| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$25,000.00 |
$51,890.07 |
$60,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 35,662 | CY |
$7.00 |
$6.00 |
$8.61 |
$8.50 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$25,000.00 |
$26,000.00 |
$40,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 8,510 | LF |
$1.20 |
$1.35 |
$1.10 |
$1.10 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 4,996 | LF |
$6.75 |
$10.00 |
$6.70 |
$6.25 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 175,063 | SY |
$1.25 |
$1.25 |
$1.15 |
$1.25 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 36.17 | AC |
$450.00 |
$350.00 |
$200.00 |
$425.00 |
| 8 | 234(A) 2824 |
FERTILIZING (10-20-10) | 18 | TON |
$725.00 |
$850.00 |
$775.00 |
$900.00 |
| 9 | 234(A) 4409 |
FERTILIZING (18-46-0) | 3 | TON |
$500.00 |
$925.00 |
$1,057.22 |
$1,300.00 |
| 10 | 307(A) 4200 |
FLY ASH | 2,427 | TON |
$50.00 |
$77.00 |
$73.70 |
$84.00 |
| 11 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 68,785 | SY |
$2.70 |
$2.25 |
$1.90 |
$1.50 |
| 12 | 311(A) 0151 |
PROCESSING EXISTING BASE & SURFACE, METHOD A | 24,090 | LF |
$5.00 |
$1.75 |
$2.16 |
$1.15 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,840 | TON |
$25.00 |
$30.00 |
$33.37 |
$30.00 |
| 14 | 407(B) 0250 |
TACK COAT | 3,085 | GAL |
$3.00 |
$3.85 |
$3.40 |
$2.50 |
| 15 | 408 5774 |
PRIME COAT | 30,488 | GAL |
$4.00 |
$4.40 |
$1.72 |
$6.75 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 10,721 | TON |
$80.00 |
$82.00 |
$86.02 |
$70.00 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 8,525 | TON |
$90.00 |
$84.00 |
$97.24 |
$86.00 |
| 18 | 509(B) 0321 |
CLASS A CONCRETE | 533.96 | CY |
$375.00 |
$450.00 |
$420.00 |
$550.00 |
| 19 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 11.02 | CY |
$550.00 |
$750.00 |
$550.00 |
$800.00 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 1,902 | CY |
$275.00 |
$220.00 |
$205.00 |
$210.00 |
| 21 | 511(A) 0332 |
REINFORCING STEEL | 44,192 | LB |
$0.9000 |
$1.00 |
$1.00 |
$1.20 |
| 22 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 1,114 | TON |
$38.10 |
$40.00 |
$48.00 |
$47.00 |
| 23 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 630 | TON |
$25.00 |
$33.00 |
$46.00 |
$38.00 |
| 24 | 601(H) 1390 |
TYPE IV GROUTED RIPRAP | 1,785 | SY |
$45.00 |
$50.00 |
$45.00 |
$47.00 |
| 25 | 609(B) 0383 |
COMBINED CURB & GUTTER (6" BARRIER) | 3,439 | LF |
$16.00 |
$22.00 |
$28.50 |
$25.00 |
| 26 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 333 | SY |
$50.00 |
$55.00 |
$50.00 |
$75.00 |
| 27 | 611(E) 4275 |
REPLACEMENT OF MANHOLE COVER | 2 | EA |
$100.00 |
$400.00 |
$500.00 |
$1,000.00 |
| 28 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 4 | EA |
$2,200.00 |
$2,500.00 |
$2,300.00 |
$1,800.00 |
| 29 | 612(A) 0641 |
MANHOLES ADJUST TO GRADE | 2 | EA |
$900.00 |
$1,000.00 |
$1,000.00 |
$1,000.00 |
| 30 | 613(A) 0400 |
12" R.C.PIPE CLASS III | 103 | LF |
$45.00 |
$60.00 |
$82.22 |
$35.00 |
| 31 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 134 | LF |
$53.00 |
$80.00 |
$94.02 |
$40.00 |
| 32 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 30 | LF |
$68.00 |
$150.00 |
$150.70 |
$73.00 |
| 33 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 54 | LF |
$140.00 |
$200.00 |
$265.78 |
$160.00 |
| 34 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 36 | LF |
$80.00 |
$120.00 |
$167.16 |
$120.00 |
| 35 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 60 | LF |
$100.00 |
$180.00 |
$315.65 |
$165.00 |
| 36 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 26 | LF |
$200.00 |
$300.00 |
$298.07 |
$235.00 |
| 37 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 2,316 | LF |
$34.00 |
$30.00 |
$36.57 |
$30.00 |
| 38 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 78 | LF |
$38.00 |
$40.00 |
$48.49 |
$35.00 |
| 39 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 449 | LF |
$50.00 |
$55.00 |
$60.00 |
$55.00 |
| 40 | 613(B) 4531 |
49" X 33" CORR. GALV. STEEL PIPE ARCH | 120 | LF |
$70.00 |
$65.00 |
$74.91 |
$63.00 |
| 41 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$750.00 |
$800.00 |
$1,340.42 |
$1,500.00 |
| 42 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$1,200.00 |
$1,500.00 |
$2,076.18 |
$1,900.00 |
| 43 | 613(L) 4546 |
58" X 36" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,500.00 |
$2,250.00 |
$2,759.87 |
$2,500.00 |
| 44 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$325.00 |
$700.00 |
$816.54 |
$950.00 |
| 45 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$900.00 |
$850.00 |
$1,211.79 |
$1,100.00 |
| 46 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,600.00 |
$1,800.00 |
$2,320.84 |
$1,900.00 |
| 47 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 82 | EA |
$1,200.00 |
$900.00 |
$750.00 |
$890.00 |
| 48 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 6 | EA |
$1,350.00 |
$900.00 |
$1,600.00 |
$1,000.00 |
| 49 | 613(M) 7193 |
TYPE CC4 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$900.00 |
$2,500.00 |
$1,900.00 |
| 50 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 678 | SY |
$7.50 |
$5.00 |
$5.94 |
$4.00 |
| 51 | 619(B) 4741 |
REMOVAL OF DRAINAGE INLETS | 1 | EA |
$480.00 |
$1,000.00 |
$502.46 |
$1,000.00 |
| 52 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 127 | LF |
$10.00 |
$10.00 |
$26.63 |
$10.00 |
| 53 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 4 | EA |
$110.00 |
$100.00 |
$200.00 |
$20.00 |
| 54 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 200 | SF |
$20.00 |
$28.00 |
$20.00 |
$27.00 |
| 55 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 324 | LF |
$15.00 |
$10.00 |
$8.00 |
$9.50 |
| 56 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 28,342 | LF |
$0.5000 |
$0.5500 |
$0.6000 |
$0.6000 |
| 57 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 99 | LF |
$0.8000 |
$13.00 |
$5.00 |
$12.00 |
| 58 | 855(B) 8821 |
TRAFFIC STRIPE(PLASTIC)(WORDS) | 1 | EA |
$160.00 |
$250.00 |
$200.00 |
$250.00 |
| 59 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 2 | EA |
$400.00 |
$400.00 |
$450.00 |
$400.00 |
| 60 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$15,000.00 |
$36,563.56 |
$14,000.00 |
| 61 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$14.00 |
$15.00 |
$20.00 |
$23.00 |
| 62 | 501(G) 6309 |
CLSM BACKFILL | 76 | CY |
$150.00 |
$120.00 |
$175.00 |
$170.00 |
| 63 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 224 | LF |
$210.00 |
$191.00 |
$223.25 |
$225.00 |
| 64 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 211.2 | LF |
$75.00 |
$70.00 |
$78.00 |
$112.00 |
| 65 | 506(A) 1322 |
STRUCTURAL STEEL | 510 | LB |
$2.75 |
$3.50 |
$3.50 |
$16.00 |
| 66 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$850.00 |
$1,200.00 |
$1,050.00 |
$1,400.00 |
| 67 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$850.00 |
$1,200.00 |
$1,050.00 |
$1,400.00 |
| 68 | 509(A) 1326 |
CLASS AA CONCRETE | 60.1 | CY |
$550.00 |
$700.00 |
$648.00 |
$900.00 |
| 69 | 509(B) 1328 |
CLASS A CONCRETE | 66.2 | CY |
$575.00 |
$700.00 |
$685.00 |
$900.00 |
| 70 | 511(A) 1332 |
REINFORCING STEEL | 23,300 | LB |
$0.9000 |
$0.9000 |
$1.40 |
$1.40 |
| 71 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 90 | LF |
$35.00 |
$30.00 |
$43.40 |
$70.00 |
| 72 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 235 | LF |
$40.00 |
$35.00 |
$54.60 |
$86.00 |
| 73 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 90 | LF |
$15.00 |
$15.00 |
$18.60 |
$23.00 |
| 74 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 160 | LF |
$15.00 |
$15.00 |
$23.40 |
$23.00 |
| 75 | 514(K) 6260 |
(PL)PILOT HOLES | 45 | LF |
$150.00 |
$150.00 |
$290.00 |
$400.00 |
| 76 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 77 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 800 | TON |
$40.00 |
$40.00 |
$48.88 |
$52.00 |
| 78 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 267 | TON |
$32.00 |
$33.00 |
$39.92 |
$41.00 |
| 79 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$8,000.00 |
$8,000.00 |
$23,500.00 |
| 80 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 25 | LF |
$20.00 |
$25.00 |
$18.50 |
$24.00 |
| 81 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 1 | EA |
$1,600.00 |
$2,000.00 |
$1,800.00 |
$2,000.00 |
| 82 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 3 | EA |
$2,200.00 |
$2,700.00 |
$2,226.00 |
$2,600.00 |
| 83 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,140 | CY |
$10.00 |
$6.00 |
$5.58 |
$8.50 |
| 84 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 111 | CY |
$10.00 |
$15.00 |
$30.00 |
$28.00 |
| 85 | 509(A) 1326 |
CLASS AA CONCRETE | 180.74 | CY |
$550.00 |
$450.00 |
$380.00 |
$735.00 |
| 86 | 511(A) 1332 |
REINFORCING STEEL | 33,035 | LB |
$0.9000 |
$0.9000 |
$0.9000 |
$1.40 |
| 87 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 66 | TON |
$40.00 |
$40.00 |
$48.00 |
$63.00 |
| 88 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 20 | TON |
$32.00 |
$33.00 |
$46.00 |
$52.00 |
| 89 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$6,508.77 |
$25,000.00 |
| 90 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$42,000.00 |
$10,000.00 |
$85,000.00 |
| 91 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$15,000.00 |
$3,500.00 |
$1,136.80 |
$1,000.00 |
| 92 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$235,000.00 |
$200,000.00 |
$261,000.00 |
$115,000.00 |