| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$1,500.00 |
$10,000.00 |
$67,000.00 |
$1,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,465 | CY |
$6.03 |
$17.86 |
$17.50 |
$6.03 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,594 | CY |
$9.09 |
$23.82 |
$20.00 |
$9.09 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$500.00 |
$10,000.00 |
$17,500.00 |
$500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 7,604 | LF |
$1.53 |
$2.38 |
$3.50 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 96 | LF |
$15.00 |
$10.66 |
$17.75 |
$15.00 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 15 | LF |
$1.85 |
$5.95 |
$7.50 |
$5.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 2,734 | SY |
$2.01 |
$2.38 |
$2.85 |
$2.50 |
| 9 | 230(F) 2812 |
WATERING | 110 | KGAL |
$10.53 |
$17.86 |
$20.00 |
$20.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 4 | AC |
$432.44 |
$952.73 |
$800.00 |
$800.00 |
| 11 | 241 2832 |
MOWING | 2 | AC |
$100.00 |
$119.09 |
$100.00 |
$100.00 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 917 | CY |
$48.00 |
$59.55 |
$65.00 |
$54.00 |
| 13 | 310(B) 0149 |
SUBGRADE, METHOD B | 4,798 | SY |
$2.70 |
$1.79 |
$2.00 |
$2.70 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 100 | TON |
$34.01 |
$28.58 |
$26.00 |
$34.00 |
| 15 | 405 5200 |
PERMEABLE FRICTION COURSE | 245 | TON |
$85.00 |
$142.91 |
$100.00 |
$120.00 |
| 16 | 407(B) 0250 |
TACK COAT | 2,735 | GAL |
$2.87 |
$2.68 |
$2.00 |
$2.25 |
| 17 | 408 5774 |
PRIME COAT | 997 | GAL |
$6.12 |
$8.34 |
$2.00 |
$7.00 |
| 18 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 704 | TON |
$78.00 |
$104.80 |
$72.50 |
$88.00 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,931 | TON |
$71.35 |
$89.32 |
$62.00 |
$75.00 |
| 20 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 469 | TON |
$95.00 |
$101.23 |
$80.00 |
$85.00 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 55 | TON |
$113.73 |
$101.23 |
$70.00 |
$85.00 |
| 22 | 504(E) 6190 |
42" F-SHAPED PARAPET | 564 | LF |
$85.39 |
$85.33 |
$50.00 |
$85.00 |
| 23 | 509(B) 0321 |
CLASS A CONCRETE | 174 | CY |
$401.49 |
$238.61 |
$550.00 |
$350.00 |
| 24 | 509(D) 0325 |
CLASS C CONCRETE | 12 | CY |
$280.77 |
$279.86 |
$150.00 |
$280.00 |
| 25 | 510(D) 6341 |
MSE RETAINING WALL | 891 | SY |
$375.00 |
$479.36 |
$650.00 |
$400.00 |
| 26 | 511(A) 0332 |
REINFORCING STEEL | 13,080 | LB |
$0.9000 |
$0.8300 |
$1.00 |
$0.9000 |
| 27 | 514(H) 6355 |
SHEET PILING, FURNISHED | 110 | SY |
$165.00 |
$17.86 |
$200.00 |
$180.00 |
| 28 | 514(I) 6360 |
SHEET PILING, DRIVEN | 110 | SY |
$55.00 |
$33.86 |
$30.00 |
$45.00 |
| 29 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 719 | TON |
$41.17 |
$35.73 |
$40.00 |
$41.00 |
| 30 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 259 | TON |
$33.25 |
$32.75 |
$27.50 |
$33.00 |
| 31 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 129 | SY |
$30.00 |
$42.87 |
$30.00 |
$30.00 |
| 32 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 1 | EA |
$2,028.39 |
$1,808.99 |
$2,000.00 |
$2,000.00 |
| 33 | 611(C) 4215 |
REPLACEMENT OF MANHOLE FRAME & COVER | 1 | EA |
$1,500.00 |
$549.01 |
$350.00 |
$1,500.00 |
| 34 | 611(G) 5100 |
INLET CI DES. 1 (STD) | 1 | EA |
$1,200.00 |
$2,433.03 |
$3,000.00 |
$1,200.00 |
| 35 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 14 | LF |
$60.32 |
$98.88 |
$50.00 |
$60.00 |
| 36 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 390 | LF |
$26.19 |
$61.01 |
$47.50 |
$26.00 |
| 37 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 701 | LF |
$11.65 |
$13.38 |
$6.00 |
$12.00 |
| 38 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 440 | LF |
$7.27 |
$14.64 |
$5.00 |
$7.30 |
| 39 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 100 | LF |
$10.07 |
$20.31 |
$5.00 |
$10.00 |
| 40 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 1 | EA |
$1,004.79 |
$1,517.71 |
$1,100.00 |
$1,000.00 |
| 41 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$588.97 |
$4,168.19 |
$100.00 |
$589.00 |
| 42 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$1,500.00 |
$2,977.28 |
$3,200.00 |
$1,500.00 |
| 43 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,869 | SY |
$3.69 |
$5.95 |
$3.00 |
$3.00 |
| 44 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 356 | SY |
$11.40 |
$15.48 |
$12.50 |
$11.40 |
| 45 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 403 | LF |
$3.52 |
$9.53 |
$2.50 |
$5.00 |
| 46 | 619(B) 4821 |
REMOVAL OF CONCRETE SLOPE PROTECTION | 483 | SY |
$3.50 |
$9.53 |
$10.00 |
$3.50 |
| 47 | 619(B) 4915 |
REMOVAL OF CONCRETE MEDIAN BARRIER | 246 | LF |
$11.29 |
$8.93 |
$14.00 |
$11.00 |
| 48 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 474 | LF |
$7.77 |
$9.53 |
$10.00 |
$8.00 |
| 49 | 619(B) 6068 |
REMOVAL OF EXISTING RETAINING WALL | 253 | LF |
$150.00 |
$154.82 |
$125.00 |
$150.00 |
| 50 | 619(B) 6252 |
REMOVAL OF EXISTING PARAPET | 253 | LF |
$30.00 |
$37.51 |
$12.50 |
$30.00 |
| 51 | 619(C) 0924 |
SAWING PAVEMENT | 1,198 | LF |
$3.67 |
$2.95 |
$3.25 |
$3.67 |
| 52 | 627(A) 4317 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 180 | LF |
$47.44 |
$98.78 |
$20.00 |
$47.00 |
| 53 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 460 | CY |
$15.00 |
$25.01 |
$11.00 |
$15.00 |
| 54 | 501(G) 6309 |
CLSM BACKFILL | 104 | CY |
$125.00 |
$112.63 |
$90.00 |
$125.00 |
| 55 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 7,406 | LF |
$215.00 |
$209.94 |
$190.00 |
$250.00 |
| 56 | 504(A) 1304 |
APPROACH SLAB | 473.2 | SY |
$175.00 |
$157.35 |
$170.00 |
$135.00 |
| 57 | 504(B) 1305 |
SAW-CUT GROOVING | 7,691.8 | SY |
$4.00 |
$4.17 |
$3.60 |
$2.50 |
| 58 | 504(C) 6250 |
SEALED EXPANSION JOINT | 690 | LF |
$300.00 |
$237.06 |
$265.00 |
$200.00 |
| 59 | 504(E) 1381 |
CONCRETE PARAPET | 100 | LF |
$75.00 |
$64.71 |
$90.00 |
$120.00 |
| 60 | 504(E) 6190 |
42" F-SHAPED PARAPET | 3,800.5 | LF |
$60.00 |
$62.80 |
$52.00 |
$65.00 |
| 61 | 506(A) 1322 |
STRUCTURAL STEEL | 8,510 | LB |
$4.00 |
$3.39 |
$4.40 |
$2.00 |
| 62 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 112 | EA |
$2,500.00 |
$1,264.21 |
$1,600.00 |
$3,500.00 |
| 63 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 40 | EA |
$2,500.00 |
$1,283.59 |
$1,600.00 |
$3,500.00 |
| 64 | 509(A) 1326 |
CLASS AA CONCRETE | 2,163.3 | CY |
$475.00 |
$554.27 |
$505.00 |
$600.00 |
| 65 | 509(B) 1328 |
CLASS A CONCRETE | 795.1 | CY |
$450.00 |
$454.34 |
$505.00 |
$700.00 |
| 66 | 511(A) 1332 |
REINFORCING STEEL | 6,930 | LB |
$0.9000 |
$0.8300 |
$1.04 |
$0.9000 |
| 67 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 684,350 | LB |
$1.00 |
$0.9100 |
$1.34 |
$1.00 |
| 68 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 10 | SY |
$300.00 |
$358.46 |
$475.00 |
$1,000.00 |
| 69 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 300 | LF |
$32.00 |
$33.23 |
$33.00 |
$24.00 |
| 70 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 300 | LF |
$14.00 |
$21.82 |
$20.00 |
$11.00 |
| 71 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 8,139 | SY |
$4.00 |
$4.17 |
$3.70 |
$3.00 |
| 72 | 516(A) 6092 |
DRILLED SHAFTS 36" DIAMETER | 326 | LF |
$380.00 |
$315.12 |
$267.00 |
$500.00 |
| 73 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 1,783 | LF |
$760.00 |
$545.82 |
$551.00 |
$1,250.00 |
| 74 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 37 | EA |
$680.00 |
$3,334.55 |
$1,300.00 |
$1,500.00 |
| 75 | 516(D) 6400 |
CSL ACCESS TUBES | 11,568 | LF |
$10.00 |
$9.93 |
$9.60 |
$10.00 |
| 76 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 100 | LF |
$35.00 |
$29.00 |
$32.00 |
$35.00 |
| 77 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 10 | GAL |
$50.00 |
$65.00 |
$73.00 |
$80.00 |
| 78 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 30 | SY |
$500.00 |
$542.30 |
$600.00 |
$1,500.00 |
| 79 | 523(A) 6550 |
SEALER CRACK PREPARATION | 4,682 | LF |
$4.00 |
$3.57 |
$3.40 |
$4.00 |
| 80 | 523(B) 6560 |
SEALER RESIN | 52 | GAL |
$110.00 |
$71.45 |
$67.00 |
$110.00 |
| 81 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 21,023 | SY |
$15.00 |
$11.73 |
$10.50 |
$15.00 |
| 82 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 100 | SF |
$100.00 |
$44.00 |
$49.40 |
$100.00 |
| 83 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 25 | SY |
$50.00 |
$85.00 |
$95.00 |
$100.00 |
| 84 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 28 | LF |
$25.00 |
$27.70 |
$11.00 |
$25.00 |
| 85 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 105 | LF |
$25.00 |
$12.19 |
$14.00 |
$25.00 |
| 86 | 619(B) 2515 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 2 | EA |
$2,500.00 |
$1,831.47 |
$660.00 |
$2,000.00 |
| 87 | 619(B) 6189 |
REMOVAL OF EXISTING SLAB | 629.7 | SY |
$25.00 |
$18.86 |
$31.00 |
$12.00 |
| 88 | 619(B) 6252 |
REMOVAL OF EXISTING PARAPET | 3,871 | LF |
$30.00 |
$8.05 |
$35.00 |
$8.00 |
| 89 | 619(B) 6319 |
REMOVAL OF DECK | 1,445.1 | SY |
$50.00 |
$45.58 |
$180.00 |
$45.00 |
| 90 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 545 | CY |
$15.00 |
$25.01 |
$11.00 |
$15.00 |
| 91 | 501(F) 6352 |
GRANULAR BACKFILL | 175 | CY |
$60.00 |
$76.23 |
$50.00 |
$45.00 |
| 92 | 501(G) 6309 |
CLSM BACKFILL | 225 | CY |
$125.00 |
$112.63 |
$100.00 |
$125.00 |
| 93 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 7,406 | LF |
$215.00 |
$209.94 |
$190.00 |
$250.00 |
| 94 | 504(A) 1304 |
APPROACH SLAB | 473.2 | SY |
$175.00 |
$158.42 |
$160.00 |
$135.00 |
| 95 | 504(B) 1305 |
SAW-CUT GROOVING | 7,691.8 | SY |
$4.00 |
$4.17 |
$3.60 |
$2.50 |
| 96 | 504(C) 6250 |
SEALED EXPANSION JOINT | 690 | LF |
$300.00 |
$237.06 |
$225.00 |
$200.00 |
| 97 | 504(E) 1381 |
CONCRETE PARAPET | 100 | LF |
$75.00 |
$64.71 |
$90.00 |
$120.00 |
| 98 | 504(E) 6190 |
42" F-SHAPED PARAPET | 3,800.5 | LF |
$60.00 |
$62.80 |
$50.00 |
$65.00 |
| 99 | 506(A) 1322 |
STRUCTURAL STEEL | 8,510 | LB |
$4.00 |
$3.39 |
$4.00 |
$2.00 |
| 100 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 112 | EA |
$2,500.00 |
$1,264.21 |
$1,600.00 |
$3,500.00 |
| 101 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 40 | EA |
$2,500.00 |
$1,283.59 |
$1,600.00 |
$3,500.00 |
| 102 | 509(A) 1326 |
CLASS AA CONCRETE | 2,179.9 | CY |
$475.00 |
$549.37 |
$400.00 |
$600.00 |
| 103 | 509(B) 1328 |
CLASS A CONCRETE | 811.5 | CY |
$450.00 |
$467.58 |
$500.00 |
$700.00 |
| 104 | 511(A) 1332 |
REINFORCING STEEL | 6,930 | LB |
$0.9000 |
$0.8300 |
$1.05 |
$0.9000 |
| 105 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 703,630 | LB |
$1.00 |
$0.9600 |
$1.30 |
$1.00 |
| 106 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 10 | SY |
$300.00 |
$358.46 |
$500.00 |
$1,000.00 |
| 107 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 300 | LF |
$32.00 |
$33.23 |
$40.00 |
$24.00 |
| 108 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 300 | LF |
$14.00 |
$21.82 |
$15.00 |
$11.00 |
| 109 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 8,143 | SY |
$4.00 |
$4.17 |
$3.50 |
$3.00 |
| 110 | 516(A) 6092 |
DRILLED SHAFTS 36" DIAMETER | 195 | LF |
$380.00 |
$346.04 |
$265.00 |
$500.00 |
| 111 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 1,767 | LF |
$760.00 |
$546.62 |
$550.00 |
$1,250.00 |
| 112 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 37 | EA |
$680.00 |
$3,334.55 |
$2,500.00 |
$1,500.00 |
| 113 | 516(D) 6400 |
CSL ACCESS TUBES | 11,568 | LF |
$10.00 |
$9.93 |
$10.00 |
$10.00 |
| 114 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 100 | LF |
$35.00 |
$29.00 |
$32.00 |
$35.00 |
| 115 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 10 | GAL |
$50.00 |
$65.00 |
$73.00 |
$80.00 |
| 116 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 30 | SY |
$500.00 |
$542.30 |
$600.00 |
$1,500.00 |
| 117 | 523(A) 6550 |
SEALER CRACK PREPARATION | 4,682 | LF |
$4.00 |
$3.57 |
$3.40 |
$4.00 |
| 118 | 523(B) 6560 |
SEALER RESIN | 52 | GAL |
$110.00 |
$71.45 |
$67.00 |
$110.00 |
| 119 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 21,023 | SY |
$15.00 |
$11.73 |
$10.50 |
$15.00 |
| 120 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 100 | SF |
$100.00 |
$44.00 |
$49.40 |
$100.00 |
| 121 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 25 | SY |
$50.00 |
$85.00 |
$95.00 |
$100.00 |
| 122 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 81 | LF |
$25.00 |
$27.70 |
$20.00 |
$25.00 |
| 123 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 53 | LF |
$25.00 |
$12.19 |
$15.00 |
$25.00 |
| 124 | 619(B) 2525 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 1 | EA |
$5,000.00 |
$3,603.40 |
$15,000.00 |
$3,000.00 |
| 125 | 619(B) 6189 |
REMOVAL OF EXISTING SLAB | 629.7 | SY |
$25.00 |
$18.86 |
$35.00 |
$12.00 |
| 126 | 619(B) 6252 |
REMOVAL OF EXISTING PARAPET | 3,831 | LF |
$30.00 |
$8.05 |
$35.00 |
$8.00 |
| 127 | 619(B) 6319 |
REMOVAL OF DECK | 1,445.1 | SY |
$50.00 |
$45.58 |
$180.00 |
$45.00 |
| 128 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 4,500 | LF |
$0.7700 |
$0.9200 |
$1.01 |
$1.00 |
| 129 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 8,500 | EA |
$0.6100 |
$0.7300 |
$0.5000 |
$0.5000 |
| 130 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 6,000 | LF |
$0.2900 |
$0.3500 |
$1.75 |
$1.50 |
| 131 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 600 | SD |
$7.46 |
$8.88 |
$10.50 |
$10.00 |
| 132 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 600 | SD |
$1.86 |
$2.22 |
$5.50 |
$5.00 |
| 133 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 10,700 | LF |
$23.55 |
$10.65 |
$27.00 |
$24.00 |
| 134 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 10,700 | LF |
$2.83 |
$3.35 |
$2.00 |
$3.00 |
| 135 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 1,200 | SD |
$3.22 |
$3.83 |
$2.15 |
$2.00 |
| 136 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 12,600 | SD |
$0.1100 |
$0.1300 |
$0.1200 |
$0.1000 |
| 137 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 14,100 | SD |
$0.1200 |
$0.1400 |
$0.1200 |
$0.1000 |
| 138 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 12,000 | SD |
$0.4900 |
$0.5800 |
$3.10 |
$3.00 |
| 139 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 14,700 | SD |
$0.1500 |
$0.1800 |
$0.1000 |
$0.1000 |
| 140 | 880(C) 8848 |
WING BARRICADES | 2,400 | SD |
$0.3100 |
$0.3700 |
$0.1000 |
$0.1000 |
| 141 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 37,800 | SD |
$0.0400 |
$0.0500 |
$0.1000 |
$0.1000 |
| 142 | 880(F) 8878 |
DRUMS | 43,500 | SD |
$0.0800 |
$0.1000 |
$0.1000 |
$0.1000 |
| 143 | 880(G) 8890 |
CHANNELIZER CONES | 34,500 | SD |
$0.0700 |
$0.0800 |
$0.2000 |
$0.2000 |
| 144 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 240 | HOUR |
$56.74 |
$62.52 |
$56.00 |
$57.00 |
| 145 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,200 | SD |
$9.60 |
$11.43 |
$6.00 |
$5.00 |
| 146 | 509(A) 0319 |
CLASS AA CONCRETE | 60.77 | CY |
$437.32 |
$261.71 |
$400.00 |
$437.00 |
| 147 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 67 | LF |
$764.78 |
$543.89 |
$500.00 |
$765.00 |
| 148 | 804(A) 2915 |
STRUCTURAL CONCRETE | 3.6 | CY |
$488.82 |
$582.14 |
$425.00 |
$400.00 |
| 149 | 804(B) 2916 |
REINFORCING STEEL | 3,995.1 | LB |
$1.64 |
$0.8900 |
$1.00 |
$1.00 |
| 150 | 805(A) 8718 |
(PL)REMOVAL OF OVERHEAD SIGN STRUCTURE & SIGNS | 1 | LSUM |
$10,000.00 |
$11,909.10 |
$5,000.00 |
$3,512.00 |
| 151 | 805(A) 8720 |
(PL)REMOVAL OF GROUND MOUNTED SIGNS | 1 | LSUM |
$1,000.00 |
$1,190.91 |
$600.00 |
$500.00 |
| 152 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$710.90 |
$846.62 |
$600.00 |
$500.00 |
| 153 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 161 | SF |
$17.91 |
$21.33 |
$16.00 |
$15.00 |
| 154 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 264.5 | SF |
$22.06 |
$26.27 |
$23.50 |
$22.00 |
| 155 | 850(B) 8114 |
EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 1,229.5 | SF |
$22.54 |
$26.84 |
$26.50 |
$25.00 |
| 156 | 851(A) 3208 |
6"@20 GALV.STEEL WIDE FLANGE BEAM POST | 54.8 | LF |
$36.42 |
$43.37 |
$28.00 |
$26.00 |
| 157 | 851(A) 3209 |
6"@25 GALV.STEEL WIDE FLANGE BEAM POST | 52.7 | LF |
$36.42 |
$43.37 |
$30.00 |
$28.00 |
| 158 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 27 | LF |
$27.32 |
$32.54 |
$17.00 |
$16.00 |
| 159 | 851(C) 8324 |
2" SQUARE TUBE POST | 150 | LF |
$8.27 |
$9.85 |
$6.50 |
$6.00 |
| 160 | 852(D) 0320 |
OVHD.SN.STR., MONOTUBE TYPE B 90' | 1 | EA |
$75,110.00 |
$89,449.27 |
$66,000.00 |
$63,000.00 |
| 161 | 852(E) 0500 |
OVHD.SN.STR., MONOTUBE TYPE C | 3 | EA |
$40,000.00 |
$47,636.41 |
$45,000.00 |
$43,000.00 |
| 162 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 18,900 | LF |
$0.2100 |
$0.2500 |
$0.2100 |
$0.2100 |
| 163 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 27,500 | LF |
$0.4900 |
$0.5800 |
$1.59 |
$1.50 |
| 164 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 3 | EA |
$20,000.00 |
$23,818.21 |
$25,000.00 |
$25,800.00 |
| 165 | 877(A) 8483 |
PORTABLE LONGITUDINAL BARRIER | 775 | LF |
$36.09 |
$13.12 |
$50.00 |
$36.00 |
| 166 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$90,000.00 |
$85,894.41 |
$32,500.00 |
$100,000.00 |
| 167 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$2,977.28 |
$10,000.00 |
$5,000.00 |
| 168 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$7,500.00 |
$5,954.55 |
$40,000.00 |
$30,000.00 |
| 169 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$695,000.00 |
$611,115.84 |
$735,000.00 |
$814,246.38 |