| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$25,903.28 |
$13,545.00 |
$26,041.61 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 67,240 | CY |
$5.50 |
$5.29 |
$5.54 |
$5.55 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 35,813 | CY |
$7.00 |
$6.00 |
$5.85 |
$5.55 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$13,000.00 |
$40,000.00 |
$39,847.50 |
$39,977.25 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 15,395 | LF |
$1.50 |
$0.6500 |
$1.24 |
$2.80 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 4 | EA |
$225.00 |
$373.30 |
$140.70 |
$238.97 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 588 | LF |
$7.00 |
$5.16 |
$6.79 |
$7.59 |
| 8 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 396 | CY |
$75.00 |
$24.45 |
$52.50 |
$65.81 |
| 9 | 229 4318 |
DITCH LINER PROTECTION | 10,250 | LF |
$1.50 |
$2.12 |
$1.19 |
$2.24 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 91,959 | SY |
$1.25 |
$1.15 |
$1.13 |
$1.35 |
| 11 | 241 2832 |
MOWING | 67 | AC |
$89.00 |
$20.00 |
$69.30 |
$48.83 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 7,988 | CY |
$40.00 |
$38.51 |
$49.25 |
$54.44 |
| 13 | 307(A) 4200 |
FLY ASH | 2,211 | TON |
$60.00 |
$64.00 |
$75.01 |
$59.00 |
| 14 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 40,940 | SY |
$2.00 |
$1.45 |
$2.42 |
$2.41 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 37,244 | SY |
$1.15 |
$1.12 |
$1.53 |
$1.13 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,523 | TON |
$27.50 |
$16.93 |
$32.35 |
$26.45 |
| 17 | 407(B) 0250 |
TACK COAT | 11,189 | GAL |
$2.70 |
$2.00 |
$3.31 |
$3.94 |
| 18 | 408 5774 |
PRIME COAT | 24,560 | GAL |
$4.00 |
$2.75 |
$4.79 |
$5.71 |
| 19 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 3,168 | TON |
$76.00 |
$77.00 |
$80.75 |
$96.28 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 10,962 | TON |
$65.00 |
$70.00 |
$71.35 |
$85.07 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 2,297 | TON |
$90.00 |
$88.00 |
$83.90 |
$100.03 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,305 | TON |
$76.00 |
$80.00 |
$75.55 |
$90.08 |
| 23 | 412 5267 |
COLD MILLING PAVEMENT | 2,000 | SY |
$5.00 |
$4.20 |
$4.04 |
$4.82 |
| 24 | 509(B) 0321 |
CLASS A CONCRETE | 22 | CY |
$400.00 |
$769.11 |
$595.70 |
$327.74 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 1,481 | CY |
$248.00 |
$230.00 |
$215.25 |
$296.49 |
| 26 | 511(A) 0332 |
REINFORCING STEEL | 252 | LB |
$1.70 |
$1.42 |
$1.10 |
$2.44 |
| 27 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 4 | EA |
$2,220.00 |
$3,969.64 |
$2,399.25 |
$2,073.18 |
| 28 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 91 | LF |
$67.00 |
$104.66 |
$81.22 |
$166.17 |
| 29 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 85 | LF |
$81.00 |
$89.64 |
$103.95 |
$194.44 |
| 30 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 840 | LF |
$24.00 |
$22.33 |
$22.89 |
$58.58 |
| 31 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 208 | LF |
$27.00 |
$36.87 |
$28.98 |
$91.16 |
| 32 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 172 | LF |
$30.00 |
$37.19 |
$35.70 |
$123.55 |
| 33 | 613(B) 0693 |
42" CORR. GALV. STEEL PIPE | 64 | LF |
$43.00 |
$88.71 |
$56.18 |
$132.67 |
| 34 | 613(B) 0696 |
60" CORR. GALV. STEEL PIPE | 144 | LF |
$70.00 |
$68.68 |
$104.84 |
$240.47 |
| 35 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$14.00 |
$15.67 |
$1.73 |
$22.87 |
| 36 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 300 | LF |
$13.00 |
$14.85 |
$1.73 |
$12.07 |
| 37 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 8 | EA |
$883.00 |
$887.43 |
$1,188.47 |
$778.18 |
| 38 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 12 | EA |
$900.00 |
$828.27 |
$1,485.59 |
$996.45 |
| 39 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 10 | EA |
$1,340.00 |
$846.02 |
$2,322.73 |
$1,715.34 |
| 40 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$1,760.00 |
$828.27 |
$2,619.28 |
$2,065.04 |
| 41 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,015.00 |
$36,004.33 |
$14,700.00 |
$10,270.67 |
| 42 | 619(B) 4725 |
REMOVAL OF FENCE | 3,915 | LF |
$1.10 |
$1.75 |
$2.10 |
$2.50 |
| 43 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 438 | LF |
$6.50 |
$15.16 |
$5.25 |
$8.76 |
| 44 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 26,887 | SY |
$1.70 |
$2.43 |
$1.58 |
$1.88 |
| 45 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 208 | LF |
$3.00 |
$11.83 |
$4.20 |
$3.76 |
| 46 | 619(C) 0924 |
SAWING PAVEMENT | 200 | LF |
$4.00 |
$3.55 |
$2.10 |
$10.02 |
| 47 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,125 | LF |
$17.50 |
$19.52 |
$18.38 |
$20.66 |
| 48 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,200.00 |
$1,981.93 |
$2,467.50 |
$2,097.11 |
| 49 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,750.00 |
$2,484.81 |
$1,837.50 |
$2,629.21 |
| 50 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,453 | LF |
$4.50 |
$6.51 |
$3.89 |
$8.14 |
| 51 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 4 | EA |
$88.00 |
$71.00 |
$63.00 |
$75.12 |
| 52 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 2 | EA |
$126.50 |
$260.31 |
$231.00 |
$275.44 |
| 53 | 629(C) 4960 |
MAILBOX | 11 | EA |
$33.00 |
$23.66 |
$21.00 |
$25.04 |
| 54 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 6 | EA |
$10.50 |
$11.83 |
$10.50 |
$12.52 |
| 55 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 110 | CY |
$15.00 |
$33.59 |
$16.80 |
$14.65 |
| 56 | 501(G) 6309 |
CLSM BACKFILL | 232 | CY |
$125.00 |
$116.44 |
$136.56 |
$127.85 |
| 57 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,495 | LF |
$225.00 |
$236.75 |
$217.20 |
$225.27 |
| 58 | 504(A) 1304 |
APPROACH SLAB | 250.6 | SY |
$175.00 |
$146.49 |
$158.68 |
$174.52 |
| 59 | 504(B) 1305 |
SAW-CUT GROOVING | 1,703.7 | SY |
$4.00 |
$4.09 |
$4.26 |
$4.76 |
| 60 | 504(E) 6190 |
42" F-SHAPED PARAPET | 697 | LF |
$90.00 |
$81.19 |
$100.90 |
$67.80 |
| 61 | 506(A) 1322 |
STRUCTURAL STEEL | 1,230 | LB |
$4.00 |
$4.98 |
$2.94 |
$1.80 |
| 62 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$900.00 |
$649.30 |
$701.55 |
$193.82 |
| 63 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,500.00 |
$1,929.30 |
$2,049.37 |
$1,645.88 |
| 64 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$400.00 |
$456.21 |
$624.65 |
$371.30 |
| 65 | 509(A) 1326 |
CLASS AA CONCRETE | 423.6 | CY |
$475.00 |
$500.00 |
$536.93 |
$543.66 |
| 66 | 509(B) 1328 |
CLASS A CONCRETE | 150.8 | CY |
$525.00 |
$613.29 |
$564.93 |
$747.84 |
| 67 | 511(A) 1332 |
REINFORCING STEEL | 420 | LB |
$1.00 |
$1.17 |
$1.04 |
$0.9100 |
| 68 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 118,430 | LB |
$1.15 |
$0.8300 |
$1.17 |
$1.02 |
| 69 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 572 | LF |
$30.00 |
$33.19 |
$39.61 |
$29.50 |
| 70 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 572 | LF |
$15.00 |
$63.51 |
$10.08 |
$23.40 |
| 71 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 72 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 976 | SY |
$4.00 |
$4.39 |
$3.58 |
$4.57 |
| 73 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 68 | LF |
$1,800.00 |
$1,522.76 |
$1,422.97 |
$972.74 |
| 74 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 4 | EA |
$3,000.00 |
$1,194.61 |
$4,592.00 |
$1,897.05 |
| 75 | 523(A) 6550 |
SEALER CRACK PREPARATION | 176 | LF |
$5.00 |
$4.68 |
$4.48 |
$5.01 |
| 76 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$115.00 |
$116.98 |
$112.00 |
$125.20 |
| 77 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,888 | TON |
$40.00 |
$25.38 |
$50.89 |
$41.82 |
| 78 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 363 | TON |
$35.00 |
$30.01 |
$40.92 |
$31.31 |
| 79 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 94 | LF |
$25.00 |
$12.78 |
$29.85 |
$32.76 |
| 80 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 46 | LF |
$25.00 |
$12.92 |
$29.85 |
$21.99 |
| 81 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$75,000.00 |
$33,605.37 |
$89,600.00 |
$39,146.20 |
| 82 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,780 | CY |
$6.50 |
$16.24 |
$8.96 |
$8.48 |
| 83 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 190 | CY |
$15.00 |
$20.00 |
$16.80 |
$13.77 |
| 84 | 509(A) 1326 |
CLASS AA CONCRETE | 490.6 | CY |
$475.00 |
$353.64 |
$508.93 |
$423.95 |
| 85 | 511(A) 1332 |
REINFORCING STEEL | 66,370 | LB |
$1.00 |
$0.9500 |
$0.9700 |
$0.8900 |
| 86 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$10,000.00 |
$17,016.61 |
$16,800.00 |
$3,543.99 |
| 87 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$32,000.00 |
$15,362.89 |
$56,000.00 |
$13,988.24 |
| 88 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,170 | CY |
$6.50 |
$8.53 |
$8.96 |
$8.48 |
| 89 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 160 | CY |
$15.00 |
$22.82 |
$16.80 |
$13.77 |
| 90 | 509(A) 1326 |
CLASS AA CONCRETE | 337.5 | CY |
$475.00 |
$222.25 |
$536.93 |
$428.26 |
| 91 | 511(A) 1332 |
REINFORCING STEEL | 48,920 | LB |
$1.00 |
$0.9500 |
$0.9700 |
$0.8900 |
| 92 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$8,000.00 |
$20,374.96 |
$16,800.00 |
$4,133.81 |
| 93 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$22,004.67 |
$56,000.00 |
$14,462.05 |
| 94 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 12,507 | LF |
$0.4000 |
$0.3000 |
$0.4100 |
$0.2900 |
| 95 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 72 | SF |
$15.40 |
$13.02 |
$11.88 |
$13.77 |
| 96 | 850(D) 8121 |
SPECIAL SIGNS | 2 | EA |
$250.00 |
$177.49 |
$162.00 |
$187.80 |
| 97 | 851(C) 8324 |
2" SQUARE TUBE POST | 210 | LF |
$9.00 |
$5.92 |
$5.40 |
$6.26 |
| 98 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 33,930 | LF |
$0.5700 |
$0.4600 |
$0.4200 |
$0.4900 |
| 99 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 27,707 | LF |
$0.1200 |
$0.0900 |
$0.0900 |
$0.1000 |
| 100 | 870(A) 8485 |
SAND FILLED IMPACT ATTENUATION MODULE | 10,350 | SD |
$0.4400 |
$0.0600 |
$0.0500 |
$0.0600 |
| 101 | 877(A) 8483 |
PORTABLE LONGITUDINAL BARRIER | 1,150 | LF |
$34.40 |
$48.91 |
$32.40 |
$52.98 |
| 102 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,060 | SD |
$0.2500 |
$0.0600 |
$0.0500 |
$0.0600 |
| 103 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,610 | SD |
$0.8000 |
$2.37 |
$2.16 |
$2.50 |
| 104 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,530 | SD |
$1.23 |
$2.37 |
$2.16 |
$2.50 |
| 105 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 6,440 | SD |
$0.3000 |
$0.2400 |
$0.2200 |
$0.2500 |
| 106 | 880(D) 8854 |
VERTICAL PANELS | 15,410 | SD |
$0.0700 |
$0.1200 |
$0.1100 |
$0.1300 |
| 107 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 12,880 | SD |
$0.0700 |
$1.18 |
$1.08 |
$1.25 |
| 108 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 44,620 | SD |
$0.0500 |
$0.0200 |
$0.0200 |
$0.0300 |
| 109 | 880(F) 8878 |
DRUMS | 29,210 | SD |
$0.1000 |
$0.1200 |
$0.1100 |
$0.1300 |
| 110 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 460 | SD |
$11.25 |
$5.92 |
$5.40 |
$6.26 |
| 111 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$9,200.00 |
$38,852.85 |
$71,550.00 |
$53,343.44 |
| 112 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,650.00 |
$1,500.00 |
$3,780.00 |
$3,130.02 |
| 113 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$7,650.00 |
$1,774.86 |
$9,180.00 |
$5,008.02 |
| 114 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$117,500.00 |
$170,000.00 |
$301,717.83 |
$261,394.56 |