| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Feb 27, 2026 | 74E30 | VariousDistrict 7 | Guardrail repairs of existing damage from motorists at locations shown on the plans and damage yet to be realized on an on-call basis throughout District 7. | — | Executed | COLLINS & HERMANN, INC. $811,102 · | ||
| Feb 27, 2026 | 76A37 | MarionDistrict 8 | Bridge replacement on Old US 51 over Crooked Creek, 0.3 miles north of Central City. (SN 061-0007) | — | Executed | Samron Midwest Contracting, Inc. $4,343,470 · | ||
| Feb 27, 2026 | 76B42 | MarionWashingtonDistrict 8 | Bridge replacement on US 51 over Louse Run Tributary, 2 miles south of Patoka, and the replacement of 3 bridge with culverts on DuBois Blacktop Road over a creek, 3 miles west of DuBois. | — | Executed | C-Hill Civil Contractors, Inc. $3,575,562 · | ||
| Feb 27, 2026 | 76U40 | MarionDistrict 8 | 4 miles of resurfacing on US 51 from Texas Avenue in Sandoval to north of Central City. | — | Executed | Howell Paving, Inc. $4,980,603 · | ||
| Feb 27, 2026 | 76U42 | MadisonDistrict 8 | 7 miles of microsurfacing on I-255 from the St. Clair County line to I-270. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $6,640,925 · | ||
| Feb 27, 2026 | 76U43 | MadisonDistrict 8 | 3.9 miles of resurfacing on IL 255 from 0.1 miles north of Seminary Road to US 67 in Godfrey. | — | Executed | Charles E. Mahoney Co. $7,764,431 · | ||
| Feb 27, 2026 | 76U52 | VariousDistrict 8 | Various pavement patching call-out locations throughout District 8. | — | Executed | Kinney Contractors, Inc. $1,982,334 · | ||
| Feb 27, 2026 | 76U67 | St. ClairDistrict 8 | 4.4 miles of patching and slurry seal on MLK Drive, Louisiana Boulevard and Lake Drive in East St. Louis. | — | Executed | Christ Bros. Asphalt, Inc. $1,246,663 · | ||
| Feb 27, 2026 | 76U71 | MonroeSt. ClairDistrict 8 | 2.2 miles of chip seal at various locations: Hilltop Road from 0.6 miles north of Hill Castle Road to Gilmore Lake Road; Hill Castle Lane from Hill Castle Road to 0.1 miles north of Hill Castle Road; Doyle Road from IL 3 to 0.1 miles north of IL 3; Old IL 156 from IL 13 to 1.0 miles east of IL 13. | — | Executed | DMS Contracting, Inc. $326,472 · | ||
| Feb 27, 2026 | 76U73 | St. ClairDistrict 8 | Bridge deck overlay and repairs on 5 structures I-64 in East St. Louis. (SN 082-0153, 0154, 0157, 0159 and 0161) | — | Executed | Keeley & Sons, Inc. $1,649,119 · | ||
| Feb 27, 2026 | 76U78 | MadisonDistrict 8 | 2.3 miles of patching on IL 203 from the I-270 westbound ramps to Branding Avenue in Granite City. | — | Executed | G. M. Sipes Construction, Inc. $898,651 · | ||
| Feb 27, 2026 | 76V02 | St. ClairDistrict 8 | 1.7 miles of resurfacing on IL 177 from County Road to Mine Road in Mascoutah. | — | Executed | The Kilian Corporation $835,131 · | ||
| Feb 27, 2026 | 76V04 | JerseyMadisonDistrict 8 | Weed control at various locations in Madison and Jersey Counties. | — | Executed | The Daltons Inc. $414,310 · | ||
| Feb 27, 2026 | 78967 | JacksonDistrict 9 | Replacement of SN 039-0026 carrying IL 3 over Worthen Bayou, 1.2 miles south of IL 149. | — | Executed | E. T. Simonds Construction Company $3,594,116 · | ||
| Feb 27, 2026 | 78A87 | FranklinDistrict 9 | Signal modifications, pedestrian crossings and sidewalks at the intersection of IL 14 and Central Street in West City. | — | Executed | F. W. Electric, Inc. $543,064 · | ||
| Feb 27, 2026 | 78B00 | JacksonDistrict 9 | Signal modifications on IL 13 in Carbondale from Glenview Drive to McKinney Avenue. | — | Executed | Gerstner Electric, Inc. $2,170,000 · | ||
| Feb 27, 2026 | 78B34 | JeffersonDistrict 9 | Bridge deck overlay on 3 sets of dual bridges on I-64: 1) approximately 2 miles east of IL 142, 2) at the Belle Rive interchange, 3) approximately 0.6 miles east of IL 37. (SN 041-0087, 041-0088, 041-0071, 041-0072, 041-0080, and 041-0081) | — | Executed | E. T. Simonds Construction Company $5,793,218 · | ||
| Feb 27, 2026 | 78B37 | WhiteDistrict 9 | Bridge deck overlay and repairs on IL 14 over Fox River Slough, 5 miles east of Crossville. (SN 097-0032) | — | Executed | E. T. Simonds Construction Company $600,818 · | ||
| Feb 27, 2026 | 78B38 | JacksonDistrict 9 | Bridge deck overlay s at 3 locations: 1) US 51 over Little Crab Orchard Creek, 2 miles north of Carbondale; 2) US 51 over Big Muddy River, 1.8 miles south of DeSoto; 3) IL 149 over Beaucoup Creek, 3.3 miles west of DeSoto. (SN 039-0063, 039-0064, 039-0065). | — | Executed | Samron Midwest Contracting, Inc. $1,494,455 · | ||
| Feb 27, 2026 | 78B52 | JeffersonDistrict 9 | Resurfacing on IL 37 from IL 15 to the north Mount Vernon city limits and on IL 37 from the Northfolk and Southern Railroad (SN 041-0039), 3.5 miles south of Dix, to the Marion County line. | — | Executed | E. T. Simonds Construction Company $4,988,975 · | ||
| Feb 27, 2026 | 78B58 | WilliamsonDistrict 9 | 1.9 miles of patching and resurfacing on IL 148 from 0.8 miles south of the Franklin County line to 17th Street, north of Herrin. | — | Executed | Samron Midwest Contracting, Inc. $744,591 · | ||
| Feb 27, 2026 | 78B83 | FranklinSalineDistrict 9 | Building demolition and site cleanup at 3 locations in West City, Benton and Harrisburg. | — | Executed | Samron Midwest Contracting, Inc. $338,886 · | ||
| Feb 27, 2026 | 78B91 | JacksonUnionDistrict 9 | Traffic signal modernization at 2 intersections: IL 13 and Reed Station Road; IL 146 and US 51. | — | Executed | F. W. Electric, Inc. $404,654 · | ||
| Feb 27, 2026 | 80B08 | DuPageDistrict 1 | Hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement (1.21-Mile) Smart Overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement of thermoplastic pavement markings located on Busse Rd (Illinois Route FAP 344, IL 83), beginning south of Bryn Mawr Ave and ending at Illinois 19 (Irving Park Rd). in the Village of Bensenville in DuPage County. | — | Executed | Builders Paving, LLC $2,172,384 · | ||
| Feb 27, 2026 | 80B13 | WillDistrict 1 | (1.07-Mile) Standard Overlay and ADA Improvements project includes hot-mix asphalt removal, PCC removal, pavement patching, PCC milling, resurfacing with hot-mix asphalt, drainage structure adjustment and cleaning, pavement markings, raised reflective markers, ADA ramps, pedestrian signals, detector loops. Location: IL 53 (Broadway Street/ Ruby Street) from Teale Woods Trail (South of IL 7) to Bluff Street, within the City of Joliet. | — | Executed | P. T. Ferro Construction Co. $1,424,777 · | ||
| Feb 27, 2026 | 80B15 | DuPageDistrict 1 | (8,333-Ft) Standard Overlay of the existing PCC pavement with HMA surface course and binder course, thermoplastic pavement markings, ADA improvements for curb ramps, combination concrete curb and gutter, concrete medians, pavement widening for flush medians, located along IL Route 38 (Roosevelt Road) from east of Nicoll Way to Edson Avenue in the Villages of Glen Ellyn and Lombard in DuPage County. | — | Executed | R. W. Dunteman Company $4,255,555 · | ||
| Feb 27, 2026 | 80B25 | DuPageDistrict 1 | (2.5-Mile) Standard Overlay, ADA Improvements, New Shoulders: Removing and replacing exist. hot-mix asphalt, (HMA) surface and binder course. Narrow (minor) pavement widening, new HMA shoulders in place of existing aggregate, and median improvement. Spot locations pavement patching and curb removal and replacement. Curb ramps for sidewalks (ADA) improvements, drainage structures adjustment and cleaning. pavement markings, raised reflective pavement markers, pedestrian signals improvements (APS), | — | Executed | R. W. Dunteman Company $3,330,985 · | ||
| Feb 27, 2026 | 80B56 | CookDistrict 1 | Cleaning and painting designated steel surfaces Bridge Painting project consists of cleaning and painting designated steel surfaces. Location 1: IL-21 (FAU 1332A) over US-14 (SN: 016-2572) Location 2: Oakton St. (FAP 374) over Des Plaines River 14 (SN: 016-2601) | — | Executed | Eagle Painting & Maintenance Company, Inc. $401,758 · | ||
| Feb 27, 2026 | 80B75 | LakeDistrict 1 | Asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian r (4.21-Mile) Standard overlay and ADA curb ramp improvement project consists of asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement patching, placement of pavement markings, traffic signal modernization. Located on IL-59 from North of IL-132 (Grand Ave) to US-12, within the Villages of Fox Lake, Lake Villa and Unincorporated Ingleside in Lake County. | — | Executed | Peter Baker & Son Co. $3,291,674 · | ||
| Feb 27, 2026 | 80B83 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish located on FAI 80, I-80 Expressway from I-294 (Tri-State Tollway) to Will / Kendall County Line in Cook and Will Counties. | — | Executed | ABC Traffic Safety $160,313 · | ||
| Feb 27, 2026 | 80B84 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish located on I-57 expressway from I-90/94 (Dan Ryan Expressway) to Will / Kankakee County Line in Cook and Will Counties. | — | Executed | ABC Traffic Safety $211,275 · | ||
| Feb 27, 2026 | 80C91 | VariousDistrict 1 | FULL EXPRESSWAY CLEANING CYCLE and SUPPLEMENTAL SWEEPING includes the pickup, removal, and proper disposal of debris such as limbs, sticks, leaves, sand, stones, dirt, weeds, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the specified highway areas. This work is located on various State maintained expressway routes located within the counties of Cook, DuPage, and Will. | — | Rejected | ROADSAFE TRAFFIC SYSTEMS, INC. $5,894,295 · | ||
| Feb 27, 2026 | 85769 | WinnebagoDistrict 2 | Construction of PCC sidewalk and PCC shared-use path along IL 125 from River Lane to E. River Boulevard in Loves Park. Work includes removal of HMA parking lanes, curb and gutter, ADA improvements, drainage improvements, lighting, traffic signals and other required work. | — | Executed | N-Trak Group LLC $3,986,156 · | ||
| Feb 27, 2026 | 85789 | OgleDistrict 2 | Resurfacing German Church Road from IL 72 to Deer Path Road. | — | Executed | Martin & Company Excavating $830,341 · | ||
| Feb 27, 2026 | 85790 | Rock IslandDistrict 2 | Traffic signal improvement at various intersections in the City of Moline. | — | Executed | Davenport Electric Contract Company $249,275 · | ||
| Feb 27, 2026 | 87886 | BureauDistrict 3 | A-1 Bituminous Surface Treatment on Cleveland Street from IL 89 to the BNSF Railroad in the Village of Ladd. | — | Executed | Universal Asphalt & Excavating, Inc. $137,248 · | ||
| Feb 27, 2026 | 87910 | LaSalleDistrict 3 | HMA resurfacing of CH 29 from IL 18 to CH 64 in LaSalle County. Additionally includes HMA shoulders, aggregate shoulders and other required work. | — | Executed | Advanced Asphalt Company $1,225,765 · | ||
| Feb 27, 2026 | 91660 | McLeanDistrict 5 | Resurfacing, aggregate shoulders and guardrail improvement on CH 7 from IL 165 to IL 9. | — | Executed | Rowe Construction, a div of UCM, Inc. $2,213,052 · | ||
| Feb 27, 2026 | 93842 | LoganDistrict 6 | Sidewalk construction at various locations within the City of Mt. Pulaski. | — | Executed | Earth Worx Solutions LLC $278,650 · | ||
| Feb 27, 2026 | 93845 | HancockDistrict 6 | Construction of a single span PPC deck beam bridge carrying 2980 East Road over Baptist Creek, 4 miles northeast of the town of Fountain Green. Additionally includes aggregate approach roadways, guardrail and other required work. | — | Executed | Laverdiere Construction, Inc. $504,870 · | ||
| Feb 27, 2026 | 93852 | SchuylerDistrict 6 | Reconstruction of West Lafayette Street from Jackson Street to Monroe Street in Rushville. Additionally includes concrete curb and gutter, PCC pavement intersections, sidewalks, lighting, landscaping and other required work. | — | Executed | Laverdiere Construction, Inc. $1,249,952 · | ||
| Feb 27, 2026 | 93853 | PikeDistrict 6 | Full-depth reclamation and resurfacing Cold-in-place recycling and HMA resurfacing of CH 2 and a portion of CH 14 in Pike County. A portion of CH 14 will also consist of full-depth reclamation and resurfacing. Work also includes aggregate shoulders, guardrail, pavement markings and other required work. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $5,678,290 · | ||
| Feb 27, 2026 | 97872 | St. ClairDistrict 8 | Reconstruction on Frank Scott Parkway East from Green Mount Road to Cross Street. , Pavement widening and reconstruction of Frank Scott Parkway East from Green Mount Road to Cross Street in the Village of Shiloh. | — | Executed | DMS Contracting, Inc. $4,689,431 · | ||
| Feb 27, 2026 | 97882 | MadisonDistrict 8 | HMA resurfacing, curb and gutter replacement, sidewalk replacement, pavement markings, and pedestrian traffic signal improvements on Madison Avenue from 27th St. to 23rd St. in Granite City. | — | Executed | Stutz Excavating, Inc. $2,795,529 · | ||
| Feb 27, 2026 | 97886 | St. ClairDistrict 8 | HMA resurfacing of Old Collinsville Road from Ashland Avenue to US 50 in the City of Fairview Heights. Additional work includes PCC patches, ADA ramps, curb and gutter and other required work. | — | Executed | Keeley & Sons, Inc. $1,199,255 · | ||
| Feb 27, 2026 | 97889 | MonroeDistrict 8 | HMA resurfacing of various roadways in the village of Valmeyer. Additionally includes variable depth PCC surface removal, pavement markings, ADA sidewalk improvements and other required work. | — | Executed | Christ Bros. Asphalt, Inc. $716,678 · | ||
| Feb 27, 2026 | 99757 | WilliamsonDistrict 9 | Construction of a roundabout intersection at Cambria Road and Cardinal Road/ Grand Avenue intersection. Work includes PCC pavement, curb and gutter, drainage improvements, lighting and other required work. , Construction of a roundabout intersection at Cambria Road and Cardinal Road/Grand Avenue intersection. Work includes PCC pavement, curb and gutter, drainage improvements, lighting and other required work. | — | Executed | Samron Midwest Contracting, Inc. $1,715,790 · |
101–147 of 147‹ Prev
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.