| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 11, 2021 | 78868 | VariousDistrict 9 | Repairing or fixing damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a workorder basis throughout District 9. | — | Executed | COLLINS & HERMANN, INC. $1,060,592 · | ||
| Jun 11, 2021 | 78870 | JeffersonWilliamsonDistrict 9 | PPC I-beam repair and substructure repairs on SN 041-0096 carrying IL 148 over over the Big Muddy River east of Waltonville in Jefferson County and PPC I-beam repair, deck patching and substructure repairs on SN 100-0072 carrying IL 37 over Crab Orchard Creek south of Marion in Williamson County. | — | Executed | Samron Midwest Contracting, Inc. $396,056 · | ||
| Jun 11, 2021 | 78877 | AlexanderDistrict 9 | Joint replacement on SN 002-0005 carrying US 60/62 over the Mississippi River. | — | Rejected | Samron Midwest Contracting, Inc. $5,868,810 · | ||
| Jun 11, 2021 | 78883 | JeffersonDistrict 9 | Patching on I-64 from the Washington County line to the I-57 / I-64 Tri-Level, north of Mt. Vernon. | — | Executed | G. M. Sipes Construction, Inc. $216,264 · | ||
| Jun 11, 2021 | 99650 | JacksonDistrict 9 | Pavement removal, construction of 8" PCC pavement, curb and gutter, sidewalks, storm sewer, water main and sewer relocation, and pavement markings on North 7th Street from 0.4 mile south of Industrial Park Road to Bost Lane in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $2,641,236 · | ||
| Jun 11, 2021 | 99661 | SalineDistrict 9 | Resurface Johnston City Road from the Williamson County line to Harco Road. | — | Executed | E. T. Simonds Construction Company $832,254 · | ||
| Jun 11, 2021 | 99662 | GallatinDistrict 9 | Resurfacing, aggregate shoulders and pavement markings on Ridgeway/New Haven Road from Jackson/New Hope to Road to Shawneetown/New Haven Road. | — | Executed | Southern Illinois Asphalt Co., Inc. $433,770 · | ||
| Jun 11, 2021 | 99663 | SalineDistrict 9 | Sidewalk Construction along US 45 from IL 142 to 300' east, along IL 142 from Locust Street to US 45, and pedestrian traffic signal improvements at the intersection of IL 142 and US 45 in Eldorado. | — | Executed | E. T. Simonds Construction Company $348,961 · | ||
| Jun 11, 2021 | 99664 | FranklinDistrict 9 | Resurface South Thompsonville Road from IL 34 to the Williamson County Line. | — | Executed | E. T. Simonds Construction Company $989,256 · | ||
| Jun 11, 2021 | 99667 | WilliamsonDistrict 9 | Resurface Lake Egypt Road from South Market Road to IL 166. | — | Executed | Southern Illinois Asphalt Co., Inc. $890,783 · | ||
| Jul 30, 2021 | 78550 | JeffersonDistrict 9 | Remove and replace SN 041-0016 and 041-0017 carrying I-57 over Norfolk Southern Railway, 0.25 miles north of the Dix interchange; Remove and replace SN 041-0014 and 041-0015 carrying I-57 over CH 39 at the Dix interchange. | — | Executed | E. T. Simonds Construction Company $16,242,143 · | ||
| Jul 30, 2021 | 78656 | FranklinDistrict 9 | 9 miles of lane addition, median barrier installation and resurfacing existing lanes of I-57 from mile post 66 to Marcum Branch. | — | Executed | E. T. Simonds Construction Company $67,611,531 · | ||
| Jul 30, 2021 | 78838 | JacksonPerryDistrict 9 | 17.8 miles of pavement patching, HMA surface removal, HMA surfacing, HMA shoulders and ADA sidewalk improvements on US 51 from near Industrial Park Road in Carbondale to Grant Way in Du Quoin. | — | Executed | E. T. Simonds Construction Company $8,586,162 · | ||
| Jul 30, 2021 | 78863 | JohnsonDistrict 9 | 3.4 miles of patching, milling, surfacing, median repairs and curb and gutter repairs at 2 locations: 1) US 45 from 0.7 miles northeast of I-24 to 1.07 miles southwest of I-24; 2) Just north of IL 146 to 1.85 miles south of IL 146. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,536,649 · | ||
| Jul 30, 2021 | 78865 | JacksonDistrict 9 | 6.2 miles of HMA surface removal, resurfacing of the mainline and shoulders and ADA upgrades on IL 149 from IL 13/127 in Murphysboro to US 51 in Desoto. | — | Executed | Samron Midwest Contracting, Inc. $1,641,027 · | ||
| Jul 30, 2021 | 78872 | PulaskiUnionDistrict 9 | 5 miles of micro-surfacing on Northbound I-57 / US 51 from 1 mile south of Big Creek to Perks Road. | — | Executed | A. C. Pavement Striping Co. $338,806 · | ||
| Jul 30, 2021 | 78886 | PulaskiDistrict 9 | 1000- of milling, resurfacing, guardrail removal and replacement and concrete rail removal and replacement on West Cedar Street from east of SN 077-0030 to Front Street in Olmstead. | — | Executed | Samron Midwest Contracting, Inc. $221,401 · | ||
| Jul 30, 2021 | 99601 | SalineDistrict 9 | Replace the bridge carrying Forest Road over Little Eagle Creek, 8 miles west of IL 1. | — | Executed | Samron Midwest Contracting, Inc. $497,333 · | ||
| Jul 30, 2021 | 99612 | GallatinDistrict 9 | Replace the bridge carrying Eldorado Blacktop Road over North Fork of Saline River, 1.8 miles west of IL 1. | — | Executed | Samron Midwest Contracting, Inc. $2,973,552 · | ||
| Jul 30, 2021 | 99668 | JeffersonDistrict 9 | Resurfacing and aggregate shoulders on East Divide Road from Harmony Lane to Papertown Lane. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,035,795 · | ||
| Sep 17, 2021 | 78503 | FranklinDistrict 9 | Conversion of the wye intersection of IL 149 and IL 184 to a roundabout intersection. | — | Executed | E. T. Simonds Construction Company $1,777,808 · | ||
| Sep 17, 2021 | 78602 | SalineDistrict 9 | 5.9 miles of patching, HMA surface removal, HMA surface, HMA shoulders and aggregate shoulders on IL 34 / 145 from the signalized intersection of US 45 and IL 34 / 145 to the intersection of IL 34 and IL 145. | — | Executed | E. T. Simonds Construction Company $2,188,313 · | ||
| Sep 17, 2021 | 78848 | FranklinUnionWilliamsonDistrict 9 | Bridge deck repairs on SN 100-0069 carrying IL 148 over Crab Orchard Lake, 2.8 miles south of IL 13; SN 091-0064 carrying IL 127 over Lingle Creek, 0.3 miles north of Mill Creek; SN 091-0067 carrying IL 127 over Mill Creek, 0.5 miles 0.5 miles north of Mill Creek; SN 028-0037 carrying IL 149 over Big Muddy River, 1.6 miles east of Ziegler. | — | Executed | E. T. Simonds Construction Company $1,177,173 · | ||
| Sep 17, 2021 | 78862 | VariousDistrict 9 | Surface preparation and application of bridge deck sealer on bridges in Alexander, Johnson, Massac, Pulaski and Union Counties. | — | Executed | All States Painting, Inc. $238,300 · | ||
| Sep 17, 2021 | 78864 | JacksonDistrict 9 | 19.3 miles of patching, HMA surface removal, HMA resurfacing and HMA safety shoulders on IL 3 and IL 149. | — | Executed | Samron Midwest Contracting, Inc. $4,252,377 · | ||
| Sep 17, 2021 | 78873 | UnionDistrict 9 | 7.4 miles of HMA surface removal and resurfacing on US 51 from IL 146 to I-57. | — | Executed | E. T. Simonds Construction Company $2,275,872 · | ||
| Sep 17, 2021 | 78875 | AlexanderDistrict 9 | 1.8 miles of pavement patching, HMA surface removal and HMA surfacing on IL 3 in Olive Branch from 0.1 miles west of Pigeon Roost Road to Brownsville Road. | — | Rejected | Southern Illinois Asphalt Co., Inc. $811,280 · | ||
| Sep 17, 2021 | 78881 | VariousDistrict 9 | Bridge painting in various counties; 2 in Jefferson, 1 in Hamilton, 1 in White, 1 in Johnson and 4 in Pulaski Counties. | — | Executed | ERA-Valdivia Contractors, Inc. $1,887,170 · | ||
| Sep 17, 2021 | 78889 | JohnsonDistrict 9 | 500 feet of grade adjustment by milling and filling with HMA binder and HMA surface coarse on US 45 approximately 2.5 miles north of the I-24 Intersection, near Roosevelt Loop. | — | Executed | E. T. Simonds Construction Company $72,246 · | ||
| Sep 17, 2021 | 78898 | FranklinDistrict 9 | 5.4 miles of patching, HMA surface removal and resurfacing, safety shoulders and guardrail removal and replacement on IL 154 from near the rail crossing in Sesser to near Fitzgerrell Park Drive. | — | Executed | E. T. Simonds Construction Company $4,066,957 · | ||
| Nov 5, 2021 | 78829 | MassacDistrict 9 | Removing a single barrel reinforced concrete box culvert and replacing it with a single barrel precast box culvert, carrying IL 145 over a ditch, 2.1 miles north of Rosebud Road. (SN 064-7027) | — | Executed | Samron Midwest Contracting, Inc. $233,784 · | ||
| Nov 5, 2021 | 78871 | SalineDistrict 9 | Resurfacing of Old IL 13 between the intersections with IL 13; Resurfacing of IL 13 from US 45 to Pankey Creek Bridge. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,393,249 · | ||
| Jan 21, 2022 | 78595 | JacksonDistrict 9 | Removing a single span bridge on US 51 in Elkville with a 12x7 cast-in-place concrete box culvert. (SN 039-0002) | — | Executed | E. T. Simonds Construction Company $816,039 · | ||
| Jan 21, 2022 | 78849 | JohnsonDistrict 9 | 10.5 miles of resurfacing, pipe underdrain work and bridge deck overlays on 12 bridges, on I-24 from 0.5 miles north of US 45 to the Massac County line. | — | Executed | E. T. Simonds Construction Company $17,924,407 · | ||
| Jan 21, 2022 | 78850 | PulaskiDistrict 9 | Slope repair on I-57 near mile post 14 southbound, south of Ullin. | — | Executed | E. T. Simonds Construction Company $127,481 · | ||
| Jan 21, 2022 | 78876 | WhiteDistrict 9 | Bridge repairs to SN 097-0024 carrying US 45 over LandN Railroad in Enfield. | — | Executed | E. T. Simonds Construction Company $275,511 · | ||
| Jan 21, 2022 | 78888 | JacksonDistrict 9 | 6 miles of resurfacing on IL 13 from Orchard Drive in Carbondale to Old IL 13 and eastbound lanes only on IL 13 from Old IL 13 to the Big Muddy Bridge in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $2,363,108 · | ||
| Jan 21, 2022 | 78904 | JeffersonDistrict 9 | 5.8 miles of HMA surface removal, HMA resurfacing and patching on I-64 from 2.8 miles east of IL 142 to the Wayne County line. | — | Executed | Southern Illinois Asphalt Co., Inc. $6,780,606 · | ||
| Jan 21, 2022 | 99634 | WilliamsonDistrict 9 | Reconstruct existing lane confirguration with traffic signal modifications and pavment markings on Williamson County Parkway at 17th Street in Marion. | — | Executed | E. T. Simonds Construction Company $353,562 · | ||
| Mar 11, 2022 | 78890 | SalineDistrict 9 | Patching on US 45 from IL 13 to IL 34/145 in Harrisburg. | — | Executed | E. T. Simonds Construction Company $148,544 · | ||
| Mar 11, 2022 | 78891 | JacksonDistrict 9 | Patching on at various locations on US 51 and IL 13 in Jackson County. | — | Executed | E. T. Simonds Construction Company $220,721 · | ||
| Mar 11, 2022 | 78895 | JeffersonWilliamsonDistrict 9 | Bridge deck HMA overlay and joint replacement on SN 100-0054 carrying Cedar Grove Road over I-57, north of Marion; and pier repair and approach slab patching on SN041-0032 carrying IL 37 over Casey Fork, 2 miles south of IL 148. | — | Executed | E. T. Simonds Construction Company $269,455 · | ||
| Mar 11, 2022 | 78903 | WhiteDistrict 9 | Culvert rehabilitation for a field entrance on IL 1 approximately 1.5 miles south of US 45. | — | Executed | E. T. Simonds Construction Company $133,869 · | ||
| Mar 11, 2022 | 78919 | PerryDistrict 9 | Patching on US 51 from Park Street to Stacy Street in DuQuoin. | — | Executed | E. T. Simonds Construction Company $112,028 · | ||
| Mar 11, 2022 | 78931 | VariousDistrict 9 | Weed spraying for Johnson grass along I-57 at various locations in various counties. | — | Executed | Endrizzi Contracting, Inc $126,373 · | ||
| Mar 11, 2022 | 78932 | VariousDistrict 9 | Weed spraying for broadleaf weeds along I-57, I-24 and I-64 at various locations in various counties. | — | Executed | The Daltons Inc. $181,425 · | ||
| Mar 11, 2022 | 99665 | WilliamsonDistrict 9 | Sidewalk construction along IL 13 from State Street to Fair Street in Marion. | — | Executed | Lake Contracting, Inc. $209,037 · | ||
| Mar 11, 2022 | 99670 | UnionDistrict 9 | Replace the structure carrying TR 112 over Mill Creek, 1.75 miles northeast of Mill Creek. | — | Executed | Sierra Bravo Contractors, LLC $284,239 · | ||
| Mar 11, 2022 | 99674 | JacksonDistrict 9 | Resurfacing, HMA shoulders, pavement markings, and raised reflective markers on Elkville Road from IL 127 to Haulage Road. | — | Executed | Samron Midwest Contracting, Inc. $575,575 · | ||
| Apr 29, 2022 | 46931 | FranklinDistrict 9 | Resurfacing the parking lot and drive, pavement widening, asphalt seal coating and pavement marking at the IDNR Region V Headquarters in Benton. | — | Executed | Lake Contracting, Inc. $239,183 · | ||
| Apr 29, 2022 | 78841 | JeffersonDistrict 9 | 145 feet of slope repair on the outside slope of northbound I-57, just north of IL 148. | — | Executed | Sierra Bravo Contractors, LLC $478,844 · | ||
| Apr 29, 2022 | 78857 | MassacDistrict 9 | Installation of flashing yellow arrows, replacement of all signal cabinets and connectivity improvements along the US 45 corridor; intersection of US 45 and Devers Road as well as both ramp locations at the I-24 interchange. | — | Executed | Brown Electric, Inc. $294,174 · | ||
| Apr 29, 2022 | 78880 | JacksonDistrict 9 | Signal modifications and ADA accommodations at the intersection of IL 13 and Giant City Road. | — | Executed | Brown Electric, Inc. $287,973 · | ||
| Apr 29, 2022 | 78896 | WilliamsonDistrict 9 | 3.2 miles of pavement patching on IL 166 from Tune Road to Kinnel Orchard Road. | — | Executed | G. M. Sipes Construction, Inc. $176,928 · | ||
| Apr 29, 2022 | 78901 | SalineDistrict 9 | 0.9 miles of resurfacing and pavement patching on IL 34 from Old IL 13 (Poplar Street) to the levee just north of Reservoir Road in Harrisburg. | — | Executed | E. T. Simonds Construction Company $646,217 · | ||
| Apr 29, 2022 | 78907 | VariousDistrict 9 | Installing retroreflective backplates on traffic signals throughout District 9. | — | Executed | F. W. Electric, Inc. $297,533 · | ||
| Apr 29, 2022 | 78910 | MassacPopeSalineDistrict 9 | Pier and abutment repairs at SN 083-0038 on IL 34 over Middle Fork Ditch in Saline County; Pier and abutment repairs and new wearing surface at SN SN 076-0006 on IL 146 over Sugar Creek in Pope County; Partial depth joint reconstruction at SN 064-0003 on US 45 over Q Ditch in Massac County. | — | Executed | E. T. Simonds Construction Company $738,610 · | ||
| Apr 29, 2022 | 78914 | JacksonWilliamsonDistrict 9 | 2.4 miles of HMA surface removal, resurfacing and patching on Old IL 13 from Giant City Road to Spillway Road. | — | Executed | E. T. Simonds Construction Company $753,253 · | ||
| Apr 29, 2022 | 78923 | WilliamsonDistrict 9 | 3.7 miles of surface removal and HMA surfacing on IL 13 from 0.9 miles east of Crab Orchard Road to the Saline County line. | — | Executed | E. T. Simonds Construction Company $1,093,312 · | ||
| Apr 29, 2022 | 78925 | JacksonDistrict 9 | 1 mile of patching and resurfacing on IL 13 in Carbondale. | — | Executed | E. T. Simonds Construction Company $1,364,664 · | ||
| Apr 29, 2022 | 78938 | JacksonDistrict 9 | 1.9 miles of resurfacing on IL 13/127 from AVA Road to IL 149 in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $898,898 · | ||
| Apr 29, 2022 | 99672 | WilliamsonDistrict 9 | Replace deck beams, modify existing abutments and pier cap to the structure carrying Spillway Road over Little Grassy Creek, 4 miles south of Carterville. | — | Executed | Samron Midwest Contracting, Inc. $444,444 · | ||
| Apr 29, 2022 | 99678 | PulaskiDistrict 9 | Replace the bridge carrying Tick Ridge Road over Post Creek Cut-off, 4 miles east of Grand Chain. | — | Rejected | Samron Midwest Contracting, Inc. $4,197,074 · | ||
| Apr 29, 2022 | 99684 | HardinDistrict 9 | Resurface Garden of the Gods Road from the Gallatin County line to Karbers Ridge Road. | — | Executed | E. T. Simonds Construction Company $409,442 · | ||
| Jun 17, 2022 | 78619 | WilliamsonDistrict 9 | Replacing SN 100-0055 carrying Westminster Drive over I-57 near the City of Marion. | — | Executed | Samron Midwest Contracting, Inc. $7,311,127 · | ||
| Jun 17, 2022 | 78624 | PerryDistrict 9 | Intersection reconstruction at the IL 13 / 127 and resurfacing along IL 13 / 127 from IL 154 to the railroad underpass in Pinckneyville. | — | Executed | Samron Midwest Contracting, Inc. $4,114,777 · | ||
| Jun 17, 2022 | 78685 | MassacDistrict 9 | Remove and replace SN 064-0017 (WB) and SN 064-0018 (EB) carrying I-24 over Bear Creek, 4 miles south of the Johnson County line. | — | Executed | Samron Midwest Contracting, Inc. $7,144,489 · | ||
| Jun 17, 2022 | 78824 | JohnsonDistrict 9 | Embankment stabilization on IL 146, 0.3 miles west of the Pope County line. | — | Rejected | Sierra Bravo Contractors, LLC $713,457 · | ||
| Jun 17, 2022 | 78874 | JacksonUnionDistrict 9 | 12.4 miles of HMA resurfacing, patching, ADA improvements and ditch re-grading on Old US 51 from Makanda to Anna. | — | Executed | E. T. Simonds Construction Company $6,063,846 · | ||
| Jun 17, 2022 | 78879 | JacksonWilliamsonDistrict 9 | Signal modifications and fiber optic installation on IL 13 from Reed Station Road in Carbondale to Fair Street in Marion and on I-57 from IL 13 to the DMS sign approximately 3 miles north. | — | Executed | Gerstner Electric, Inc. $3,725,432 · | ||
| Jun 17, 2022 | 78897 | FranklinDistrict 9 | 1 mile of HMA resurfacing and ADA improvements on IL 34 from Benton Square to Brown Street. | — | Executed | Samron Midwest Contracting, Inc. $1,048,828 · | ||
| Jun 17, 2022 | 78899 | AlexanderDistrict 9 | Joint replacement of 14 bridge joints (7 per bridge) on existing SN 002-0023 002-0024 on I-57 at the Cairo interchange (exit 3) over IL 3, Outer Road, CN/IC Railroad and Levee Road. | — | Executed | E. T. Simonds Construction Company $3,085,776 · | ||
| Jun 17, 2022 | 78940 | JeffersonDistrict 9 | 13.2 miles of patching on I-64 from the Washington County line to the north tri-level, north of Mt. Vernon and on I-57 from the north tri-level to Veteran's Drive. Project also includes deck slab repair on SN 041-0012 and 041-0013 on I-57. | — | Executed | Kinney Contractors, Inc. $426,244 · | ||
| Jun 17, 2022 | 78946 | VariousDistrict 9 | Electrical repair and/or replacement at various locations throughout District 9. | — | Executed | F. W. Electric, Inc. $114,770 · | ||
| Jun 17, 2022 | 78947 | VariousDistrict 9 | Upgrade railroad interconnected traffic signals in Carbondale, Herrin and Anna. | — | Rejected | Wissehr Electric, Inc. $447,258 · | ||
| Jun 17, 2022 | 78950 | GallatinDistrict 9 | 0.4 miles of patching at the intersection of IL 13 and IL 1 in Equality. | — | Executed | E. T. Simonds Construction Company $161,219 · | ||
| Jun 17, 2022 | 78951 | FranklinDistrict 9 | Patching at the northbound and southbound rest areas on I-57 near Rend Lake. | — | Executed | E. T. Simonds Construction Company $702,322 · | ||
| Jun 17, 2022 | 78952 | VariousDistrict 9 | Replace batteries in uninterruptable power supplies at various locations throughout District 9. | — | Active | Electrico, Inc. $75,240 · | ||
| Jun 17, 2022 | 78954 | AlexanderPulaskiDistrict 9 | Pavement patching on I-57 from the Mississippi River Bridge to the Pulaski / Union County line. | — | Executed | Kinney Contractors, Inc. $739,969 · | ||
| Jun 17, 2022 | 78955 | JohnsonUnionDistrict 9 | 12.7 miles of patching on the I-57 northbound lanes from mile marker 44 to mile marker 31. | — | Executed | E. T. Simonds Construction Company $638,849 · | ||
| Jun 17, 2022 | 99632 | JacksonDistrict 9 | Construction of 5,700 feet of PCC sidewalk, pipe culverts, abutment construction, and a pedestrian truss superstructure along an abandoned rail line from New Era Road to Oakland Avenue in Carbondale. | — | Executed | Samron Midwest Contracting, Inc. $1,034,513 · | ||
| Jun 17, 2022 | 99655 | PerryDistrict 9 | Resurface Pyatt-Culter Road from IL 4 to Union School Road. | — | Executed | E. T. Simonds Construction Company $1,751,544 · | ||
| Jun 17, 2022 | 99676 | WilliamsonDistrict 9 | Resurface Thompsonville Road from Locust Grove road to Corinth Road. | — | Executed | E. T. Simonds Construction Company $985,189 · | ||
| Jun 17, 2022 | 99677 | GallatinDistrict 9 | Resurface Ridgway/New Haven Road from Murphy Street in Ridgway, to Shawneetown Road. | — | Executed | E. T. Simonds Construction Company $775,030 · | ||
| Jun 17, 2022 | 99682 | FranklinDistrict 9 | Resurface Creek Nation Blacktop from IL 184 to IL 148. | — | Executed | Samron Midwest Contracting, Inc. $974,794 · | ||
| Jun 17, 2022 | 99685 | MassacDistrict 9 | Replace the bridge carrying Unionville Road over Mud Creek, 2.9 miles east of Unionville. | — | Executed | Dees, Inc. $374,572 · | ||
| Jun 17, 2022 | 99686 | WilliamsonDistrict 9 | Resurface Pittsburg Road from Corinth Road to IL 13. | — | Rejected | Southern Illinois Asphalt Co., Inc. $2,744,365 · | ||
| Jun 17, 2022 | 99688 | JohnsonDistrict 9 | Resurface Tunnel Hill Road from IL 37 to Parrish Ridge Lane. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,182,686 · | ||
| Jun 17, 2022 | 99689 | JacksonDistrict 9 | Reconstruction of New Era Road from Glenn Road to Airport Road in Carbondale. | — | Executed | E. T. Simonds Construction Company $1,176,665 · | ||
| Jun 17, 2022 | 99692 | JeffersonDistrict 9 | Resurfacing, HMA shoulders and rumble strips on Dix Irvington Road from east of US 51 to Boyd Road. | — | Rejected | Samron Midwest Contracting, Inc. $4,108,927 · | ||
| Aug 5, 2022 | 78700 | JacksonDistrict 9 | Resurfacing, patching, sidewalks and ADA upgrades at the District 9 headquarters parking lot. | — | Executed | E. T. Simonds Construction Company $302,610 · | ||
| Aug 5, 2022 | 78892 | VariousDistrict 9 | Repairing or fixing guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a workorder basis throughout District 9. | — | Executed | COLLINS & HERMANN, INC. $1,060,735 · | ||
| Aug 5, 2022 | 78913 | JacksonDistrict 9 | Bridge joint reconstruction, strip seals, bridge deck scarification and bridge deck microsilica concrete overlay on SN 039-0056 on IL 149 over Kinkaid Creek, 0.9 miles east of IL 3. | — | Executed | E. T. Simonds Construction Company $492,697 · | ||
| Aug 5, 2022 | 78956 | FranklinJeffersonDistrict 9 | Patching, milling and resurfacing on I-57 from 1.5 miles south of IL 154 to 1.25 miles north of the Campground Road overpass bridge. | — | Executed | E. T. Simonds Construction Company $1,169,133 · | ||
| Aug 5, 2022 | 99675 | JacksonDistrict 9 | Hot-Mix Asphalt Surface Removal and Resurfacing with HMA shoulders on Elkville Road from Haulage Road in Elkville to US 51. | — | Executed | Samron Midwest Contracting, Inc. $697,697 · | ||
| Aug 5, 2022 | 99693 | MassacDistrict 9 | Resurfacing New Columbia Road from Teague Hill Road to Benton Road. | — | Executed | E. T. Simonds Construction Company $887,854 · | ||
| Sep 23, 2022 | 78834 | WhiteDistrict 9 | Replacing SN 097-7045 with a new single cell concrete box culvert to carry IL 1 over an unnamed stream in Carmi. | — | Executed | Samron Midwest Contracting, Inc. $567,891 · | ||
| Nov 18, 2022 | 78372 | JacksonWilliamsonDistrict 9 | Intersection improvements, pavement widening, HMA resurfacing and a multi-use path on IL 13 from the Williamson County line to east of Spillway Road. | — | Executed | E. T. Simonds Construction Company $6,023,216 · | ||
| Nov 18, 2022 | 78719 | PopeDistrict 9 | Bridge replacement project on IL 145, approximately 2.3 miles south of the IL 145 / IL 146 intersection. (SN 076-0024) | — | Executed | E. T. Simonds Construction Company $4,417,453 · | ||
| Nov 18, 2022 | 78893 | FranklinDistrict 9 | Replacement of 5 box culverts on IL 34 between Benton and Thompsonville. | — | Executed | Sierra Bravo Contractors, LLC $1,395,537 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.