| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$22,900.00 |
$50,000.00 |
$25,000.00 |
$25,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 125,163 | CY |
$5.00 |
$4.15 |
$4.00 |
$3.84 |
$4.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 121,294 | CY |
$7.50 |
$4.75 |
$5.85 |
$5.56 |
$6.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$125,000.00 |
$57,475.00 |
$100,000.00 |
$77,334.46 |
$75,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 320 | LF |
$2.50 |
$1.35 |
$1.50 |
$1.29 |
$1.29 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$300.00 |
$235.00 |
$350.00 |
$225.00 |
$225.00 |
| 7 | 221(E) 2804 |
TEMPORARY SEDIMENT BASIN | 3 | EA |
$8,000.00 |
$8,778.00 |
$7,500.00 |
$7,250.00 |
$8,000.00 |
| 8 | 221(F) 0100 |
TEMPORARY SILT DIKE | 2,744 | LF |
$6.00 |
$6.75 |
$6.50 |
$6.49 |
$6.49 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 225,818 | SY |
$1.25 |
$1.22 |
$1.25 |
$1.17 |
$1.17 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 46.7 | AC |
$650.00 |
$99.30 |
$420.00 |
$95.00 |
$95.00 |
| 11 | 241 2832 |
MOWING | 94 | AC |
$100.00 |
$51.20 |
$78.00 |
$49.00 |
$49.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 89,266 | SY |
$6.00 |
$4.75 |
$4.25 |
$4.50 |
$7.25 |
| 13 | 310(B) 0149 |
SUBGRADE, METHOD B | 2,926 | SY |
$3.00 |
$4.75 |
$0.7000 |
$0.7000 |
$1.75 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 564 | TON |
$50.00 |
$51.25 |
$50.00 |
$43.90 |
$40.00 |
| 15 | 407(B) 0250 |
TACK COAT | 18,416 | GAL |
$3.25 |
$3.50 |
$2.25 |
$2.45 |
$4.00 |
| 16 | 408 5774 |
PRIME COAT | 32,487 | GAL |
$4.25 |
$4.00 |
$3.50 |
$3.30 |
$4.25 |
| 17 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 7,577 | TON |
$85.00 |
$76.25 |
$76.00 |
$88.00 |
$77.75 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 34,459 | TON |
$75.00 |
$66.00 |
$69.00 |
$79.00 |
$67.50 |
| 19 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 7,635 | TON |
$97.00 |
$84.50 |
$82.00 |
$92.00 |
$85.50 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,828 | TON |
$82.00 |
$75.50 |
$72.00 |
$79.00 |
$76.50 |
| 21 | 412 5267 |
COLD MILLING PAVEMENT | 784 | SY |
$5.00 |
$3.90 |
$15.00 |
$3.50 |
$7.30 |
| 22 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 103 | CY |
$20.00 |
$10.45 |
$10.00 |
$30.00 |
$55.00 |
| 23 | 509(A) 0319 |
CLASS AA CONCRETE | 294 | CY |
$500.00 |
$271.75 |
$260.00 |
$434.50 |
$400.00 |
| 24 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 1.35 | CY |
$1,500.00 |
$731.50 |
$700.00 |
$1,250.00 |
$525.00 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$292.60 |
$280.00 |
$325.00 |
$280.00 |
| 26 | 511(A) 0332 |
REINFORCING STEEL | 39,379 | LB |
$1.00 |
$0.8500 |
$0.8000 |
$0.9000 |
$1.00 |
| 27 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 178 | SY |
$60.00 |
$83.60 |
$80.00 |
$58.00 |
$80.00 |
| 28 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$3,000.00 |
$2,090.00 |
$2,656.25 |
$2,656.25 |
$3,100.00 |
| 29 | 611(G) 6006 |
INLET (SMD-TYPE 2B) | 1 | EA |
$3,500.00 |
$2,090.00 |
$3,850.25 |
$3,850.25 |
$4,400.00 |
| 30 | 611(L) 0487 |
JUNCTION BOXES | 20.4 | CF |
$35.00 |
$156.75 |
$208.82 |
$208.82 |
$275.00 |
| 31 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 718 | LF |
$60.00 |
$39.25 |
$40.58 |
$40.58 |
$42.00 |
| 32 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 214 | LF |
$70.00 |
$51.25 |
$59.33 |
$59.33 |
$55.00 |
| 33 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 122 | LF |
$90.00 |
$74.25 |
$82.50 |
$82.50 |
$85.00 |
| 34 | 613(A) 4501 |
65" X 40" R.C.PIPE ARCH CLASS A-III | 198 | LF |
$275.00 |
$183.00 |
$210.93 |
$210.93 |
$225.00 |
| 35 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 64 | LF |
$35.00 |
$45.00 |
$42.41 |
$42.41 |
$35.00 |
| 36 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 32 | LF |
$50.00 |
$22.50 |
$39.30 |
$39.30 |
$28.00 |
| 37 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$400.00 |
$146.50 |
$225.45 |
$225.45 |
$125.00 |
| 38 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 5 | EA |
$1,000.00 |
$1,045.00 |
$800.00 |
$1,025.00 |
$800.00 |
| 39 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,250.00 |
$1,045.00 |
$900.00 |
$1,175.00 |
$900.00 |
| 40 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$1,350.00 |
$1,045.00 |
$1,300.00 |
$1,200.00 |
$1,300.00 |
| 41 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 7 | EA |
$2,000.00 |
$1,045.00 |
$1,800.00 |
$1,650.00 |
$1,800.00 |
| 42 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 5 | EA |
$1,500.00 |
$1,045.00 |
$1,000.00 |
$1,050.00 |
$1,000.00 |
| 43 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,750.00 |
$1,045.00 |
$2,500.00 |
$1,450.00 |
$2,500.00 |
| 44 | 613(N) 7520 |
TYPE A6 SLOPED CONCRETE END SECTION | 2 | EA |
$1,500.00 |
$1,045.00 |
$1,000.00 |
$1,800.00 |
$1,000.00 |
| 45 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$28,750.00 |
$48,000.00 |
$11,189.83 |
$20,000.00 |
| 46 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 28,328 | SY |
$4.00 |
$3.75 |
$3.00 |
$5.00 |
$4.17 |
| 47 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,267 | LF |
$5.00 |
$4.00 |
$5.20 |
$3.80 |
$3.80 |
| 48 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 1,805 | CY |
$12.00 |
$10.45 |
$10.00 |
$30.00 |
$10.00 |
| 49 | 509(A) 1326 |
CLASS AA CONCRETE | 3,529.1 | CY |
$450.00 |
$286.50 |
$260.00 |
$262.53 |
$260.00 |
| 50 | 511 6306 |
MECHANICAL SPLICES | 636 | EA |
$20.00 |
$20.90 |
$20.00 |
$45.00 |
$20.00 |
| 51 | 511(A) 1332 |
REINFORCING STEEL | 576,200 | LB |
$1.00 |
$0.8500 |
$0.8000 |
$0.7800 |
$0.8000 |
| 52 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,535 | CY |
$6.00 |
$10.45 |
$10.00 |
$5.00 |
$5.00 |
| 53 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 430 | CY |
$12.00 |
$10.45 |
$10.00 |
$30.00 |
$35.00 |
| 54 | 509(A) 1326 |
CLASS AA CONCRETE | 873 | CY |
$450.00 |
$271.75 |
$260.00 |
$345.00 |
$400.00 |
| 55 | 511(A) 1332 |
REINFORCING STEEL | 127,150 | LB |
$1.00 |
$0.8500 |
$0.8000 |
$0.7800 |
$1.00 |
| 56 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$3,500.00 |
$10,450.00 |
$10,000.00 |
$4,000.00 |
$6,500.00 |
| 57 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 123,880 | LF |
$0.1500 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
| 58 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 4,000 | EA |
$0.7500 |
$0.5200 |
$0.5000 |
$0.5000 |
$0.5000 |
| 59 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 16,000 | LF |
$0.5000 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.2500 |
| 60 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 28,700 | SD |
$0.7500 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.2500 |
| 61 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 43,400 | SD |
$1.25 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.2500 |
| 62 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 19,950 | SD |
$2.00 |
$2.60 |
$2.50 |
$2.50 |
$2.50 |
| 63 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 37,100 | SD |
$0.5000 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.2500 |
| 64 | 880(C) 8848 |
WING BARRICADES | 2,100 | SD |
$0.4000 |
$3.15 |
$3.00 |
$3.00 |
$3.00 |
| 65 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 74,200 | SD |
$0.0500 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1000 |
| 66 | 880(F) 8878 |
DRUMS | 103,075 | SD |
$0.2000 |
$0.1500 |
$0.1500 |
$0.1500 |
$0.1500 |
| 67 | 880(G) 8890 |
CHANNELIZER CONES | 7,700 | SD |
$0.3000 |
$0.2500 |
$0.2000 |
$0.2000 |
$0.2000 |
| 68 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 300 | SD |
$30.00 |
$21.00 |
$20.00 |
$20.00 |
$20.00 |
| 69 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 45,600 | LF |
$0.1000 |
$0.1500 |
$0.2300 |
$0.1300 |
$0.0500 |
| 70 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 312.3 | SF |
$20.00 |
$15.00 |
$14.00 |
$14.00 |
$14.00 |
| 71 | 851(C) 8324 |
2" SQUARE TUBE POST | 375 | LF |
$8.00 |
$8.35 |
$8.00 |
$8.00 |
$8.00 |
| 72 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 200 | LF |
$10.00 |
$8.35 |
$8.00 |
$8.00 |
$8.00 |
| 73 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 133 | LF |
$10.00 |
$8.35 |
$8.00 |
$8.00 |
$8.00 |
| 74 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 56,974 | LF |
$0.4000 |
$0.4000 |
$0.3800 |
$0.3800 |
$0.3800 |
| 75 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 66 | LF |
$2.50 |
$10.45 |
$10.00 |
$10.00 |
$10.00 |
| 76 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 18 | EA |
$150.00 |
$104.00 |
$100.00 |
$100.00 |
$100.00 |
| 77 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$170,000.00 |
$151,000.00 |
$135,000.00 |
$144,000.00 |
$144,000.00 |
| 78 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$41,800.00 |
$50,000.00 |
$5,000.00 |
$9,000.00 |
| 79 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$1,065,000.00 |
$500,000.00 |
$866,000.00 |
$900,000.00 |
|
| 80 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$35,000.00 |
$36,575.00 |
$35,000.00 |
$25,000.00 |
$20,000.00 |
| 81 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 102,243 | CY |
$5.00 |
$4.13 |
$4.00 |
$3.76 |
$4.50 |
| 82 | 202(D) 0184 |
UNCLASSIFIED BORROW | 61,059 | CY |
$7.50 |
$5.30 |
$6.90 |
$6.63 |
$7.65 |
| 83 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$150,000.00 |
$56,430.00 |
$80,000.00 |
$73,131.68 |
$70,000.00 |
| 84 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,403 | LF |
$2.00 |
$1.35 |
$1.25 |
$1.29 |
$1.29 |
| 85 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 7 | EA |
$300.00 |
$235.00 |
$300.00 |
$225.00 |
$225.00 |
| 86 | 221(E) 2804 |
TEMPORARY SEDIMENT BASIN | 4 | EA |
$8,000.00 |
$8,800.00 |
$7,500.00 |
$7,350.00 |
$8,000.00 |
| 87 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,890 | LF |
$6.00 |
$6.75 |
$6.50 |
$6.49 |
$6.49 |
| 88 | 230(A) 2806 |
SOLID SLAB SODDING | 213,449 | SY |
$1.25 |
$1.25 |
$1.25 |
$1.17 |
$1.17 |
| 89 | 233(A) 2817 |
VEGETATIVE MULCHING | 44.1 | AC |
$650.00 |
$99.30 |
$450.00 |
$95.00 |
$95.00 |
| 90 | 241 2832 |
MOWING | 88.2 | AC |
$100.00 |
$51.25 |
$66.00 |
$49.00 |
$49.00 |
| 91 | 307(K) 4300 |
STABILIZED SUBGRADE | 154,781 | SY |
$6.00 |
$4.75 |
$4.25 |
$4.50 |
$7.25 |
| 92 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,565 | TON |
$50.00 |
$51.25 |
$50.00 |
$43.90 |
$40.00 |
| 93 | 407(B) 0250 |
TACK COAT | 29,806 | GAL |
$3.25 |
$3.50 |
$2.25 |
$2.45 |
$3.95 |
| 94 | 408 5774 |
PRIME COAT | 54,704 | GAL |
$4.25 |
$4.00 |
$3.50 |
$3.30 |
$4.25 |
| 95 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 9,625 | TON |
$85.00 |
$76.00 |
$76.00 |
$88.00 |
$77.50 |
| 96 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 49,274 | TON |
$75.00 |
$66.35 |
$69.00 |
$80.00 |
$67.85 |
| 97 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 11,550 | TON |
$82.00 |
$83.75 |
$82.00 |
$92.00 |
$84.75 |
| 98 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 8,332 | TON |
$90.00 |
$73.50 |
$72.00 |
$77.00 |
$74.50 |
| 99 | 412 5267 |
COLD MILLING PAVEMENT | 1,456 | SY |
$3.00 |
$4.50 |
$15.00 |
$3.50 |
$7.30 |
| 100 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 93 | CY |
$20.00 |
$10.45 |
$10.00 |
$30.00 |
$55.00 |
| 101 | 509(A) 0319 |
CLASS AA CONCRETE | 166 | CY |
$500.00 |
$271.75 |
$260.00 |
$492.25 |
$500.00 |
| 102 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 1.6 | CY |
$750.00 |
$836.00 |
$800.00 |
$1,250.00 |
$445.00 |
| 103 | 509(D) 0325 |
CLASS C CONCRETE | 14 | CY |
$350.00 |
$313.50 |
$300.00 |
$325.00 |
$300.00 |
| 104 | 511(A) 0332 |
REINFORCING STEEL | 23,175 | LB |
$1.00 |
$0.8500 |
$0.8000 |
$0.9000 |
$1.00 |
| 105 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 7 | EA |
$3,000.00 |
$2,090.00 |
$2,717.29 |
$2,717.29 |
$2,800.00 |
| 106 | 611(L) 0487 |
JUNCTION BOXES | 30.5 | CF |
$80.00 |
$156.75 |
$156.69 |
$156.69 |
$175.00 |
| 107 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 296 | LF |
$60.00 |
$86.25 |
$40.70 |
$40.70 |
$42.00 |
| 108 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 682 | LF |
$70.00 |
$51.25 |
$40.20 |
$40.20 |
$55.00 |
| 109 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 102 | LF |
$125.00 |
$98.23 |
$123.79 |
$123.79 |
$145.00 |
| 110 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 70 | LF |
$40.00 |
$22.50 |
$32.86 |
$32.86 |
$28.00 |
| 111 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 94 | LF |
$50.00 |
$28.25 |
$36.57 |
$36.57 |
$30.00 |
| 112 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 84 | LF |
$50.00 |
$22.50 |
$39.30 |
$39.30 |
$28.00 |
| 113 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$400.00 |
$146.50 |
$225.45 |
$225.45 |
$125.00 |
| 114 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,000.00 |
$1,045.00 |
$800.00 |
$1,025.00 |
$800.00 |
| 115 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$1,250.00 |
$1,045.00 |
$900.00 |
$1,175.00 |
$900.00 |
| 116 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$1,045.00 |
$1,000.00 |
$1,050.00 |
$1,000.00 |
| 117 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 8 | EA |
$1,750.00 |
$1,045.00 |
$2,500.00 |
$1,450.00 |
$2,500.00 |
| 118 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 1 | EA |
$2,000.00 |
$1,045.00 |
$3,200.00 |
$1,550.00 |
$3,200.00 |
| 119 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$33,500.00 |
$25,000.00 |
$9,742.17 |
$34,000.00 |
| 120 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 30,132 | SY |
$4.00 |
$3.75 |
$3.00 |
$5.00 |
$3.89 |
| 121 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,512.5 | LF |
$20.00 |
$16.75 |
$16.00 |
$16.00 |
$16.00 |
| 122 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 5 | EA |
$1,250.00 |
$522.50 |
$500.00 |
$500.00 |
$500.00 |
| 123 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 5 | EA |
$2,000.00 |
$2,090.00 |
$2,000.00 |
$2,000.00 |
$2,000.00 |
| 124 | 623(I) 8690 |
GUARDRAIL BRIDGE CONN-TRAIL END (31") | 4 | EA |
$1,500.00 |
$888.25 |
$850.00 |
$850.00 |
$850.00 |
| 125 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,500.00 |
$1,515.25 |
$1,450.00 |
$1,450.00 |
$1,450.00 |
| 126 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 17,362 | LF |
$5.00 |
$3.75 |
$5.20 |
$3.55 |
$3.55 |
| 127 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,815 | CY |
$10.00 |
$15.70 |
$15.00 |
$8.90 |
$5.00 |
| 128 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 70 | CY |
$20.00 |
$0.9500 |
$15.00 |
$50.00 |
$50.00 |
| 129 | 501(G) 6309 |
CLSM BACKFILL | 50 | CY |
$225.00 |
$177.65 |
$170.00 |
$155.00 |
$155.00 |
| 130 | 504(A) 1304 |
APPROACH SLAB | 178.6 | SY |
$200.00 |
$188.50 |
$180.00 |
$225.00 |
$225.00 |
| 131 | 504(B) 1305 |
SAW-CUT GROOVING | 573 | SY |
$5.00 |
$4.20 |
$4.00 |
$15.00 |
$15.00 |
| 132 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 272 | LF |
$80.00 |
$78.38 |
$75.00 |
$65.00 |
$65.00 |
| 133 | 506(A) 1322 |
STRUCTURAL STEEL | 200 | LB |
$4.00 |
$2.65 |
$2.50 |
$5.00 |
$5.00 |
| 134 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 2 | EA |
$1,000.00 |
$31.35 |
$3,000.00 |
$24,000.00 |
$24,000.00 |
| 135 | 509(A) 1326 |
CLASS AA CONCRETE | 274.2 | CY |
$600.00 |
$731.50 |
$700.00 |
$490.00 |
$490.00 |
| 136 | 509(B) 1328 |
CLASS A CONCRETE | 74.4 | CY |
$550.00 |
$627.00 |
$600.00 |
$490.00 |
$490.00 |
| 137 | 509(D) 1331 |
CLASS C CONCRETE | 4.3 | CY |
$500.00 |
$522.00 |
$500.00 |
$500.00 |
$500.00 |
| 138 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 55,390 | LB |
$1.10 |
$1.15 |
$1.10 |
$1.00 |
$1.00 |
| 139 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 770 | LF |
$35.00 |
$27.25 |
$26.00 |
$36.00 |
$36.00 |
| 140 | 514(A) 6016 |
PILES, FURNISHED (HP 14X89) | 930 | LF |
$70.00 |
$47.10 |
$45.00 |
$72.00 |
$72.00 |
| 141 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 770 | LF |
$15.00 |
$15.75 |
$15.00 |
$10.00 |
$10.00 |
| 142 | 514(B) 6297 |
PILES, DRIVEN (HP 14X89) | 930 | LF |
$20.00 |
$15.75 |
$15.00 |
$14.00 |
$14.00 |
| 143 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 144 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 195 | SY |
$4.00 |
$4.70 |
$4.50 |
$12.00 |
$12.00 |
| 145 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,003 | TON |
$60.00 |
$47.00 |
$45.00 |
$52.20 |
$55.00 |
| 146 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 158 | TON |
$50.00 |
$47.00 |
$45.00 |
$43.72 |
$45.00 |
| 147 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 80 | LF |
$25.00 |
$52.25 |
$50.00 |
$6.00 |
$6.00 |
| 148 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 48 | LF |
$25.00 |
$52.25 |
$50.00 |
$6.00 |
$6.00 |
| 149 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$26,125.00 |
$25,000.00 |
$16,742.03 |
$6,000.00 |
| 150 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 70 | CY |
$20.00 |
$15.70 |
$15.00 |
$50.00 |
$50.00 |
| 151 | 501(G) 6309 |
CLSM BACKFILL | 50 | CY |
$225.00 |
$177.75 |
$170.00 |
$155.00 |
$155.00 |
| 152 | 504(A) 1304 |
APPROACH SLAB | 178.6 | SY |
$200.00 |
$188.15 |
$180.00 |
$215.00 |
$215.00 |
| 153 | 504(B) 1305 |
SAW-CUT GROOVING | 573 | SY |
$5.00 |
$4.25 |
$4.00 |
$15.00 |
$15.00 |
| 154 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 272 | LF |
$80.00 |
$78.50 |
$75.00 |
$65.00 |
$65.00 |
| 155 | 506(A) 1322 |
STRUCTURAL STEEL | 200 | LB |
$4.00 |
$2.65 |
$2.50 |
$5.00 |
$5.00 |
| 156 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 2 | EA |
$1,000.00 |
$3,135.00 |
$3,000.00 |
$22,500.00 |
$22,500.00 |
| 157 | 509(A) 1326 |
CLASS AA CONCRETE | 274.2 | CY |
$600.00 |
$732.00 |
$700.00 |
$450.00 |
$450.00 |
| 158 | 509(B) 1328 |
CLASS A CONCRETE | 74.4 | CY |
$550.00 |
$627.00 |
$600.00 |
$450.00 |
$450.00 |
| 159 | 509(D) 1331 |
CLASS C CONCRETE | 3.7 | CY |
$500.00 |
$522.50 |
$500.00 |
$500.00 |
$500.00 |
| 160 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 55,390 | LB |
$1.10 |
$1.15 |
$1.10 |
$0.9700 |
$0.9700 |
| 161 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 655 | LF |
$35.00 |
$27.25 |
$26.00 |
$36.00 |
$36.00 |
| 162 | 514(A) 6016 |
PILES, FURNISHED (HP 14X89) | 798 | LF |
$70.00 |
$47.15 |
$45.00 |
$72.00 |
$72.00 |
| 163 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 655 | LF |
$15.00 |
$15.70 |
$15.00 |
$10.00 |
$10.00 |
| 164 | 514(B) 6297 |
PILES, DRIVEN (HP 14X89) | 798 | LF |
$20.00 |
$15.78 |
$15.00 |
$14.00 |
$14.00 |
| 165 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 166 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 195 | SY |
$4.00 |
$4.70 |
$4.50 |
$12.00 |
$12.00 |
| 167 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 940 | TON |
$60.00 |
$47.10 |
$45.00 |
$52.20 |
$55.00 |
| 168 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 147 | TON |
$50.00 |
$47.10 |
$45.00 |
$43.72 |
$45.00 |
| 169 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 80 | LF |
$25.00 |
$52.25 |
$50.00 |
$6.00 |
$6.00 |
| 170 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 44 | LF |
$25.00 |
$52.25 |
$50.00 |
$6.00 |
$6.00 |
| 171 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,085 | CY |
$10.00 |
$10.45 |
$10.00 |
$5.00 |
$5.00 |
| 172 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 270 | CY |
$20.00 |
$10.45 |
$10.00 |
$30.00 |
$10.00 |
| 173 | 509(A) 1326 |
CLASS AA CONCRETE | 635.4 | CY |
$450.00 |
$272.00 |
$260.00 |
$310.00 |
$260.00 |
| 174 | 511(A) 1332 |
REINFORCING STEEL | 95,580 | LB |
$1.00 |
$0.8500 |
$0.8000 |
$0.7800 |
$0.8000 |
| 175 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$10,450.00 |
$10,000.00 |
$9,500.00 |
$4,000.00 |
| 176 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 5,105 | CY |
$10.00 |
$10.45 |
$10.00 |
$5.00 |
$5.00 |
| 177 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 335 | CY |
$20.00 |
$10.45 |
$10.00 |
$30.00 |
$10.00 |
| 178 | 509(A) 1326 |
CLASS AA CONCRETE | 783.7 | CY |
$450.00 |
$272.00 |
$260.00 |
$312.00 |
$260.00 |
| 179 | 511(A) 1332 |
REINFORCING STEEL | 118,680 | LB |
$1.00 |
$0.8500 |
$0.8000 |
$0.7800 |
$0.8000 |
| 180 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$15,675.00 |
$15,000.00 |
$9,000.00 |
$7,000.00 |
| 181 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,290 | CY |
$10.00 |
$10.45 |
$10.00 |
$5.00 |
$5.00 |
| 182 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 190 | CY |
$20.00 |
$10.45 |
$10.00 |
$30.00 |
$10.00 |
| 183 | 509(A) 1326 |
CLASS AA CONCRETE | 486.6 | CY |
$450.00 |
$272.00 |
$260.00 |
$308.00 |
$260.00 |
| 184 | 511(A) 1332 |
REINFORCING STEEL | 68,530 | LB |
$1.00 |
$0.8500 |
$0.8000 |
$0.7800 |
$0.8000 |
| 185 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$10,450.00 |
$10,000.00 |
$7,500.00 |
$3,500.00 |
| 186 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 240 | CY |
$10.00 |
$10.45 |
$10.00 |
$5.00 |
$5.00 |
| 187 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 120 | CY |
$20.00 |
$10.45 |
$10.00 |
$30.00 |
$10.00 |
| 188 | 509(A) 1326 |
CLASS AA CONCRETE | 261.3 | CY |
$450.00 |
$272.00 |
$260.00 |
$310.00 |
$260.00 |
| 189 | 511(A) 1332 |
REINFORCING STEEL | 43,580 | LB |
$1.00 |
$0.8500 |
$0.8000 |
$0.7800 |
$0.8000 |
| 190 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$10,450.00 |
$10,000.00 |
$7,500.00 |
$1,000.00 |
| 191 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 70,400 | LF |
$0.1000 |
$0.1300 |
$0.2300 |
$0.1300 |
$0.0500 |
| 192 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 17 | EA |
$50.00 |
$52.25 |
$50.00 |
$50.00 |
$50.00 |
| 193 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 590.32 | SF |
$20.00 |
$14.65 |
$14.00 |
$14.00 |
$14.00 |
| 194 | 851(C) 8324 |
2" SQUARE TUBE POST | 892 | LF |
$8.00 |
$8.40 |
$8.00 |
$8.00 |
$8.00 |
| 195 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 417 | LF |
$10.00 |
$8.40 |
$8.00 |
$8.00 |
$8.00 |
| 196 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 120 | LF |
$10.00 |
$8.40 |
$8.00 |
$8.00 |
$8.00 |
| 197 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 47 | EA |
$10.00 |
$20.90 |
$20.00 |
$20.00 |
$20.00 |
| 198 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 87,522 | LF |
$0.4000 |
$0.4000 |
$0.3800 |
$0.3800 |
$0.3800 |
| 199 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 513 | LF |
$1.50 |
$2.10 |
$2.00 |
$2.00 |
$2.00 |
| 200 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 120 | LF |
$2.50 |
$10.45 |
$10.00 |
$10.00 |
$10.00 |
| 201 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 36 | EA |
$150.00 |
$105.00 |
$100.00 |
$100.00 |
$100.00 |