Bid tab 130005

Let Jan 17, 2013 · Division 7 · Carter Sign up free

‹ Jan 2013 results

GRADE, DRAIN, SURFACE , AND BRIDGE SH-53: FROM 5.5 MILES EAST OF SH -76, EXTEND EAST. PROJECT LENGTH = 1.46 MILES

Let date
Thursday, January 17, 2013
Contract
130005
J/P numbers
23291(04)
District
Division 7
County
Carter
Highway
Limits
GRADE, DRAIN, SURFACE , AND BRIDGE SH-53: FROM 5.5 MILES EAST OF SH -76, EXTEND EAST. PROJECT LENGTH = 1.46 MILES
Project number
STPY-110C(157)

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$6,811,765
1 Silver Star Construction Company, Inc. Low bidder $6,604,900 -3.0%
2 OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV) $6,725,347 -1.3% +1.8%
3 OVERLAND CORPORATION $6,827,368 +0.2% +3.4%
4 IHC Scott, INC. $7,020,461 +3.1% +6.3%

Bid tab: unit prices 139 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Silver Star Con…#2 OBC, INC./PLAIN…#3 OVERLAND CORPOR…#4 IHC Scott, INC.
1201(A) 0102 CLEARING AND GRUBBING1LSUM $25,000.00 $27,970.00 $20,142.00 $40,000.00 $4,980.00
2202(A) 0183 UNCLASSIFIED EXCAVATION101,260CY $6.00 $4.10 $4.88 $4.90 $6.55
3202(D) 0184 UNCLASSIFIED BORROW45,534CY $8.00 $5.90 $5.21 $5.40 $7.05
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $40,000.00 $127,100.00 $62,100.00 $30,000.00 $88,300.00
5221(C) 2801 TEMPORARY SILT FENCE600LF $2.00 $1.55 $2.68 $1.55 $2.75
6221(F) 0100 TEMPORARY SILT DIKE1,360LF $8.00 $8.20 $9.16 $8.05 $9.40
7221(G) 0151 TEMPORARY ROCK FILTER DAM TYPE 216CY $80.00 $25.50 $79.92 $26.00 $81.90
8230(A) 2806 SOLID SLAB SODDING33,700SY $1.50 $1.45 $1.32 $1.45 $1.35
9232(B) 2814 SEEDING METHOD B20AC $500.00 $618.00 $591.84 $625.00 $606.50
10233(A) 2817 VEGETATIVE MULCHING20AC $500.00 $515.00 $571.32 $525.00 $585.50
11241 2832 MOWING40AC $65.00 $82.40 $89.64 $80.00 $89.30
12303(A) 2100 AGGREGATE BASE TYPE A7,306CY $40.00 $44.50 $36.52 $52.00 $44.80
13307(B) 4210 CEMENT KILN DUST1,916TON $67.00 $40.00 $54.00 $48.00 $57.50
14307(D) 4230 LIME256TON $150.00 $150.00 $165.24 $152.00 $200.00
15307(E) 4240 CEMENTITIOUS STABILIZED SUBGRADE35,471SY $2.50 $2.20 $2.86 $3.70 $2.15
16307(G) 4260 LIME PRETREATMENT14,189SY $2.00 $2.20 $1.73 $2.45 $2.00
17325 5271 SEPARATOR FABRIC40,776SY $1.30 $0.9000 $1.54 $1.20 $1.20
18402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E6,388TON $2.80 $18.40 $20.09 $22.00 $19.30
19407(B) 0250 TACK COAT4,373GAL $2.80 $4.00 $3.24 $3.00 $3.35
20408 5774 PRIME COAT13,582GAL $4.50 $4.50 $5.99 $5.00 $4.50
21411(B) 5940 SUPERPAVE, TYPE S3(PG 70-28 OK)3,133TON $74.00 $70.15 $73.98 $80.00 $76.80
22411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)10,174TON $68.00 $60.50 $68.47 $74.00 $71.40
23411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)2,089TON $82.00 $78.90 $85.32 $93.00 $88.50
24411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)3,557TON $78.00 $68.00 $72.36 $78.00 $75.10
25412 5267 COLD MILLING PAVEMENT3,000SY $1.70 $3.30 $4.32 $5.00 $3.70
26413(A) 4861 RUMBLE STRIP-METHOD HMA-CON13,979LF $0.2000 $0.1500 $0.8100 $0.1200 $0.2800
27501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED90CY $16.00 $10.30 $21.60 $11.00 $13.70
28509(A) 0319 CLASS AA CONCRETE185CY $400.00 $309.00 $402.08 $315.00 $586.50
29509(D) 0325 CLASS C CONCRETE466CY $255.00 $227.00 $312.99 $230.00 $280.00
30511(A) 0332 REINFORCING STEEL29,924LB $0.9000 $0.9000 $1.04 $0.9200 $0.9600
31601(A) 0297 TYPE I PLAIN RIPRAP743TON $25.00 $46.00 $34.43 $47.00 $41.40
32613(A) 0491 18" R.C.PIPE CLASS III495LF $45.00 $62.00 $37.99 $55.00 $27.80
33613(A) 0492 24" R.C.PIPE CLASS III126LF $57.00 $103.00 $51.46 $75.00 $40.10
34613(B) 0689 18" CORR. GALV. STEEL PIPE717LF $28.00 $23.00 $20.90 $33.00 $38.30
35613(B) 4531 49" X 33" CORR. GALV. STEEL PIPE ARCH34LF $200.00 $72.00 $46.21 $90.00 $237.00
36613(M) 7186 TYPE A4 CULVERT END TREATMENT5EA $900.00 $721.00 $922.83 $760.00 $806.00
37613(M) 7187 TYPE B4 CULVERT END TREATMENT2EA $1,100.00 $1,030.00 $1,178.99 $810.00 $1,080.00
38613(M) 7196 TYPE A6 CULVERT END TREATMENT5EA $1,100.00 $1,030.00 $1,270.31 $875.00 $1,110.00
39613(M) 7197 TYPE B6 CULVERT END TREATMENT2EA $1,300.00 $1,545.00 $1,607.47 $935.00 $1,570.00
40619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $30,000.00 $42,130.00 $9,720.00 $30,000.00 $15,700.00
41619(B) 4728 REMOVAL OF ASPHALT PAVEMENT19,218SY $2.80 $2.00 $2.16 $2.75 $2.00
42619(B) 4780 REMOVAL OF GUARDRAIL2,222LF $2.50 $1.30 $2.70 $1.50 $3.50
43619(C) 0924 SAWING PAVEMENT2,851LF $3.00 $4.00 $2.70 $3.00 $8.85
44623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE2,625LF $17.00 $15.50 $16.31 $15.25 $16.60
45623(G) 8590 GUARDRAIL END TREATMENT (31")12EA $2,300.00 $2,050.00 $2,149.20 $2,000.00 $2,180.00
46623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")12EA $1,700.00 $1,380.00 $1,447.20 $1,600.00 $1,470.00
47624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)1,122LF $4.00 $4.10 $4.08 $8.00 $5.25
48624(D) 4470 GATE, GALVANIZED STEEL1EA $800.00 $721.00 $756.00 $825.00 $633.00
49501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON270CY $15.00 $10.30 $22.40 $11.00 $13.70
50501(G) 6309 CLSM BACKFILL326CY $150.00 $113.00 $156.55 $115.00 $129.00
51503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)1,076LF $200.00 $206.00 $205.10 $210.00 $207.00
52504(A) 1304 APPROACH SLAB468.6SY $170.00 $175.00 $157.17 $175.00 $133.50
53504(B) 1305 SAW-CUT GROOVING1,668.8SY $6.00 $4.00 $4.03 $4.10 $3.25
54504(C) 6250 SEALED EXPANSION JOINT57.9LF $300.00 $330.00 $305.58 $330.00 $197.50
55504(D) 6245 CONCRETE RAIL (TR4)751LF $65.00 $67.00 $84.33 $67.00 $105.50
56506(A) 1322 STRUCTURAL STEEL1,780LB $4.00 $2.60 $3.65 $2.60 $3.10
57507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY8EA $3,000.00 $3,090.00 $1,722.16 $3,100.00 $2,560.00
58507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY16EA $3,000.00 $3,090.00 $1,733.89 $3,100.00 $2,580.00
59509(A) 1326 CLASS AA CONCRETE324.1CY $475.00 $474.00 $509.93 $475.00 $643.50
60509(B) 1328 CLASS A CONCRETE288.5CY $450.00 $474.00 $551.11 $475.00 $507.50
61511(B) 6010 EPOXY COATED REINFORCING STEEL145,430LB $1.05 $1.00 $0.9900 $1.03 $0.8500
62513(B) 6019 CLASS B BRIDGE DECK REPAIR40SY $500.00 $257.50 $672.00 $260.00 $502.50
63513(C) 6020 CLASS C BRIDGE DECK REPAIR40SY $800.00 $257.50 $896.00 $260.00 $804.00
64514(A) 6011 PILES, FURNISHED (HP 12X53)1,137LF $40.00 $36.00 $37.49 $36.00 $28.70
65514(B) 6294 PILES, DRIVEN (HP 12X53)1,137LF $20.00 $15.50 $8.96 $15.50 $27.40
66515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,466SY $4.00 $4.65 $3.92 $4.60 $4.20
67516(A) 6096 DRILLED SHAFTS 60" DIAMETER212LF $700.00 $721.00 $648.95 $725.00 $377.00
68523(A) 6550 SEALER CRACK PREPARATION57.3LF $5.00 $5.00 $3.36 $5.20 $5.25
69523(B) 6560 SEALER RESIN1GAL $250.00 $154.50 $112.00 $155.00 $263.50
70601(B) 1353 TYPE I-A PLAIN RIPRAP1,962TON $36.00 $41.00 $31.23 $42.00 $25.70
71601(C) 1355 TYPE I-A FILTER BLANKET352TON $30.00 $41.00 $23.01 $42.00 $20.80
72613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND118LF $20.00 $51.00 $41.76 $50.00 $20.00
73613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.82LF $10.00 $51.00 $7.95 $50.00 $16.50
74619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $50,000.00 $30,900.00 $78,400.00 $32,000.00 $45,000.00
75501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON90CY $15.00 $93.00 $28.00 $10.50 $13.70
76501(G) 6309 CLSM BACKFILL304CY $150.00 $113.00 $156.55 $115.00 $125.00
77503(A) 6290 PRESTRESSED CONCRETE BEAMS (TYPE J BT)479LF $250.00 $268.00 $267.28 $270.00 $296.00
78504(A) 1304 APPROACH SLAB271.8SY $170.00 $175.00 $156.00 $175.00 $133.00
79504(B) 1305 SAW-CUT GROOVING793.4SY $6.00 $4.00 $4.03 $4.20 $3.25
80504(D) 6245 CONCRETE RAIL (TR4)357LF $65.00 $67.00 $78.73 $67.00 $104.50
81506(A) 1322 STRUCTURAL STEEL600LB $4.00 $2.60 $3.65 $2.60 $2.55
82507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY8EA $800.00 $566.50 $287.98 $560.00 $558.00
83509(A) 1326 CLASS AA CONCRETE203.1CY $475.00 $474.00 $528.97 $475.00 $571.50
84509(B) 1328 CLASS A CONCRETE69.2CY $450.00 $474.00 $579.11 $475.00 $640.00
85511(B) 6010 EPOXY COATED REINFORCING STEEL49,450LB $1.05 $1.00 $1.11 $1.03 $0.8600
86513(B) 6019 CLASS B BRIDGE DECK REPAIR20SY $500.00 $309.00 $672.00 $310.00 $502.50
87513(C) 6020 CLASS C BRIDGE DECK REPAIR20SY $800.00 $309.00 $896.00 $310.00 $804.00
88514(A) 6010 PILES, FURNISHED (HP 10X42)1,476LF $30.00 $31.00 $27.36 $31.00 $23.00
89514(B) 6292 PILES, DRIVEN (HP 10X42)1,476LF $15.00 $15.50 $5.60 $15.50 $21.10
90515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)620SY $4.00 $4.65 $3.92 $4.60 $4.20
91601(B) 1353 TYPE I-A PLAIN RIPRAP60TON $36.00 $41.00 $31.23 $42.00 $25.70
92601(C) 1355 TYPE I-A FILTER BLANKET20TON $30.00 $41.00 $23.01 $42.00 $20.80
93613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND84LF $20.00 $51.00 $47.36 $50.00 $20.00
94613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.85LF $20.00 $51.00 $7.95 $50.00 $16.50
95619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $25,000.00 $41,200.00 $24,640.00 $44,000.00 $17,100.00
96501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON90CY $15.00 $10.00 $28.00 $10.50 $13.70
97501(G) 6309 CLSM BACKFILL304CY $150.00 $113.00 $145.35 $115.00 $125.00
98503(A) 6290 PRESTRESSED CONCRETE BEAMS (TYPE J BT)698LF $250.00 $268.00 $276.66 $265.00 $281.00
99504(A) 1304 APPROACH SLAB271.8SY $170.00 $175.00 $156.00 $175.00 $133.00
100504(B) 1305 SAW-CUT GROOVING882.2SY $6.00 $4.00 $4.03 $4.20 $3.25
101504(D) 6245 CONCRETE RAIL (TR4)397LF $65.00 $67.00 $78.73 $67.00 $105.00
102506(A) 1322 STRUCTURAL STEEL600LB $4.00 $2.60 $3.65 $2.60 $3.50
103507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY10EA $800.00 $670.00 $287.98 $660.00 $558.00
104509(A) 1326 CLASS AA CONCRETE224.2CY $475.00 $474.00 $500.97 $475.00 $567.50
105509(B) 1328 CLASS A CONCRETE69.6CY $450.00 $474.00 $579.11 $475.00 $636.00
106511(B) 6010 EPOXY COATED REINFORCING STEEL54,780LB $1.20 $1.00 $1.11 $1.03 $0.8600
107513(B) 6019 CLASS B BRIDGE DECK REPAIR20SY $500.00 $309.00 $672.00 $310.00 $502.50
108513(C) 6020 CLASS C BRIDGE DECK REPAIR20SY $800.00 $309.00 $896.00 $310.00 $804.00
109514(A) 6010 PILES, FURNISHED (HP 10X42)1,260LF $30.00 $31.00 $28.52 $31.00 $23.80
110514(B) 6292 PILES, DRIVEN (HP 10X42)1,260LF $15.00 $15.50 $5.60 $15.50 $24.70
111515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)700SY $4.00 $4.00 $3.92 $4.20 $4.20
112601(B) 1353 TYPE I-A PLAIN RIPRAP60TON $36.00 $46.00 $31.23 $47.00 $25.70
113601(C) 1355 TYPE I-A FILTER BLANKET20TON $30.00 $46.00 $23.01 $47.00 $20.80
114613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND84LF $20.00 $51.00 $47.36 $50.00 $20.00
115613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.22LF $20.00 $51.00 $7.95 $50.00 $20.00
116619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $25,000.00 $103,000.00 $24,640.00 $107,000.00 $16,000.00
117850(A) 8110 SHEET ALUMINUM SIGNS162SF $16.50 $15.40 $17.82 $12.25 $17.60
118851(C) 8324 2" SQUARE TUBE POST176LF $8.00 $25.60 $8.10 $20.50 $8.00
119853 9033 DELINEATORS(TYPE 2, CODE 1)51EA $27.00 $21.80 $21.60 $17.50 $21.30
120853 9039 DELINEATORS(TYPE 2, CODE 3)4EA $35.00 $25.60 $27.00 $20.50 $26.60
121855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)28,866LF $0.5000 $0.6500 $0.5500 $0.5100 $0.5400
122857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)2,000LF $0.1000 $0.2500 $0.4900 $0.2100 $0.4800
123857(E) 8890 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-21,955EA $0.6000 $1.00 $0.5400 $0.8300 $0.5300
124857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)1,000LF $0.2500 $0.4000 $0.5400 $0.3100 $0.5300
125871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.240SD $12.00 $1.30 $10.80 $1.03 $10.70
126877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER4,351LF $24.00 $17.25 $17.99 $21.00 $18.60
127877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER392LF $5.00 $11.40 $10.80 $4.70 $11.20
128880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF11,670SD $0.2000 $0.0500 $0.0900 $0.0200 $0.0900
129880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF6,000SD $0.6000 $1.15 $1.73 $0.9200 $1.70
130880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF5,000SD $1.00 $1.30 $0.9200 $1.03 $0.9100
131880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)7,860SD $0.3000 $0.0600 $0.2700 $0.0500 $0.2700
132880(C) 8848 WING BARRICADES1,440SD $0.9000 $0.9500 $0.5400 $0.8200 $0.5300
133880(D) 8854 VERTICAL PANELS15,450SD $0.1000 $0.2600 $0.1100 $0.2000 $0.1100
134880(E) 8860 WARNING LIGHTS(TYPE A)21,690SD $0.1100 $0.0600 $0.0900 $0.0500 $0.0900
135880(F) 8878 DRUMS29,790SD $0.1100 $0.0600 $0.0900 $0.0500 $0.0900
136642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $50,000.00 $50,985.00 $51,318.75 $40,000.00 $50,000.00
137220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $8,000.00 $14,415.00 $5,225.00 $6,000.00 $10,800.00
138640(A) 1426 FIELD OFFICE1EA $8,000.00 $17,300.00 $12,650.00 $7,500.00 $15,000.00
139641 1552 MOBILIZATION1LSUM $330,000.00 $378,928.25 $330,000.54 $225,400.00 $300,000.00