| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$11,742.41 |
$30,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 83,401 | CY |
$4.95 |
$8.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,123.7 | CY |
$8.81 |
$8.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$31,329.10 |
$55,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,690.4 | LF |
$2.07 |
$2.00 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 5 | EA |
$238.26 |
$50.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 88 | LF |
$8.90 |
$9.00 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 3,948 | LF |
$1.61 |
$2.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 41,009.3 | SY |
$1.45 |
$1.70 |
| 10 | 232(A) 2813 |
SEEDING METHOD A | 8.47 | AC |
$735.00 |
$550.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 8.47 | AC |
$374.45 |
$450.00 |
| 12 | 241 2832 |
MOWING | 8.5 | AC |
$50.80 |
$110.00 |
| 13 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 7,682.8 | CY |
$38.00 |
$35.00 |
| 14 | 307(A) 4200 |
FLY ASH | 1,957 | TON |
$57.05 |
$60.00 |
| 15 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 42,700.3 | SY |
$1.99 |
$3.00 |
| 16 | 310(B) 0149 |
SUBGRADE, METHOD B | 1,140.3 | SY |
$4.40 |
$0.8000 |
| 17 | 325 5271 |
SEPARATOR FABRIC | 40,443 | SY |
$1.23 |
$1.25 |
| 18 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,960.1 | TON |
$22.47 |
$17.00 |
| 19 | 407(B) 0250 |
TACK COAT | 4,307.4 | GAL |
$2.75 |
$3.00 |
| 20 | 408 5774 |
PRIME COAT | 12,077.2 | GAL |
$3.01 |
$3.00 |
| 21 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 3,439.8 | TON |
$75.00 |
$56.00 |
| 22 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 11,074.2 | TON |
$70.00 |
$55.00 |
| 23 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 2,293.2 | TON |
$90.00 |
$75.00 |
| 24 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,437 | TON |
$83.44 |
$65.00 |
| 25 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 582.2 | CY |
$9.01 |
$15.00 |
| 26 | 509(A) 0319 |
CLASS AA CONCRETE | 127.8 | CY |
$438.18 |
$500.00 |
| 27 | 509(D) 0325 |
CLASS C CONCRETE | 308.9 | CY |
$223.61 |
$380.00 |
| 28 | 510(A) 6333 |
RETAINING WALL | 540.9 | SY |
$400.00 |
$700.00 |
| 29 | 511(A) 0332 |
REINFORCING STEEL | 20,132.9 | LB |
$0.9500 |
$1.20 |
| 30 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 117.5 | TON |
$34.52 |
$30.00 |
| 31 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 32.3 | TON |
$40.25 |
$25.00 |
| 32 | 611(G) 5705 |
INLET CDI RCP DES. 2 | 2 | EA |
$3,750.00 |
$5,000.00 |
| 33 | 612(C) 0645 |
INLET ADJUST TO GRADE | 2 | EA |
$1,275.00 |
$2,000.00 |
| 34 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 72.1 | LF |
$55.00 |
$55.00 |
| 35 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 175.5 | LF |
$65.00 |
$65.00 |
| 36 | 613(B) 0688 |
12" CORR. GALV. STEEL PIPE | 944 | LF |
$16.75 |
$35.00 |
| 37 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 356 | LF |
$20.77 |
$45.00 |
| 38 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 2 | EA |
$1,175.48 |
$1,100.00 |
| 39 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 4 | EA |
$1,238.00 |
$1,350.00 |
| 40 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 26.3 | CY |
$43.99 |
$45.00 |
| 41 | 613(V) 1180 |
TRENCH EXCAVATION | 52.3 | CY |
$10.62 |
$15.00 |
| 42 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$12,757.41 |
$30,000.00 |
| 43 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 381.7 | SY |
$8.14 |
$6.00 |
| 44 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 14,587.8 | SY |
$2.80 |
$4.00 |
| 45 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 14,687.2 | SY |
$7.20 |
$6.00 |
| 46 | 619(C) 0924 |
SAWING PAVEMENT | 572.6 | LF |
$3.46 |
$5.00 |
| 47 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$52,226.73 |
$75,000.00 |
| 48 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,732.7 | LF |
$17.25 |
$15.00 |
| 49 | 623(F) 4447 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 3 | EA |
$661.89 |
$400.00 |
| 50 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$2,182.75 |
$2,100.00 |
| 51 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 6 | EA |
$1,598.58 |
$1,600.00 |
| 52 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 4,416.1 | LF |
$3.79 |
$5.00 |
| 53 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 106.8 | LF |
$5.26 |
$8.00 |
| 54 | 626(A) 1257 |
MONUMENTS | 1 | EA |
$750.00 |
$2,000.00 |
| 55 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 230 | CY |
$14.97 |
$15.00 |
| 56 | 501(G) 6309 |
CLSM BACKFILL | 440 | CY |
$77.88 |
$90.00 |
| 57 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 478.7 | LF |
$265.00 |
$275.00 |
| 58 | 504(A) 1304 |
APPROACH SLAB | 414.3 | SY |
$131.25 |
$175.00 |
| 59 | 504(B) 1305 |
SAW-CUT GROOVING | 904.2 | SY |
$4.78 |
$4.00 |
| 60 | 504(C) 6250 |
SEALED EXPANSION JOINT | 47.7 | LF |
$255.60 |
$225.00 |
| 61 | 504(E) 6190 |
42" F-SHAPED PARAPET | 428.1 | LF |
$80.00 |
$90.00 |
| 62 | 506(A) 1322 |
STRUCTURAL STEEL | 1,375 | LB |
$3.08 |
$2.00 |
| 63 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$3,000.00 |
$1,500.00 |
| 64 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$3,000.00 |
$1,500.00 |
| 65 | 509(A) 1326 |
CLASS AA CONCRETE | 167.1 | CY |
$470.00 |
$400.00 |
| 66 | 509(B) 1328 |
CLASS A CONCRETE | 152.4 | CY |
$473.43 |
$650.00 |
| 67 | 509(D) 1331 |
CLASS C CONCRETE | 12.5 | CY |
$300.00 |
$450.00 |
| 68 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 64,200 | LB |
$1.10 |
$1.00 |
| 69 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 336 | LF |
$30.44 |
$30.00 |
| 70 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 842 | LF |
$33.96 |
$35.00 |
| 71 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 336 | LF |
$15.00 |
$20.00 |
| 72 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 842 | LF |
$15.00 |
$20.00 |
| 73 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 567 | SY |
$4.19 |
$4.00 |
| 74 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,230 | TON |
$30.38 |
$30.00 |
| 75 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 295 | TON |
$25.92 |
$25.00 |
| 76 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 94 | LF |
$22.65 |
$25.00 |
| 77 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$19.64 |
$15.00 |
| 78 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$100,000.00 |
$150,000.00 |
| 79 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 36,720 | LF |
$0.0900 |
$0.1500 |
| 80 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 7,344 | EA |
$0.5200 |
$0.5000 |
| 81 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 43,595 | LF |
$0.1500 |
$0.1100 |
| 82 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 510 | SD |
$7.62 |
$5.50 |
| 83 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 4,325 | LF |
$18.04 |
$25.00 |
| 84 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 3,174 | LF |
$3.80 |
$4.00 |
| 85 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 619,452 | SD |
$0.0100 |
$0.0100 |
| 86 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,120 | SD |
$0.4000 |
$1.10 |
| 87 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 7,890 | SD |
$1.75 |
$1.10 |
| 88 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,630 | SD |
$0.9000 |
$2.20 |
| 89 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 9,810 | SD |
$0.3600 |
$1.10 |
| 90 | 880(C) 8848 |
WING BARRICADES | 1,050 | SD |
$0.9100 |
$3.30 |
| 91 | 880(D) 8854 |
VERTICAL PANELS | 22,320 | SD |
$0.1200 |
$0.1100 |
| 92 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 37,230 | SD |
$0.0500 |
$0.0200 |
| 93 | 880(F) 8878 |
DRUMS | 119,250 | SD |
$0.0700 |
$0.1100 |
| 94 | 880(G) 8890 |
CHANNELIZER CONES | 4,500 | SD |
$0.2500 |
$0.4000 |
| 95 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 780 | SD |
$16.25 |
$30.00 |
| 96 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 26 | EA |
$40.95 |
$55.00 |
| 97 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$297.04 |
$330.00 |
| 98 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 90.4 | SF |
$16.17 |
$17.00 |
| 99 | 851(C) 8324 |
2" SQUARE TUBE POST | 157 | LF |
$7.00 |
$14.00 |
| 100 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 50 | LF |
$9.51 |
$14.00 |
| 101 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 44 | EA |
$16.00 |
$30.00 |
| 102 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 15,179 | LF |
$0.7400 |
$0.8500 |
| 103 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 18 | EA |
$110.00 |
$110.00 |
| 104 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$26,059.83 |
$33,000.00 |
| 105 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,489.44 |
$5,000.00 |
| 106 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$9,149.91 |
$8,500.00 |
| 107 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$231,385.56 |
$255,000.00 |