Filtered by: County: Will Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 60X59 | WillDistrict 1 | Intersection improvement and signal installation at the intersection of North Bolingbrook Drive and Royce Road in the Village of Bolingbrook. | — | Executed | P. T. Ferro Construction Co. $774,315 · | ||
| Jan 19, 2018 | 61E30 | WillDistrict 1 | Reconstruct Rathje Road from Joliet Road to Corning Avenue in the Village of Peotone. | — | Executed | P. T. Ferro Construction Co. $1,623,160 · | ||
| Jan 19, 2018 | 62D54 | CookDuPageWillDistrict 1 | Guardrail and traffic barrier terminal removal and replacement on various arterial and expressway routes. | — | Executed | Kujo, Inc. $537,608 · | ||
| Jan 19, 2018 | 78592 | WilliamsonDistrict 9 | 8.8 miles of roadway improvement including guardrail and culvert liner on IL 148. | — | Executed | E. T. Simonds Construction Company $3,348,417 · | ||
| Jan 19, 2018 | 78616 | WilliamsonDistrict 9 | Roadway improvement on IL 37 from south of IL 148 to Pulleys Mill. | — | Executed | Southern Illinois Asphalt Co., Inc. $214,032 · | ||
| Jan 19, 2018 | 78621 | HamiltonJeffersonWilliamsonDistrict 9 | Cleaning and painting portions of 3 structures. | — | Executed | Thomas Industrial Coatings, Inc. $165,153 · | ||
| Mar 9, 2018 | 60X10 | WillDistrict 1 | Interchange reconstruction of I-55 at Weber Road and roadway reconstruction of Weber Road from Normantown Road to Rodeo Drive in the municipalities of Bolingbrook and Romeoville. | — | Executed | Judlau Contracting, Inc. $47,970,125 · | ||
| Mar 9, 2018 | 61D22 | WillDistrict 1 | Reconstruction, resurfacing, bike/ped path, rehabilitate the structure over over Union Ditch and construction of pedestrian structure over Union Ditch, on St. Francis Road from 88th Avenue to 80th Avenue in the Village of Frankfort. | — | Executed | Iroquois Paving Corporation $3,351,885 · | ||
| Mar 9, 2018 | 61D47 | WillDistrict 1 | Reconstruction of Weber Road from Normantown Road to 135th Street in Romeoville. | — | Executed | R. W. Dunteman Company $20,364,790 · | ||
| Mar 9, 2018 | 62A95 | WillDistrict 1 | Culvert replacement on US Route 45/52, approximately 1.4 miles south of US Route 52 in unincorporated Will County. | — | Executed | Iroquois Paving Corporation $644,048 · | ||
| Mar 9, 2018 | 62F04 | WillDistrict 1 | Embankment stabilization along both sides of US 45 between I-80 and the METRA Railroad. | — | Executed | D. Construction, Inc. $1,115,027 · | ||
| Mar 9, 2018 | 62F93 | WillDistrict 1 | Cleaning and painting existing steel structures at various locations in the villages of Monee, Peotone and the city of Joliet. | — | Executed | Eagle Painting & Maintenance Company, Inc. $524,711 · | ||
| Mar 9, 2018 | 78580 | WilliamsonDistrict 9 | 0.09 miles of pavement repair of the whitetopping and installation of radar detection equipment at IL 37 and Old IL 13. | — | Executed | Samron Midwest Contracting, Inc. $95,440 · | ||
| Mar 9, 2018 | 78628 | WilliamsonDistrict 9 | Culvert replacement across six lanes of traffic on IL 148, 1.1 miles north of IL 13 near the City of Energy (SN 100-7042). | — | Executed | Sierra Bravo Contractors, LLC $179,791 · | ||
| Apr 27, 2018 | 60P55 | WillDistrict 1 | Local centralized control and operation of the six movable bridges from Ruby Street to Brandon Road in the City of Joliet | — | Rejected | Meade Inc. $21,260,736 · | ||
| Apr 27, 2018 | 60V18 | WillDistrict 1 | Resurfacing and pedestrian ramps on US 30 from Collins Street to I-80 in the City of Joliet. | — | Executed | D. Construction, Inc. $1,753,921 · | ||
| Apr 27, 2018 | 61E47 | WillDistrict 1 | Intersection improvement at West 167th Street and Gougar Road in the City of Lockport. | — | Executed | D. Construction, Inc. $1,576,688 · | ||
| Apr 27, 2018 | 62B45 | WillDistrict 1 | Shoulder widening, milled rumble strips and guardrail replacement on US 52 from Spencer Road to US 45 in the village of Manhattan and unincorporated Will County. | — | Executed | D. Construction, Inc. $1,555,085 · | ||
| Apr 27, 2018 | 62D57 | WillDistrict 1 | Pedestrian ramp improvement on IL 53, IL 113, IL 102 and IL 1 in the cities of Beecher, Wilmington and the Village of Crete. | — | Executed | D. Construction, Inc. $370,717 · | ||
| Apr 27, 2018 | 62G06 | WillDistrict 1 | Repair bridge SN 099-0271 carrying Wolf Road over Hickory Creek in the Village of Mokena. | — | Executed | D. Construction, Inc. $181,966 · | ||
| Jun 15, 2018 | 60M88 | WillDistrict 1 | Repair bridge SN 099-0035 carrying I-55 Frontage Road over the I and M Canal, 1.1 miles south of I-80 in Channahon. | — | Executed | Austin Tyler Construction, Inc. $454,150 · | ||
| Jun 15, 2018 | 62F67 | WillDistrict 1 | 3P resurfacing on I-55 East Frontage Road in the cities of Wilmington and Briadwood. | — | Executed | P. T. Ferro Construction Co. $473,083 · | ||
| Jun 15, 2018 | 62G24 | WillDistrict 1 | Repair culvert 099-0922 under US 52 between Doyle Road and Wallingford Trail. | — | Executed | Iroquois Paving Corporation $43,236 · | ||
| Jun 15, 2018 | 62G33 | WillDistrict 1 | Resurfacing on I-80, from Will County line to the Des Plaines River, and on I-55 from the Des Plaines River to Weber Road. | — | Executed | D. Construction, Inc. $623,122 · | ||
| Jun 15, 2018 | 78644 | JacksonWilliamsonDistrict 9 | Centerline crack routing and sealing on IL 13 from Lewis Lane to Greenbriar Road. | — | Executed | Huff Sealing Corporation $390,736 · | ||
| Jun 15, 2018 | 99599 | WilliamsonDistrict 9 | Resurfacing with HMA shoulders and pavment marking on FAS Route 903 (Corinth Road) from the Johnston City limits to Paulton Road. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,222,620 · | ||
| Aug 3, 2018 | 60N87 | WillDistrict 1 | 1.4 miles of reconstruction on I-80 from 1.1 miles west of US 30 to 0.3 miles east ofUS 30; reconstruction of I-80 at US 30 interchange; reconstruction of 0.5 miles of US 30 including re-decking and partial bridge replacement of I-80 over US 30, Metra Railroad and Hickory Creek within the Village of New Lenox. | — | Executed | D. Construction, Inc. $47,130,620 · | ||
| Aug 3, 2018 | 62F85 | WillDistrict 1 | 1.3 miles of tree removal, selective clearing, grubbing and tree pruning along US 6 from Haas Road to Spring Meadows Drive in the village of Homer. | — | Executed | Clean Cut Tree Service, Inc. $92,279 · | ||
| Aug 3, 2018 | 62G46 | WillDistrict 1 | Construction of median crossovers just north and south of the structures carrying I-55 over the Burlington Northern Santa Fe Railroad and Grant Creek. | — | Executed | D. Construction, Inc. $1,854,497 · | ||
| Sep 21, 2018 | 60V28 | WillDistrict 1 | Replace bridge 099-0170 carrying Illinois Route 102 over Rayn's Creek with a cast in place, 3 cell culvert, in Wesley Township. | — | Executed | Austin Tyler Construction, Inc. $1,055,878 · | ||
| Sep 21, 2018 | 61E00 | WillDistrict 1 | Reconstruction of Moen Avenue from Mound Road to Larkin Avenue in the Village of Rockdale. | — | Executed | P. T. Ferro Construction Co. $4,999,401 · | ||
| Sep 21, 2018 | 78645 | JohnsonUnionWilliamsonDistrict 9 | Inserting culvert liners at 3 locations: 1) SN 100-7038, located 2 miles NW of I-57 near Neber Road on IL 148 in Williamson County; 2) SN 091-7089 located 0.3 miles north of exit 40 along I-57 in Johnson County; 3) SN 044-7073 located at MP 27.9 along I-57 SB in Union County. | — | Executed | Samron Midwest Contracting, Inc. $271,925 · | ||
| Nov 9, 2018 | 46472 | DuPageWillDistrict 1 | Replacing damaged and deteriorated overhead sign structures, componenets, and supports, described in the schedule of locations. | — | Executed | Aldridge Electric, Inc. $3,199,710 · | ||
| Nov 9, 2018 | 61F19 | WillDistrict 1 | Reconstruction and resurfacing on Sioux Drive and Dove Drive from Sunset Drive to West Eames Street and from Navajo Drive to Sunsewt Drive in the Village of Channahon. | — | Executed | P. T. Ferro Construction Co. $1,607,993 · | ||
| Nov 9, 2018 | 62G91 | WillDistrict 1 | Resurfacing on Blodgett Road from Kelly Road to 1.8 miles east of Kelly Road in Wilmington Township. | — | Executed | Iroquois Paving Corporation $389,562 · | ||
| Nov 9, 2018 | 78363 | FranklinWilliamsonDistrict 9 | Expand approximately 4.4 miles of I-57 to add an additional lane in each direction, install a median barrier, sresurface existing lanes, update pavement markings, upgrade guardrails, and install raised relectors and rumble strip. | — | Executed | E. T. Simonds Construction Company $14,359,766 · | ||
| Jan 18, 2019 | 46485 | WillDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings. | — | Executed | Superior Road Striping, Inc. $371,419 · | ||
| Jan 18, 2019 | 60M99 | WillDistrict 1 | Bridge deck repairs and thin polymer overlay of the existing bridge deck of SN 099-0263 carrying US 30 (Cass Street) over Spring Creek in the City of Joliet. | — | Executed | MYS, Incorporated $88,200 · | ||
| Jan 18, 2019 | 61F12 | WillDistrict 1 | Rehabilitate the bridge carrying IL 7 Frontage Road over the Des Plaines River in the City of Lockport. | — | Rejected | ICC Group Inc. $2,191,000 · | ||
| Jan 18, 2019 | 62G14 | WillDistrict 1 | Insatallation of a fiber optic line to provide local centralized control and operation of 6 moveable bridges over the Des Plaines River in Joliet. | — | Executed | John Burns Construction Company $1,900,000 · | ||
| Jan 18, 2019 | 62G66 | DuPageWillDistrict 1 | Installation of seven truss mounted LED dynamic message signs, CCTBV, fiber optic networks and roadside bluetooth detectors at various locations. | — | Executed | John Burns Construction Company $5,592,292 · | ||
| Jan 18, 2019 | 62G99 | WillDistrict 1 | Bridge deck overlay, joint repairs, structural repair of concrete, and drainage repairs on 099-0264 carrying US 30 over WCL RR in Joliet. | — | Executed | D. Construction, Inc. $1,673,197 · | ||
| Jan 18, 2019 | 78667 | WilliamsonDistrict 9 | Bridge repairs and approach work on SN 100-0062 carrying Cambria Rd. over Big Muddy River, 1 mile south of Hurst. | — | Executed | E. T. Simonds Construction Company $299,154 · | ||
| Jan 18, 2019 | 99610 | WilliamsonDistrict 9 | Pavement widening, resurfacing, and water main improvements on East Grand Avenue, from Hofer Road to Hurricane Road in Crainville. | — | Executed | Samron Midwest Contracting, Inc. $872,797 · | ||
| Mar 8, 2019 | 60N00 | WillDistrict 1 | Bridge deck overlay and joint repairs on the bridge carrying US 52 over Forked Creek. | — | Executed | MYS, Incorporated $301,046 · | ||
| Mar 8, 2019 | 61F40 | WillDistrict 1 | Construct an extension of Kings Road from Rodeo Drive to Hassert Boulevard in Bollingbrook. | — | Executed | K-Five Construction Corporation & Herlihy Mid-Continent Company $7,485,866 · | ||
| Mar 8, 2019 | 61F44 | WillDistrict 1 | Replace the bridge carrying TR 68 over Lily Creek, 0.1 mil north of Caton Farm Road in Plainfield Township. | — | Executed | D. Construction, Inc. $945,717 · | ||
| Mar 8, 2019 | 61F61 | WillDistrict 1 | Resurfacing Burville Road from stte Street to IL 394 in the Village of Crete. | — | Executed | Iroquois Paving Corporation $395,403 · | ||
| Mar 8, 2019 | 62F49 | CookWillDistrict 1 | 6.45 miles of 3P resurfacing and ADA ramps on IL 43 from north of US 30 to just north of US 6. | — | Executed | D. Construction, Inc. $5,880,439 · | ||
| Mar 8, 2019 | 62G98 | WillDistrict 1 | Removal and replacement of bridge decks of SN 099-0286, 099-0005 and 099-0304 c carrying I-55 over BNSF Railroad and Grant Creek in Wilminton and Channahon Townships. | — | Executed | D. Construction, Inc. $7,870,946 · | ||
| Mar 8, 2019 | 62H35 | WillDistrict 1 | Repairs on SN 099-0056 carrying I-80 over the Des Plaines River in Joliet. | — | Executed | Lakes & Rivers Contracting, Inc. $847,500 · | ||
| Mar 8, 2019 | 62H55 | WillDistrict 1 | 9.62 miles of Shoulder rumble strip installation on I-80 at various locations between the Will County line and US 30. | — | Executed | D. Construction, Inc. $277,857 · | ||
| Mar 8, 2019 | 62H68 | WillDistrict 1 | Bridge structural steel repair and bearing replacement of the bridges carrying I-80 over Des Plaines River in Joliet | — | Executed | ICC Group Inc. $4,978,000 · | ||
| Mar 8, 2019 | 78637 | WilliamsonDistrict 9 | Installation of sidewalks, ADA improvements and installation of pedestrian crossing signals on IL 13 from Johnson Street to Railroad Street in Marion. | — | Executed | Samron Midwest Contracting, Inc. $158,480 · | ||
| Mar 8, 2019 | 78662 | WilliamsonDistrict 9 | Joint reconstruction, approach slab and deck slab repairs, waterproofing membrane system, HMA overlays and substructure repairs on SN 100-0032 and SN 100-0033 carrying IL 148 over the Big Muddy River and Pond Creek | — | Executed | Samron Midwest Contracting, Inc. $497,797 · | ||
| Apr 26, 2019 | 60R52 | WillDistrict 1 | Approximately 3 miles of roadway reconstruction, resurfacing, replacement of bridge structures carrying US 6 over Marley Creek, drainage improvement, pavement markings, and aesthetic landscaping from Cedar Rd to Will-Cook Rd in Homer Glen. | — | Executed | D. Construction, Inc. $14,392,722 · | ||
| Apr 26, 2019 | 60R74 | WillDistrict 1 | Bridge deck overlay and bridge joint repair of the bridge carrying IL 50 over rock creek in unincorporated Wilton Township. | — | Executed | Iroquois Paving Corporation $658,368 · | ||
| Apr 26, 2019 | 61D48 | WillDistrict 1 | Construction of a multi-use path and sidewalk replacement algon the west parkway of Farrell Road from Division Street to south of 7th Street in the City of Lockport. | — | Executed | P. T. Ferro Construction Co. $334,680 · | ||
| Apr 26, 2019 | 61F64 | WillDistrict 1 | Reconstruct the intersection of Rodeo Drive at Kings Road in Bolingbrook. | — | Executed | K-Five Construction Corporation $2,914,616 · | ||
| Apr 26, 2019 | 61F67 | WillDistrict 1 | Resurfacing University Parkway from Steger-Monee Road to Western Avenue in the Village of University Park. | — | Executed | D. Construction, Inc. $583,358 · | ||
| Apr 26, 2019 | 61F68 | WillDistrict 1 | Intersection improvement on US 52 at Gougar Road in the Village of Manhattan. | — | Executed | P. T. Ferro Construction Co. $874,335 · | ||
| Apr 26, 2019 | 62G97 | WillDistrict 1 | Jack column retrofitting, repairing bascule girders, modification of center and tail lock, repairing steel grid deck and railings, and painting of Brandon Rd over the Des Plaines River in Joliet. | — | Executed | D. Construction, Inc. $3,391,575 · | ||
| Apr 26, 2019 | 62H13 | KendallWillDistrict 1 | Clean and paint SN 099-0083 carrying US 52 over Hickory Creek in Joliet, and SN 047-0006 carrying IL 31 over BNSF RR in Oswego. | — | Executed | Eagle Painting & Maintenance Company, Inc. $279,700 · | ||
| Apr 26, 2019 | 78694 | WilliamsonDistrict 9 | Single pass microsurfacing, bump removal and fiber-modified asphalt crack sealing on IL 13 eastbound lane from west of Main Street to East Crab Orchard Road. | — | Executed | Beniach Construction Company, Inc. and Pavement Maintenance Systems, LLC $456,657 · | ||
| Apr 26, 2019 | 99613 | WilliamsonDistrict 9 | Resurfacing CH 18 from Stonefort Road to East Boundary Road north of Creal Springs. | — | Executed | Southern Illinois Asphalt Co., Inc. $605,762 · | ||
| Jun 14, 2019 | 46507 | LakeWillDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Lake and Will counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $593,000 · | ||
| Jun 14, 2019 | 61F76 | WillDistrict 1 | Construction of a multi-use path adjacent to University Parkway from Steger- Monee Road to Western Avenue in the Village of University Park. | — | Executed | Iroquois Paving Corporation $525,868 · | ||
| Jun 14, 2019 | 62H11 | CookWillDistrict 1 | Guardrail end section replacement at various locations in Cook and Will Counties. | — | Executed | Midwest Fence Corporation $559,277 · | ||
| Jun 14, 2019 | 62J08 | WillDistrict 1 | Intermittent pavement resurfacing project located on various state maintained arterial routes. | — | Executed | P. T. Ferro Construction Co. $425,756 · | ||
| Jun 14, 2019 | 62J12 | CookWillDistrict 1 | Intermittent resurfacing on various state maintained expressway routes in Cook and Will counties. | — | Executed | D. Construction, Inc. $826,171 · | ||
| Jun 14, 2019 | 66K23 | KankakeeWillDistrict 3 | Radii widening at the intersection of IL 1 and E 1200N Road at the Kankakee/Will County Line. Includes new foreslopes and ditches and 0.75 mile centerline milling and resurfacing to add rumble strips. | — | Executed | Iroquois Paving Corporation $148,374 · | ||
| Jun 14, 2019 | 99620 | WilliamsonDistrict 9 | Replace the bridge carrying Grassy Road over Little Wolf Creek, located 0.2 miles West of IL 148. | — | Executed | E. T. Simonds Construction Company $389,831 · | ||
| Jun 14, 2019 | 99624 | WilliamsonDistrict 9 | Resurfacing Grassy Road from Spillway Road to West of Caney Branch Lane and resurfacing Spillway Road from Hayton Shcool Road to Grassy Road. | — | Executed | E. T. Simonds Construction Company $512,791 · | ||
| Jul 12, 2019 | 62G13 | WillDistrict 1 | 2.73 miles of shoulder widening and milled rumble strips with ditch regrading on IL 53 between Murphey Drive to IL 7 in Romeoville. | — | Executed | D. Construction, Inc. $1,458,014 · | ||
| Jul 12, 2019 | 62H93 | WillDistrict 1 | 1.3 miles of resurfacing along IL 50 from Cicero Avenue to Manhattan-Monee Road in Monee Township | — | Executed | Iroquois Paving Corporation $1,177,820 · | ||
| Jul 12, 2019 | 78608 | FranklinWilliamsonDistrict 9 | 2.6 miles of resurfacing on IL 148 from Maple Street in Zeigler to 0.8 miles south of Franklin/Williamson County line. | — | Executed | Southern Illinois Asphalt Co., Inc. $881,036 · | ||
| Jul 12, 2019 | 78639 | WilliamsonDistrict 9 | 2.1 miles of resurfacing on Herrin Road from Christmas Tree Road to just east of I-57. | — | Executed | E. T. Simonds Construction Company $835,539 · | ||
| Jul 12, 2019 | 78692 | WilliamsonDistrict 9 | 0.8 miles of milling and resurfacing on IL 13 from IL 37 to Fair Street in Marion. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,005,135 · | ||
| Aug 2, 2019 | 61F18 | WillDistrict 1 | Construction of a multi-use path from McKinley Woods road to IandM Canal and the construction of a pedestrian bridge over the IandM Canal. Project is located along US Route 6 and Bridge Street, beginning west of McKinley Drive and ending east of the IandM Canal at Bridge Street in the Village of Channahon. | — | Executed | D. Construction, Inc. $734,856 · | ||
| Sep 20, 2019 | 99631 | WilliamsonDistrict 9 | Resurfacing Paulton Road from 0.3 miles north of Grant Brick Road to Toledo Road. | — | Executed | E. T. Simonds Construction Company $477,971 · | ||
| Nov 8, 2019 | 62K13 | WillDistrict 1 | Surveillance camera replacement on I-55 (Lorenzo Rd to Joliet Rd) and I-80 (IL 43 to US 30). | — | Executed | Meade Inc. $482,744 · | ||
| Nov 8, 2019 | 78636 | WilliamsonDistrict 9 | Convert existing intersection of Cambria Road and Herrin Road into a roundabout. Includes HMA surface removal, PCC pavement, HMA surfacing and storm sewers. | — | Executed | E. T. Simonds Construction Company $1,624,828 · | ||
| Nov 8, 2019 | 78732 | JeffersonWilliamsonDistrict 9 | Inserting culvert liners at three locations: 1) SN 100-7039 on IL 148 approximately 2 miles northwest of I-57 near Neber Road in Williamson County; 2) SN 041-7075 on IL 15 approximately 0.2 miles west of Shepherd Lane in Jefferson County; 3) SN 041-7076 on IL 15 approximately 0.3 miles east of Shepherd Lane in Jefferson County. | — | Executed | Samron Midwest Contracting, Inc. $219,125 · | ||
| Jan 17, 2020 | 61F81 | WillDistrict 1 | Resurfacing Corning avenue from Rathje Road to IL 50 in the Village of Peotone. | — | Executed | Iroquois Paving Corporation $476,339 · | ||
| Jan 17, 2020 | 61F94 | WillDistrict 1 | Reconstruct and realign the intersection of St. Louis Street at IL 53 in the Village of Elwood. | — | Executed | P. T. Ferro Construction Co. $2,572,560 · | ||
| Jan 17, 2020 | 61G21 | WillDistrict 1 | Replace the bridge carrying Essington Road over Rock Run Creek between Pandola Avenue and Citadel Drive in the City of Joliet. | — | Executed | Herlihy Mid-Continent Company $2,812,985 · | ||
| Jan 17, 2020 | 62J42 | WillDistrict 1 | Removal and replacement of a weigh-in-motion scale, adjacent pavement and shoulder removal and replacement on I-80 at the westbound Frankfort weigh station scale #10. , Removal and replacement of a weigh-in-motion scale, adjacent pavement and shoulder removal and replacement on I-80 at the westbound Frankfort weigh station scale #10. | — | Executed | D. Construction, Inc. $559,193 · | ||
| Jan 17, 2020 | 62J60 | WillDistrict 1 | Bridge deck overlay and joint repairs on IL 113 over I-55 in the City of Braidwood. (SN 099-0151) | — | Executed | D. Construction, Inc. $822,716 · | ||
| Jan 17, 2020 | 62K44 | CookWillDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-35 The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-355. 325 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $177,600 · | ||
| Jan 17, 2020 | 62K45 | WillDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kend The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kendall County Line. 240 miles in length. | — | Rejected | MYS, Incorporated $193,806 · | ||
| Jan 17, 2020 | 62K48 | WillDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 expwy from I-355 to Reed The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 expwy from I-355 to Reed Rd. 180 miles in length. | — | Rejected | Western Remac, Inc. $345,600 · | ||
| Jan 17, 2020 | 78506 | WilliamsonDistrict 9 | Replacement of a three-span bridge with a two-span integral abutment bridge carrying IL 148 over Wolf Creek, 1 mile south of the I-57 interchange. (SN 100-0038) | — | Executed | E. T. Simonds Construction Company $2,587,670 · | ||
| Jan 17, 2020 | 78751 | WilliamsonDistrict 9 | Resurfacing ramps, shoulders and gore areas on I-57 northbound ramps at Exit 53. | — | Executed | Samron Midwest Contracting, Inc. $197,218 · | ||
| Mar 6, 2020 | 61F15 | WillDistrict 1 | Replace the bridge carrying Danne Road over a Branch of Plum Creek, located 0.70 mile east of Klemme Road. | — | Executed | D. Construction, Inc. $1,359,864 · | ||
| Mar 6, 2020 | 62H85 | CookDuPageWillDistrict 1 | This is a safety (HSIP) improvement including guardrail end section replacement and new guardrail installation on various state maintained arterial routes. | — | Executed | Copenhaver Construction, Inc. $584,674 · | ||
| Mar 6, 2020 | 62K15 | WillDistrict 1 | 3.2 miles of standard overlay and milled rumble strips on New Avenue from Long Creek to the Cook County line in the City of Lockport. | — | Executed | P. T. Ferro Construction Co. $1,163,112 · | ||
| Mar 6, 2020 | 62K16 | WillDistrict 1 | 1.7 miles of standard overlay, ADA improvments and guardrail replacement on IL 126 from the Kendall County line to Wallin Drive in the Village of Plainfield and unincorporated Plainfield Township. | — | Executed | P. T. Ferro Construction Co. $889,686 · | ||
| Mar 6, 2020 | 62K32 | CookWillDistrict 1 | Concrete bridge deck sealing upon the entire top surface of the bridge deck, top of sidewalks, and the inside and top of parapets on structures at various locations. | — | Executed | M & M Concrete, Inc. $179,824 · | ||
| Mar 6, 2020 | 78715 | WilliamsonDistrict 9 | Converting the IL 13 and Aurelia Drive intersection into a restricted crossing U-turn (RCUT) intersection; adding a right turn lane to the eastbound lanes for Aurelia Drive; and resurfacing from Fair Street to the bridges east of Old IL 13. | — | Executed | E. T. Simonds Construction Company $2,242,850 · | ||
| Mar 6, 2020 | 78725 | WilliamsonDistrict 9 | Shallow joint replacement, HMA overlay, waterproofing, substructure repairs, deck and approach slab repairs to SN 100-0029 carrying IL 166 over South Fork Saline Relief, 3.3 miles south of IL 13. | — | Executed | Samron Midwest Contracting, Inc. $158,444 · |
1–100 of 402Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.