE45,010SY $2.00 $2.02 $1.75 $1.32 $1.42 $2.50 $1.95
12402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E496TON $45.00 $28.92 $30.00 $48.20 $38.63 $50.00 $45.00
13407(B) 0250 TACK COAT12,140GAL $3.00 $3.08 $3.35 $3.35 $4.25 $2.00 $3.05
14408 5774 PRIME COAT9,655GAL $4.00 $6.62 $7.20 $4.10 $6.00 $3.50 $6.55
15411(B) 5940 SUPERPAVE, TYPE S3(PG 70-28 OK)5,478TON $65.00 $80.40 $84.00 $78.45 $88.75 $79.00 $79.60
16411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)14,417TON $60.00 $70.09 $73.00 $68.25 $80.00 $71.00 $69.40
17411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)6,530TON $77.00 $87.47 $91.00 $85.42 $94.75 $87.00 $86.60
18411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)1,022TON $70.00 $73.25 $77.00 $71.25 $88.25 $84.00 $72.50
19412 5267 COLD MILLING PAVEMENT8,206SY $2.00 $4.29 $5.00 $4.15 $2.82 $4.00 $4.15
20413(A) 4861 RUMBLE STRIP-METHOD HMA-CON33,460LF $0.1500 $0.1100 $0.1500 $0.1500 $0.1100 $0.1600 $0.0900
21501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED52CY $20.00 $5.50 $10.00 $10.15 $9.47 $9.00 $9.00
22509(B) 0321 CLASS A CONCRETE205CY $400.00 $330.00 $400.00 $416.15 $422.94 $402.00 $402.00
23509(D) 0325 CLASS C CONCRETE40CY $250.00 $260.00 $250.00 $406.00 $316.68 $402.00 $301.00
24511(A) 0332 REINFORCING STEEL28,437LB $0.7500 $0.6700 $0.8500 $1.02 $0.8400 $0.8000 $0.8000
25611(G) 6002 INLET (SMD-TYPE 2)1EA $1,400.00 $1,262.50 $1,500.00 $1,827.00 $1,525.52 $2,000.00 $343.65
26613(A) 0491 18" R.C.PIPE CLASS III242LF $50.00 $26.26 $22.00 $24.40 $29.46 $28.00 $46.50
27613(A) 0492 24" R.C.PIPE CLASS III184LF $60.00 $36.36 $34.00 $35.55 $44.19 $42.00 $58.50
28613(A) 4496 28" X 18" R.C.PIPE ARCH CLASS A-III88LF $65.00 $56.56 $58.00 $60.90 $66.28 $63.00 $62.50
29613(A) 4497 36" X 22" R.C.PIPE ARCH CLASS A-III106LF $140.00 $66.66 $70.00 $73.10 $76.80 $73.00 $136.50
30613(B) 0689 18" CORR. GALV. STEEL PIPE48LF $30.00 $18.18 $20.00 $22.35 $32.61 $31.00 $27.00
31613(B) 0690 24" CORR. GALV. STEEL PIPE380LF $40.00 $26.26 $25.00 $27.45 $37.87 $36.00 $36.00
32613(M) 7186 TYPE A4 CULVERT END TREATMENT3EA $1,200.00 $556.73 $1,000.00 $1,192.65 $1,462.39 $1,450.00 $1,500.00
33613(M) 7187 TYPE B4 CULVERT END TREATMENT5EA $1,400.00 $600.00 $1,000.00 $1,268.75 $1,893.75 $2,000.00 $1,800.00
34613(M) 7196 TYPE A6 CULVERT END TREATMENT1EA $1,600.00 $650.00 $1,020.00 $1,195.00 $2,114.68 $2,500.00 $2,200.00
35613(M) 7197 TYPE B6 CULVERT END TREATMENT6EA $1,300.00 $690.00 $1,020.00 $1,345.00 $3,345.62 $3,500.00 $3,400.00
36619(B) 0291 REMOVAL OF HEADWALL6EA $1,000.00 $505.00 $400.00 $710.50 $10.52 $10.00 $2,000.00
37619(B) 4728 REMOVAL OF ASPHALT PAVEMENT6,385SY $5.00 $4.14 $8.00 $8.65 $5.32 $8.00 $5.00
38619(B) 4778 REMOVAL OF EXISTING STRUCTURES2EA $3,000.00 $505.00 $1,000.00 $1,522.50 $1,610.33 $2,500.00 $2,000.00
39619(B) 4780 REMOVAL OF GUARDRAIL600LF $3.00 $1.01 $1.00 $2.55 $3.16 $1.50 $2.50
40623 0100 (PL)GUARDRAIL CURBING4EA $250.00 $505.00 $200.00 $510.00 $526.04 $1,000.00 $500.00
41623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE1,200LF $15.00 $14.10 $15.50 $23.85 $14.99 $15.75 $23.50
42623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,500.00 $1,818.00 $1,980.00 $2,435.00 $1,932.40 $2,095.00 $2,395.00
43623(I) 8675 GUARDRAIL BRIDGE CONNECTION-TYPE A2EA $1,800.00 $1,414.00 $1,550.00 $2,000.00 $1,502.98 $1,375.00 $1,926.00
44623(I) 8680 GUARDRAIL BRIDGE CONNECTION-TYPE B2EA $1,300.00 $656.50 $750.00 $2,050.00 $697.81 $800.00 $2,015.00
45624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)9,691LF $3.00 $3.23 $3.50 $3.40 $3.47 $3.20 $4.85
46501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON180CY $10.00 $5.10 $7.00 $10.15 $5.37 $9.67 $50.00
47501(G) 6309 CLSM BACKFILL160CY $120.00 $90.00 $120.00 $121.80 $94.69 $145.36 $125.00
48503(A) 1311 PRESTRESSED CONCRETE BEAMS (TYPE II)2,344LF $150.00 $154.00 $163.00 $167.50 $162.02 $215.00 $175.00
49504(A) 1304 APPROACH SLAB267.8SY $150.00 $110.00 $145.00 $147.20 $115.73 $156.81 $220.00
50504(B) 1305 SAW-CUT GROOVING2,748.1SY $5.00 $3.25 $4.00 $4.10 $3.42 $4.49 $4.00
51504(C) 6250 SEALED EXPANSION JOINT200.9LF $200.00 $235.00 $270.00 $279.15 $247.24 $274.00 $250.00
52504(D) 6245 CONCRETE RAIL (TR4)1,301.7LF $70.00 $56.00 $65.00 $71.05 $58.92 $58.50 $50.00
53506(A) 1322 STRUCTURAL STEEL5,330LB $3.50 $1.69 $4.00 $4.10 $1.78 $2.23 $2.00
54507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY24EA $3,000.00 $2,075.00 $1,800.00 $2,030.00 $2,183.07 $2,150.00 $3,000.00
55507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY72EA $3,000.00 $2,075.00 $1,800.00 $2,030.00 $2,183.07 $2,150.00 $3,000.00
56509(A) 1326 CLASS AA CONCRETE659.6CY $425.00 $400.00 $420.00 $431.40 $420.83 $437.54 $675.00
57509(B) 1328 CLASS A CONCRETE800CY $400.00 $400.00 $400.00 $426.30 $420.83 $347.28 $675.00
58509(D) 1331 CLASS C CONCRETE3.7CY $500.00 $430.00 $405.00 $426.30 $452.39 $617.19 $600.00
59511(A) 1332 REINFORCING STEEL16,500LB $0.8000 $0.7800 $1.00 $1.02 $0.8200 $0.8800 $1.00
60511(B) 6010 EPOXY COATED REINFORCING STEEL296,190LB $1.20 $0.7000 $1.10 $1.12 $0.7400 $0.9500 $1.30
61514(A) 6010 PILES, FURNISHED (HP 10X42)356LF $30.00 $25.00 $25.00 $24.40 $26.30 $30.23 $25.00
62514(A) 6011 PILES, FURNISHED (HP 12X53)1,216LF $40.00 $31.00 $28.00 $28.45 $32.61 $36.09 $30.00
63514(A) 6016 PILES, FURNISHED (HP 14X89)5,928LF $40.00 $65.00 $45.00 $42.65 $68.39 $58.00 $47.00
64514(B) 6292 PILES, DRIVEN (HP 10X42)356LF $15.00 $10.20 $10.00 $11.20 $11.57 $7.00 $8.00
65514(B) 6294 PILES, DRIVEN (HP 12X53)1,216LF $20.00 $10.20 $10.00 $12.20 $11.57 $7.25 $10.00
66514(B) 6297 PILES, DRIVEN (HP 14X89)5,928LF $20.00 $12.24 $14.00 $18.30 $13.68 $15.50 $10.00
67514(F) 6354 PILE LOAD TEST (DYNAMIC)80EA $800.00 $336.60 $650.00 $659.75 $353.50 $515.00 $700.00
68515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)2,543SY $5.00 $3.57 $3.00 $3.55 $3.25 $3.50 $4.00
69523(A) 6550 SEALER CRACK PREPARATION310.4LF $5.00 $3.06 $5.00 $5.10 $5.26 $3.00 $4.00
70523(B) 6560 SEALER RESIN4GAL $200.00 $102.00 $150.00 $203.00 $215.68 $100.00 $125.00
71601(B) 1353 TYPE I-A PLAIN RIPRAP1,060TON $30.00 $42.74 $39.00 $40.60 $45.24 $64.89 $50.00
72601(C) 1355 TYPE I-A FILTER BLANKET240TON $25.00 $35.00 $32.00 $34.55 $36.82 $50.89 $44.00
73613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND80LF $15.00 $15.00 $20.00 $24.40 $15.78 $14.69 $15.00
74613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.46LF $10.00 $15.00 $20.00 $24.40 $15.78 $28.00 $15.00
75880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF5,670SD $0.5000 $0.0200 $0.0400 $0.0200 $0.0200 $0.0200 $0.5000
76880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF3,990SD $1.25 $0.8000 $0.8200 $0.8500 $0.8400 $0.8000 $2.00
77880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)3,570SD $2.00 $0.6000 $0.6400 $0.6500 $0.6300 $0.6000 $1.00
78880(C) 8848 WING BARRICADES420SD $2.00 $2.02 $2.25 $2.05 $2.10 $2.00 $3.00
79880(E) 8860 WARNING LIGHTS(TYPE A)7,140SD $0.3000 $0.5000 $0.5200 $0.5500 $0.5300 $0.5000 $0.3500
80880(G) 8890 CHANNELIZER CONES16,800SD $0.3000 $0.3900 $0.4000 $0.4000 $0.4000 $0.3800 $0.2500
81805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS2EA $40.00 $101.00 $250.00 $103.00 $105.21 $200.00 $100.00
82805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS3EA $200.00 $81.00 $90.00 $81.20 $84.17 $80.00 $250.00
83850(A) 8110 SHEET ALUMINUM SIGNS207SF $20.00 $20.20 $22.00 $20.30 $21.04 $20.00 $15.00
84851(B) 3218 3"@7.58 GALV.STEEL PIPE POST75LF $21.00 $20.20 $22.00 $20.30 $21.04 $20.00 $25.00
85851(C) 8324 2" SQUARE TUBE POST375LF $12.00 $9.09 $9.50 $9.15 $9.47 $9.00 $8.00
86856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)44,364LF $0.4000 $0.4400 $0.4500 $0.4500 $0.4500 $0.4300 $0.5800
87856(A) 8535 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)370LF $0.6000 $0.7400 $0.7500 $0.7500 $0.7400 $0.7000 $1.00
88856(A) 8555 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE)39LF $2.50 $3.03 $3.50 $3.05 $3.16 $3.00 $5.00
89856(B) 8525 TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.)12EA $120.00 $50.50 $55.00 $50.75 $52.60 $50.00 $100.00
90642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $41,600.00 $25,029.00 $26,750.00 $24,664.50 $52,604.08 $40,000.00 $28,700.00
91220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $1,515.00 $2,000.00 $8,630.00 $4,762.09 $32,000.00 $8,000.00
92641 1552 MOBILIZATION1LSUM $290,000.00 $175,000.00 $165,000.00 $326,625.00 $250,000.00 $323,000.00 $318,266.00
93643 0087 (SP)CONTRACTORS QUALITY CONTROL1LSUM $11,800.00 $16,000.00 $15,000.00 $14,500.00 $25,000.00 $70,000.00 $35,000.00