| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$29,980.00 |
$79,500.00 |
$45,000.00 |
$85,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 173,548 | CY |
$4.25 |
$4.25 |
$4.45 |
$6.00 |
$6.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 9,680 | CY |
$6.00 |
$5.10 |
$5.46 |
$6.75 |
$7.25 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$58,080.00 |
$115,000.00 |
$70,000.00 |
$72,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,525 | LF |
$3.00 |
$1.16 |
$1.16 |
$1.20 |
$1.22 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$115.00 |
$1,340.00 |
$145.00 |
$150.00 |
$152.94 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 812 | LF |
$8.00 |
$7.68 |
$7.68 |
$7.75 |
$8.10 |
| 8 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 69 | CY |
$90.00 |
$40.00 |
$40.00 |
$41.00 |
$42.19 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 165,953 | SY |
$1.50 |
$1.24 |
$1.24 |
$1.26 |
$1.31 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 60 | AC |
$350.00 |
$411.00 |
$411.00 |
$420.00 |
$433.52 |
| 11 | 234(A) 2824 |
FERTILIZING (10-20-10) | 17 | TON |
$550.00 |
$688.00 |
$688.00 |
$700.00 |
$725.71 |
| 12 | 241 2832 |
MOWING | 60 | AC |
$60.00 |
$96.00 |
$96.00 |
$96.00 |
$101.26 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 52,915 | CY |
$30.00 |
$36.00 |
$33.50 |
$50.00 |
$49.23 |
| 14 | 307(D) 4230 |
LIME | 3,590 | TON |
$150.00 |
$151.67 |
$60.00 |
$158.00 |
$187.44 |
| 15 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 166,168 | SY |
$2.50 |
$2.69 |
$4.50 |
$3.40 |
$2.14 |
| 16 | 325 5271 |
SEPARATOR FABRIC | 166,168 | SY |
$1.50 |
$0.8500 |
$1.25 |
$1.03 |
$1.15 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 15,161 | TON |
$22.00 |
$17.00 |
$17.50 |
$18.00 |
$20.75 |
| 18 | 407(B) 0250 |
TACK COAT | 25,366 | GAL |
$2.40 |
$3.30 |
$2.50 |
$2.90 |
$3.64 |
| 19 | 408 5774 |
PRIME COAT | 64,054 | GAL |
$4.00 |
$5.40 |
$3.90 |
$4.75 |
$5.22 |
| 20 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 18,577 | TON |
$70.00 |
$64.00 |
$72.50 |
$75.00 |
$79.76 |
| 21 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 42,139 | TON |
$65.00 |
$56.50 |
$67.50 |
$71.00 |
$70.44 |
| 22 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 12,385 | TON |
$79.00 |
$80.70 |
$82.50 |
$86.00 |
$92.57 |
| 23 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,433 | TON |
$74.00 |
$66.00 |
$75.50 |
$75.00 |
$77.89 |
| 24 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 376 | CY |
$15.00 |
$15.00 |
$30.00 |
$15.50 |
$31.50 |
| 25 | 509(A) 0319 |
CLASS AA CONCRETE | 831 | CY |
$400.00 |
$290.00 |
$465.00 |
$300.00 |
$488.25 |
| 26 | 509(D) 0325 |
CLASS C CONCRETE | 1,067 | CY |
$250.00 |
$175.00 |
$195.00 |
$200.00 |
$204.75 |
| 27 | 511(A) 0332 |
REINFORCING STEEL | 112,844 | LB |
$0.9000 |
$0.8500 |
$0.8500 |
$0.8700 |
$0.8900 |
| 28 | 611(G) 5393 |
INLET CDI RCB DES. 7 | 1 | EA |
$5,000.00 |
$5,000.00 |
$1,850.00 |
$5,200.00 |
$1,942.50 |
| 29 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 4,466 | LF |
$30.00 |
$27.00 |
$22.56 |
$32.00 |
$31.50 |
| 30 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 546 | LF |
$35.00 |
$27.00 |
$22.20 |
$44.00 |
$33.60 |
| 31 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,172 | LF |
$10.00 |
$6.30 |
$4.70 |
$9.00 |
$15.75 |
| 32 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 390 | LF |
$10.00 |
$6.30 |
$4.70 |
$9.00 |
$15.75 |
| 33 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 90 | EA |
$900.00 |
$750.00 |
$800.00 |
$800.00 |
$840.00 |
| 34 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 4 | EA |
$500.00 |
$600.00 |
$500.00 |
$650.00 |
$787.50 |
| 35 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 352 | CY |
$33.00 |
$46.25 |
$43.50 |
$48.00 |
$10.50 |
| 36 | 613(V) 1180 |
TRENCH EXCAVATION | 469 | CY |
$9.00 |
$8.00 |
$7.50 |
$12.00 |
$12.60 |
| 37 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$34,100.00 |
$12,750.00 |
$45,000.00 |
$42,262.50 |
| 38 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$600.00 |
$500.00 |
$950.00 |
$2,250.00 |
$997.50 |
| 39 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 53,489 | SY |
$3.30 |
$2.00 |
$3.48 |
$3.00 |
$2.68 |
| 40 | 619(C) 0924 |
SAWING PAVEMENT | 5,313 | LF |
$3.25 |
$3.75 |
$3.00 |
$2.75 |
$2.38 |
| 41 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 11,522 | LF |
$4.25 |
$3.85 |
$3.82 |
$5.00 |
$4.73 |
| 42 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 5 | EA |
$50.00 |
$50.00 |
$50.00 |
$52.00 |
$52.50 |
| 43 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 3 | EA |
$130.00 |
$125.00 |
$125.00 |
$130.00 |
$131.25 |
| 44 | 629(C) 4960 |
MAILBOX | 13 | EA |
$40.00 |
$25.00 |
$25.00 |
$26.00 |
$26.25 |
| 45 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 12 | EA |
$16.00 |
$5.00 |
$5.00 |
$5.00 |
$5.25 |
| 46 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 4,485 | CY |
$5.40 |
$5.00 |
$2.00 |
$5.25 |
$2.10 |
| 47 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 330 | CY |
$14.00 |
$15.00 |
$30.00 |
$15.25 |
$31.50 |
| 48 | 509(A) 1326 |
CLASS AA CONCRETE | 794.2 | CY |
$425.00 |
$285.00 |
$350.00 |
$300.00 |
$367.50 |
| 49 | 511(A) 1332 |
REINFORCING STEEL | 109,220 | LB |
$0.9000 |
$0.8500 |
$0.8500 |
$0.8700 |
$0.8900 |
| 50 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$14,500.00 |
$30,000.00 |
$3,300.00 |
$16,000.00 |
$3,465.00 |
| 51 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 37,600 | LF |
$0.1700 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1100 |
| 52 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 500 | EA |
$0.5600 |
$1.00 |
$1.00 |
$1.00 |
$1.05 |
| 53 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 7,500 | LF |
$0.2500 |
$0.5000 |
$0.5000 |
$0.5000 |
$0.5300 |
| 54 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 800 | SD |
$4.71 |
$5.00 |
$5.00 |
$5.00 |
$5.25 |
| 55 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 30 | SD |
$12.67 |
$50.00 |
$50.00 |
$50.00 |
$52.50 |
| 56 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,500 | LF |
$19.50 |
$29.00 |
$29.00 |
$31.00 |
$30.45 |
| 57 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 3,500 | LF |
$4.85 |
$3.00 |
$3.00 |
$4.60 |
$3.15 |
| 58 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 1,200 | SD |
$6.82 |
$1.00 |
$1.00 |
$1.00 |
$1.05 |
| 59 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 19,600 | SD |
$0.5400 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.2600 |
| 60 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 18,000 | SD |
$0.5600 |
$0.5000 |
$0.5000 |
$0.5200 |
$0.5300 |
| 61 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 20,800 | SD |
$1.01 |
$1.00 |
$1.00 |
$1.00 |
$1.05 |
| 62 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 14,800 | SD |
$0.4200 |
$0.3000 |
$0.3000 |
$0.3100 |
$0.3200 |
| 63 | 880(C) 8848 |
WING BARRICADES | 4,800 | SD |
$1.01 |
$0.5000 |
$0.5000 |
$0.5200 |
$0.5300 |
| 64 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 19,600 | SD |
$0.1900 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1100 |
| 65 | 880(F) 8878 |
DRUMS | 26,400 | SD |
$0.1100 |
$0.1500 |
$0.1500 |
$0.1500 |
$0.1600 |
| 66 | 880(G) 8890 |
CHANNELIZER CONES | 21,200 | SD |
$0.1300 |
$0.1500 |
$0.1500 |
$0.1500 |
$0.1600 |
| 67 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 800 | SD |
$20.00 |
$10.00 |
$10.00 |
$10.25 |
$10.50 |
| 68 | 804(A) 2915 |
STRUCTURAL CONCRETE | 1.44 | CY |
$520.00 |
$300.00 |
$300.00 |
$550.00 |
$315.00 |
| 69 | 804(B) 2916 |
REINFORCING STEEL | 260 | LB |
$2.00 |
$1.00 |
$1.00 |
$1.05 |
$1.05 |
| 70 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 48 | EA |
$60.80 |
$25.00 |
$25.00 |
$25.00 |
$26.25 |
| 71 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 20 | EA |
$150.00 |
$100.00 |
$100.00 |
$105.00 |
$105.00 |
| 72 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 482.42 | SF |
$15.40 |
$12.00 |
$12.00 |
$12.30 |
$12.60 |
| 73 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 51 | SF |
$22.00 |
$25.00 |
$25.00 |
$25.25 |
$26.25 |
| 74 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 62.8 | LF |
$17.00 |
$20.00 |
$20.00 |
$20.25 |
$21.00 |
| 75 | 851(C) 8324 |
2" SQUARE TUBE POST | 942 | LF |
$8.00 |
$6.00 |
$6.00 |
$6.00 |
$6.30 |
| 76 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 81,897 | LF |
$0.5000 |
$0.4000 |
$0.4000 |
$0.4100 |
$0.4200 |
| 77 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 864 | LF |
$1.55 |
$1.00 |
$1.00 |
$1.00 |
$1.05 |
| 78 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 175 | LF |
$6.65 |
$10.00 |
$10.00 |
$10.50 |
$10.50 |
| 79 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 46 | EA |
$100.00 |
$100.00 |
$100.00 |
$105.00 |
$105.00 |
| 80 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$140,000.00 |
$125,000.00 |
$77,920.00 |
$45,000.00 |
$170,255.57 |
| 81 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$7,000.00 |
$5,500.00 |
$4,800.00 |
$5,250.00 |
| 82 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$7,000.00 |
$26,000.00 |
$10,000.00 |
$37,261.90 |
| 83 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$554,000.00 |
$262,000.00 |
$515,400.00 |
$147,000.00 |
$745,000.00 |