| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 5, 2021 | 66F01 | IroquoisDistrict 3 | The project length is 700 feet. It is located along IL 1 and includes the replacement of the exisiting SN 038-0028 over Gay Creek approximately 0.2 miles South of Wellington, Il. | — | Executed | Iroquois Paving Corporation $1,138,320 · | ||
| Nov 5, 2021 | 66F71 | KankakeeDistrict 3 | Pier, pier cap, and bearing seat repairs, abutment repairs, and expansion joint gland repairs This project is located on FAP 330 (US 45/52) North of Bourbonnais in Kankakee County. SN 046-0047 carries US 45/52 over South Branch Rock Creek approximately 1.5 miles South of County Highway 9. Work on this project consists of pier, pier cap, and bearing seat repairs, abutment repairs, and expansion joint gland repairs. | — | Executed | Tobey's Construction & Cartage, Inc. $169,192 · | ||
| Nov 5, 2021 | 66H26 | BureauDistrict 3 | The project is a bridge replacement over the Hennepin Feeder Canal located on IL 92, 1 mile East of IL 172 in Bureau County. The profile grade will be raised approx 5'-10", therefore, additional work such as guardrail upgrades, embankment, etc is expected. Work within IDNR property is also proposed. Construction shall be achieved via Detour. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $2,548,314 · | ||
| Nov 5, 2021 | 66J01 | BureauDistrict 3 | Removal and replacement of superstructures on SN 006-0014 and 006-0015, milling and resurfacing of mainline an This project is located on FAI 80 (I-80) at the Maple Grove Creek crossing, approximately 2 miles north of Wyanet, in Bureau County. The work consists of removal and replacement of superstructures on SN 006-0014 and 006-0015, milling and resurfacing of mainline and shoulders, guardrail removal and replacement, and other work. | — | Executed | D. Construction, Inc. $2,541,583 · | ||
| Nov 5, 2021 | 66L96 | GrundyDistrict 3 | Removing and replace failed wing wall stems and headwall This project is located at Structure No. 032-2525, a 12' x 8' concrete box culvert, 400' feet West of Ashley Rd. in Grundy County. This project consists of removing and replace failed wing wall stems and headwall. | — | Executed | D. Construction, Inc. $239,279 · | ||
| Nov 5, 2021 | 68E12 | FultonDistrict 4 | Culvert replacement with slope repair on IL Route 97, 1.0 mile North of Cuba, Fulton County. | — | Executed | Phoenix Corporation of the Quad Cities $311,555 · | ||
| Nov 5, 2021 | 68F74 | PeoriaDistrict 4 | Bridge deck overlay and bridge joint replace/repair on IL 8 structures; S.N. 072-0164 over Nixon Run Creek; S.N. 072-0165 over Warsaw Creek and S.N. 072-0166 over Kickapo Creek Tributary. | — | Executed | Stark Excavating, Inc. $993,747 · | ||
| Nov 5, 2021 | 68G57 | MarshallWoodfordDistrict 4 | Bridge painting at various locations in Marshall and Woodford Counties on Structure Nos.: 062-0085, 062-0049, 062-0053, 062-0054, 062-0055, 102-048, 102-0050 and 102-0051. | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,487,500 · | ||
| Nov 5, 2021 | 68G64 | TazewellDistrict 4 | Remove and replace existing high mast light tower, luminaires and concrete foundation on Riverfront Drive Spur, e ast of W ashinton Street in East Peoria. | — | Executed | Oberlander Electric Co. $127,380 · | ||
| Nov 5, 2021 | 70905 | VermilionDistrict 5 | Bridge Replacement of SN 092-0060 over a Drainage Ditch 0.5 Mi N of US 136 (E.) Gross Length= Net Length= 300.00 FT = 0.057 Mi. | — | Executed | Stark Excavating, Inc. $1,345,979 · | ||
| Nov 5, 2021 | 70E93 | VermilionDistrict 5 | Modernize traffic signals on IL Rt 1 / US Rt 150 at the intersection with Ross Lane in Tilton of Vermilion County. | — | Executed | Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $310,744 · | ||
| Nov 5, 2021 | 72F35 | MasonDistrict 6 | 2 culvert replacements on IL 78: 1. Over a ditch, 0.8 miles south of White Oak Creek south of Havana; 2. Over a ditch, 0.8 miles north of Elm Street in Bath. (SN 063-7017 and 063-7020) | — | Executed | Phoenix Corporation of the Quad Cities $1,110,070 · | ||
| Nov 5, 2021 | 72K81 | LoganDistrict 6 | 5.5 miles of standard overlay, bridge joint repair/replacement, bridge repair and drain repair/replacement on US 136 west of Union Road to the McLean County line. (SN 054-0026 and 054-0027) | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $3,889,732 · | ||
| Nov 5, 2021 | 72L62 | AdamsDistrict 6 | Bridge repair on US 24 over Homan Creek, 0.1 miles north of 12th Street in Quincy. (SN 001-0010) | — | Executed | Sangamo Construction Company $2,360,755 · | ||
| Nov 5, 2021 | 72M92 | MorganDistrict 6 | Bearing replacements on two bridges carrying I-72 over North Fork Mauvaise Terre Creek, 1.1 miles northeast of Old US 36 near Jacksonville. (SN 069-0048 and SN 069-0049) | — | Executed | Sangamo Construction Company $159,430 · | ||
| Nov 5, 2021 | 72M93 | AdamsDistrict 6 | Deck patching and expansion joint repairs on SN 001-0069 carrying East 1100th Street over I-172, 0.1 miles northwest of the Pike County line. | — | Executed | County Contractors, Inc. $128,618 · | ||
| Nov 5, 2021 | 72M94 | ScottDistrict 6 | Deck patching on SN 086-0501 and 086-0502 on IL 106 near Alsey. | — | Executed | Freesen, a div of UCM, Inc. $139,283 · | ||
| Nov 5, 2021 | 72N04 | LoganDistrict 6 | Bridge painting on SN 054-0041 and 054-0042 carrying I-55 over Salt Creek, 2.2 miles south of IL 10. | — | Executed | Venus Painting Co. $1,231,900 · | ||
| Nov 5, 2021 | 72N05 | SangamonDistrict 6 | Bridge painting on SN 084-0154 carrying Overpass Road over I-72, 1.4 miles east of the Sangamon River at the Riverton Interchange. | — | Executed | Eagle Painting & Maintenance Company, Inc. $296,950 · | ||
| Nov 5, 2021 | 74181 | CrawfordDistrict 7 | Replacement of SN 017-0003 and SN 017-0004 on IL 1, 2.5 and 0.3 miles north of IL 33. | — | Executed | Sangamo Construction Company $3,233,083 · | ||
| Nov 5, 2021 | 74320 | WabashDistrict 7 | Removal and replacement of SN 093-0006, PCC pavement and sidewalks on IL 1 between 11th and 12th Streets in Mt. Carmel. | — | Executed | Sierra Bravo Contractors, LLC $935,076 · | ||
| Nov 5, 2021 | 74364 | CumberlandDistrict 7 | Removal and replacement of SN 018-0028 carrying IL 121 over Long Point Branch Creek, 1.3 miles east of Montrose Road. | — | Executed | Plocher Construction Company, Inc. $2,084,000 · | ||
| Nov 5, 2021 | 74948 | WabashDistrict 7 | Polymer overlay on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel. | — | Executed | Samron Midwest Contracting, Inc. $1,144,946 · | ||
| Nov 5, 2021 | 74995 | CumberlandDistrict 7 | Bridge deck overlay, bridge deck repairs, bridge approach replacement HMA paving and guardrail on US 40 over Big Muddy Creek, 1.3 miles east of Woodbury. (SN 018-0007) | — | Executed | Sangamo Construction Company $486,093 · | ||
| Nov 5, 2021 | 74996 | MaconDistrict 7 | Bridge deck overlay, bridge joint replacement/repair and bridge repair on the structure carrying North Wyckles Rd. Over I-72, 2 miles north of Harristown. | — | Executed | Freesen, a div of UCM, Inc. $709,055 · | ||
| Nov 5, 2021 | 74997 | WayneDistrict 7 | Bridge deck overlay, bridge joint replace/repair, bridge deck repairs, approach slab replacements on 8 structures between IL. 242 and US 45. | — | Executed | Samron Midwest Contracting, Inc. $6,291,494 · | ||
| Nov 5, 2021 | 74A66 | VariousDistrict 7 | Cleaning and painting 3 structures on I-57 and I-70. | — | Executed | All States Painting, Inc. $773,428 · | ||
| Nov 5, 2021 | 74A73 | MaconDistrict 7 | 25 miles of weed spraying along I-72 in Macon County. | — | Executed | The Daltons Inc. $70,694 · | ||
| Nov 5, 2021 | 74A84 | EffinghamFayetteDistrict 7 | 23 miles of weed spraying along I-70 from milepost 61 in Fayette County to milepost 84 in Effingham County. | — | Executed | The Daltons Inc. $47,173 · | ||
| Nov 5, 2021 | 74A86 | ClayEffinghamFayetteDistrict 7 | Tree removal on I-57 from mile marker 134 to mile marker 158. | — | Executed | Brewster Companies, Inc. $139,700 · | ||
| Nov 5, 2021 | 74A87 | FayetteDistrict 7 | Slope wall repair, shoulder replacement and guardrail work on I-70 between the twin bridges over CSXT Railroad, 1.5 miles west of the Brownstown Interchange. | — | Executed | Stutz Excavating, Inc. $187,166 · | ||
| Nov 5, 2021 | 76L10 | JerseyDistrict 8 | 8.2 miles of resurfacing on IL 109 from US 67 in Jerseyville to IL 3. | — | Executed | Charles E. Mahoney Co. $4,522,278 · | ||
| Nov 5, 2021 | 76P05 | St. ClairDistrict 8 | Bridge joint repair on SN 082-0318 carrying the eastbound I-70 departure over the Mississippi River. | — | Executed | The Kilian Corporation $986,791 · | ||
| Nov 5, 2021 | 76P51 | JerseyDistrict 8 | Cleaning and painting two steel bridges on IL 100 over Chautauqua and Elsah Creek, South of Grafton. (SN 042-0013 and SN 042-0014) | — | Executed | Civil Coatings and Construction Inc. $255,819 · | ||
| Nov 5, 2021 | 76P54 | ClintonDistrict 8 | 4.5 miles of resurfacing on IL 161 from Albers Road to Hanover Street in Germantown. | — | Executed | Christ Bros. Asphalt, Inc. $1,222,498 · | ||
| Nov 5, 2021 | 76P55 | St. ClairDistrict 8 | 2 miles of resurfacing along US 50 from Anne Avenue to IL 158. | — | Executed | Christ Bros. Asphalt, Inc. $1,682,926 · | ||
| Nov 5, 2021 | 76P64 | St. ClairDistrict 8 | Bridge painting at the Poplar Street Complex; I-55/64 Eastbound Collector - Distributor Lanes over TRRA Railroad and over and under IL 3 ramps (SN 082-0144). | — | Executed | Thomas Industrial Coatings, Inc. $1,121,957 · | ||
| Nov 5, 2021 | 76P84 | MadisonDistrict 8 | 3.8 miles of pavement patching along IL 111 / IL 3 / US 67 from Montclaire Avenue to Homer Adams Parkway, then to Alby Street. | — | Executed | Christ Bros. Asphalt, Inc. $341,876 · | ||
| Nov 5, 2021 | 76P89 | MonroeSt. ClairDistrict 8 | 9.2 miles of patching on I-255 from the Jefferson Barracks Bridge to IL 157. | — | Executed | Keeley & Sons, Inc. $444,060 · | ||
| Nov 5, 2021 | 78829 | MassacDistrict 9 | Removing a single barrel reinforced concrete box culvert and replacing it with a single barrel precast box culvert, carrying IL 145 over a ditch, 2.1 miles north of Rosebud Road. (SN 064-7027) | — | Executed | Samron Midwest Contracting, Inc. $233,784 · | ||
| Nov 5, 2021 | 78871 | SalineDistrict 9 | Resurfacing of Old IL 13 between the intersections with IL 13; Resurfacing of IL 13 from US 45 to Pankey Creek Bridge. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,393,249 · | ||
| Nov 5, 2021 | 85695 | WinnebagoDistrict 2 | Sidewalk replacement, construction of new sidewalks, lighting improvements, streetscaping and landscaping along Center Street from North Street to Howard Street in Durand. | — | Executed | Alliance Contractors, Inc. $1,737,375 · | ||
| Nov 5, 2021 | 85712 | Rock IslandDistrict 2 | Sidewalk construction on 48th Street, from Wilson Middle School to 53rd Street onto 20th Avenue to 19th Avenue at the YMCA in Moline. | — | Executed | Valley Construction Co. $363,329 · | ||
| Nov 5, 2021 | 87742 | LaSalleDistrict 3 | Replace the bridge carrying TR 222 over a tributary of Indian Creek, 0.5 mile north of Earville. | — | Executed | Riber Construction, Inc. $815,302 · | ||
| Nov 5, 2021 | 87752 | LaSalleDistrict 3 | Realign and reconstruct the intersection of Commercial Street, Broadway Street, and Main Street in Marseilles. | — | Executed | D. Construction, Inc. $810,168 · | ||
| Nov 5, 2021 | 87782 | GrundyDistrict 3 | Resurfacing, sidewalk replacement, curb and gutter replacement and pedestrian traffic signal improvements on Minooka Road from Tables Road to Ridge Road in Minooka. | — | Executed | D. Construction, Inc. $2,146,151 · | ||
| Nov 5, 2021 | 89721 | TazewellDistrict 4 | Replace the bridge carrying Furrow Road over Lost Creek, one half mile east of Pekin. | — | Executed | Stark Excavating, Inc. $1,138,863 · | ||
| Nov 5, 2021 | 89727 | TazewellDistrict 4 | Resurfacing, HMA shoulders, concrete curb, drainage improvements and pavement markings on Broadway Road from Veterans Drive to Springfield Road. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $4,998,272 · | ||
| Nov 5, 2021 | 89811 | PeoriaDistrict 4 | Replace the bridge carrying CH 23R over the west fork of Kickapoo Creek, located southeast of Elmwood. | — | Executed | Stark Excavating, Inc. $1,996,313 · | ||
| Nov 5, 2021 | 91613 | ChampaignDistrict 5 | Construction of a shared use path along 1st Street from Windsor Road to Curtis Road in Savoy. | — | Executed | Feutz Contractors, Inc. $1,184,256 · | ||
| Nov 5, 2021 | 93740 | HancockDistrict 6 | Reconstruction of aggregate base, resurfacing, curlverts, storm sewer, sidwalks , curb and gutter, and pavement markings on CH11, from west of the Basco corporate limits to east of Washington Street in Basco. | — | Executed | Phoenix Corporation of the Quad Cities $1,472,412 · | ||
| Nov 5, 2021 | 93776 | LoganDistrict 6 | Replace the bridge carrying CH 12 over Lake Fork Creek, 1 mile east of Broadwell. | — | Rejected | County Contractors, Inc. $657,571 · |
901–952 of 952‹ Prev
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.