Bid tab 120357

Let Sep 20, 2012 · Division 1 · Sequoyah Sign up free

‹ Sep 2012 results

WIDEN, RESURFACE , AND BRIDGE SH-100: FROM THE CITY OF GORE , EXTEND NORTH . PROJECT LENGTH = 6.180 MILES

Let date
Thursday, September 20, 2012
Contract
120357
J/P numbers
12531(04)
District
Division 1
County
Sequoyah
Highway
Limits
WIDEN, RESURFACE , AND BRIDGE SH-100: FROM THE CITY OF GORE , EXTEND NORTH . PROJECT LENGTH = 6.180 MILES
Project number
STPY-068C(238)

Bidders 2

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$12,173,916
1 SHERWOOD CONSTRUCTION CO., INC. Low bidder $11,931,292 -2.0%
2 GLOVER & ASSOCIATES, INC. $12,406,712 +1.9% +4.0%

Bid tab: unit prices 133 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SHERWOOD CONSTR…#2 GLOVER & ASSOCI…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $200,000.00 $150,000.00 $150,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION77,657CY $7.00 $10.40 $11.50
3202(C) 0182 ROCK EXCAVATION3,138CY $15.00 $25.00 $26.48
4202(D) 0184 UNCLASSIFIED BORROW24,336CY $8.00 $10.00 $6.00
5202(J) 5250 QUARRY STONE EMBANKMENT24,663TON $40.00 $14.18 $36.50
6205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $170,000.00 $76,311.00 $30,000.00
7221(C) 2801 TEMPORARY SILT FENCE14,952LF $2.50 $2.28 $1.32
8221(D) 2803 TEMPORARY SEDIMENT FILTER6EA $225.00 $194.74 $785.40
9221(F) 0100 TEMPORARY SILT DIKE2,652LF $6.00 $6.60 $5.31
10229 4318 DITCH LINER PROTECTION13,539LF $2.00 $1.52 $2.07
11230(A) 2806 SOLID SLAB SODDING155,391SY $1.75 $1.52 $1.65
12232(B) 2814 SEEDING METHOD B75.42AC $400.00 $475.28 $513.34
13233(A) 2817 VEGETATIVE MULCHING64.21AC $500.00 $581.13 $627.67
14241 2832 MOWING128.42AC $40.00 $67.75 $10.00
15303(A) 2100 AGGREGATE BASE TYPE A1,376CY $50.00 $31.60 $42.54
16307(A) 4200 FLY ASH4,346TON $50.00 $50.11 $57.17
17307(D) 4230 LIME388TON $140.00 $166.61 $182.93
18307(E) 4240 CEMENTITIOUS STABILIZED SUBGRADE88,278SY $1.50 $2.23 $2.79
19307(G) 4260 LIME PRETREATMENT19,815SY $1.25 $1.81 $3.14
20318 5112 ECONOCRETE BASE589SY $15.00 $34.56 $17.15
21325 5271 SEPARATOR FABRIC18,480SY $2.00 $1.03 $1.82
22326(B) 0100 GEOGRID REINFORCEMENT14,657SY $5.00 $1.96 $4.18
23402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E4,183TON $25.00 $18.03 $17.52
24407(B) 0250 TACK COAT26,540GAL $2.25 $1.24 $2.50
25408 5774 PRIME COAT26,165GAL $4.50 $1.50 $1.50
26409(A) 4242 FABRIC REINFORCEMENT94,611SY $1.75 $1.17 $1.11
27409(B) 4268 BITUMINOUS BINDER18,923GAL $2.75 $2.68 $5.32
28411(B) 5940 SUPERPAVE, TYPE S3(PG 70-28 OK)17,960TON $70.00 $80.37 $61.57
29411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)36,937TON $65.00 $71.73 $68.54
30411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)10,023TON $75.00 $85.50 $78.22
31411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)9,292TON $72.00 $77.02 $75.68
32412 5267 COLD MILLING PAVEMENT78,555SY $1.25 $2.10 $0.8700
33414(A) 0210 P.C.CONCRETE PAVEMENT(PLACEMENT)514SY $22.00 $27.62 $28.07
34414(G) 5275 P.C. CONCRETE FOR PAVEMENT129CY $130.00 $106.30 $142.91
35501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED232CY $15.00 $21.17 $35.00
36509(B) 0321 CLASS A CONCRETE716CY $500.00 $423.41 $857.48
37509(D) 0325 CLASS C CONCRETE804CY $190.00 $238.17 $228.66
38511(A) 0332 REINFORCING STEEL85,404LB $0.9000 $0.7900 $0.9700
39601(A) 0297 TYPE I PLAIN RIPRAP1,658TON $35.00 $21.90 $50.39
40601(C) 0538 TYPE I-A FILTER BLANKET51TON $35.00 $13.10 $111.87
41611(G) 5705 INLET CDI RCP DES. 21EA $3,500.00 $2,910.95 $3,596.90
42611(G) 5706 INLET CDI RCP DES. 32EA $4,000.00 $3,175.59 $3,751.26
43611(G) 5707 INLET CDI RCP DES. 42EA $3,750.00 $3,440.22 $3,768.41
44611(G) 5709 INLET CDI RCP DES. 61EA $4,300.00 $3,704.85 $5,426.19
45611(H) 5790 ADD'L DEPTH IN INLET CDI RCP DES. 22VF $375.00 $291.10 $1,215.82
46611(H) 5791 ADD'L DEPTH IN INLET CDI RCP DES. 310VF $400.00 $317.56 $576.65
47611(H) 5792 ADD'L DEPTH IN INLET CDI RCP DES. 44VF $350.00 $370.49 $690.80
48611(H) 5794 ADD'L DEPTH IN INLET CDI RCP DES. 64VF $450.00 $423.41 $542.17
49613(A) 0492 24" R.C.PIPE CLASS III168LF $90.00 $68.00 $54.84
50613(A) 0493 30" R.C.PIPE CLASS III152LF $92.00 $80.04 $68.16
51613(A) 0494 36" R.C.PIPE CLASS III426LF $94.00 $99.79 $72.74
52613(A) 0495 42" R.C.PIPE CLASS III62LF $100.00 $107.56 $160.80
53613(A) 0496 48" R.C.PIPE CLASS III92LF $115.00 $123.62 $117.97
54613(A) 4496 28" X 18" R.C.PIPE ARCH CLASS A-III54LF $65.00 $82.69 $94.71
55613(A) 4498 43" X 26" R.C.PIPE ARCH CLASS A-III62LF $100.00 $146.34 $128.61
56613(A) 4505 24" X 38" R.C.PIPE ELLIPTICAL CLASS HE-III414LF $125.00 $112.03 $110.03
57613(A) 4507 34" X 53" R.C.PIPE ELLIPTICAL CLASS HE-III58LF $225.00 $133.80 $196.64
58613(B) 0689 18" CORR. GALV. STEEL PIPE948LF $30.00 $65.31 $26.56
59613(B) 0690 24" CORR. GALV. STEEL PIPE246LF $35.00 $67.31 $54.50
60613(B) 0691 30" CORR. GALV. STEEL PIPE68LF $40.00 $84.82 $61.46
61613(B) 4525 17" X 13" CORR. GALV. STEEL PIPE ARCH332LF $30.00 $61.78 $32.85
62613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH4,093LF $35.00 $53.86 $26.30
63613(B) 4528 28" X 20" CORR. GALV. STEEL PIPE ARCH114LF $40.00 $81.57 $49.42
64613(L) 4501 17" X 13" PREFAB. CULVERT END SECTION, ARCH16EA $200.00 $312.78 $233.77
65613(L) 4504 21" X 15" PREFAB. CULVERT END SECTION, ARCH242EA $220.00 $332.79 $168.78
66613(L) 4515 28" X 18" PREFAB. CULVERT END SECTION, ARCH2EA $250.00 $820.80 $1,855.01
67613(L) 4516 28" X 20" PREFAB. CULVERT END SECTION, ARCH8EA $270.00 $438.36 $1,628.89
68613(L) 4531 43" X 26" PREFAB. CULVERT END SECTION, ARCH2EA $300.00 $1,188.11 $1,901.20
69613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND44EA $200.00 $537.16 $1,228.42
70613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND13EA $425.00 $668.07 $1,037.25
71613(L) 5732 30" PREFAB. CULVERT END SECTION, ROUND2EA $900.00 $780.59 $1,446.16
72613(L) 5734 36" PREFAB. CULVERT END SECTION, ROUND8EA $950.00 $947.27 $1,624.71
73613(L) 5736 42" PREFAB. CULVERT END SECTION, ROUND2EA $1,420.00 $1,148.54 $1,874.90
74613(L) 5738 48" PREFAB. CULVERT END SECTION, ROUND1EA $1,500.00 $1,723.73 $2,224.75
75613(O) 5100 SPECIAL END SECTION OF 24" X 38" RCP ELLIPTICAL10EA $1,000.00 $1,575.18 $917.95
76613(O) 5155 SPECIAL END SECTION OF 34" X 53" RCP ELLIPTICAL2EA $1,250.00 $2,464.82 $1,002.02
77613(T) 1187 STANDARD BEDDING MATERIAL, CLASS C963CY $50.00 $15.88 $30.98
78613(V) 1180 TRENCH EXCAVATION3,645CY $15.00 $4.23 $6.75
79619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $50,000.00 $13,538.05 $22,123.93
80619(B) 0291 REMOVAL OF HEADWALL34EA $600.00 $157.17 $800.31
81619(B) 4728 REMOVAL OF ASPHALT PAVEMENT20,739SY $3.00 $0.7300 $5.57
82619(C) 0924 SAWING PAVEMENT72,808LF $1.25 $2.62 $1.03
83623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE3,200LF $18.00 $15.19 $17.72
84623(G) 8571 GUARDRAIL END TREATMENT (GET)6EA $2,500.00 $2,143.52 $2,458.10
85624(A) 4281 FENCE-STYLE WWF5,069LF $5.00 $4.29 $4.63
86624(B) 4462 GATES-STYLE WWF (4.5'HIGH X 12'LONG)6EA $550.00 $677.46 $731.71
87624(B) 4468 GATES-STYLE WWF (4.5'HIGH X 20'LONG)2EA $800.00 $1,058.53 $1,143.31
88624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)9,173LF $6.00 $4.00 $4.32
89624(E) 4288 FENCE-STYLE CLF (4'HIGH, CLASS A)3,058LF $50.00 $16.20 $17.49
90624(F) 5847 GATES-STYLE CLF (4'HIGH X 12'LONG)18EA $1,000.00 $899.75 $971.81
91629(A) 4958 MAILBOX INSTALLATION-SINGLE34EA $100.00 $79.39 $85.75
92629(B) 4959 MAILBOX INSTALLATION-MULTIPLE10EA $175.00 $158.80 $171.52
93629(C) 4960 MAILBOX64EA $35.00 $21.17 $22.87
94629(D) 4961 REMOVAL OF MAILBOX INSTALLATION52EA $15.00 $5.29 $5.72
95202(A) 1301 UNCLASSIFIED EXCAVATION710CY $6.00 $6.35 $1.71
96501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED184CY $20.00 $21.17 $28.58
97509(A) 1326 CLASS AA CONCRETE329.4CY $500.00 $476.34 $571.65
98511(A) 1332 REINFORCING STEEL50,290LB $0.8500 $0.7900 $0.9700
99619(B) 2515 REMOVAL OF BRIDGE ITEM (TYPE A)4EA $2,500.00 $2,646.32 $1,745.83
100202(A) 1301 UNCLASSIFIED EXCAVATION730CY $6.00 $6.35 $1.71
101501(C) 1308 SUBSTRUCTURE EXCAVATION ROCK26CY $50.00 $52.93 $57.17
102509(A) 1326 CLASS AA CONCRETE183.8CY $500.00 $476.34 $571.65
103511(A) 1332 REINFORCING STEEL38,240LB $0.8500 $0.7900 $0.9700
104619(B) 2515 REMOVAL OF BRIDGE ITEM (TYPE A)4EA $2,500.00 $2,646.32 $1,745.83
105413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC65,104LF $0.0500 $0.2000 $0.2200
106805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS14EA $63.00 $52.52 $56.73
107805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS86EA $247.00 $105.85 $114.33
108823 8478 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM700SD $150.00 $79.39 $5.72
109850(A) 8110 SHEET ALUMINUM SIGNS665.76SF $16.00 $12.70 $13.72
110851(C) 8324 2" SQUARE TUBE POST1,284.5LF $8.00 $8.47 $9.15
111855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)130,800LF $0.4500 $0.3700 $0.4000
112857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)145,400LF $0.1000 $0.1100 $0.1100
113857(E) 8890 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-226,200EA $0.7000 $0.4200 $0.4600
114857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)5,000LF $0.2000 $0.5400 $0.5800
115871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.700SD $13.50 $5.29 $5.72
116876(A) 8482 (PL)TRUCK MOUNTED ATTENUATOR350SD $13.20 $5.29 $5.72
117877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,425LF $18.75 $14.84 $40.29
118877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER9,900LF $2.75 $3.69 $3.14
119880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF33,950SD $0.2500 $0.2600 $0.2900
120880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF10,500SD $0.6000 $1.06 $1.14
121880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF30,450SD $1.25 $0.7900 $0.8600
122880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)2,100SD $0.5000 $1.06 $1.14
123880(C) 8848 WING BARRICADES2,800SD $1.00 $1.06 $1.14
124880(D) 8854 VERTICAL PANELS77,000SD $0.0500 $0.1100 $0.1100
125880(E) 8860 WARNING LIGHTS(TYPE A)14,700SD $0.1000 $1.06 $1.14
126880(F) 8878 DRUMS7,000SD $0.1000 $0.2600 $0.2900
127880(G) 8890 CHANNELIZER CONES52,500SD $0.0500 $0.1600 $0.1700
128880(I) 8902 FLAGGER350SD $152.00 $150.00 $178.68
129882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN700SD $13.75 $10.59 $11.43
130642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $115,000.00 $90,980.56 $144,416.42
131220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $10,000.00 $2,500.00 $2,500.00
132640(A) 1426 FIELD OFFICE1EA $50,000.00 $7,500.00 $9,718.08
133641 1552 MOBILIZATION1LSUM $505,000.00 $477,225.96 $450,000.00