| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$5,500.00 |
$5,258.19 |
$5,000.00 |
$5,000.00 |
$25,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 18,085 | CY |
$3.00 |
$3.68 |
$3.84 |
$4.76 |
$3.65 |
$3.65 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 36,950 | CY |
$4.50 |
$4.55 |
$4.73 |
$4.50 |
$4.50 |
$4.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$33,500.00 |
$12,500.00 |
$13,145.47 |
$12,500.00 |
$12,500.00 |
$25,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,500 | LF |
$2.00 |
$3.45 |
$1.65 |
$2.00 |
$0.8500 |
$2.50 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 5 | EA |
$175.00 |
$200.00 |
$53.11 |
$175.00 |
$150.00 |
$50.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 800 | LF |
$6.00 |
$8.00 |
$7.44 |
$10.00 |
$4.00 |
$8.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 64,355 | SY |
$1.50 |
$1.50 |
$1.33 |
$1.22 |
$1.18 |
$1.25 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 14 | AC |
$475.00 |
$780.00 |
$106.23 |
$200.00 |
$350.00 |
$100.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 14 | AC |
$400.00 |
$380.00 |
$106.23 |
$300.00 |
$300.00 |
$100.00 |
| 11 | 241 2832 |
MOWING | 28 | AC |
$100.00 |
$60.00 |
$106.23 |
$100.00 |
$50.00 |
$100.00 |
| 12 | 307(A) 4200 |
FLY ASH | 2,270 | TON |
$55.00 |
$64.50 |
$76.96 |
$62.25 |
$55.00 |
$60.00 |
| 13 | 307(D) 4230 |
LIME | 121 | TON |
$150.00 |
$80.00 |
$140.00 |
$157.25 |
$120.00 |
$160.00 |
| 14 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 44,097 | SY |
$2.00 |
$1.50 |
$1.57 |
$2.20 |
$3.80 |
$3.50 |
| 15 | 307(G) 4260 |
LIME PRETREATMENT | 6,675 | SY |
$1.50 |
$1.00 |
$0.4500 |
$2.40 |
$1.40 |
$3.00 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 365 | TON |
$30.00 |
$27.50 |
$28.39 |
$27.00 |
$27.00 |
$50.00 |
| 17 | 407(B) 0250 |
TACK COAT | 15,518 | GAL |
$2.00 |
$2.25 |
$3.50 |
$3.25 |
$2.10 |
$2.10 |
| 18 | 408 5774 |
PRIME COAT | 9,964 | GAL |
$4.00 |
$5.60 |
$2.50 |
$5.45 |
$5.40 |
$3.35 |
| 19 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 9,748 | TON |
$62.00 |
$65.20 |
$72.00 |
$70.50 |
$90.00 |
$75.50 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 19,547 | TON |
$55.00 |
$60.90 |
$63.00 |
$64.50 |
$84.00 |
$70.50 |
| 21 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 7,000 | TON |
$70.00 |
$69.85 |
$77.00 |
$77.00 |
$96.00 |
$80.50 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,548 | TON |
$65.00 |
$65.30 |
$72.00 |
$77.00 |
$92.00 |
$85.50 |
| 23 | 412 5267 |
COLD MILLING PAVEMENT | 41,032 | SY |
$1.25 |
$1.00 |
$0.9100 |
$2.25 |
$2.50 |
$1.50 |
| 24 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 23,170 | LF |
$0.2500 |
$0.2000 |
$0.1900 |
$0.2000 |
$0.1700 |
$0.3000 |
| 25 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 12 | CY |
$15.00 |
$20.50 |
$21.03 |
$20.00 |
$20.00 |
$20.00 |
| 26 | 509(B) 0321 |
CLASS A CONCRETE | 25 | CY |
$750.00 |
$1,000.00 |
$1,051.64 |
$1,000.00 |
$1,000.00 |
$1,000.00 |
| 27 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$500.00 |
$310.00 |
$315.49 |
$300.00 |
$300.00 |
$300.00 |
| 28 | 511(A) 0332 |
REINFORCING STEEL | 3,472 | LB |
$1.00 |
$1.05 |
$1.05 |
$1.00 |
$1.00 |
$1.00 |
| 29 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 4 | EA |
$1,500.00 |
$1,250.00 |
$1,261.97 |
$1,200.00 |
$1,200.00 |
$1,200.00 |
| 30 | 612(B) 0642 |
MANHOLES REBUILT | 4 | EA |
$1,000.00 |
$1,250.00 |
$1,051.64 |
$1,000.00 |
$1,000.00 |
$1,000.00 |
| 31 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 36 | LF |
$55.00 |
$85.00 |
$87.29 |
$83.00 |
$83.00 |
$83.00 |
| 32 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 60 | LF |
$75.00 |
$85.00 |
$86.23 |
$82.00 |
$82.00 |
$82.00 |
| 33 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 148 | LF |
$25.00 |
$35.00 |
$35.76 |
$34.00 |
$34.00 |
$34.00 |
| 34 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 650 | LF |
$30.00 |
$38.00 |
$38.91 |
$37.00 |
$37.00 |
$37.00 |
| 35 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 288 | LF |
$40.00 |
$42.00 |
$43.12 |
$41.00 |
$41.00 |
$41.00 |
| 36 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$1,400.00 |
$600.00 |
$578.40 |
$550.00 |
$550.00 |
$550.00 |
| 37 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$800.00 |
$804.51 |
$765.00 |
$765.00 |
$765.00 |
| 38 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$1,600.00 |
$1,000.00 |
$972.77 |
$925.00 |
$925.00 |
$925.00 |
| 39 | 613(M) 7193 |
TYPE CC4 CULVERT END TREATMENT | 8 | EA |
$1,800.00 |
$1,300.00 |
$1,261.97 |
$1,200.00 |
$1,200.00 |
$1,200.00 |
| 40 | 613(M) 7194 |
TYPE DD4 CULVERT END TREATMENT | 4 | EA |
$2,100.00 |
$1,600.00 |
$1,666.85 |
$1,585.00 |
$1,585.00 |
$1,585.00 |
| 41 | 619(B) 0291 |
REMOVAL OF HEADWALL | 3 | EA |
$1,000.00 |
$800.00 |
$788.73 |
$750.00 |
$750.00 |
$750.00 |
| 42 | 619(B) 4725 |
REMOVAL OF FENCE | 500 | LF |
$10.00 |
$1.00 |
$1.05 |
$1.00 |
$1.00 |
$1.00 |
| 43 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 11,315 | SY |
$1.50 |
$2.40 |
$3.58 |
$2.50 |
$5.00 |
$5.00 |
| 44 | 619(B) 4778 |
REMOVAL OF EXISTING STRUCTURES | 10 | EA |
$1,000.00 |
$400.00 |
$315.49 |
$300.00 |
$300.00 |
$300.00 |
| 45 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,332 | LF |
$2.00 |
$1.00 |
$1.05 |
$1.00 |
$1.00 |
$1.00 |
| 46 | 623 0100 |
(PL)GUARDRAIL CURBING | 8 | EA |
$500.00 |
$1,500.00 |
$1,051.64 |
$3,000.00 |
$750.00 |
$250.00 |
| 47 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,525 | LF |
$16.00 |
$16.00 |
$15.77 |
$15.00 |
$14.00 |
$14.50 |
| 48 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,250.00 |
$2,750.00 |
$2,366.19 |
$2,250.00 |
$2,000.00 |
$2,500.00 |
| 49 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 8 | EA |
$1,250.00 |
$2,300.00 |
$1,735.20 |
$1,650.00 |
$1,500.00 |
$2,050.00 |
| 50 | 624(C) 4457 |
FENCE-STYLE SWF (3 BARBED WIRE) | 1,800 | LF |
$2.50 |
$3.40 |
$3.21 |
$3.40 |
$3.15 |
$3.05 |
| 51 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,700 | LF |
$3.00 |
$3.50 |
$3.34 |
$3.15 |
$3.40 |
$3.18 |
| 52 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 4 | EA |
$250.00 |
$500.00 |
$105.16 |
$100.00 |
$75.00 |
$250.00 |
| 53 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$15.00 |
$10.00 |
$10.52 |
$10.00 |
$10.00 |
$15.00 |
| 54 | 501(G) 6309 |
CLSM BACKFILL | 180 | CY |
$150.00 |
$130.00 |
$136.71 |
$130.00 |
$130.00 |
$160.00 |
| 55 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$10,000.00 |
$20,000.00 |
$21,032.75 |
$20,000.00 |
$20,000.00 |
$26,000.00 |
| 56 | 504(A) 1304 |
APPROACH SLAB | 467.6 | SY |
$150.00 |
$150.00 |
$157.75 |
$150.00 |
$150.00 |
$150.00 |
| 57 | 504(C) 6250 |
SEALED EXPANSION JOINT | 213.4 | LF |
$190.00 |
$210.00 |
$220.84 |
$210.00 |
$210.00 |
$300.00 |
| 58 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,022.6 | LF |
$80.00 |
$55.00 |
$57.84 |
$55.00 |
$55.00 |
$65.00 |
| 59 | 506(A) 1322 |
STRUCTURAL STEEL | 258,320 | LB |
$1.60 |
$1.51 |
$1.59 |
$1.51 |
$1.51 |
$1.70 |
| 60 | 507(A) 6164 |
FIXED BEARING ASSEMBLY | 40 | EA |
$1,000.00 |
$850.00 |
$893.89 |
$850.00 |
$850.00 |
$1,100.00 |
| 61 | 507(A) 6165 |
EXPANSION BEARING ASSEMBLY | 104 | EA |
$1,000.00 |
$850.00 |
$893.89 |
$850.00 |
$850.00 |
$1,100.00 |
| 62 | 509(A) 1326 |
CLASS AA CONCRETE | 825.6 | CY |
$400.00 |
$375.00 |
$394.36 |
$375.00 |
$375.00 |
$475.00 |
| 63 | 509(B) 1328 |
CLASS A CONCRETE | 127.6 | CY |
$400.00 |
$600.00 |
$630.98 |
$600.00 |
$600.00 |
$700.00 |
| 64 | 509(D) 1331 |
CLASS C CONCRETE | 12.2 | CY |
$400.00 |
$500.00 |
$525.82 |
$500.00 |
$500.00 |
$900.00 |
| 65 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 172,020 | LB |
$0.9000 |
$0.7600 |
$0.8000 |
$0.7600 |
$0.7600 |
$1.05 |
| 66 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$60,000.00 |
$235,000.00 |
$247,134.79 |
$235,000.00 |
$235,000.00 |
$260,015.00 |
| 67 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$6,000.00 |
$40,000.00 |
$42,065.50 |
$40,000.00 |
$40,000.00 |
$40,303.00 |
| 68 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 578 | LF |
$30.00 |
$30.00 |
$31.55 |
$30.00 |
$30.00 |
$29.00 |
| 69 | 514(A) 6012 |
PILES, FURNISHED (HP 14X73) | 1,032 | LF |
$45.00 |
$40.00 |
$42.07 |
$40.00 |
$40.00 |
$50.00 |
| 70 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 578 | LF |
$15.00 |
$10.00 |
$10.52 |
$10.00 |
$10.00 |
$11.35 |
| 71 | 514(B) 6296 |
PILES, DRIVEN (HP 14X73) | 1,032 | LF |
$23.00 |
$10.00 |
$10.52 |
$10.00 |
$10.00 |
$13.00 |
| 72 | 514(F) 6354 |
PILE LOAD TEST (DYNAMIC) | 24 | EA |
$700.00 |
$450.00 |
$473.24 |
$450.00 |
$450.00 |
$750.00 |
| 73 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,670 | SY |
$5.00 |
$3.00 |
$6.36 |
$3.00 |
$3.00 |
$3.00 |
| 74 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 110 | LF |
$50.00 |
$40.00 |
$42.07 |
$40.00 |
$40.00 |
$50.00 |
| 75 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 10 | GAL |
$80.00 |
$100.00 |
$105.16 |
$100.00 |
$100.00 |
$75.00 |
| 76 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 40 | SY |
$400.00 |
$700.00 |
$736.15 |
$700.00 |
$700.00 |
$300.00 |
| 77 | 523(A) 6550 |
SEALER CRACK PREPARATION | 802 | LF |
$5.00 |
$3.00 |
$8.31 |
$3.00 |
$3.00 |
$3.00 |
| 78 | 523(B) 6560 |
SEALER RESIN | 9 | GAL |
$300.00 |
$100.00 |
$315.49 |
$100.00 |
$100.00 |
$100.00 |
| 79 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,892 | TON |
$35.00 |
$33.50 |
$35.23 |
$33.50 |
$33.50 |
$60.00 |
| 80 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 331 | TON |
$25.00 |
$26.50 |
$27.87 |
$26.50 |
$26.50 |
$55.00 |
| 81 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 140 | LF |
$15.00 |
$15.00 |
$15.77 |
$15.00 |
$15.00 |
$20.00 |
| 82 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$15.00 |
$15.00 |
$15.77 |
$15.00 |
$15.00 |
$20.00 |
| 83 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$50,000.00 |
$37,500.00 |
$39,436.40 |
$37,500.00 |
$37,500.00 |
$55,000.00 |
| 84 | 619(B) 2520 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 1 | LSUM |
$25,000.00 |
$15,000.00 |
$15,774.56 |
$15,000.00 |
$15,000.00 |
$22,500.00 |
| 85 | 619(B) 2530 |
REMOVAL OF BRIDGE ITEM (TYPE C) | 1 | LSUM |
$25,000.00 |
$8,000.00 |
$8,413.10 |
$8,000.00 |
$8,000.00 |
$14,000.00 |
| 86 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 260 | CY |
$15.00 |
$10.00 |
$10.52 |
$10.00 |
$10.00 |
$15.00 |
| 87 | 501(G) 6309 |
CLSM BACKFILL | 200 | CY |
$150.00 |
$130.00 |
$136.71 |
$130.00 |
$130.00 |
$160.00 |
| 88 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$15,000.00 |
$17,500.00 |
$18,403.65 |
$17,500.00 |
$17,500.00 |
$25,000.00 |
| 89 | 504(A) 1304 |
APPROACH SLAB | 467.6 | SY |
$150.00 |
$150.00 |
$157.75 |
$150.00 |
$150.00 |
$150.00 |
| 90 | 504(C) 6250 |
SEALED EXPANSION JOINT | 139.6 | LF |
$190.00 |
$210.00 |
$220.84 |
$210.00 |
$210.00 |
$300.00 |
| 91 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 924 | LF |
$80.00 |
$55.00 |
$57.84 |
$55.00 |
$55.00 |
$65.00 |
| 92 | 506(A) 1322 |
STRUCTURAL STEEL | 310,760 | LB |
$1.60 |
$1.58 |
$1.66 |
$1.58 |
$1.58 |
$1.85 |
| 93 | 507(A) 6164 |
FIXED BEARING ASSEMBLY | 8 | EA |
$1,500.00 |
$2,000.00 |
$2,103.28 |
$2,000.00 |
$2,000.00 |
$1,100.00 |
| 94 | 507(A) 6165 |
EXPANSION BEARING ASSEMBLY | 32 | EA |
$1,500.00 |
$1,600.00 |
$1,682.62 |
$1,600.00 |
$1,600.00 |
$1,100.00 |
| 95 | 509(A) 1326 |
CLASS AA CONCRETE | 737.4 | CY |
$400.00 |
$375.00 |
$394.36 |
$375.00 |
$375.00 |
$475.00 |
| 96 | 509(B) 1328 |
CLASS A CONCRETE | 131.2 | CY |
$400.00 |
$600.00 |
$630.98 |
$600.00 |
$600.00 |
$600.00 |
| 97 | 509(D) 1331 |
CLASS C CONCRETE | 11.1 | CY |
$400.00 |
$500.00 |
$525.82 |
$500.00 |
$500.00 |
$900.00 |
| 98 | 511(A) 1332 |
REINFORCING STEEL | 950 | LB |
$0.8000 |
$1.00 |
$1.05 |
$1.00 |
$1.00 |
$2.90 |
| 99 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 182,950 | LB |
$0.9000 |
$0.7600 |
$0.8000 |
$0.7600 |
$0.7600 |
$1.05 |
| 100 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$60,000.00 |
$292,500.00 |
$307,603.94 |
$292,500.00 |
$292,500.00 |
$318,464.00 |
| 101 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$6,000.00 |
$50,000.00 |
$52,581.87 |
$50,000.00 |
$50,000.00 |
$50,230.00 |
| 102 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 170 | LF |
$30.00 |
$30.00 |
$31.55 |
$30.00 |
$30.00 |
$29.00 |
| 103 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 375 | LF |
$40.00 |
$35.00 |
$36.81 |
$35.00 |
$35.00 |
$40.00 |
| 104 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 170 | LF |
$15.00 |
$10.00 |
$10.52 |
$10.00 |
$10.00 |
$11.35 |
| 105 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 375 | LF |
$20.00 |
$10.00 |
$10.52 |
$10.00 |
$10.00 |
$12.00 |
| 106 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,266 | SY |
$5.00 |
$3.00 |
$6.36 |
$3.00 |
$3.00 |
$3.00 |
| 107 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 236 | LF |
$700.00 |
$410.00 |
$428.98 |
$407.92 |
$407.92 |
$760.00 |
| 108 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 55 | LF |
$50.00 |
$40.00 |
$42.07 |
$40.00 |
$40.00 |
$50.00 |
| 109 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 5 | GAL |
$80.00 |
$100.00 |
$105.16 |
$100.00 |
$100.00 |
$75.00 |
| 110 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 20 | SY |
$400.00 |
$700.00 |
$736.15 |
$700.00 |
$700.00 |
$300.00 |
| 111 | 523(A) 6550 |
SEALER CRACK PREPARATION | 822 | LF |
$5.00 |
$3.00 |
$8.31 |
$3.00 |
$3.00 |
$3.00 |
| 112 | 523(B) 6560 |
SEALER RESIN | 10 | GAL |
$300.00 |
$100.00 |
$315.49 |
$100.00 |
$100.00 |
$100.00 |
| 113 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,522 | TON |
$35.00 |
$33.50 |
$35.23 |
$33.50 |
$33.50 |
$60.00 |
| 114 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 271 | TON |
$25.00 |
$26.50 |
$27.87 |
$26.50 |
$26.50 |
$55.00 |
| 115 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 140 | LF |
$15.00 |
$15.00 |
$15.77 |
$15.00 |
$15.00 |
$20.00 |
| 116 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$15.00 |
$15.00 |
$15.77 |
$15.00 |
$15.00 |
$20.00 |
| 117 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$50,000.00 |
$37,500.00 |
$39,436.40 |
$47,000.00 |
$37,500.00 |
$55,000.00 |
| 118 | 619(B) 2520 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 1 | LSUM |
$25,000.00 |
$15,000.00 |
$15,774.56 |
$78,325.00 |
$15,000.00 |
$22,500.00 |
| 119 | 619(B) 2530 |
REMOVAL OF BRIDGE ITEM (TYPE C) | 1 | LSUM |
$25,000.00 |
$8,500.00 |
$8,938.92 |
$71,825.00 |
$8,500.00 |
$15,000.00 |
| 120 | 619(B) 2540 |
REMOVAL OF BRIDGE ITEM (TYPE D) | 1 | LSUM |
$5,000.00 |
$20,000.00 |
$18,403.65 |
$47,000.00 |
$17,500.00 |
$11,500.00 |
| 121 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 6 | EA |
$50.00 |
$55.00 |
$53.11 |
$50.00 |
$50.00 |
$50.00 |
| 122 | 805(D) 8760 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 1 | EA |
$500.00 |
$110.00 |
$106.23 |
$100.00 |
$100.00 |
$100.00 |
| 123 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 196 | SF |
$15.00 |
$15.00 |
$14.87 |
$14.00 |
$14.00 |
$14.00 |
| 124 | 851(C) 8324 |
2" SQUARE TUBE POST | 418 | LF |
$8.50 |
$8.00 |
$7.44 |
$7.00 |
$7.00 |
$7.00 |
| 125 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 51,888 | LF |
$0.6000 |
$0.4100 |
$0.4000 |
$0.3800 |
$0.3800 |
$0.3800 |
| 126 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,288 | LF |
$1.20 |
$3.30 |
$3.19 |
$3.00 |
$3.00 |
$3.00 |
| 127 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 45 | LF |
$5.00 |
$22.00 |
$21.25 |
$20.00 |
$20.00 |
$20.00 |
| 128 | 880(C) 8850 |
PERMANENT BARRICADE UNIT | 2 | EA |
$1,000.00 |
$700.00 |
$690.47 |
$650.00 |
$650.00 |
$650.00 |
| 129 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 154,626 | LF |
$0.1500 |
$0.0700 |
$0.0600 |
$0.0600 |
$0.0600 |
$0.0600 |
| 130 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 9,360 | EA |
$0.7500 |
$0.4500 |
$0.4200 |
$0.4000 |
$0.4000 |
$0.4000 |
| 131 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 63,192 | LF |
$0.4000 |
$0.1700 |
$0.1600 |
$0.1500 |
$0.1500 |
$0.1500 |
| 132 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 600 | SD |
$10.00 |
$11.00 |
$10.62 |
$10.00 |
$10.00 |
$10.00 |
| 133 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,200 | LF |
$25.00 |
$26.00 |
$27.34 |
$30.00 |
$26.00 |
$26.00 |
| 134 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 2,200 | LF |
$5.00 |
$3.00 |
$3.15 |
$5.00 |
$3.00 |
$3.00 |
| 135 | 880(A) 8800 |
ARROW DISPLAY(TYPE A) | 720 | SD |
$2.00 |
$5.50 |
$5.31 |
$5.00 |
$5.00 |
$5.00 |
| 136 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,920 | SD |
$0.3000 |
$1.05 |
$1.06 |
$1.00 |
$1.00 |
$1.00 |
| 137 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 6,540 | SD |
$0.7500 |
$1.40 |
$1.38 |
$1.30 |
$1.30 |
$1.30 |
| 138 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 7,800 | SD |
$1.25 |
$2.75 |
$2.66 |
$2.50 |
$2.50 |
$2.50 |
| 139 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 6,600 | SD |
$1.00 |
$0.1100 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1000 |
| 140 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$2.00 |
$0.1100 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1000 |
| 141 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 10,320 | SD |
$0.1500 |
$0.1600 |
$0.1600 |
$0.1500 |
$0.1500 |
$0.1500 |
| 142 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 27,720 | SD |
$0.1500 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
| 143 | 880(F) 8878 |
DRUMS | 30,240 | SD |
$0.1500 |
$0.1100 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1000 |
| 144 | 880(G) 8890 |
CHANNELIZER CONES | 23,820 | SD |
$0.0700 |
$0.1600 |
$0.1600 |
$0.1500 |
$0.1500 |
$0.1500 |
| 145 | 880(I) 8902 |
FLAGGER | 120 | SD |
$175.00 |
$200.00 |
$150.00 |
$350.00 |
$50.00 |
$496.30 |
| 146 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 720 | SD |
$3.00 |
$11.00 |
$10.62 |
$10.00 |
$10.00 |
$10.00 |
| 147 | 642(A) 0095 |
CONSTRUCTION STAKING LEVEL I | 1 | LSUM |
$40,000.00 |
$40,000.00 |
$35,000.00 |
$29,100.00 |
$18,200.00 |
$96,000.00 |
| 148 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$2,500.00 |
$4,500.00 |
$130,000.00 |
$10,000.00 |
$70,000.00 |
| 149 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$5,000.00 |
$10,000.00 |
$5,000.00 |
$25,000.00 |
$5,000.00 |
$17,000.00 |
| 150 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$370,000.00 |
$250,000.00 |
$500,000.00 |
$460,000.00 |
$450,000.00 |
$442,000.00 |
| 151 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$27,000.00 |
$20,000.00 |
$25,000.00 |
$130,000.00 |
$53,000.00 |
$95,000.00 |