| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 26, 2019 | 70D57 | VariousDistrict 5 | Traffic signal backplate replacements on various routes in District 5. | — | Executed | Bodine Electric of Decatur $679,705 · | ||
| Apr 26, 2019 | 72J94 | SangamonDistrict 6 | Patching, milling, paving and structure work on I-72 from from east of the MacArthur Boulevard interchange to the I-55/I-55 BUS (6th Street) interchange and on I-55/I-55 BUS from just south of the 6th Street interchange to south of Hazel Dell Road. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $9,858,077 · | ||
| Apr 26, 2019 | 72K65 | PikeDistrict 6 | Painting portions of two bridges on I-72, 1.8 miles west of Barry. (SN 075-0098 and 075-0099). | — | Executed | Thomas Industrial Coatings, Inc. $274,171 · | ||
| Apr 26, 2019 | 72K78 | ScottDistrict 6 | Painting portions of two bridges on IL 100 and Hillview Road (SN 086-0016, 086-0039). | — | Rejected | Venus Painting Co. $182,900 · | ||
| Apr 26, 2019 | 72K99 | LoganSangamonDistrict 6 | Patching on I-55 in Sangamon and Logan Counties and on I-72 in Sangamon County | — | Executed | Kinney Contractors, Inc. $397,481 · | ||
| Apr 26, 2019 | 72L04 | AdamsDistrict 6 | Installation of fiber optic cables at various locations in Quincy. | — | Executed | Bodine Electric of Decatur $695,379 · | ||
| Apr 26, 2019 | 72L06 | LoganDistrict 6 | 14 miles of seal centerline joints and route and seal isolated transverse cracks on I-55 from Kickapoo Creek to the McLean County line, includes the interchange ramps at I-155. | — | Executed | Kinney Contractors, Inc. $115,963 · | ||
| Apr 26, 2019 | 72L07 | HancockDistrict 6 | 5.7 miles of micro-surfacing, cape seal of pavement and fog seal of shoulders on IL 110/336. | — | Executed | A. C. Pavement Striping Co. $1,448,072 · | ||
| Apr 26, 2019 | 72L09 | ScottDistrict 6 | Deck patching and expansion joint repairs on four structures on I-72. (SN 086-0040, 0041, 0042, 0043) | — | Executed | ERA-Valdivia Contractors, Inc. $195,843 · | ||
| Apr 26, 2019 | 72L11 | MontgomeryDistrict 6 | Centerline microsurfacing on I-55 from IL 48 to milemarker 6.74. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $212,915 · | ||
| Apr 26, 2019 | 72L12 | MontgomeryDistrict 6 | Centerline microsurfacing on I-55 from Macoupine Creek, southeast of Farmersville, to IL 48. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $244,992 · | ||
| Apr 26, 2019 | 74419 | ClarkDistrict 7 | 2 1/4" inlay of the existing pavement and ADA ramp improvements on IL 49 in Casey, from just south of Tyler Avenue to just north of the I-70 interchange. | — | Executed | Ne-Co Asphalt Co., Inc. $1,571,146 · | ||
| Apr 26, 2019 | 74886 | CrawfordDistrict 7 | Culvert extension on IL 1 at Duncanville Road, 3.6 miles south of IL 33. | — | Executed | Phoenix Corporation of the Quad Cities $181,499 · | ||
| Apr 26, 2019 | 74908 | VariousDistrict 7 | Repairing, replacing, servicing and maintaining the electrical systems within Fayette, Effingham, Jasper, Crawford, Lawrence, Richland, Clay, Wayne, Edwards and Wabash Counties. | — | Executed | Bodine Electric of Decatur $185,226 · | ||
| Apr 26, 2019 | 74909 | VariousDistrict 7 | Repairing, replacing, servicing and maintaining the electrical systems within Macon, Moultrie, Shelby, Clark, Cumberland and Coles and Effingham counties. | — | Executed | Bodine Electric of Decatur $180,226 · | ||
| Apr 26, 2019 | 76H14 | ClintonDistrict 8 | 3.8 miles of resurfacing on IL 160 from IL 161 to IL 177. | — | Executed | Christ Bros. Asphalt, Inc. $1,595,478 · | ||
| Apr 26, 2019 | 76J17 | CalhounDistrict 8 | Deck replacement on SN 007-0014 carrying IL 96 over an unnamed creek in Kampsville. | — | Rejected | Stutz Excavating, Inc. $669,788 · | ||
| Apr 26, 2019 | 76J86 | MadisonDistrict 8 | Construction of ADA accessible ramps on IL 159 from Park Street in Edwardsville to Glen Crossing Road in glen Carbon and on IL 157 from Vandalia Street/St. Louis Street in Edwardsville to Meridian Road in Glen Carbon. | — | Rejected | Keller Construction, Inc. $349,450 · | ||
| Apr 26, 2019 | 76K57 | GreeneDistrict 8 | Replace bridge deck of SN 031-0016 carrying IL 267 over Lick Creek, south of CH-9. | — | Rejected | RCS Construction, Inc. $1,089,072 · | ||
| Apr 26, 2019 | 76K88 | MadisonDistrict 8 | 5.7 miles of resurfacing and 3 foot shoulders in IL 160 from the Clinton County line to Highland Rd./Broadway in Highland. | — | Executed | The Kilian Corporation $3,495,396 · | ||
| Apr 26, 2019 | 76L07 | RandolphDistrict 8 | 3.6 miles of resurfacing on IL 150 from Murphysboro Road to Briar Hill Road. | — | Executed | E. T. Simonds Construction Company $2,650,244 · | ||
| Apr 26, 2019 | 76L16 | MadisonDistrict 8 | 2.1 miles of resurfacing on IL 162 from 0.1 mile east of IL 159 to 0.3 mile east of Gliddon Boulevard in Troy. | — | Executed | Christ Bros. Asphalt, Inc. $1,197,686 · | ||
| Apr 26, 2019 | 76L56 | JerseyDistrict 8 | Serpentine and parking lot resurfacing, ADA upgrades, lighting, and roadway ramp reconstruction on both the Jersey and Calhoun County sides, and dredging at the Brussels Ferry. | — | Rejected | RCS Construction, Inc. $2,267,111 · | ||
| Apr 26, 2019 | 76L98 | St. ClairDistrict 8 | Bridge painting on SN 082-0039 carrying IL 15 over Hardin Ditch and on SN 082-0040 carrying IL 15 over IL 157. | — | Executed | Thomas Industrial Coatings, Inc. $191,140 · | ||
| Apr 26, 2019 | 76M00 | St. ClairDistrict 8 | Resurfacing on 20th Street from Central Avenue to Reed Avenue and from 47th Street to St. Claire Avenue in Summit, | — | Executed | Hank's Excavating & Landscaping, Inc. $417,791 · | ||
| Apr 26, 2019 | 76M09 | MadisonDistrict 8 | Microsurfacing on Old US 40 (St. Louis Road) from just east of Collinsville Road to National Terrace in Collinsville. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $194,988 · | ||
| Apr 26, 2019 | 76M11 | MadisonDistrict 8 | 3.8 miles of single pass microsurfacing on IL 255 from just north of Seminary road to 0.5 mile north of IL 111/267. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $765,948 · | ||
| Apr 26, 2019 | 76M12 | St. ClairDistrict 8 | 5.3 miles of single-pass microsurfacing on IL 158 from Anglers club Road to Atlanta Drive in Belleville. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $525,480 · | ||
| Apr 26, 2019 | 76M13 | MadisonDistrict 8 | 3.2 miles of micro-surfacing from Blue Spruce Lane to the St. Clair County line | — | Executed | MISSOURI PETROLEUM PRODUCTS COMPANY LLC $245,474 · | ||
| Apr 26, 2019 | 76M15 | ClintonDistrict 8 | Slab on slab repair and culvert maintenance at SN 014-2005 carrying IL 127 over Mid Trib Flat Branch, 1.2 miles south of the Bond County line. | — | Executed | Stutz Excavating, Inc. $137,628 · | ||
| Apr 26, 2019 | 76M24 | St. ClairDistrict 8 | Cleaning and painting SN 082-0143 and SN 082-0205 at the Poplar Street Complex | — | Executed | ERA-Valdivia Contractors, Inc. $1,241,790 · | ||
| Apr 26, 2019 | 78029 | JohnsonDistrict 9 | Replacement of SN 044-0004 carrying US 45 over Little Cache Creek, just south of IL 146. | — | Executed | Sierra Bravo Contractors, LLC $1,748,326 · | ||
| Apr 26, 2019 | 78461 | JeffersonDistrict 9 | Replacement of 2 structures on 1-57 over Atchison Creek, 2 miles north of Ina (SN 041-0001 and 041-0002) | — | Executed | The Kilian Corporation $7,123,315 · | ||
| Apr 26, 2019 | 78690 | WhiteDistrict 9 | Removing the four way flashing beacon installation suspended by spanwire at the intersection of IL 14 and US 45 and replacing it with a new four way flashing beacon suspended by mast arm. | — | Executed | F. W. Electric, Inc. $36,411 · | ||
| Apr 26, 2019 | 78694 | WilliamsonDistrict 9 | Single pass microsurfacing, bump removal and fiber-modified asphalt crack sealing on IL 13 eastbound lane from west of Main Street to East Crab Orchard Road. | — | Executed | Beniach Construction Company, Inc. and Pavement Maintenance Systems, LLC $456,657 · | ||
| Apr 26, 2019 | 78702 | JacksonDistrict 9 | 1.9 miles of milling and resurfacing on US 51 from Old US 51 South Connector to Old Us 51 North connector, south of Carbondale. | — | Executed | E. T. Simonds Construction Company $682,787 · | ||
| Apr 26, 2019 | 78704 | PulaskiUnionDistrict 9 | HMA resurfacing, shoulder upgrades and patching on Old US 51 beginning at the south limits of Dongola and proceeding south for 3.7 miles | — | Executed | Southern Illinois Asphalt Co., Inc. $1,250,359 · | ||
| Apr 26, 2019 | 85679 | WinnebagoDistrict 2 | Remove existing pedestrian superstructure and construct a steel truss pedestrian superstructure, includes rehabilitation of existing bridge ramp structural members. Located beneath the Jefferson Street (US Business Route 20) bridge over the Rock River in the Rockford. | — | Executed | Sjostrom & Sons, Inc. $2,477,072 · | ||
| Apr 26, 2019 | 85681 | WhitesideDistrict 2 | Cold-In-Place recycling and resurfacing on Fulfs Road from Coleta Road to IL 40 | — | Executed | Martin & Company Excavating $970,071 · | ||
| Apr 26, 2019 | 85682 | StephensonDistrict 2 | Cold-In-Place recycling lon Loran Road from Kent Road to IL 73. | — | Executed | W K Construction Company, Inc. $349,527 · | ||
| Apr 26, 2019 | 87689 | DeKalbDistrict 3 | Replace the bridge carrying Base Line Road over Coon Creek, located 0.25 mile west of the Kane County Line. | — | Executed | Civil Constructors, Inc. $552,219 · | ||
| Apr 26, 2019 | 87698 | BureauDistrict 3 | Replace the bridge carrying TR 281 over East Bureau Creek, 3.5 miles west of Depue. | — | Executed | Stark Excavating, Inc. $1,004,126 · | ||
| Apr 26, 2019 | 87699 | LivingstonDistrict 3 | Replace the bridge carrying TR 245A over the south fork of Vermilion River, 4 miles south of chatsworth. | — | Executed | Riber Construction, Inc. $309,930 · | ||
| Apr 26, 2019 | 87704 | DeKalbDistrict 3 | Reconstruct the intersection of Peace Road at IL 64. | — | Executed | William Charles Construction Company, LLC $2,164,846 · | ||
| Apr 26, 2019 | 87705 | DeKalbDistrict 3 | Shoulder widening, resurfacing, extend a culvert and street lighting on Plank Road from Lindgren Road to East County Line Road. | — | Executed | William Charles Construction Company, LLC $1,758,430 · | ||
| Apr 26, 2019 | 87708 | LaSalleDistrict 3 | Replace the bridges carrying TR 469 and TR 382 over Covel Creek, 6 miles east of Grand Ridge. | — | Executed | Riber Construction, Inc. $726,079 · | ||
| Apr 26, 2019 | 87714 | LaSalleDistrict 3 | Resurfacing and intersection improvements on FAS Route 263 (CH 5) at Illinois Route 23. | — | Executed | Advanced Asphalt Company $216,236 · | ||
| Apr 26, 2019 | 89474 | KnoxDistrict 4 | Replace the bridge carrying CH 4 over Walnut Creek, 0.5 mile west of Altona. | — | Executed | County Contractors, Inc. $699,269 · | ||
| Apr 26, 2019 | 93723 | MacoupinDistrict 6 | Remove and replace guardrail and terminals at various locations in Macoupin County. | — | Executed | Clevenger Contractors, Inc. $1,612,957 · | ||
| Apr 26, 2019 | 93725 | AdamsDistrict 6 | Resurfacing CH 4 from North 200th Avenue to North 400th Avenue. | — | Executed | Diamond Construction Company $472,774 · | ||
| Apr 26, 2019 | 95798 | MaconDistrict 7 | Replace the bridge carrying CH 57 over a tributary to Big Creek, 0.2 mile south of Lehman Road. | — | Executed | County Contractors, Inc. $2,990,685 · | ||
| Apr 26, 2019 | 95846 | WabashDistrict 7 | Replace the bridge carrying TR 173 over a drainage ditch, 1.5 miles south of Keensburg. | — | Executed | Lake Contracting, Inc. $244,759 · | ||
| Apr 26, 2019 | 95847 | MoultrieDistrict 7 | Resurface CH 13 from County Road 1500 North to County Road 1400 North. | — | Executed | Ne-Co Asphalt Co., Inc. $254,906 · | ||
| Apr 26, 2019 | 97654 | St. ClairDistrict 8 | Reconstruction of Cargill Elevator Road from the Mississippi River bridge_docks to IL 3 in Cahokia. | — | Executed | Baxmeyer Construction, Inc. $3,245,028 · | ||
| Apr 26, 2019 | 97684 | MadisonDistrict 8 | Resurfacing Clifton Terrace Road from south of IL 3 to Rosenberg Lane in the Village of Godfrey. | — | Executed | Charles E. Mahoney Co. $329,987 · | ||
| Apr 26, 2019 | 97690 | MadisonDistrict 8 | Resurfacing Wanda Road from IL 143 to New Poag Road. | — | Executed | The Kilian Corporation $1,635,887 · | ||
| Apr 26, 2019 | 97694 | St. ClairDistrict 8 | Pavement reconstrcution, curb and gutter, storm sewer, sidewalks, and pavement markings on Simmons Road from Milburn School Road to Porter Road in O'Fallon. | — | Executed | Kamadulski Excavating and Grading Company, Inc. $1,218,315 · | ||
| Apr 26, 2019 | 97695 | MadisonDistrict 8 | Resurfacing Washington Avenue from north of Salu Street to College Avenue in Alton. | — | Executed | Charles E. Mahoney Co. $622,115 · | ||
| Apr 26, 2019 | 97696 | RandolphDistrict 8 | Resurfacing Baldwin Road from Wirth Lane to Ridge Road and from the St. Clair County line to north city limits of Baldwin. | — | Executed | The Kilian Corporation $1,302,949 · | ||
| Apr 26, 2019 | 99575 | SalineDistrict 9 | Replace the bridge carrying DeNeal Road over an unnamed creek, 3 miles east of Mitchellsville. | — | Executed | Dees, Inc. $188,243 · | ||
| Apr 26, 2019 | 99607 | MassacDistrict 9 | Replace the bridge carrying Portland Road over an unnamed stream, 2 miles northwest of Joppa. | — | Executed | Samron Midwest Contracting, Inc. $232,115 · | ||
| Apr 26, 2019 | 99613 | WilliamsonDistrict 9 | Resurfacing CH 18 from Stonefort Road to East Boundary Road north of Creal Springs. | — | Executed | Southern Illinois Asphalt Co., Inc. $605,762 · | ||
| Apr 26, 2019 | 99616 | JacksonDistrict 9 | Resurfacing Ava Road from IL 4 to South of Francis Lane. | — | Executed | E. T. Simonds Construction Company $1,545,387 · | ||
| Apr 26, 2019 | 99618 | JeffersonDistrict 9 | Resurfacing Marlow Road from IL 15 to Opdyke Road | — | Executed | Southern Illinois Asphalt Co., Inc. $382,099 · | ||
| Apr 26, 2019 | 99619 | WhiteDistrict 9 | Resurfacing CH 7 from 650 North Road to IL 141. | — | Executed | E. T. Simonds Construction Company $1,527,191 · | ||
| Jun 14, 2019 | 46497 | VariousDistrict 6 | PAVEMENT MARKING ON VARIOUS ROUTES THROUGHOUT DISTRICT 6 | — | Executed | STF, LLC d/b/a Traffic Control Company $1,337,766 · | ||
| Jun 14, 2019 | 46505 | DuPageMcHenryDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Dupage and McHenry counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $422,500 · | ||
| Jun 14, 2019 | 46506 | CookDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Cook County. | — | Executed | STF, LLC d/b/a Traffic Control Company $820,000 · | ||
| Jun 14, 2019 | 46507 | LakeWillDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Lake and Will counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $593,000 · | ||
| Jun 14, 2019 | 46508 | VariousDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, 8, 12 and 24 inches in width throughout District One. | — | Executed | STF, LLC d/b/a Traffic Control Company $699,050 · | ||
| Jun 14, 2019 | 46509 | CookDistrict 1 | Remove and replace reflectors and pavement marker castings within limits shown. | — | Executed | STF, LLC d/b/a Traffic Control Company $246,018 · | ||
| Jun 14, 2019 | 46511 | VariousDistrict 3 | REPLACING REFLECTORIZED GUARDRAIL MARKERS, TERMINAL MARKERS, AND PLACING LINEAR DELINEATOR PANELS WITHIN THE LIMITS OF THE CONTRACT. | — | Executed | Northern Contracting, Inc. $202,126 · | ||
| Jun 14, 2019 | 46512 | VariousDistrict 3 | REMOVING REFLECTORS, PLACING NEW REFLECTORS, REMOVING DAMAGED RAISED RFLECTIVE PAVEMENT MARKER CASTINGS AND REPLACING WITH NEW WITHIN THE LIMITS SHOWN. | — | Executed | P & P Construction Co. $125,347 · | ||
| Jun 14, 2019 | 46513 | VariousDistrict 3 | REMOVING AND REPLACING REFLCTORS, AND RAISED REFLECTIVE PAVEMENT MARKER CASTINGS WITHIN THE LIMITS SHOWN. | — | Executed | STF, LLC d/b/a Traffic Control Company $202,445 · | ||
| Jun 14, 2019 | 46514 | VariousDistrict 3 | Remove and replace reflectors, remove and replace damaged raised reflective pavement marker castings within limits shown. | — | Executed | P & P Construction Co. $153,496 · | ||
| Jun 14, 2019 | 46515 | VermilionDistrict 5 | 38.57 MILES OF GROOVING AND PAVEMENT STRIPING. | — | Executed | Varsity Striping & Construction Co. $524,436 · | ||
| Jun 14, 2019 | 46516 | VariousDistrict 4 | Remove and replace raised reflective pavement markers within limits shown. | — | Executed | P & P Construction Co. $571,845 · | ||
| Jun 14, 2019 | 46517 | VariousDistrict 4 | REMOVAL OF EXISTING PAVEMENT MARKINGS AND REPLACING WITH EPOXY AND MODIFIED URETHANE PAVEMENT MARKING LINES WITHIN THE LIMITS SPECIFIED ON EACH WORK ORDER. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,098,686 · | ||
| Jun 14, 2019 | 46518 | VariousDistrict 6 | REPAIRING OR REPLACING DAMAGED SIGN COMPONENTS, FURNISHING AND INSTALLING NEW SIGN SUPPORTS, REPAIRING OR REPLACING DAMAGED SIGN COMPONENTS, FURNISHING NEW OVERHEAD SIGN STRUCTURES AND REAPIRS TO OVERHEAD SIGN STRUCTURES AT VARIOUS LOCATIONS THROUGHOUT THE STATE. | — | Executed | Kujo, Inc. $2,556,621 · | ||
| Jun 14, 2019 | 46519 | VariousDistrict 2 | REMOVING EXISTING GUARDRAIL DELINEATORS AND INSTALLING NEW GUARDRAIL DELINEATORS WITHIN THE LIMITS SPECIFIED ON EACH INDIVIDUAL WORK ORDER. | — | Executed | Endrizzi Contracting, Inc $279,807 · | ||
| Jun 14, 2019 | 46520 | VariousDistrict 2 | PLACING VARIOUS WIDTHS OF MODIFIED URETHANE AND THERMOPLASTIC PAVEMENT MARKING LINES, LETTERS, AND SYMBOLS WITHIN THE LIMITS SPECIFIED ON EACH WORK ORDER. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,587,475 · | ||
| Jun 14, 2019 | 46521 | VariousDistrict 9 | REMOVING REFLECTORS, PLACING NEW REFLECTORS, REMOVING DAMAGED RAISED REFLECTIVE PAVEMENT MARKER CASTINGS AND INSTALLING NEW CASTINGS ON VARIOUS ROUTES THROUGH- OUT DISTRICT 9. | — | Executed | STF, LLC d/b/a Traffic Control Company $227,183 · | ||
| Jun 14, 2019 | 46526 | MadisonDistrict 8 | Pump station improvements at 2 locations: 1) I-255 at Grey's Farm/Sparks Lane in Collinsville; 2) I-270/Fun and Sun at West Chain of Rocks in Mitchell. | — | Rejected | Electrico, Inc. $60,485 · | ||
| Jun 14, 2019 | 46528 | LoganDistrict 6 | INSTALLATION OF NEW AUTOMATIC TRANSFER SWITCH AT THE STORM WATER PUMP STATION ON IL 121. | — | Rejected | Kovilic Construction Company, Inc. $147,850 · | ||
| Jun 14, 2019 | 46529 | EffinghamLawrenceMaconDistrict 7 | New automatic transfer switch and miscellaneous improvements to 3 pump stations: 1) Westport Pump House along IL 33 in Lawrence County; 2) Effingham Pump House at US 40 and US 45 in Effingham County; 3) Decatur Pump House on Garfield Avenue east of IL 121 in Macon County. | — | Executed | Bodine Electric of Decatur $230,811 · | ||
| Jun 14, 2019 | 46916 | ClintonDistrict 8 | RESURFACING OF PARK ROADS AND PARKING LOT. ADA SIDEWALK AND RAMP UPGRADES AND REPLACEMENT OF CULVERTS AT ELDON HAZLET STATE PARK. | — | Executed | Howell Paving, Inc. $1,323,717 · | ||
| Jun 14, 2019 | 46917 | BureauDistrict 3 | 2 miles of resurfacing park roads and parking lots with A-2 Oil and Chip at Mautino State Fish and Wildlife Area. Project includes some roadway widening, culvert replacement and drainage improvements. | — | Executed | Phoenix Corporation of the Quad Cities $476,639 · | ||
| Jun 14, 2019 | 60R80 | CookDistrict 1 | Bridge deck and approach overlay, repairs and reconstruction of deck joints on structures carrying Sheridan Road over ravines in the Village of Glencoe and City of Highland Park. (SN 016-0616, 0617, 0618, 0619) | — | Executed | Copenhaver Construction, Inc. $1,624,894 · | ||
| Jun 14, 2019 | 61E01 | KaneDistrict 1 | Construction of a pedestrian tunnel under the UP Railroad to reconnect the Fox River Trail on the west side of the tracks to the Prairie Path on the east side of the tracks, in the Raymond Street Forest Preserve. | — | Executed | Martam Construction Incorporated $3,439,622 · | ||
| Jun 14, 2019 | 61F06 | CookDistrict 1 | PCC multi-use path construction with ADA ramp improvements on Shermer Road from West Lake Avenue to willow Road in the Village of Glenview. | — | Executed | M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company $999,270 · | ||
| Jun 14, 2019 | 61F37 | CookDistrict 1 | Roadway reconstruction, traffic signals, interconnection with railroad signals, curb and gutter, sidewalk and street lighting at the intersection of 95th Street and Museum Avenue in Oak Lawn. | — | Executed | Alliance Contractors, Inc. $1,728,958 · | ||
| Jun 14, 2019 | 61F76 | WillDistrict 1 | Construction of a multi-use path adjacent to University Parkway from Steger- Monee Road to Western Avenue in the Village of University Park. | — | Executed | Iroquois Paving Corporation $525,868 · | ||
| Jun 14, 2019 | 61F78 | McHenryDistrict 1 | Sidewalk and lighting improvements on Pearl Street from Illinois Route 31 to Riverside Drive in the City of McHenry. | — | Executed | Sumit Construction Co., Inc. $530,035 · | ||
| Jun 14, 2019 | 61F80 | McHenryDistrict 1 | Resurfacing Curran Road from Illinois Route 120 to Ojibwa Lane in the City of McHenry. | — | Executed | Curran Contracting Company $525,561 · | ||
| Jun 14, 2019 | 61F83 | DuPageDistrict 1 | Bridge deck scarification, bridge deck latex concrete overlay and bridge deck grooving on the structure carryi Work consists of bridge deck scarification, bridge deck latex concrete overlay and bridge deck grooving on the structure carrying 83rd Street over I-355 between Wharf Dr. and Woodward Avenue in the village of Woodridge. | — | Executed | D. Construction, Inc. $288,756 · | ||
| Jun 14, 2019 | 61F84 | CookDistrict 1 | Construction of a pedestrian path adjacent to Roselle Road from Algonquin Road to Shire Circle in the Village of Palatine. | — | Executed | A Lamp Concrete Contractors, Inc. $379,874 · | ||
| Jun 14, 2019 | 62B75 | LakeDistrict 1 | Intersection reconstruction at IL 131 and Kenosha Road in the Village of Beach Park. | — | Executed | Campanella and Sons, Inc. $3,348,311 · | ||
| Jun 14, 2019 | 62C06 | McHenryDistrict 1 | Intersection improvement, roadway realignment and traffic signal installation where IL 176 intersects with Mt. Thabor Road and Haligus Road in Crystal Lake. | — | Executed | Plote Construction, Inc. $3,852,700 · | ||
| Jun 14, 2019 | 62C08 | CookDistrict 1 | Intersection widening, traffic signal modernization and resurfacing at Kedzie Avenue and 119th Street in Merrionette. | — | Executed | D. Construction, Inc. $920,917 · | ||
| Jun 14, 2019 | 62D39 | McHenryDistrict 1 | Replace culvert, roadway reconstruction and resurfacing on IL 120 in Greenwood Township. | — | Executed | Alliance Contractors, Inc. $243,993 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.