| 1 | 104 0300 |
CONSTRUCTION MISCELLANEOUS | 200 | LF |
$35.00 |
$26.90 |
$28.10 |
$11.00 |
$34.32 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 48,613 | CY |
$5.50 |
$9.00 |
$14.77 |
$13.00 |
$8.18 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 30,934 | CY |
$7.00 |
$0.2500 |
$14.77 |
$13.00 |
$13.98 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$45,000.00 |
$40,000.00 |
$78,463.20 |
$90,000.00 |
$69,034.97 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 32,896 | LF |
$2.75 |
$1.88 |
$1.28 |
$1.70 |
$1.17 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 27 | EA |
$200.00 |
$394.95 |
$209.68 |
$350.00 |
$144.90 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,780 | LF |
$6.50 |
$9.48 |
$8.31 |
$8.00 |
$8.52 |
| 8 | 221(H) 0450 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 65 | EA |
$150.00 |
$150.00 |
$209.68 |
$175.00 |
$131.25 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 78,438 | SY |
$2.20 |
$1.45 |
$1.38 |
$1.50 |
$1.29 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 15 | AC |
$500.00 |
$426.00 |
$471.01 |
$450.00 |
$439.95 |
| 11 | 241 2832 |
MOWING | 48 | AC |
$70.00 |
$53.25 |
$93.30 |
$60.00 |
$87.15 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 63,108 | CY |
$30.00 |
$44.00 |
$36.27 |
$35.00 |
$39.83 |
| 13 | 307(D) 4230 |
LIME | 7,951 | TON |
$125.00 |
$76.00 |
$193.14 |
$155.00 |
$170.10 |
| 14 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 369,019 | SY |
$2.50 |
$3.00 |
$1.98 |
$2.70 |
$1.54 |
| 15 | 317 4270 |
CEMENT TREATED BASE | 351,438 | SY |
$10.00 |
$11.00 |
$11.05 |
$10.70 |
$13.60 |
| 16 | 325 5271 |
SEPARATOR FABRIC | 369,019 | SY |
$1.50 |
$1.30 |
$1.01 |
$1.25 |
$1.75 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 45,252 | TON |
$35.00 |
$20.00 |
$24.43 |
$27.50 |
$21.55 |
| 18 | 408 5774 |
PRIME COAT | 217,619 | GAL |
$3.50 |
$1.00 |
$4.10 |
$2.20 |
$4.52 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 259 | TON |
$115.00 |
$105.36 |
$106.79 |
$71.00 |
$82.95 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 38,035 | SY |
$1.70 |
$6.00 |
$2.81 |
$1.25 |
$4.70 |
| 21 | 413(C) 4868 |
RUMBLE STRIP-METHOD PCC-CON | 82,800 | LF |
$0.7500 |
$0.1600 |
$0.1200 |
$0.2000 |
$0.2500 |
| 22 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 146,056 | SY |
$11.00 |
$6.00 |
$8.44 |
$8.10 |
$8.82 |
| 23 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 234,147 | SY |
$16.00 |
$11.00 |
$11.62 |
$11.00 |
$13.10 |
| 24 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 50 | SY |
$100.00 |
$465.00 |
$29.33 |
$37.00 |
$133.88 |
| 25 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 110,859 | CY |
$95.00 |
$85.00 |
$90.47 |
$95.00 |
$80.73 |
| 26 | 501(F) 6352 |
GRANULAR BACKFILL | 728 | CY |
$35.00 |
$38.28 |
$48.34 |
$50.00 |
$77.29 |
| 27 | 509(A) 0319 |
CLASS AA CONCRETE | 953 | CY |
$475.00 |
$363.31 |
$365.35 |
$385.00 |
$547.43 |
| 28 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 7.3 | CY |
$635.00 |
$3,355.04 |
$505.86 |
$1,100.00 |
$578.34 |
| 29 | 509(D) 0325 |
CLASS C CONCRETE | 196.1 | CY |
$270.00 |
$238.95 |
$252.93 |
$275.00 |
$205.23 |
| 30 | 510(B) 6334 |
SOUND BARRIER WALL | 9,834 | SY |
$200.00 |
$154.59 |
$169.99 |
$195.00 |
$325.16 |
| 31 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 177,010 | SF |
$3.15 |
$1.83 |
$1.85 |
$1.80 |
$2.36 |
| 32 | 511(A) 0332 |
REINFORCING STEEL | 50,017 | LB |
$0.9000 |
$0.8000 |
$0.8000 |
$0.9000 |
$1.67 |
| 33 | 516(A) 6091 |
DRILLED SHAFTS 30" DIAMETER | 3,728 | LF |
$200.00 |
$144.23 |
$245.92 |
$150.00 |
$367.25 |
| 34 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 555 | SY |
$30.00 |
$23.49 |
$31.18 |
$28.00 |
$35.63 |
| 35 | 611(G) 4012 |
SPECIAL INLET DRAIN | 4 | EA |
$1,200.00 |
$1,617.76 |
$4,304.62 |
$1,200.00 |
$3,741.28 |
| 36 | 611(G) 5700 |
INLET - LONGITUDINAL BARRIER - TYPE II, DES. 2 | 8 | EA |
$3,500.00 |
$6,500.00 |
$2,665.20 |
$4,000.00 |
$4,429.60 |
| 37 | 611(N) 3600 |
WELDED STEEL GRATE (30" SQ.) | 8 | EA |
$250.00 |
$987.19 |
$711.24 |
$1,800.00 |
$652.56 |
| 38 | 611(N) 3610 |
WELDED STEEL GRATE (36" SQ.) | 8 | EA |
$270.00 |
$1,114.71 |
$839.60 |
$1,900.00 |
$652.56 |
| 39 | 612(A) 0641 |
MANHOLES ADJUST TO GRADE | 1 | EA |
$600.00 |
$6,092.50 |
$505.86 |
$1,000.00 |
$2,517.08 |
| 40 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 50 | LF |
$80.00 |
$135.22 |
$100.63 |
$75.00 |
$68.56 |
| 41 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 12 | LF |
$90.00 |
$79.15 |
$186.04 |
$100.00 |
$89.83 |
| 42 | 613(B) 0688 |
12" CORR. GALV. STEEL PIPE | 236 | LF |
$20.00 |
$36.66 |
$36.27 |
$30.00 |
$22.20 |
| 43 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 1,200 | LF |
$30.00 |
$20.07 |
$37.20 |
$24.00 |
$22.44 |
| 44 | 613(I) 1094 |
4" NON-PERF.PIPE UNDERDRAIN RND. | 23,595 | LF |
$9.00 |
$4.84 |
$6.69 |
$5.20 |
$6.30 |
| 45 | 613(N) 7501 |
TYPE B4 SLOPED CONCRETE END SECTION | 1 | EA |
$2,000.00 |
$8,301.80 |
$2,756.96 |
$2,000.00 |
$1,145.54 |
| 46 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 7 | EA |
$500.00 |
$373.67 |
$181.59 |
$625.00 |
$787.50 |
| 47 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$115,000.00 |
$35,410.72 |
$100,000.00 |
$44,863.77 |
| 48 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 186,245 | SY |
$4.25 |
$3.20 |
$3.18 |
$3.25 |
$3.98 |
| 49 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 69,941 | SY |
$3.50 |
$4.33 |
$2.25 |
$2.20 |
$2.51 |
| 50 | 619(B) 4915 |
REMOVAL OF CONCRETE MEDIAN BARRIER | 11,102 | LF |
$6.00 |
$7.94 |
$10.32 |
$6.50 |
$11.23 |
| 51 | 619(B) 5151 |
REMOVAL OF CONCRETE CHATTER MEDIAN | 229 | SY |
$4.50 |
$3.26 |
$10.12 |
$2.50 |
$7.02 |
| 52 | 625(D) 1254 |
REMOVE AND RECONSTRUCT GUARDRAIL | 430 | LF |
$50.00 |
$7.02 |
$7.81 |
$13.00 |
$12.58 |
| 53 | 627(A) 4317 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 9,754 | LF |
$48.00 |
$40.00 |
$29.67 |
$40.00 |
$106.50 |
| 54 | 627(B) 4410 |
CONCRETE LONGITUDINAL BARRIER END SECTIONS | 26 | EA |
$300.00 |
$188.00 |
$451.14 |
$1,200.00 |
$2,404.08 |
| 55 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 19 | EA |
$24,000.00 |
$22,841.57 |
$24,905.48 |
$24,017.47 |
$21,525.00 |
| 56 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 270 | CY |
$20.00 |
$18.67 |
$18.25 |
$40.00 |
$56.34 |
| 57 | 501(G) 6309 |
CLSM BACKFILL | 205 | CY |
$150.00 |
$97.79 |
$105.78 |
$135.00 |
$286.22 |
| 58 | 504(A) 1304 |
APPROACH SLAB | 727.6 | SY |
$180.00 |
$136.46 |
$135.21 |
$160.00 |
$177.36 |
| 59 | 504(B) 1305 |
SAW-CUT GROOVING | 2,294 | SY |
$8.00 |
$4.09 |
$4.55 |
$4.50 |
$14.04 |
| 60 | 504(C) 6250 |
SEALED EXPANSION JOINT | 87.4 | LF |
$250.00 |
$280.85 |
$228.40 |
$240.00 |
$543.43 |
| 61 | 504(E) 6190 |
42" F-SHAPED PARAPET | 573.8 | LF |
$85.00 |
$86.38 |
$76.76 |
$80.00 |
$125.66 |
| 62 | 506(A) 1322 |
STRUCTURAL STEEL | 284,520 | LB |
$1.75 |
$1.89 |
$1.64 |
$1.88 |
$1.83 |
| 63 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 18 | EA |
$1,200.00 |
$1,114.84 |
$902.59 |
$1,100.00 |
$1,665.70 |
| 64 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 54 | EA |
$1,200.00 |
$1,114.84 |
$969.83 |
$1,100.00 |
$1,665.70 |
| 65 | 509 6152 |
SPECIAL CONCRETE FINISH | 116 | SY |
$20.00 |
$12.94 |
$11.63 |
$40.00 |
$174.30 |
| 66 | 509(A) 1326 |
CLASS AA CONCRETE | 386.3 | CY |
$470.00 |
$446.26 |
$677.17 |
$475.00 |
$731.83 |
| 67 | 509(B) 1328 |
CLASS A CONCRETE | 244.2 | CY |
$450.00 |
$494.38 |
$514.79 |
$650.00 |
$493.98 |
| 68 | 511(A) 1332 |
REINFORCING STEEL | 1,120 | LB |
$1.00 |
$1.66 |
$0.7400 |
$1.25 |
$5.22 |
| 69 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 132,000 | LB |
$1.00 |
$1.09 |
$0.9300 |
$1.00 |
$1.72 |
| 70 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 967 | SY |
$4.00 |
$3.72 |
$3.93 |
$4.00 |
$14.04 |
| 71 | 516(A) 6091 |
DRILLED SHAFTS 30" DIAMETER | 179 | LF |
$250.00 |
$357.58 |
$236.37 |
$350.00 |
$431.07 |
| 72 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 64 | LF |
$550.00 |
$767.25 |
$419.88 |
$550.00 |
$847.02 |
| 73 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 12 | LF |
$125.00 |
$3.50 |
$37.08 |
$50.00 |
$174.30 |
| 74 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 1 | GAL |
$300.00 |
$91.32 |
$98.88 |
$150.00 |
$1,375.21 |
| 75 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 42 | SY |
$1,250.00 |
$584.36 |
$618.05 |
$775.00 |
$283.30 |
| 76 | 523(A) 6550 |
SEALER CRACK PREPARATION | 172.6 | LF |
$5.00 |
$3.03 |
$3.53 |
$4.00 |
$34.86 |
| 77 | 523(B) 6560 |
SEALER RESIN | 3 | GAL |
$200.00 |
$101.01 |
$117.72 |
$200.00 |
$1,178.03 |
| 78 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 178 | LF |
$20.00 |
$47.52 |
$16.43 |
$20.00 |
$117.80 |
| 79 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 74 | LF |
$20.00 |
$20.74 |
$20.15 |
$20.00 |
$117.80 |
| 80 | 619(B) 2515 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 2 | EA |
$1,500.00 |
$1,620.00 |
$3,724.51 |
$4,000.00 |
$5,746.05 |
| 81 | 619(B) 2520 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 1 | LSUM |
$35,000.00 |
$32,400.00 |
$32,421.85 |
$110,000.00 |
$114,040.75 |
| 82 | 619(B) 2535 |
REMOVAL OF BRIDGE ITEM (TYPE C) | 2 | EA |
$2,500.00 |
$2,700.00 |
$3,650.00 |
$15,000.00 |
$8,475.00 |
| 83 | 619(B) 2545 |
REMOVAL OF BRIDGE ITEM (TYPE D) | 3 | EA |
$1,500.00 |
$2,160.00 |
$3,505.39 |
$7,500.00 |
$22,600.00 |
| 84 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 270 | CY |
$20.00 |
$18.67 |
$18.25 |
$40.00 |
$45.20 |
| 85 | 501(G) 6309 |
CLSM BACKFILL | 205 | CY |
$150.00 |
$103.19 |
$105.78 |
$135.00 |
$286.22 |
| 86 | 504(A) 1304 |
APPROACH SLAB | 727.6 | SY |
$180.00 |
$136.46 |
$135.21 |
$160.00 |
$177.36 |
| 87 | 504(B) 1305 |
SAW-CUT GROOVING | 2,294 | SY |
$8.00 |
$4.09 |
$4.55 |
$4.50 |
$14.04 |
| 88 | 504(C) 6250 |
SEALED EXPANSION JOINT | 87.4 | LF |
$250.00 |
$280.85 |
$228.40 |
$240.00 |
$543.43 |
| 89 | 504(E) 6190 |
42" F-SHAPED PARAPET | 573.8 | LF |
$85.00 |
$86.38 |
$76.76 |
$80.00 |
$125.66 |
| 90 | 506(A) 1322 |
STRUCTURAL STEEL | 284,520 | LB |
$1.75 |
$1.85 |
$1.64 |
$1.88 |
$1.83 |
| 91 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 18 | EA |
$1,200.00 |
$1,114.84 |
$902.59 |
$1,100.00 |
$794.69 |
| 92 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 54 | EA |
$1,200.00 |
$1,114.84 |
$969.83 |
$1,100.00 |
$1,404.03 |
| 93 | 509 6152 |
SPECIAL CONCRETE FINISH | 115.6 | SY |
$20.00 |
$12.94 |
$11.63 |
$40.00 |
$1,261.78 |
| 94 | 509(A) 1326 |
CLASS AA CONCRETE | 386.3 | CY |
$470.00 |
$446.26 |
$665.82 |
$475.00 |
$713.65 |
| 95 | 509(B) 1328 |
CLASS A CONCRETE | 243.9 | CY |
$450.00 |
$494.38 |
$512.70 |
$650.00 |
$466.68 |
| 96 | 510(C) 6137 |
SLOPE WALL (4") | 2,823 | SY |
$80.00 |
$79.15 |
$82.10 |
$87.50 |
$84.75 |
| 97 | 511(A) 1332 |
REINFORCING STEEL | 1,120 | LB |
$1.00 |
$1.66 |
$0.8000 |
$1.25 |
$5.22 |
| 98 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 132,000 | LB |
$1.00 |
$1.14 |
$0.9700 |
$1.00 |
$1.72 |
| 99 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 966 | SY |
$4.00 |
$3.03 |
$3.93 |
$4.00 |
$14.04 |
| 100 | 516(A) 6091 |
DRILLED SHAFTS 30" DIAMETER | 209 | LF |
$250.00 |
$361.65 |
$238.78 |
$350.00 |
$369.19 |
| 101 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 58 | LF |
$550.00 |
$790.04 |
$425.77 |
$550.00 |
$775.25 |
| 102 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 12 | LF |
$125.00 |
$32.23 |
$37.08 |
$50.00 |
$174.30 |
| 103 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 1 | GAL |
$300.00 |
$91.32 |
$98.88 |
$150.00 |
$1,375.21 |
| 104 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 31 | SY |
$1,250.00 |
$584.36 |
$618.05 |
$775.00 |
$383.83 |
| 105 | 523(A) 6550 |
SEALER CRACK PREPARATION | 172.6 | LF |
$5.00 |
$3.03 |
$3.53 |
$4.00 |
$34.86 |
| 106 | 523(B) 6560 |
SEALER RESIN | 3 | GAL |
$200.00 |
$101.01 |
$117.72 |
$200.00 |
$1,178.03 |
| 107 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 178 | LF |
$20.00 |
$34.56 |
$16.43 |
$20.00 |
$117.80 |
| 108 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 70 | LF |
$20.00 |
$20.72 |
$20.15 |
$20.00 |
$117.80 |
| 109 | 619(B) 2515 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 2 | EA |
$1,500.00 |
$1,620.00 |
$3,724.51 |
$4,000.00 |
$4,568.03 |
| 110 | 619(B) 2520 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 1 | LSUM |
$35,000.00 |
$32,400.00 |
$32,421.85 |
$110,000.00 |
$96,610.50 |
| 111 | 619(B) 2535 |
REMOVAL OF BRIDGE ITEM (TYPE C) | 2 | EA |
$2,500.00 |
$2,700.00 |
$3,650.00 |
$15,000.00 |
$9,605.00 |
| 112 | 619(B) 2545 |
REMOVAL OF BRIDGE ITEM (TYPE D) | 3 | EA |
$1,500.00 |
$2,160.00 |
$3,505.39 |
$7,500.00 |
$28,250.00 |
| 113 | 619(B) 2550 |
REMOVAL OF BRIDGE ITEM (TYPE E) | 1 | LSUM |
$5,000.00 |
$4,320.00 |
$8,757.50 |
$15,000.00 |
$6,788.03 |
| 114 | 802(A) 8306 |
1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 545 | LF |
$9.00 |
$11.13 |
$7.87 |
$11.20 |
$12.60 |
| 115 | 802(B) 8340 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 1,410 | LF |
$20.10 |
$11.41 |
$13.49 |
$11.47 |
$12.60 |
| 116 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 38,960 | LF |
$5.00 |
$3.12 |
$6.74 |
$3.14 |
$3.83 |
| 117 | 803(A) 8060 |
PULL BOX | 17 | EA |
$450.00 |
$532.50 |
$1,124.13 |
$535.83 |
$761.25 |
| 118 | 803(A) 8065 |
PULL BOX(SIZE I) | 23 | EA |
$270.00 |
$263.56 |
$674.48 |
$265.21 |
$294.00 |
| 119 | 804(A) 2915 |
STRUCTURAL CONCRETE | 142 | CY |
$475.00 |
$403.41 |
$281.03 |
$405.93 |
$556.50 |
| 120 | 804(B) 2916 |
REINFORCING STEEL | 10,185 | LB |
$1.30 |
$1.37 |
$4.50 |
$1.39 |
$1.37 |
| 121 | 806(D) 8991 |
45' MTG.HT.HL.PTP.(G.STL.) | 19 | EA |
$2,000.00 |
$2,133.23 |
$2,473.09 |
$2,146.57 |
$2,308.95 |
| 122 | 806(D) 8995 |
36' MTG.HT.HL.PTP.(G.STL.) | 17 | EA |
$2,500.00 |
$1,620.09 |
$2,023.44 |
$1,630.23 |
$2,098.95 |
| 123 | 806(D) 8997 |
38' MTG.HT.HL.PTP.(G.STL.) | 147 | EA |
$3,500.00 |
$1,466.26 |
$2,045.92 |
$1,475.43 |
$1,821.75 |
| 124 | 807 8092 |
BREAKAWAY BASE (DES. B) | 164 | EA |
$300.00 |
$360.37 |
$562.07 |
$362.63 |
$313.95 |
| 125 | 809(A) 8090 |
ROADWAY LUMINAIRE | 219 | EA |
$900.00 |
$1,018.75 |
$786.89 |
$1,025.12 |
$672.00 |
| 126 | 810(A) 3118 |
SERVICE POLE | 5 | EA |
$2,600.00 |
$3,108.94 |
$5,058.59 |
$3,128.39 |
$3,444.00 |
| 127 | 811 8038 |
1/C NO.4 ELECTRICAL CONDUCTOR | 87,005 | LF |
$2.00 |
$1.74 |
$1.69 |
$1.74 |
$1.52 |
| 128 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 26,810 | LF |
$0.5500 |
$0.6500 |
$0.5600 |
$0.6500 |
$0.9200 |
| 129 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 131,825 | LF |
$0.7500 |
$0.5300 |
$0.6000 |
$0.5300 |
$0.5100 |
| 130 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 10,245 | LF |
$1.25 |
$1.30 |
$1.46 |
$1.30 |
$1.26 |
| 131 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 7,380 | LF |
$2.80 |
$4.54 |
$5.10 |
$4.60 |
$4.41 |
| 132 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 321,210 | LF |
$0.5000 |
$0.0700 |
$0.0900 |
$0.1000 |
$0.0700 |
| 133 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 9,269 | EA |
$0.7500 |
$0.6500 |
$0.7300 |
$0.7000 |
$1.65 |
| 134 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 74,655 | LF |
$0.4000 |
$0.1900 |
$0.2200 |
$0.2000 |
$0.1900 |
| 135 | 870(A) 8485 |
SAND FILLED IMPACT ATTENUATION MODULE | 77,760 | SD |
$1.00 |
$0.1100 |
$0.1200 |
$0.1100 |
$0.1100 |
| 136 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 600 | SD |
$3.75 |
$6.49 |
$7.29 |
$6.49 |
$6.30 |
| 137 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 300 | SD |
$50.00 |
$6.49 |
$7.29 |
$6.49 |
$6.30 |
| 138 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 70,050 | LF |
$18.00 |
$28.00 |
$25.37 |
$25.00 |
$25.40 |
| 139 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 138,790 | LF |
$3.00 |
$1.00 |
$2.46 |
$3.00 |
$3.62 |
| 140 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 108,600 | SD |
$0.0600 |
$0.1100 |
$0.1200 |
$0.1100 |
$0.1100 |
| 141 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 1,200 | SD |
$15.00 |
$1.08 |
$1.21 |
$1.08 |
$1.05 |
| 142 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 124,200 | SD |
$0.1000 |
$0.1100 |
$0.1200 |
$0.1100 |
$0.1100 |
| 143 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 59,400 | SD |
$0.6000 |
$0.1100 |
$0.1200 |
$0.1100 |
$0.1100 |
| 144 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 66,000 | SD |
$3.00 |
$0.1100 |
$0.1200 |
$0.1100 |
$0.1100 |
| 145 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 24,000 | SD |
$0.5000 |
$0.0500 |
$0.0600 |
$0.0500 |
$0.0500 |
| 146 | 880(C) 8848 |
WING BARRICADES | 2,400 | SD |
$2.00 |
$2.16 |
$2.43 |
$2.16 |
$2.10 |
| 147 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 54,000 | SD |
$0.2500 |
$0.3200 |
$0.3600 |
$0.3200 |
$0.3200 |
| 148 | 880(F) 8878 |
DRUMS | 405,000 | SD |
$0.1000 |
$0.2100 |
$0.2400 |
$0.2200 |
$0.2100 |
| 149 | 880(G) 8884 |
TUBE CHANNELIZERS | 12,000 | SD |
$0.2500 |
$0.2100 |
$0.2400 |
$0.2200 |
$0.2100 |
| 150 | 880(G) 8890 |
CHANNELIZER CONES | 16,800 | SD |
$0.3000 |
$0.2100 |
$0.2400 |
$0.2200 |
$0.2100 |
| 151 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 1,080 | HOUR |
$75.00 |
$59.46 |
$61.83 |
$59.58 |
$68.25 |
| 152 | 882 8370 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 13,200 | SD |
$20.00 |
$6.49 |
$7.29 |
$6.49 |
$6.30 |
| 153 | 882 8372 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | 10,800 | SD |
$15.00 |
$6.49 |
$7.29 |
$6.49 |
$6.30 |
| 154 | 882 8374 |
(SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | 1,200 | SD |
$15.00 |
$8.64 |
$9.72 |
$8.66 |
$8.40 |
| 155 | 882 8376 |
(SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | 600 | SD |
$30.00 |
$8.64 |
$9.72 |
$8.66 |
$8.40 |
| 156 | 882 8378 |
(PL)SMART WORK ZONE SYSTEM SETUP | 1 | EA |
$25,000.00 |
$8,640.97 |
$9,719.21 |
$8,659.91 |
$8,400.00 |
| 157 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 600 | SD |
$100.00 |
$16.20 |
$18.22 |
$16.24 |
$15.75 |
| 158 | 509(D) 0325 |
CLASS C CONCRETE | 109.28 | CY |
$266.00 |
$250.28 |
$323.16 |
$270.62 |
$262.50 |
| 159 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 932.25 | LF |
$580.00 |
$637.27 |
$458.22 |
$611.61 |
$619.50 |
| 160 | 804(A) 2915 |
STRUCTURAL CONCRETE | 21.08 | CY |
$490.00 |
$540.06 |
$607.46 |
$541.24 |
$525.00 |
| 161 | 804(B) 2916 |
REINFORCING STEEL | 7,858 | LB |
$1.50 |
$1.08 |
$1.21 |
$0.4500 |
$1.05 |
| 162 | 805(A) 8718 |
(PL)REMOVAL OF OVERHEAD SIGN STRUCTURE & SIGNS | 1 | LSUM |
$6,500.00 |
$4,860.54 |
$5,467.06 |
$4,871.20 |
$4,725.00 |
| 163 | 805(A) 8720 |
(PL)REMOVAL OF GROUND MOUNTED SIGNS | 1 | LSUM |
$1,100.00 |
$864.10 |
$971.92 |
$865.99 |
$840.00 |
| 164 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$380.00 |
$1,296.15 |
$1,457.88 |
$1,298.99 |
$1,260.00 |
| 165 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 5 | EA |
$185.00 |
$324.04 |
$364.48 |
$324.75 |
$315.00 |
| 166 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 1,322.82 | SF |
$15.00 |
$16.20 |
$18.22 |
$16.24 |
$15.75 |
| 167 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 1,138 | SF |
$18.50 |
$19.45 |
$21.87 |
$19.48 |
$18.90 |
| 168 | 850(B) 8114 |
EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 5,326.9 | SF |
$18.00 |
$19.45 |
$21.87 |
$19.48 |
$18.90 |
| 169 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 557 | LF |
$22.00 |
$15.12 |
$17.01 |
$15.15 |
$14.70 |
| 170 | 851(A) 3207 |
6"@15 GALV.STEEL WIDE FLANGE BEAM POST | 164 | LF |
$28.00 |
$18.90 |
$21.26 |
$18.94 |
$18.38 |
| 171 | 851(B) 3217 |
2 1/2"@5.79 GALV.STEEL PIPE POST | 136 | LF |
$15.00 |
$12.96 |
$14.58 |
$12.99 |
$12.60 |
| 172 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 400 | LF |
$19.00 |
$16.20 |
$18.22 |
$16.24 |
$15.75 |
| 173 | 851(B) 3219 |
3 1/2"@9.11 GALV.STEEL PIPE POST | 240 | LF |
$19.25 |
$18.36 |
$20.65 |
$18.40 |
$17.85 |
| 174 | 851(C) 8324 |
2" SQUARE TUBE POST | 1,223 | LF |
$7.00 |
$7.02 |
$7.90 |
$7.04 |
$6.83 |
| 175 | 852(D) 0315 |
OVHD.SN.STR., MONOTUBE TYPE B 85' | 3 | EA |
$53,000.00 |
$70,207.91 |
$66,863.92 |
$70,361.73 |
$68,250.00 |
| 176 | 852(D) 0320 |
OVHD.SN.STR., MONOTUBE TYPE B 90' | 3 | EA |
$46,000.00 |
$71,180.02 |
$67,169.55 |
$71,335.97 |
$69,195.00 |
| 177 | 852(E) 0500 |
OVHD.SN.STR., MONOTUBE TYPE C | 21 | EA |
$40,000.00 |
$46,839.48 |
$42,238.20 |
$46,546.99 |
$45,150.00 |
| 178 | 870(A) 8011 |
SAND FILLED IMPACT ATTENUATION MODULE | 304 | EA |
$300.00 |
$313.24 |
$352.32 |
$313.92 |
$304.50 |
| 179 | 509(A) 0319 |
CLASS AA CONCRETE | 342 | CY |
$450.00 |
$267.75 |
$251.58 |
$113.66 |
$110.25 |
| 180 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 31,437 | LF |
$11.00 |
$10.22 |
$12.14 |
$11.23 |
$10.89 |
| 181 | 628(C) 5110 |
END ANCHORS | 8 | EA |
$1,500.00 |
$1,499.39 |
$1,461.83 |
$4,329.95 |
$4,200.00 |
| 182 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$150,000.00 |
$168,000.00 |
$142,118.36 |
$130,000.00 |
$227,750.00 |
| 183 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$9,500.00 |
$3,247.80 |
$2,810.33 |
$11,300.00 |
$33,900.00 |
| 184 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$27,650.69 |
$6,744.79 |
$36,000.00 |
$13,560.00 |
| 185 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$2,032,170.40 |
|
|
|
|
| 186 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$35,000.00 |
$75,000.00 |
$129,679.85 |
$110,000.00 |
$79,100.00 |
| 187 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,714 | CY |
$6.98 |
$10.00 |
$14.77 |
$12.00 |
$14.41 |
| 188 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,726 | CY |
$8.49 |
$6.50 |
$14.77 |
$12.00 |
$19.45 |
| 189 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,611 | LF |
$1.85 |
$2.05 |
$1.63 |
$1.65 |
$1.17 |
| 190 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 4 | EA |
$169.26 |
$434.30 |
$209.68 |
$325.00 |
$144.90 |
| 191 | 221(F) 0100 |
TEMPORARY SILT DIKE | 84 | LF |
$10.00 |
$10.52 |
$6.89 |
$7.60 |
$8.52 |
| 192 | 229 4318 |
DITCH LINER PROTECTION | 105 | LF |
$2.50 |
$1.07 |
$14.05 |
$1.10 |
$13.13 |
| 193 | 230(A) 2806 |
SOLID SLAB SODDING | 12,240 | SY |
$1.69 |
$1.33 |
$1.38 |
$1.50 |
$1.29 |
| 194 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 516 | CY |
$48.91 |
$55.00 |
$33.72 |
$45.00 |
$82.77 |
| 195 | 307(A) 4200 |
FLY ASH | 532 | TON |
$62.25 |
$45.00 |
$59.65 |
$70.00 |
$73.50 |
| 196 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 9,840 | SY |
$2.63 |
$3.50 |
$2.92 |
$2.75 |
$3.11 |
| 197 | 407(B) 0250 |
TACK COAT | 634 | GAL |
$3.44 |
$1.60 |
$2.81 |
$1.10 |
$3.15 |
| 198 | 408 5774 |
PRIME COAT | 4,443 | GAL |
$5.22 |
$1.50 |
$4.10 |
$2.50 |
$4.52 |
| 199 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,562 | TON |
$75.22 |
$60.97 |
$84.31 |
$70.00 |
$71.40 |
| 200 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 513 | TON |
$99.45 |
$73.49 |
$106.79 |
$71.00 |
$84.00 |
| 201 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 5,994 | SY |
$16.00 |
$18.00 |
$22.79 |
$15.00 |
$28.39 |
| 202 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 1,582 | CY |
$95.00 |
$99.00 |
$122.42 |
$100.00 |
$80.66 |
| 203 | 509(D) 0325 |
CLASS C CONCRETE | 23 | CY |
$265.06 |
$350.00 |
$297.90 |
$250.00 |
$232.92 |
| 204 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 54 | TON |
$42.44 |
$48.44 |
$50.03 |
$60.00 |
$35.82 |
| 205 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 2,089 | LF |
$11.44 |
$15.88 |
$1.94 |
$6.00 |
$12.40 |
| 206 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 896 | LF |
$4.80 |
$22.12 |
$2.29 |
$6.00 |
$12.77 |
| 207 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 528 | SY |
$46.03 |
$36.37 |
$28.61 |
$50.00 |
$39.59 |
| 208 | 610(C) 0609 |
6" CONCRETE DIVIDING STRIP | 1,819 | SY |
$41.93 |
$37.94 |
$22.30 |
$38.00 |
$42.65 |
| 209 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 64 | SF |
$32.72 |
$28.32 |
$20.78 |
$23.00 |
$35.34 |
| 210 | 611(G) 5113 |
INLET CI DES. 2 (B) | 4 | EA |
$3,312.76 |
$6,290.71 |
$2,754.11 |
$3,500.00 |
$2,993.09 |
| 211 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 2 | VF |
$308.77 |
$517.06 |
$186.08 |
$200.00 |
$325.16 |
| 212 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 148 | LF |
$56.76 |
$67.09 |
$58.76 |
$45.00 |
$60.94 |
| 213 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$437.79 |
$1,306.03 |
$1,051.36 |
$700.00 |
$994.68 |
| 214 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 29 | CY |
$43.19 |
$40.46 |
$22.25 |
$22.00 |
$54.50 |
| 215 | 613(V) 1180 |
TRENCH EXCAVATION | 49 | CY |
$10.70 |
$16.45 |
$11.24 |
$8.00 |
$11.30 |
| 216 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$12,621.33 |
$3,272.52 |
$8,993.06 |
$5,000.00 |
$4,496.44 |
| 217 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 4,597 | SY |
$6.27 |
$3.02 |
$5.62 |
$5.50 |
$8.14 |
| 218 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 5,067 | SY |
$3.55 |
$4.47 |
$3.11 |
$2.50 |
$3.42 |
| 219 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 561 | LF |
$2.27 |
$2.02 |
$2.53 |
$4.50 |
$2.10 |
| 220 | 619(B) 4791 |
REMOVAL OF CURB | 2,474 | LF |
$5.74 |
$2.45 |
$4.50 |
$4.50 |
$4.37 |
| 221 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 130 | LF |
$4.83 |
$8.37 |
$11.24 |
$4.50 |
$10.49 |
| 222 | 619(C) 0924 |
SAWING PAVEMENT | 3,171 | LF |
$2.65 |
$3.83 |
$4.50 |
$7.30 |
$4.20 |
| 223 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 375 | LF |
$15.22 |
$16.13 |
$25.40 |
$14.60 |
$14.17 |
| 224 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,247.01 |
$2,140.76 |
$2,147.09 |
$1,834.82 |
$1,779.75 |
| 225 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,423.33 |
$1,441.52 |
$2,085.27 |
$1,516.57 |
$1,471.05 |
| 226 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 20 | EA |
$12.00 |
$10.76 |
$16.86 |
$5.79 |
$5.62 |
| 227 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 385 | CY |
$20.00 |
$29.47 |
$18.25 |
$40.00 |
$45.20 |
| 228 | 501(G) 6309 |
CLSM BACKFILL | 776.6 | CY |
$160.00 |
$103.19 |
$105.78 |
$135.00 |
$199.10 |
| 229 | 504(A) 1304 |
APPROACH SLAB | 1,274 | SY |
$170.00 |
$145.44 |
$144.12 |
$170.00 |
$164.05 |
| 230 | 504(B) 1305 |
SAW-CUT GROOVING | 4,033.1 | SY |
$5.00 |
$4.09 |
$4.55 |
$4.50 |
$14.04 |
| 231 | 504(C) 6250 |
SEALED EXPANSION JOINT | 215.5 | LF |
$275.00 |
$291.65 |
$224.42 |
$240.00 |
$340.65 |
| 232 | 504(E) 6190 |
42" F-SHAPED PARAPET | 955.4 | LF |
$85.00 |
$86.38 |
$76.76 |
$72.50 |
$125.66 |
| 233 | 506(A) 1322 |
STRUCTURAL STEEL | 938,390 | LB |
$1.75 |
$1.66 |
$1.60 |
$1.48 |
$1.82 |
| 234 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 44 | EA |
$2,000.00 |
$2,250.55 |
$2,112.86 |
$2,000.00 |
$3,054.39 |
| 235 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 44 | EA |
$2,000.00 |
$2,250.55 |
$2,345.13 |
$2,250.00 |
$3,054.39 |
| 236 | 509(A) 1326 |
CLASS AA CONCRETE | 999 | CY |
$450.00 |
$419.26 |
$635.00 |
$400.00 |
$571.93 |
| 237 | 509(B) 1328 |
CLASS A CONCRETE | 654.1 | CY |
$425.00 |
$467.38 |
$487.43 |
$500.00 |
$512.30 |
| 238 | 510(C) 6138 |
SLOPE WALL (5") | 1,606 | SY |
$70.00 |
$87.18 |
$88.81 |
$90.00 |
$75.85 |
| 239 | 511 6306 |
MECHANICAL SPLICES | 83 | EA |
$50.00 |
$38.18 |
$14.72 |
$100.00 |
$83.90 |
| 240 | 511(A) 1332 |
REINFORCING STEEL | 4,340 | LB |
$0.8500 |
$1.57 |
$0.9800 |
$1.25 |
$1.80 |
| 241 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 302,350 | LB |
$1.00 |
$0.8700 |
$1.17 |
$1.00 |
$1.88 |
| 242 | 514(J) 6390 |
TEMPORARY SHEET PILING | 1 | LSUM |
$90,000.00 |
$41,995.80 |
$48,831.33 |
$85,000.00 |
$52,290.75 |
| 243 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,272 | SY |
$4.50 |
$3.03 |
$3.93 |
$4.00 |
$14.04 |
| 244 | 516(A) 6091 |
DRILLED SHAFTS 30" DIAMETER | 172 | LF |
$300.00 |
$295.81 |
$249.72 |
$350.00 |
$497.48 |
| 245 | 516(A) 6092 |
DRILLED SHAFTS 36" DIAMETER | 469 | LF |
$450.00 |
$332.87 |
$288.12 |
$400.00 |
$439.86 |
| 246 | 516(A) 6097 |
DRILLED SHAFTS 66" DIAMETER | 363 | LF |
$600.00 |
$611.34 |
$587.52 |
$650.00 |
$685.36 |
| 247 | 523(A) 6550 |
SEALER CRACK PREPARATION | 458.8 | LF |
$4.00 |
$3.03 |
$3.53 |
$4.00 |
$34.86 |
| 248 | 523(B) 6560 |
SEALER RESIN | 4 | GAL |
$150.00 |
$101.01 |
$117.72 |
$200.00 |
$1,178.03 |
| 249 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$33.00 |
$45.37 |
$14.99 |
$20.00 |
$117.80 |
| 250 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 500 | LF |
$32.00 |
$20.73 |
$20.15 |
$20.00 |
$117.80 |
| 251 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$225,000.00 |
$108,000.00 |
$127,869.53 |
$255,000.00 |
$248,760.50 |
| 252 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 170 | LF |
$4.18 |
$3.60 |
$6.74 |
$3.63 |
$4.20 |
| 253 | 802(B) 8344 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 280 | LF |
$19.41 |
$15.17 |
$15.74 |
$15.26 |
$18.90 |
| 254 | 802(B) 8346 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 80 | LF |
$11.07 |
$6.08 |
$8.99 |
$6.12 |
$7.35 |
| 255 | 803(A) 8065 |
PULL BOX(SIZE I) | 4 | EA |
$263.73 |
$263.57 |
$674.48 |
$265.21 |
$315.00 |
| 256 | 803(A) 8066 |
PULL BOX(SIZE II) | 2 | EA |
$307.21 |
$317.35 |
$786.89 |
$319.34 |
$330.75 |
| 257 | 804(A) 2915 |
STRUCTURAL CONCRETE | 13.6 | CY |
$469.25 |
$403.41 |
$337.24 |
$405.93 |
$519.75 |
| 258 | 804(B) 2916 |
REINFORCING STEEL | 1,997.6 | LB |
$1.02 |
$1.37 |
$4.50 |
$1.39 |
$1.52 |
| 259 | 805(A) 8726 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$2,000.00 |
$5,034.54 |
$5,620.66 |
$5,066.04 |
$3,549.00 |
| 260 | 806(A) 8313 |
32'MH POLE 45'TS & 10'LMA(G.STL.) | 2 | EA |
$6,600.00 |
$8,492.03 |
$15,737.85 |
$8,545.16 |
$9,120.30 |
| 261 | 806(A) 8355 |
32'MH POLE,TWIN TS & 10'LMA(G.STL.) | 2 | EA |
$10,400.00 |
$9,380.61 |
$17,986.11 |
$9,439.30 |
$9,655.80 |
| 262 | 806(B) 8894 |
10' MTG.HT.TS PED.POLE(G.STL.) | 4 | EA |
$650.00 |
$629.32 |
$1,124.13 |
$633.26 |
$504.00 |
| 263 | 809(A) 8090 |
ROADWAY LUMINAIRE | 4 | EA |
$856.50 |
$428.15 |
$562.07 |
$430.83 |
$383.25 |
| 264 | 810(A) 3118 |
SERVICE POLE | 2 | EA |
$2,306.63 |
$430.30 |
$2,810.33 |
$433.00 |
$472.50 |
| 265 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 400 | LF |
$2.26 |
$1.89 |
$1.69 |
$1.89 |
$1.05 |
| 266 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 1,525 | LF |
$0.6600 |
$0.6500 |
$0.5600 |
$0.6500 |
$0.7400 |
| 267 | 825 8550 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 2 | EA |
$15,285.81 |
$32,961.22 |
$20,234.37 |
$33,167.44 |
$32,445.00 |
| 268 | 828 8132 |
(PL)DETECTION SYSTEM (VIDEO) | 1 | LSUM |
$27,633.24 |
$34,187.58 |
$33,096.80 |
$34,401.47 |
$33,600.00 |
| 269 | 830 8000 |
PEDESTRIAN PUSH BUTTON | 4 | EA |
$950.00 |
$2,176.26 |
$1,124.13 |
$2,189.87 |
$1,932.00 |
| 270 | 831 8231 |
1WAY 3SEC. ADJ. SIG. HD. S-6 | 12 | EA |
$494.84 |
$522.82 |
$786.89 |
$526.09 |
$483.00 |
| 271 | 831 8252 |
1WAY 3SEC. ADJ. SIG. HD. S-9 | 2 | EA |
$462.41 |
$512.06 |
$674.48 |
$515.27 |
$483.00 |
| 272 | 831 8295 |
1WAY 2SEC. ADJ. PED. SIG. HD. S-20 | 4 | EA |
$390.00 |
$432.45 |
$562.07 |
$435.16 |
$425.25 |
| 273 | 833 3030 |
BACKPLATE | 14 | EA |
$67.11 |
$82.29 |
$112.41 |
$82.81 |
$72.45 |
| 274 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 1,245 | LF |
$1.09 |
$1.25 |
$1.12 |
$1.26 |
$1.36 |
| 275 | 834(A) 8208 |
7/C TRAFFIC SIGNAL ELECTRICAL CABLE | 455 | LF |
$1.29 |
$1.51 |
$1.69 |
$1.53 |
$1.47 |
| 276 | 834(A) 8213 |
21/C TRAFFIC SIGNAL ELECTRICAL CABLE | 545 | LF |
$4.15 |
$4.20 |
$3.37 |
$4.22 |
$3.83 |
| 277 | 834(B) 8220 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 10 | LF |
$1.10 |
$2.15 |
$1.12 |
$2.17 |
$0.5300 |
| 278 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 76 | SF |
$31.94 |
$35.50 |
$28.10 |
$35.72 |
$30.45 |
| 279 | 804(A) 2915 |
STRUCTURAL CONCRETE | 10.34 | CY |
$469.25 |
$540.06 |
$607.46 |
$541.24 |
$525.00 |
| 280 | 804(B) 2916 |
REINFORCING STEEL | 1,424 | LB |
$1.02 |
$1.08 |
$1.21 |
$1.08 |
$1.05 |
| 281 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 52 | EA |
$57.06 |
$10.80 |
$12.15 |
$10.82 |
$10.50 |
| 282 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 206.86 | SF |
$16.86 |
$16.20 |
$18.22 |
$16.24 |
$15.75 |
| 283 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 410.75 | SF |
$22.63 |
$19.45 |
$21.87 |
$19.48 |
$18.90 |
| 284 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 178 | LF |
$27.57 |
$15.12 |
$17.01 |
$15.15 |
$14.70 |
| 285 | 851(A) 3207 |
6"@15 GALV.STEEL WIDE FLANGE BEAM POST | 102 | LF |
$33.73 |
$18.90 |
$21.26 |
$18.94 |
$18.38 |
| 286 | 851(B) 3216 |
2"@3.65 GALV.STEEL PIPE POST | 84 | LF |
$7.82 |
$8.64 |
$9.72 |
$8.66 |
$8.40 |
| 287 | 851(B) 3217 |
2 1/2"@5.79 GALV.STEEL PIPE POST | 276 | LF |
$13.21 |
$12.96 |
$14.58 |
$12.99 |
$12.60 |
| 288 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 11,509 | LF |
$0.9900 |
$0.4400 |
$0.4900 |
$0.4300 |
$0.4200 |
| 289 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 603 | LF |
$1.36 |
$1.30 |
$1.46 |
$1.30 |
$1.26 |
| 290 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 284 | LF |
$1.75 |
$4.32 |
$4.86 |
$4.33 |
$4.20 |
| 291 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 473 | LF |
$8.29 |
$7.56 |
$8.50 |
$7.58 |
$7.35 |
| 292 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 31 | EA |
$249.91 |
$108.01 |
$121.50 |
$108.25 |
$105.00 |
| 293 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 5 | EA |
$75.00 |
$64.81 |
$72.90 |
$64.95 |
$63.00 |
| 294 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,000 | LF |
$0.2500 |
$0.2100 |
$0.2400 |
$0.2200 |
$0.2100 |
| 295 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 2 | EA |
$21,931.54 |
$22,196.51 |
$24,905.48 |
$22,191.01 |
$21,525.00 |
| 296 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 22,108 | LF |
$0.7500 |
$0.6000 |
$0.6700 |
$0.6000 |
$0.5800 |
| 297 | 857(C) 8860 |
REMOVABLE PAVEMENT MARKING TAPE(ARROWS) | 4 | EA |
$50.00 |
$102.61 |
$115.41 |
$102.84 |
$99.75 |
| 298 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,000 | LF |
$0.2500 |
$0.2100 |
$0.2400 |
$0.2200 |
$0.2100 |
| 299 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 684 | SD |
$4.86 |
$10.80 |
$12.15 |
$10.82 |
$10.50 |
| 300 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,514 | SD |
$0.1000 |
$0.3200 |
$0.3600 |
$0.3200 |
$0.3200 |
| 301 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 7,816 | SD |
$0.2100 |
$0.3200 |
$0.3600 |
$0.3200 |
$0.3200 |
| 302 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,751 | SD |
$0.9100 |
$0.3200 |
$0.3600 |
$0.3200 |
$0.3200 |
| 303 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 7,586 | SD |
$0.1000 |
$0.1300 |
$0.1500 |
$0.1300 |
$0.1300 |
| 304 | 880(C) 8848 |
WING BARRICADES | 2,400 | SD |
$0.2400 |
$0.0500 |
$0.0600 |
$0.0500 |
$0.0500 |
| 305 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 18,923 | SD |
$0.0500 |
$0.1600 |
$0.1800 |
$0.1600 |
$0.1600 |
| 306 | 880(F) 8878 |
DRUMS | 29,768 | SD |
$0.1400 |
$0.5400 |
$0.6100 |
$0.5400 |
$0.5300 |
| 307 | 880(N) 0100 |
(SP) TEMPORARY TRAFFIC SIGNAL SPAN WIRE EQUIPMENT | 1 | LSUM |
$20,000.00 |
$38,727.28 |
$33,723.96 |
$38,969.57 |
$35,542.50 |
| 308 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,000 | LF |
$2.50 |
$1.60 |
$2.48 |
$1.62 |
$1.16 |
| 309 | 501(G) 6309 |
CLSM BACKFILL | 610.7 | CY |
$150.00 |
$143.60 |
$108.93 |
$135.00 |
$157.50 |
| 310 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$10,000.00 |
$2,780.00 |
$14,418.83 |
$10,000.00 |
$9,450.00 |
| 311 | 504(A) 1304 |
APPROACH SLAB | 916 | SY |
$150.00 |
$162.79 |
$134.54 |
$150.00 |
$189.00 |
| 312 | 504(B) 1305 |
SAW-CUT GROOVING | 2,507 | SY |
$6.00 |
$4.09 |
$4.55 |
$4.50 |
$14.04 |
| 313 | 504(C) 6250 |
SEALED EXPANSION JOINT | 228 | LF |
$250.00 |
$313.55 |
$230.39 |
$235.00 |
$315.00 |
| 314 | 504(E) 6190 |
42" F-SHAPED PARAPET | 785.6 | LF |
$75.00 |
$93.48 |
$76.76 |
$65.00 |
$105.00 |
| 315 | 506(A) 1322 |
STRUCTURAL STEEL | 2,690 | LB |
$6.00 |
$5.33 |
$7.68 |
$5.00 |
$7.88 |
| 316 | 509(A) 1326 |
CLASS AA CONCRETE | 397.4 | CY |
$450.00 |
$674.60 |
$765.97 |
$600.00 |
$840.00 |
| 317 | 511 6306 |
MECHANICAL SPLICES | 1,028 | EA |
$30.00 |
$32.18 |
$14.72 |
$17.50 |
$36.75 |
| 318 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 134,243 | LB |
$1.00 |
$1.05 |
$0.9700 |
$1.00 |
$1.05 |
| 319 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$5,000.00 |
$38,381.25 |
$25,744.63 |
$25,000.00 |
$20,714.40 |
| 320 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$4,400.00 |
$5,578.00 |
$5,000.00 |
$5,178.00 |
| 321 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 549 | SY |
$4.50 |
$3.03 |
$3.93 |
$4.00 |
$14.04 |
| 322 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 52 | LF |
$40.00 |
$32.23 |
$37.08 |
$50.00 |
$52.50 |
| 323 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$100.00 |
$91.32 |
$98.88 |
$150.00 |
$105.00 |
| 324 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$650.00 |
$584.36 |
$1,050.67 |
$1,500.00 |
$1,050.00 |
| 325 | 523(A) 6550 |
SEALER CRACK PREPARATION | 256.8 | LF |
$5.00 |
$3.03 |
$3.53 |
$4.00 |
$34.86 |
| 326 | 523(B) 6560 |
SEALER RESIN | 2.5 | GAL |
$250.00 |
$101.01 |
$117.72 |
$200.00 |
$1,178.00 |
| 327 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 460.3 | SF |
$45.00 |
$43.20 |
$56.86 |
$70.00 |
$61.43 |
| 328 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 66.2 | SY |
$45.00 |
$108.00 |
$67.99 |
$100.00 |
$52.50 |
| 329 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 13 | EA |
$250.00 |
$17,437.50 |
$3,600.03 |
$500.00 |
$393.75 |
| 330 | 540 4525 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 3 | EA |
$400.00 |
$15,975.00 |
$1,123.68 |
$750.00 |
$488.25 |
| 331 | 545 4815 |
(PL)REPLACE BRIDGE ITEM (TYPE A) | 2 | EA |
$2,500.00 |
$4,190.70 |
$8,045.73 |
$3,000.00 |
$2,625.00 |
| 332 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$5,000.00 |
$60,500.00 |
$96,128.45 |
$220,000.00 |
$147,000.00 |
| 333 | 501(G) 6309 |
CLSM BACKFILL | 610.7 | CY |
$150.00 |
$143.60 |
$105.78 |
$135.00 |
$157.50 |
| 334 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$10,000.00 |
$2,780.00 |
$15,412.57 |
$10,000.00 |
$8,400.00 |
| 335 | 504(A) 1304 |
APPROACH SLAB | 916 | SY |
$150.00 |
$162.79 |
$134.54 |
$150.00 |
$189.00 |
| 336 | 504(B) 1305 |
SAW-CUT GROOVING | 2,507 | SY |
$6.00 |
$4.09 |
$4.55 |
$4.50 |
$14.04 |
| 337 | 504(C) 6250 |
SEALED EXPANSION JOINT | 228 | LF |
$250.00 |
$313.55 |
$230.39 |
$235.00 |
$315.00 |
| 338 | 504(E) 6190 |
42" F-SHAPED PARAPET | 785.6 | LF |
$75.00 |
$93.48 |
$76.76 |
$65.00 |
$105.00 |
| 339 | 506(A) 1322 |
STRUCTURAL STEEL | 2,690 | LB |
$6.00 |
$5.33 |
$7.68 |
$5.00 |
$7.87 |
| 340 | 509(A) 1326 |
CLASS AA CONCRETE | 395.2 | CY |
$450.00 |
$680.59 |
$729.78 |
$525.00 |
$840.00 |
| 341 | 511 6306 |
MECHANICAL SPLICES | 1,028 | EA |
$30.00 |
$32.18 |
$14.72 |
$17.50 |
$36.75 |
| 342 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 133,824 | LB |
$1.00 |
$1.16 |
$0.9700 |
$1.00 |
$1.05 |
| 343 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$5,000.00 |
$33,381.25 |
$25,744.63 |
$25,000.00 |
$20,714.40 |
| 344 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$4,400.00 |
$5,578.00 |
$5,000.00 |
$5,178.60 |
| 345 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 549 | SY |
$4.50 |
$3.03 |
$3.93 |
$4.00 |
$14.04 |
| 346 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 35 | LF |
$40.00 |
$32.23 |
$37.08 |
$50.00 |
$52.50 |
| 347 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 1.4 | GAL |
$100.00 |
$91.32 |
$98.88 |
$150.00 |
$105.00 |
| 348 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 3 | SY |
$650.00 |
$584.36 |
$1,050.67 |
$1,500.00 |
$1,050.00 |
| 349 | 523(A) 6550 |
SEALER CRACK PREPARATION | 256.8 | LF |
$5.00 |
$3.03 |
$3.53 |
$4.00 |
$34.86 |
| 350 | 523(B) 6560 |
SEALER RESIN | 2.5 | GAL |
$250.00 |
$101.01 |
$117.72 |
$200.00 |
$1,178.00 |
| 351 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 574.2 | SF |
$45.00 |
$43.20 |
$56.86 |
$70.00 |
$61.43 |
| 352 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 63.8 | SY |
$45.00 |
$108.00 |
$75.11 |
$100.00 |
$52.50 |
| 353 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 10 | EA |
$250.00 |
$2,000.00 |
$3,600.03 |
$500.00 |
$393.75 |
| 354 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$5,000.00 |
$60,500.00 |
$96,128.45 |
$220,000.00 |
$147,000.00 |
| 355 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 1,164 | LF |
$1.00 |
$0.4900 |
$0.5500 |
$0.4900 |
$0.4700 |
| 356 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,164 | LF |
$1.00 |
$0.2100 |
$0.2400 |
$0.2200 |
$0.2100 |
| 357 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 60 | SD |
$20.00 |
$7.56 |
$8.50 |
$7.58 |
$7.35 |
| 358 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 60 | SD |
$5.00 |
$9.72 |
$10.93 |
$9.74 |
$9.45 |
| 359 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 240 | SD |
$1.50 |
$0.5400 |
$0.6100 |
$0.5400 |
$0.5300 |
| 360 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 420 | SD |
$2.50 |
$0.5400 |
$0.6100 |
$0.5400 |
$0.5300 |
| 361 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 300 | SD |
$3.50 |
$4.32 |
$4.86 |
$4.33 |
$4.20 |
| 362 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 240 | SD |
$0.4000 |
$0.1100 |
$0.1200 |
$0.1100 |
$0.1100 |
| 363 | 880(C) 8851 |
WING BARRICADES | 4 | EA |
$130.00 |
$108.01 |
$121.50 |
$108.25 |
$105.00 |
| 364 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 300 | SD |
$0.4000 |
$1.08 |
$1.21 |
$1.08 |
$1.05 |
| 365 | 880(F) 8878 |
DRUMS | 1,800 | SD |
$0.4000 |
$0.1100 |
$0.1200 |
$0.1100 |
$0.1100 |
| 366 | 642(A) 0095 |
CONSTRUCTION STAKING LEVEL I | 1 | LSUM |
$10,000.00 |
$30,000.00 |
$10,000.00 |
$22,000.00 |
$90,050.00 |
| 367 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$375,000.00 |
$50,000.00 |
$100,000.00 |
$509,232.00 |