Filtered by: District: District 9 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 18, 2022 | 78930 | FranklinDistrict 9 | Joint reconstruction, hydro-scarification with microsilica concrete overlay, bearing replacement and approach Proposed improvements consist of joint reconstruction, hydro-scarification with microsilica concrete overlay, bearing replacement and approach slab repair on SN 028-0063, W. Webster St. over 1-57 in Franklin County. | — | Executed | E. T. Simonds Construction Company $453,453 · | ||
| Nov 18, 2022 | 78957 | WilliamsonDistrict 9 | This project involves the construction of a mid-block crosswalk with ADA ramps, median refuge island, rectangular rapid flashing beacons, highway lighting and appropriate pavement markings on IL 13 at Ray Fosse Park in Marion IL. | — | Executed | Samron Midwest Contracting, Inc. $246,246 · | ||
| Nov 18, 2022 | 78958 | FranklinDistrict 9 | Replacement of the pumps, piping, back-up and electrical controls of the pump station along I-57 at the West Frankfort interchange. | — | Active | Haier Plumbing and Heating, Inc. $3,343,253 · | ||
| Nov 18, 2022 | 78962 | FranklinDistrict 9 | Replacement of the sanitary sewer lift station and grinder, electrical service, alarm system, driveway pavement and water service at northbound I-57 Rend Lake Rest Area, 2.4 miles north of the IL 14 / Benton interchange. | — | Active | Lake Contracting, Inc. $434,024 · | ||
| Nov 18, 2022 | 99671 | FranklinDistrict 9 | .55 miles of PCC and HMA pavement road reconstruction, concrete curb and gutter, and storm sewer construction on Wastena Street from IL 37 to South McLeansboro Street in Benton. | — | Executed | Samron Midwest Contracting, Inc. $1,598,362 · | ||
| Nov 18, 2022 | 99696 | MassacDistrict 9 | Resurfacing CH 5 from CH 4 to the east city limits of Joppa. | — | Executed | Southern Illinois Asphalt Co., Inc. $640,826 · | ||
| Jan 20, 2023 | 78604 | JeffersonDistrict 9 | 10.8 miles of reconstruction/rehabilitation on I-64 from 0.3 miles east of Shiloh Road to just east of the Washington County line. | — | Executed | Plote Construction, Inc. $94,073,768 · | ||
| Jan 20, 2023 | 78682 | WhiteDistrict 9 | Replacement of SN 097-0013 carrying US 45 over Bear Creek and SN 097-0014 carrying US 45 over TR 381, approximately 2 miles south of Norris City. | — | Executed | E. T. Simonds Construction Company $2,693,689 · | ||
| Jan 20, 2023 | 78716 | SalineDistrict 9 | Remove and replace SN 083-0001 and 083-0002 carrying US 45 over North Fork of Saline River and overflow, 1 mile and 0.5 miles north of Texas City. | — | Executed | E. T. Simonds Construction Company $9,746,225 · | ||
| Jan 20, 2023 | 78778 | FranklinDistrict 9 | 1.5 miles of milling, rubbilizing and resurfacing on IL 148 from Ziegler-Royalton School to north of Yellow Banks Road. | — | Executed | Samron Midwest Contracting, Inc. $2,185,355 · | ||
| Jan 20, 2023 | 78866 | AlexanderDistrict 9 | Surface preparation and application of bridge deck concrete sealer at SN 002-0022 carrying I-57 over the Mississippi River. | — | Executed | All States Painting, Inc. $39,400 · | ||
| Jan 20, 2023 | 78909 | SalineDistrict 9 | Signal modifications and ADA improvements at the intersection of Old IL 13 and Main Street in Harrisburg. , Signal modifications and ADA improvements at the intersection of Old IL 13 and Main Street in Harrisburg. | — | Executed | Brown Electric, Inc. $412,836 · | ||
| Jan 20, 2023 | 78963 | JeffersonDistrict 9 | Joint reconstruction with strip seals, bridge deck and structure repair, crack sealer, and waterproofing with HMA overlay on SN 041-0096 carrying IL 148 over Big Muddy River. | — | Executed | E. T. Simonds Construction Company $830,574 · | ||
| Jan 20, 2023 | 78966 | UnionDistrict 9 | New bridge deck overlay on SN 091-0060 carrying IL 146 over Clear Creek, 2 miles east of IL 3. | — | Executed | E. T. Simonds Construction Company $200,126 · | ||
| Jan 20, 2023 | 78980 | VariousDistrict 9 | Weed spraying for the control of Johnson Grass along I-57 at various locations. | — | Executed | The Daltons Inc. $116,248 · | ||
| Jan 20, 2023 | 78981 | VariousDistrict 9 | Weed spraying for the control of broadleaf weeds at various locations along I-24 and I-57. | — | Executed | Endrizzi Contracting, Inc $159,610 · | ||
| Mar 10, 2023 | 78610 | AlexanderDistrict 9 | Replacement of SN 002-0010 carrying Old IL 3 over Miller Creek, approximately 1 mile north of Thebes. | — | Executed | E. T. Simonds Construction Company $2,284,273 · | ||
| Mar 10, 2023 | 78902 | UnionDistrict 9 | Earth excavation for backslope repair along IL 127 just north of Rhine Road, south of Alto Pass. | — | Executed | Chris Harner Excavating $25,672 · | ||
| Mar 10, 2023 | 78905 | JacksonPerryDistrict 9 | Intersection widening and resurfacing at 3 locations: IL 154 at Water Street in Pinckneyville, IL 127/149 at North 4th Street in Murphysboro and IL 13/127/149 at North Street in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $373,373 · | ||
| Mar 10, 2023 | 78953 | FranklinHamiltonDistrict 9 | Scour repair on SN 028-0040 carrying IL 149 over Tilley Creek, 3.4 miles west of IL 34; and scour repair on SN 033-0016 carrying IL 142 over Bear Creek, 1.8 miles south of IL 14. | — | Executed | E. T. Simonds Construction Company $176,175 · | ||
| Mar 10, 2023 | 78974 | WhiteDistrict 9 | 0.6 miles of patching, surface removal and HMA surfacing on IL 1 under I-64 near Grayville, including the radius returns for the entrance and exit ramps to the existing joint for eastbound and westbound I-64. | — | Rejected | E. T. Simonds Construction Company $538,851 · | ||
| Mar 10, 2023 | 99690 | FranklinDistrict 9 | Resurfacing Log Cabin Road from the Jefferson County Line to Ewing Road. | — | Executed | E. T. Simonds Construction Company $967,116 · | ||
| Mar 10, 2023 | 99697 | AlexanderDistrict 9 | Resurfacing CH 4 from Tamms-Olivebranch Road to IL 127, and from Sexton Creek to Tamms-Olivebranch Road. | — | Executed | E. T. Simonds Construction Company $2,058,067 · | ||
| Mar 10, 2023 | 99699 | WhiteDistrict 9 | HMA resurfacing with rumble strips, aggregate shoulders, pavement markings and raised reflective markers on Epworth Road from 1300 N to 1100 N. | — | Executed | E. T. Simonds Construction Company $1,127,407 · | ||
| Apr 28, 2023 | 46925 | JacksonDistrict 9 | Bituminous surface treatment on existing roads and parking lots in Burning Star State Fish and Wildlife Area. | — | Executed | DMS Contracting, Inc. $1,851,558 · | ||
| Apr 28, 2023 | 78918 | WilliamsonDistrict 9 | Superstructure repairs on SN 100-0072 carrying IL 37 over Crab Orchard Creek. | — | Executed | E. T. Simonds Construction Company $338,907 · | ||
| Apr 28, 2023 | 78921 | UnionDistrict 9 | Approach slab repair, HMA widening and waterproofing with HMA overlay on SN 091-0068 carrying IL 127 over Clear Creek south of Alto Pass; approximately 0.16 miles south of Brown Section Road. | — | Executed | E. T. Simonds Construction Company $174,513 · | ||
| Apr 28, 2023 | 78939 | JacksonJohnsonDistrict 9 | Bridge deck overlay on SN 044-0012 carrying IL 37 over an abandoned railroad, 0.2 miles south of Cypress and bridge deck overlay on SN 039-0057 carrying IL 149 over Little Muddy River, 2 miles east of Desoto. | — | Executed | E. T. Simonds Construction Company $866,504 · | ||
| Apr 28, 2023 | 78968 | JohnsonMassacDistrict 9 | Bridge superstructure repair on SN 064-0029 carrying US 45 over I-24, 3.5 miles east of Metropolis and bridge joint repair on SN 044-0051 carrying Central Hill Road over I-24, 1.8 miles north of the Massac County line. | — | Executed | E. T. Simonds Construction Company $713,312 · | ||
| Apr 28, 2023 | 78984 | WhiteDistrict 9 | Upgrading the traffic signal communication systems at 8 signalized intersections on IL 1 / IL 14 in Carmi. | — | Executed | F. W. Electric, Inc. $193,438 · | ||
| Apr 28, 2023 | 78991 | HamiltonDistrict 9 | Placement of riprap on the fore slope of the east roadside ditch on IL 242 at Blairesville Road, approximately 3.3 miles north of McLeansboro. | — | Executed | Big Creek Excavating, Inc. $141,911 · | ||
| Apr 28, 2023 | 78992 | VariousDistrict 9 | Deck sealing on various bridges in Jackson, Perry and Jefferson Counties. | — | Executed | All States Painting, Inc. $114,800 · | ||
| Apr 28, 2023 | 78993 | AlexanderDistrict 9 | Patching and ADA improvements on US 51 (Washington Avenue) at 14th Street in Cairo. | — | Executed | E. T. Simonds Construction Company $151,847 · | ||
| Apr 28, 2023 | 99681 | SalineDistrict 9 | Replace existing structure with a single-span PPC Deck Beam Bridge with Aggregate approaches on Tuller Road over a drainage ditch 1.6 miels south of Carrier Mills. | — | Executed | Dees, Inc. $317,900 · | ||
| Apr 28, 2023 | 99691 | PerryDistrict 9 | Resurfacing with HMA shoulders, Aggregate Shoulders, Signage, and Guardrail upgrades along Pyatt-Cutler Road from Union school Road to IL 131127. | — | Executed | Samron Midwest Contracting, Inc. $2,089,377 · | ||
| Apr 28, 2023 | 99695 | WilliamsonDistrict 9 | PCC Pavement, Curb and Gutter, sidewalk replacement, concrete median, decorative lighting, and landscaping on Park Avenue from Adams Street to Herrin Street in Herrin. | — | Executed | E. T. Simonds Construction Company $1,573,149 · | ||
| Jun 16, 2023 | 46932 | FranklinDistrict 9 | Parking lot resurfacing, sealing, striping, ADA sidewalk improvements, lighting and signing at the Wayne Fitzgerrell State Recreation Area. | — | Executed | E. T. Simonds Construction Company $1,974,520 · | ||
| Jun 16, 2023 | 78524 | JohnsonDistrict 9 | Lane addition and shared use path on IL 146 from US 45 to the intersection with the eastbound I-24 ramps and construction of a roundabout at the intersection of IL 146 and Red Bud Lane in Vienna. | — | Executed | Samron Midwest Contracting, Inc. $7,246,220 · | ||
| Jun 16, 2023 | 78599 | JohnsonUnionDistrict 9 | 12.7 miles of PCC overlay on I-57 northbound from just north of IL 146 to the Williamson / Johnson County line. Also includes resurfacing northbound ramps at the Goreville and Lick Creek interchanges. | — | Executed | Plote Construction, Inc. $36,839,730 · | ||
| Jun 16, 2023 | 78790 | JacksonDistrict 9 | Replacement of 3 culverts on IL 3: SN 039-2013(E) over a stream 1.8 miles east of the Randolph County line; SN 039-2014(E) over a drainage ditch 0.1 miles southeast of Raddle Road; SN 039-2015(E) over Talbott Hollow Creek 1.1 miles northwest of IL 151. | — | Executed | E. T. Simonds Construction Company $2,188,576 · | ||
| Jun 16, 2023 | 78792 | PopeDistrict 9 | Removal and replacement of SN 076-0019 carrying IL 145 over Bear Creek Ditch, 0.6 miles north of the Massac County line. | — | Executed | E. T. Simonds Construction Company $2,433,895 · | ||
| Jun 16, 2023 | 78882 | VariousDistrict 9 | Painting of three bridges: One in Williamson County, one in Alexander County and one in Jefferson County. (SN 100-0003, SN 002-0026, SN 041-0060) | — | Executed | Civil Coatings and Construction Inc. $2,570,899 · | ||
| Jun 16, 2023 | 78912 | JohnsonWilliamsonDistrict 9 | 13 miles of patching, resurfacing, shoulder work, repairs to 5 bridges and cleaning/painting of 2 bridges. | — | Executed | Samron Midwest Contracting, Inc. $21,648,901 · | ||
| Jun 16, 2023 | 78915 | FranklinDistrict 9 | Replacement of two structures on IL 149: SN 028-7061 in Royalton and SN 028-7078 east of West Frankfort. | — | Executed | Sierra Bravo Contractors, LLC $864,428 · | ||
| Jun 16, 2023 | 78917 | JeffersonDistrict 9 | Substructure and superstructure repairs on SN 041-0083 and SN 041-0084 carrying I-64 over CN/IC Railroad, east of the Belle River interchange. | — | Executed | E. T. Simonds Construction Company $1,602,470 · | ||
| Jun 16, 2023 | 78926 | WilliamsonDistrict 9 | Resurfacing and safety shoulders on Cambria Road north of Blairsville roundabout to 149; resurfacing of mainline and shoulders on Herrin Road east of the Blairsville roundabout to Division Street; resurfacing of mainline and shoulders on Division Street for approximately 1 mile to the state maintenance sign. | — | Executed | Samron Midwest Contracting, Inc. $2,117,873 · | ||
| Jun 16, 2023 | 78945 | WilliamsonDistrict 9 | Replacing SN 100-0044 carrying Grassy Road (CH 25) over I-57. | — | Executed | Samron Midwest Contracting, Inc. $4,288,284 · | ||
| Jun 16, 2023 | 78959 | AlexanderDistrict 9 | Pavement approach and joint repairs on SN 002-0022 carrying I-57 over the Mississippi River. | — | Executed | Samron Midwest Contracting, Inc. $1,540,668 · | ||
| Jun 16, 2023 | 78960 | WilliamsonDistrict 9 | 3 miles of patching and resurfacing, with ADA upgrades and safety shoulders in sections of the project, on IL 149 from the Jackson County line to the Franklin County line. | — | Executed | Samron Midwest Contracting, Inc. $1,383,930 · | ||
| Jun 16, 2023 | 78982 | MassacDistrict 9 | Removal and replacement of HMA overlay at various locations, cleaning of deck drains and removal of debris from the shoulders on SN 064-0035 carrying I-24 over the Ohio River. | — | Executed | E. T. Simonds Construction Company $2,434,986 · | ||
| Jun 16, 2023 | 78983 | VariousDistrict 9 | Replacement of high-pressure sodium luminaires with LED luminaires at high mast light towers on various routes in various counties of District 9. | — | Executed | F. W. Electric, Inc. $618,611 · | ||
| Jun 16, 2023 | 78986 | PulaskiDistrict 9 | Structural repair of concrete and replacement of seismic restrainer cables on piers 1-15 on SN 077-0001 carrying I-57 northbound over Old US 51, south of Mounds. | — | Executed | E. T. Simonds Construction Company $2,211,144 · | ||
| Jun 16, 2023 | 78995 | VariousDistrict 9 | Electrical repair and/or maintenance on various routes throughout District 9. | — | Executed | F. W. Electric, Inc. $277,020 · | ||
| Jun 16, 2023 | 78996 | MassacDistrict 9 | Concrete bridge pier repair due to damage caused by barge impact on SN 064-0035 carrying I-24 over the Ohio River. | — | Executed | Samron Midwest Contracting, Inc. $448,800 · | ||
| Jun 16, 2023 | 99666 | WilliamsonDistrict 9 | HMA resurfacing with pavement patching, sidewalks, ADA ramps, and pavement markings on East Herrin Street from IL 148 to North 3rd Street, and on North 3rd Street from Bond Street to East Herrin Street in Herrin. | — | Executed | Samron Midwest Contracting, Inc. $673,149 · | ||
| Jun 16, 2023 | 99683 | JacksonDistrict 9 | Construct an offset right turn lane and install traffic signal equipment at the intersection of Giant City Road and East Pleasant Hill Road in Carbondale. | — | Executed | E. T. Simonds Construction Company $733,609 · | ||
| Jun 16, 2023 | 99698 | PulaskiDistrict 9 | Resurfacing Tick Ridge Road from IL 37 to the Massac County line. | — | Executed | E. T. Simonds Construction Company $1,861,497 · | ||
| Jun 16, 2023 | 99700 | WilliamsonDistrict 9 | Construction of a concrete multi-use trail from the Marion High School Sports Complex to Prison Road within the Crab Orchard National Wildlife Refuge. | — | Executed | Samron Midwest Contracting, Inc. $3,086,491 · | ||
| Jun 16, 2023 | 99701 | UnionDistrict 9 | Resurface Wing Hill Road from 0.4 mile east of Cbden to US 51. | — | Executed | E. T. Simonds Construction Company $722,633 · | ||
| Jun 16, 2023 | 99702 | MassacDistrict 9 | Remove and replace guardrail on New Columbia Road, 7.6 miles northeast of Joppa and on Unionville Road, 3.2 miles east of Brookport. | — | Executed | Midwest Fence Corporation $122,345 · | ||
| Jun 16, 2023 | 99703 | GallatinDistrict 9 | Resurfacing Eldorado Road from the Saline County Line to IL 1. | — | Executed | E. T. Simonds Construction Company $1,257,240 · | ||
| Jun 16, 2023 | 99705 | SalineDistrict 9 | HMA resurfacing with aggregate shoulders, precast box culvert extensions, and pavement markings on College Road from IL 142 to IL 13. | — | Executed | E. T. Simonds Construction Company $1,063,122 · | ||
| Jun 16, 2023 | 99708 | WilliamsonDistrict 9 | Resurface Pentecost Road from south of West DeYoung Street to Old Route 13, and Old Bainbridge Trail from Crab Orchard and Eqyptian Railroad to Old Route 13, and south of West DeYoung Street to Crab Orchard and Eqyptian Railroad, all within the City of Marion. | — | Executed | Samron Midwest Contracting, Inc. $621,140 · | ||
| Jun 16, 2023 | 99710 | HamiltonDistrict 9 | HMA resurfacing and aggregate shoulders on Dahlgren Road from 1900 North Road to IL 14. | — | Executed | E. T. Simonds Construction Company $1,432,052 · | ||
| Aug 4, 2023 | 78814 | FranklinDistrict 9 | Conversion of I-57 and IL 149 ramp terminals into roundabouts, pavement pavement reconstruction and bridge modifications in West Frankfort. | — | Rejected | Samron Midwest Contracting, Inc. $6,389,347 · | ||
| Aug 4, 2023 | 78944 | FranklinDistrict 9 | 0.78 miles of resurfacing on IL 149 from Orient Road to Ken Gray Boulevard in West Frankfort. | — | Executed | E. T. Simonds Construction Company $544,594 · | ||
| Aug 4, 2023 | 78964 | AlexanderDistrict 9 | Navigation lighting upgrade on SN 002-0005 on US 60/62 over the Mississippi River in Cairo. | — | Executed | Bodine Electric of Decatur $957,293 · | ||
| Aug 4, 2023 | 78971 | HardinDistrict 9 | Joint reconstruction, HMA widening, bridge deck, approach slab and structure repair, epoxy crack injection and waterproofing with HMA overlay on SN 035-0004 carrying IL 34 over Rose Creek, south of Herod and north of Karbers Ridge Road. | — | Executed | E. T. Simonds Construction Company $589,268 · | ||
| Aug 4, 2023 | 78A01 | VariousDistrict 9 | Repairing or replacing damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a work order basis throughout District 9. | — | Executed | COLLINS & HERMANN, INC. $1,169,530 · | ||
| Aug 4, 2023 | 78A11 | JacksonDistrict 9 | Installation of median crossovers for the eastbound lanes of IL 13 at SN 039-0075 carrying IL 13 over the Big Muddy River, east of Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $151,672 · | ||
| Aug 4, 2023 | 99704 | WilliamsonDistrict 9 | Pedestrian safety enhancements, lighting, landscaping, and resurfacing around the town square and along portions of Main street in Marion. | — | Executed | Samron Midwest Contracting, Inc. $3,131,313 · | ||
| Aug 4, 2023 | 99706 | GallatinDistrict 9 | Replace the bridge carrying Shawnee - New Haven Road over South Fork Cypress Creek, 3 miles north of IL 13 | — | Executed | Dees, Inc. $704,636 · | ||
| Sep 22, 2023 | 78924 | MassacDistrict 9 | Resurfacing on US 45 from Belgrade Road to the Ohio River bridge in Brookport. Also includes ADA improvements on US 45 at 2nd Street and US 45 at 3rd Street. | — | Executed | Samron Midwest Contracting, Inc. $1,930,021 · | ||
| Sep 22, 2023 | 78928 | PerryDistrict 9 | 2.6 miles of patching, HMA surface removal, resurfacing and shoulder work on US 51 from a butt joint near Raven Road, north of Tamaroa, to a butt joint near the Washington County line. | — | Executed | Samron Midwest Contracting, Inc. $1,876,543 · | ||
| Sep 22, 2023 | 78970 | UnionDistrict 9 | 2.6 miles of HMA surface removal and resurfacing on IL 146 / IL 127 from the Jonesboro Square to the IL 146 and IL 127 intersection. | — | Executed | E. T. Simonds Construction Company $1,974,043 · | ||
| Sep 22, 2023 | 78A03 | VariousDistrict 9 | Bridge deck sealing of various structures in Franklin, Hamilton and White Counties. | — | Executed | All States Painting, Inc. $98,240 · | ||
| Sep 22, 2023 | 99709 | JacksonDistrict 9 | HMA resurfacing and shoulders on Royalton Road from US 51 to the Franklin County Line. | — | Executed | Samron Midwest Contracting, Inc. $1,048,899 · | ||
| Sep 22, 2023 | 99714 | JeffersonDistrict 9 | HMA overlay with HMA and Aggregate Shoulders, drainage improvements and signage on Richview Road from East Pleasant Road to North Shiloh Drive. | — | Executed | E. T. Simonds Construction Company $3,038,200 · | ||
| Nov 17, 2023 | 78199 | PerryDistrict 9 | Replacement of a bridge with a double reinforced concrete box culvert on US 51 north of Tamaroa. (SN 073-0002) | — | Executed | E. T. Simonds Construction Company $924,177 · | ||
| Nov 17, 2023 | 78771 | SalineDistrict 9 | Intersection reconstruction at the intersection of US 45 and Poplar (Old IL 13) in Harrisburg. | — | Executed | E. T. Simonds Construction Company $1,369,045 · | ||
| Nov 17, 2023 | 78809 | GallatinDistrict 9 | Slope stabilization at SN 030-0021 carrying IL 1 over the Saline River, 2.5 miles south of IL 13, southeast of Equality. | — | Executed | E. T. Simonds Construction Company $399,347 · | ||
| Nov 17, 2023 | 78929 | JacksonDistrict 9 | 0.75 miles of resurfacing on North 6th Street in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $339,339 · | ||
| Nov 17, 2023 | 78A02 | AlexanderJacksonUnionDistrict 9 | 25.4 miles of patching, milling, resurfacing and shoulders on IL 3 from Howardton Road, near Grand Tower, to the Cape T intersection. | — | Executed | E. T. Simonds Construction Company $11,663,246 · | ||
| Nov 17, 2023 | 99673 | WilliamsonDistrict 9 | Resurfacing East Grand Avenue from Hurricane Road to IL 148. | — | Executed | Samron Midwest Contracting, Inc. $402,402 · | ||
| Nov 17, 2023 | 99711 | JacksonDistrict 9 | Resurfacing North Marion Street from East Fischer Street to Dillinger Road. | — | Executed | E. T. Simonds Construction Company $658,507 · | ||
| Nov 17, 2023 | 99713 | JacksonDistrict 9 | Replace existing structure with a precast concrete box culvert with pre-cast box culvert end sections, PCC pavement, sidewalk, curb and gutter, on East College Street over Piles Fork Creek in Carbondale. | — | Executed | E. T. Simonds Construction Company $553,288 · | ||
| Nov 17, 2023 | 99716 | WilliamsonDistrict 9 | Remove and replace sidewalks, ADA ramps and crosswalks along North 18 Street from East Herrin Street to West Monroe Street in Herrin. | — | Executed | E. T. Simonds Construction Company $290,697 · | ||
| Nov 17, 2023 | 99720 | WilliamsonDistrict 9 | HMA resurfacing on Lake of Egypt Road from IL 37 to South Market Road, and on Power Plant Road from Lake of Egypt Road to County Club Road. Includes HMA and aggregate shoulders, guardrail adjustments and replacements, and raised pavement markers. | — | Executed | Samron Midwest Contracting, Inc. $1,664,664 · | ||
| Jan 19, 2024 | 78830 | HamiltonDistrict 9 | Replacement of SN 033-0004 with a triple reinforced concrete box culvert on IL 14 over Bear Creek, 9 miles east of the Franklin County line. | — | Executed | Samron Midwest Contracting, Inc. $1,034,009 · | ||
| Jan 19, 2024 | 78A04 | VariousDistrict 9 | Painting of 10 bridges in various counties of District 9. | — | Executed | ERA-Valdivia Contractors, Inc. $2,546,592 · | ||
| Jan 19, 2024 | 78A18 | WilliamsonDistrict 9 | 10.2 miles of resurfacing on IL 13 westbound lanes from the Saline County line to Crab Orchard Creek in Marion. | — | Executed | Samron Midwest Contracting, Inc. $2,696,596 · | ||
| Jan 19, 2024 | 78A23 | AlexanderPulaskiDistrict 9 | 20.2 miles of centerline joint repair and microsurfacing of a 2- wide strip along the centerline on the northbound and southbound lanes of I-57 from Perks Road, 1.2 miles south of the Union County line, to the Mississippi River. | — | Executed | Beniach Construction Co., Inc. $747,770 · | ||
| Jan 19, 2024 | 78A48 | VariousDistrict 9 | Weed spraying for broadleaf weeds along I-57 and I-24 at various locations in various counties. | — | Executed | Endrizzi Contracting, Inc $155,120 · | ||
| Jan 19, 2024 | 78A49 | VariousDistrict 9 | Weed spraying along I-57 and I-24 for Johnson Grass in various counties within District 9. | — | Executed | The Daltons Inc. $126,182 · | ||
| Jan 19, 2024 | 99715 | HardinDistrict 9 | Resurfacing on Bassett Road from Peters Creek Road to IL 146 | — | Executed | Samron Midwest Contracting, Inc. $769,769 · | ||
| Jan 19, 2024 | 99719 | HardinDistrict 9 | Replace a concrete ford low water crossing with a bridge to carry TR 52 over an unnamed stream located 2.4 miles south of Karbers Ridge. | — | Executed | Dees, Inc. $391,671 · | ||
| Jan 19, 2024 | 99721 | HamiltonDistrict 9 | 35.36 miles of bituminous surface treatment on various routes. | — | Executed | Illini Asphalt Corporation $653,563 · | ||
| Jan 19, 2024 | 99722 | SalineDistrict 9 | HMA Resurfacing with aggregate shoulders on Galatia Road from Cedar Point Road to IL 34 | — | Executed | Samron Midwest Contracting, Inc. $343,343 · | ||
| Jan 19, 2024 | 99723 | JohnsonDistrict 9 | HMA overlay with aggregate wedge shoulders, entrance and sideroad improvements, guardrail replacement, patching, and pavement marking on Belknap Road, from East Main Street to US 45. | — | Executed | Samron Midwest Contracting, Inc. $994,695 · | ||
| Jan 19, 2024 | 99725 | WhiteDistrict 9 | HMA resurfacing with HMA shoulders, aggregate wedge shoulders, shoulder rumble strips, pavement markings, and raised pavement markings on Epworth Road from the east corporate limits of Carmi to 1300 W. Road. | — | Executed | E. T. Simonds Construction Company $1,388,323 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.