| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$72,820.00 |
$180,000.00 |
$30,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 60,632 | CY |
$6.00 |
$8.00 |
$10.50 |
$12.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$8.00 |
$15.14 |
$11.75 |
$6.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$95,000.00 |
$90,598.33 |
$168,132.00 |
$600,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 970 | LF |
$2.50 |
$1.93 |
$2.15 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 532 | LF |
$9.00 |
$10.99 |
$18.10 |
$9.00 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 3 | CY |
$300.00 |
$285.67 |
$1,335.00 |
$350.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 84,190 | SY |
$1.50 |
$1.25 |
$1.40 |
$1.30 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 18 | AC |
$350.00 |
$215.37 |
$208.55 |
$350.00 |
| 10 | 241 2832 |
MOWING | 36 | AC |
$100.00 |
$59.64 |
$57.65 |
$75.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 6,191 | CY |
$55.00 |
$72.07 |
$77.65 |
$65.00 |
| 12 | 307(A) 4200 |
FLY ASH | 299 | TON |
$70.00 |
$76.98 |
$69.40 |
$75.00 |
| 13 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 5,540 | SY |
$4.00 |
$3.60 |
$3.75 |
$5.00 |
| 14 | 310(B) 0149 |
SUBGRADE, METHOD B | 25,667 | SY |
$3.50 |
$2.04 |
$2.40 |
$1.00 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 34,880 | SY |
$1.25 |
$1.57 |
$1.85 |
$1.00 |
| 16 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 33,096 | SY |
$3.00 |
$1.37 |
$2.30 |
$1.00 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 6,848 | TON |
$35.00 |
$42.89 |
$26.05 |
$35.00 |
| 18 | 407(B) 0250 |
TACK COAT | 6,315 | GAL |
$3.00 |
$2.76 |
$3.60 |
$3.00 |
| 19 | 408 5774 |
PRIME COAT | 21,124 | GAL |
$4.50 |
$7.73 |
$4.55 |
$4.00 |
| 20 | 409(A) 4242 |
FABRIC REINFORCEMENT | 7,467 | SY |
$2.00 |
$2.76 |
$2.70 |
$3.00 |
| 21 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 6,593 | TON |
$87.00 |
$93.88 |
$95.20 |
$75.00 |
| 22 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 6,063 | TON |
$82.00 |
$85.05 |
$91.50 |
$70.00 |
| 23 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 4,350 | TON |
$95.00 |
$103.82 |
$110.00 |
$85.00 |
| 24 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 521 | TON |
$100.00 |
$92.78 |
$117.25 |
$80.00 |
| 25 | 412 5267 |
COLD MILLING PAVEMENT | 16,800 | SY |
$3.00 |
$1.44 |
$3.15 |
$2.00 |
| 26 | 509(A) 0319 |
CLASS AA CONCRETE | 41 | CY |
$700.00 |
$896.00 |
$720.60 |
$850.00 |
| 27 | 509(D) 0325 |
CLASS C CONCRETE | 289 | CY |
$300.00 |
$303.73 |
$245.55 |
$335.00 |
| 28 | 511(A) 0332 |
REINFORCING STEEL | 4,660 | LB |
$1.20 |
$0.3000 |
$1.10 |
$3.00 |
| 29 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 66 | LF |
$75.00 |
$115.93 |
$111.00 |
$120.00 |
| 30 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 46 | LF |
$60.00 |
$92.68 |
$81.00 |
$160.00 |
| 31 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 46 | LF |
$60.00 |
$114.21 |
$105.60 |
$175.00 |
| 32 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 220 | LF |
$34.00 |
$43.00 |
$36.60 |
$45.00 |
| 33 | 613(B) 0696 |
60" CORR. GALV. STEEL PIPE | 168 | LF |
$76.00 |
$205.33 |
$123.85 |
$110.00 |
| 34 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 84 | LF |
$34.00 |
$37.86 |
$28.85 |
$45.00 |
| 35 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 48 | LF |
$36.00 |
$46.15 |
$33.10 |
$55.00 |
| 36 | 613(B) 5168 |
24" X 18" CORR. GALV. STEEL PIPE ARCH | 188 | LF |
$40.00 |
$42.43 |
$31.00 |
$55.00 |
| 37 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,200.00 |
$989.52 |
$1,445.00 |
$1,100.00 |
| 38 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 2 | EA |
$1,300.00 |
$1,942.61 |
$1,121.00 |
$1,400.00 |
| 39 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 9 | EA |
$1,500.00 |
$2,150.90 |
$961.00 |
$1,600.00 |
| 40 | 613(M) 7201 |
TYPE AA6 CULVERT END TREATMENT | 10 | EA |
$1,800.00 |
$1,927.63 |
$1,400.00 |
$2,300.00 |
| 41 | 613(M) 7202 |
TYPE BB6 CULVERT END TREATMENT | 4 | EA |
$2,000.00 |
$2,290.10 |
$1,885.00 |
$3,000.00 |
| 42 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$45,000.00 |
$27,188.18 |
$31,225.00 |
$100,000.00 |
| 43 | 619(B) 0291 |
REMOVAL OF HEADWALL | 4 | EA |
$750.00 |
$1,632.76 |
$1,175.00 |
$5,000.00 |
| 44 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 8,634 | SY |
$3.00 |
$8.05 |
$4.70 |
$3.00 |
| 45 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 800 | SY |
$10.00 |
$18.07 |
$12.35 |
$10.00 |
| 46 | 619(C) 0924 |
SAWING PAVEMENT | 17,358 | LF |
$2.00 |
$1.66 |
$2.15 |
$2.00 |
| 47 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 369 | LF |
$4.50 |
$3.59 |
$4.55 |
$4.00 |
| 48 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 14,156 | LF |
$5.50 |
$3.81 |
$5.00 |
$5.00 |
| 49 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$75.00 |
$93.88 |
$90.75 |
$100.00 |
| 50 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 2 | EA |
$100.00 |
$204.33 |
$198.00 |
$200.00 |
| 51 | 629(C) 4960 |
MAILBOX | 6 | EA |
$30.00 |
$55.23 |
$53.40 |
$55.00 |
| 52 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 4 | EA |
$25.00 |
$27.61 |
$53.40 |
$30.00 |
| 53 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 5,063 | CY |
$5.00 |
$24.98 |
$1.10 |
$10.00 |
| 54 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 239 | CY |
$30.00 |
$19.64 |
$37.40 |
$10.00 |
| 55 | 509(A) 1326 |
CLASS AA CONCRETE | 631 | CY |
$430.00 |
$423.30 |
$362.95 |
$500.00 |
| 56 | 511(A) 1332 |
REINFORCING STEEL | 81,480 | LB |
$0.9500 |
$1.07 |
$1.10 |
$1.00 |
| 57 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$11,037.50 |
$5,551.00 |
$89,000.00 |
| 58 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 34,800 | LF |
$0.2000 |
$0.0200 |
$0.0500 |
$0.0200 |
| 59 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 7,000 | EA |
$0.5300 |
$0.3900 |
$0.4000 |
$0.4000 |
| 60 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,000 | LF |
$0.5300 |
$0.0200 |
$0.0500 |
$0.0200 |
| 61 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 180 | SD |
$25.00 |
$5.52 |
$5.35 |
$5.50 |
| 62 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,980 | SD |
$0.3500 |
$0.5500 |
$0.5500 |
$0.5500 |
| 63 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,800 | SD |
$0.6500 |
$1.10 |
$1.10 |
$1.10 |
| 64 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,400 | SD |
$1.35 |
$0.8300 |
$0.8000 |
$0.8500 |
| 65 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,080 | SD |
$0.5000 |
$2.76 |
$2.70 |
$2.75 |
| 66 | 880(C) 8848 |
WING BARRICADES | 360 | SD |
$1.20 |
$3.31 |
$3.20 |
$3.30 |
| 67 | 880(D) 8854 |
VERTICAL PANELS | 5,400 | SD |
$0.5500 |
$0.1700 |
$0.2000 |
$0.2000 |
| 68 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 5,400 | SD |
$0.1500 |
$0.1700 |
$0.2000 |
$0.2000 |
| 69 | 880(F) 8878 |
DRUMS | 1,750 | SD |
$0.1500 |
$0.3900 |
$0.4000 |
$0.4000 |
| 70 | 880(G) 8890 |
CHANNELIZER CONES | 5,400 | SD |
$0.3000 |
$0.3900 |
$0.4000 |
$0.4000 |
| 71 | 880(I) 8902 |
FLAGGER | 360 | SD |
$150.00 |
$331.35 |
$171.00 |
$250.00 |
| 72 | 880(W) 8800 |
PILOT CAR | 1 | LSUM |
$15,000.00 |
$22,089.71 |
$26,690.00 |
$20,000.00 |
| 73 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 360 | SD |
$16.00 |
$16.57 |
$16.00 |
$20.00 |
| 74 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$200.00 |
$276.12 |
$267.00 |
$275.00 |
| 75 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 34,800 | LF |
$0.5300 |
$0.5000 |
$0.5000 |
$0.5000 |
| 76 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$53,981.72 |
$33,400.00 |
$75,000.00 |
| 77 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$3,482.50 |
$9,610.00 |
$5,000.00 |
| 78 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$6,468.08 |
$8,540.00 |
$5,000.00 |
| 79 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$205,000.00 |
$200,000.00 |
$398,000.00 |
$265,000.00 |