218Let jobs
$801,344,382Total low bids
—Total estimates
—Low bids vs estimates
Jun 2023 results
Bid tabs (Excel) ExcelCSV| Let date | Contract | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jun 16, 2023 | 64B13 | Winnebago District 2 |
(201-3)K · | — | $98,823,286 | Curran Contracting Company and Civil Constructors, Inc. d/b/a Helm Civil Joint Venture | 3 | |
| Jun 16, 2023 | 95893 | Macon District 7 |
09-00933-01-BR · | — | $68,927,124 | William Charles Construction Company, LLC and White Construction, LLC JV | 2 | |
| Jun 16, 2023 | 62P71 | Various District 1 |
2021-154-R · | — | $55,371,028 | D. Construction, Inc. | 5 | |
| Jun 16, 2023 | 78599 | Johnson, Union District 9 |
(91-3,91-1,44-1-1,44-1)RS-3 · | — | $36,839,730 | Plote Construction, Inc. | 4 | |
| Jun 16, 2023 | 68F89 | Henry, Knox District 4 |
(37-24;48-24,25,26-1)RS-4 · | — | $28,792,543 | Gunther Construction & Advanced Asphalt Company JV | 1 | |
| Jun 16, 2023 | 74800 | Macon District 7 |
50,51,52 RS-3 · | — | $24,477,448 | Illinois Valley Paving, a div of UCM, Inc. | 1 | |
| Jun 16, 2023 | 78912 | Johnson, Williamson District 9 |
13 miles of patching, resurfacing, shoulder work, repairs to 5 bridges and cleaning/painting of 2 bridges. · | — | $21,648,901 | Samron Midwest Contracting, Inc. | 2 | |
| Jun 16, 2023 | 62H82 | Cook District 1 |
2019-001-R · | — | $20,567,520 | Judlau Contracting, Inc. | 4 | |
| Jun 16, 2023 | 62G41 | Kane District 1 |
8HB-2 · Replacing the existing (SN 045-0017) single span IL 31 bridge with a proposed (SN 045-2106) two span structure | — | $18,715,185 | Martam Construction Incorporated and Dunnet Bay Construction Company JV | 3 | |
| Jun 16, 2023 | 76R40 | Madison District 8 |
60-(12,13,14)RS-3,(60-9)RS-3 · | — | $15,205,837 | The Kilian Corporation | 2 | |
| Jun 16, 2023 | 62H52 | Cook District 1 |
2018-125-B-R · | — | $14,441,528 | D. Construction, Inc. | 3 | |
| Jun 16, 2023 | 62G38 | Cook District 1 |
(22&23)TS-1 · | — | $12,192,447 | D. Construction, Inc. | 2 | |
| Jun 16, 2023 | 95901 | Lawrence District 7 |
15-00018-00-BR · | — | $11,635,682 | Samron Midwest Contracting, Inc. | 2 | |
| Jun 16, 2023 | 74477 | Macon District 7 |
135RS-4 · | — | $11,583,263 | Illinois Valley Paving, a div of UCM, Inc. | 1 | |
| Jun 16, 2023 | 76L18 | Greene District 8 |
(105,3-2,410,411)RS-4 · | — | $11,557,794 | Illinois Valley Paving, a div of UCM, Inc. | 2 | |
| Jun 16, 2023 | 74799 | Moultrie District 7 |
(101,103)RS-2 · | — | $10,801,690 | Illinois Valley Paving, a div of UCM, Inc. | 1 | |
| Jun 16, 2023 | 72799 | Christian District 6 |
(135RS-7, 136RS-4, 137RS-5)SW · | — | $10,483,427 | Illinois Valley Paving, a div of UCM, Inc. | 1 | |
| Jun 16, 2023 | 62G37 | Cook District 1 |
212-0103 N-1 · | — | $9,496,988 | K-Five Construction Corporation | 2 | |
| Jun 16, 2023 | 70D61 | Piatt District 5 |
(74-68)BR · | — | $8,349,591 | White Construction LLC | 2 | |
| Jun 16, 2023 | 61H85 | Kane District 1 |
06-00260-02-PV · | — | $8,184,713 | R. W. Dunteman Company | 4 | |
| Jun 16, 2023 | 62J41 | Lake District 1 |
2019-074-SW&I · Replacing the existing 8-x10- double box culvert (SN 049-0214) and replacing it with a 12'x12' triple box culv | — | $7,886,157 | Campanella and Sons, Inc. | 3 | |
| Jun 16, 2023 | 74A06 | Clark, Crawford District 7 |
(21XNRH,21NRH 22,23)RS-3 · | — | $7,826,400 | Ambraw Asphalt Materials, Inc. | 1 | |
| Jun 16, 2023 | 72F56 | Cass District 6 |
(6RS-4,5RS-6)SR,145RS-5 · | — | $7,556,572 | Illinois Valley Paving, a div of UCM, Inc. | 1 | |
| Jun 16, 2023 | 70A87 | Champaign District 5 |
(10-30)BR · | — | $7,370,308 | Sangamo Construction Company | 3 | |
| Jun 16, 2023 | 74975 | Jasper District 7 |
121RS-4,122RS-5 · | — | $7,289,962 | Howell Paving, Inc. | 1 | |
| Jun 16, 2023 | 78524 | Johnson District 9 |
110(W-2,RS-5) · | — | $7,246,220 | Samron Midwest Contracting, Inc. | 2 | |
| Jun 16, 2023 | 72G52 | Cass District 6 |
86RS-3,114RS-4,6RS-5,SR1 · | — | $5,940,696 | Illinois Valley Paving, a div of UCM, Inc. | 1 | |
| Jun 16, 2023 | 78877 | Alexander District 9 |
(138D-BR)I-9 · | — | $5,868,810 | Samron Midwest Contracting, Inc. | 2 | |
| Jun 16, 2023 | 62K04 | Dupage District 1 |
2019-131-TS&N · | — | $5,675,641 | R. W. Dunteman Company | 3 | |
| Jun 16, 2023 | 72M78 | Macoupin District 6 |
(110)RS-6,(111)RS-5 · | — | $5,455,763 | Illinois Valley Paving, a div of UCM, Inc. | 1 | |
| Jun 16, 2023 | 61J09 | Cook District 1 |
18-00132-00-PV · | — | $5,220,905 | R. W. Dunteman Company | 3 | |
| Jun 16, 2023 | 74977 | Clay, Richland District 7 |
7RS-1 · | — | $4,953,553 | Howell Paving, Inc. | 1 | |
| Jun 16, 2023 | 72984 | Christian, Montgomery District 6 |
18(B-2,B-3);16(CR) · | — | $4,885,000 | Plocher Construction Company, Inc. | 1 | |
| Jun 16, 2023 | 72A75 | Sangamon District 6 |
(84-2-2)RS-2,Q;(79Z)RS-6 · | — | $4,597,033 | Illinois Valley Paving, a div of UCM, Inc. | 1 | |
| Jun 16, 2023 | 74B09 | Wayne District 7 |
(18,19,20)RS-4 · | — | $4,525,156 | Howell Paving, Inc. | 1 | |
| Jun 16, 2023 | 70A93 | Champaign District 5 |
(104)RS-2 · | — | $4,336,940 | Cross Construction, Inc. | 2 | |
| Jun 16, 2023 | 78945 | Williamson District 9 |
(X1-7-1)B-2 · | — | $4,288,284 | Samron Midwest Contracting, Inc. | 2 | |
| Jun 16, 2023 | 66B05 | Lasalle, Livingston District 3 |
(28,29)RS-3 · | — | $4,236,173 | Advanced Asphalt Company | 2 | |
| Jun 16, 2023 | 62N88 | Will District 1 |
2021-057-N · | — | $4,196,716 | Iroquois Paving Corporation | 3 | |
| Jun 16, 2023 | 62U26 | Will District 1 |
FAI 80 22 FABRICATION · The furnishing and storage of structural steel beams and bearings for the bridges along I-80 between east of R | — | $4,017,035 | DeLong's Inc. of Missouri | 2 | |
| Jun 16, 2023 | 70A88 | Mclean District 5 |
(27)RS-3,(28)RS-5&(27,28)BR-1 · | — | $3,924,420 | Kankakee Valley Construction Company, Inc. | 2 | |
| Jun 16, 2023 | 72G51 | Morgan District 6 |
6RS-6,81RS-5 · | — | $3,863,258 | K. E. Vas Company | 2 | |
| Jun 16, 2023 | 70908 | Champaign District 5 |
(10-31HB)BR · | — | $3,830,423 | Sangamo Construction Company | 3 | |
| Jun 16, 2023 | 68862 | Peoria District 4 |
(Z-2C-15D)BR-1 · | — | $3,713,452 | Stark Excavating, Inc. | 2 | |
| Jun 16, 2023 | 62T53 | Cook, Dupage District 1 |
2023 TRAFFIC 03 · | — | $3,706,914 | H & H Electric Co. | 3 | |
| Jun 16, 2023 | 72656 | Brown District 6 |
9RS-3,10RS-2 · | — | $3,506,197 | Illinois Valley Paving, a div of UCM, Inc. | 2 | |
| Jun 16, 2023 | 76R53 | Various District 8 |
DIST 8 GUARDRAIL 2024-1 · | — | $3,352,376 | Illini Excavation & Reclamation, Inc. | 1 | |
| Jun 16, 2023 | 46624 | Cook District 1 |
D 1 REFLECTOR REPL 24-06 S COOK · Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p | — | $3,228,282 | Superior Road Striping, Inc. | 1 | |
| Jun 16, 2023 | 99700 | Williamson District 9 |
21-00163-00-BT · | — | $3,086,491 | Samron Midwest Contracting, Inc. | 2 | |
| Jun 16, 2023 | 93805 | Morgan District 6 |
19-00109-00-RS · | — | $3,045,731 | Illinois Valley Paving, a div of UCM, Inc. | 3 | |
| Jun 16, 2023 | 74A88 | Effingham District 7 |
(6,7)RS-2 · | — | $2,949,123 | Howell Paving, Inc. | 1 | |
| Jun 16, 2023 | 46620 | Cook District 1 |
D 1 APP PAINT PVT MKG 23-27 · Applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width | — | $2,944,000 | Preform Traffic Control Systems, Ltd. | 1 | |
| Jun 16, 2023 | 46615 | Various District 4 |
D 4 HT PVMNT MRK RPR 23-23 · | — | $2,865,095 | ROADSAFE TRAFFIC SYSTEMS, INC. | 2 | |
| Jun 16, 2023 | 76P08 | St Clair District 8 |
(Z-1)PS-2,29PS-2 · | — | $2,785,320 | Haier Plumbing and Heating, Inc. | 1 | |
| Jun 16, 2023 | 72136 | Scott District 6 |
(86-8)BDR1,BJR1,BRR1,BP · | — | $2,757,903 | Freesen, a div of UCM, Inc. | 1 | |
| Jun 16, 2023 | 74812 | Coles District 7 |
111 RS-7 · | — | $2,757,361 | Howell Paving, Inc. | 2 | |
| Jun 16, 2023 | 76P65 | St Clair District 8 |
32RS-6 · | — | $2,744,682 | Christ Bros. Asphalt, Inc. | 2 | |
| Jun 16, 2023 | 76R83 | Washington District 8 |
95-(5,6)PP · | — | $2,704,152 | The Kilian Corporation | 2 | |
| Jun 16, 2023 | 66N28 | Various District 3 |
D3 HWY DAMAGE REPAIR FY 24 · | — | $2,597,629 | Northern Contracting, Inc. | 2 | |
| Jun 16, 2023 | 78882 | Various District 9 |
D9 BRIDGE PAINT 2023-1 · | — | $2,570,899 | Civil Coatings and Construction Inc. | 2 | |
| Jun 16, 2023 | 64F57 | Ogle, Whiteside District 2 |
115BC · | — | $2,530,997 | Martin & Company Excavating | 1 | |
| Jun 16, 2023 | 78982 | Massac District 9 |
(64-3B)BDR-1 · | — | $2,434,986 | E. T. Simonds Construction Company | 1 | |
| Jun 16, 2023 | 78792 | Pope District 9 |
103B-3 · | — | $2,433,895 | E. T. Simonds Construction Company | 2 | |
| Jun 16, 2023 | 74A13 | Effingham District 7 |
3-1BR · | — | $2,319,476 | Plocher Construction Company, Inc. | 2 | |
| Jun 16, 2023 | 78986 | Pulaski District 9 |
D9 BRIDGE REPAIR 2023-3 · | — | $2,211,144 | E. T. Simonds Construction Company | 2 | |
| Jun 16, 2023 | 46623 | Various District 6 |
D 6 HT PVMNT MRK RPR 24-05 · | — | $2,196,936 | Varsity Striping & Construction Co. | 1 | |
| Jun 16, 2023 | 78790 | Jackson District 9 |
123B-5;123B-6;123B-7 · | — | $2,188,576 | E. T. Simonds Construction Company | 2 | |
| Jun 16, 2023 | 78926 | Williamson District 9 |
(20,2-1,37,2)RS-2 · | — | $2,117,873 | Samron Midwest Contracting, Inc. | 2 | |
| Jun 16, 2023 | 97800 | Jersey District 8 |
20-00040-00-PV · | — | $2,034,135 | Stutz Excavating, Inc. | 1 | |
| Jun 16, 2023 | 70D69 | Champaign District 5 |
(10-6)BDR · | — | $1,999,987 | Stark Excavating, Inc. | 1 | |
| Jun 16, 2023 | 89779 | Woodford District 4 |
18-00166-00-BR · | — | $1,998,400 | Otto Baum Company, Inc. | 2 | |
| Jun 16, 2023 | 46932 | Franklin District 9 |
FITZGERRELL PARKING · | — | $1,974,520 | E. T. Simonds Construction Company | 2 | |
| Jun 16, 2023 | 99698 | Pulaski District 9 |
16-00075-00-RS · | — | $1,861,497 | E. T. Simonds Construction Company | 1 | |
| Jun 16, 2023 | 74651 | Wayne District 7 |
(18BY)B · | — | $1,840,237 | E. T. Simonds Construction Company | 2 | |
| Jun 16, 2023 | 46621 | Lake, Will District 1 |
D 1 APP PAINT PVT MKG 23-28 · | — | $1,816,500 | Precision Pavement Markings Inc. | 3 | |
| Jun 16, 2023 | 95935 | Effingham District 7 |
11-00094-00-RS · | — | $1,759,700 | Howell Paving, Inc. | 1 | |
| Jun 16, 2023 | 68H58 | Various District 4 |
D4 BRIDGE PAINTING 2023 · | — | $1,739,800 | Eagle Painting & Maintenance Company, Inc. | 4 | |
| Jun 16, 2023 | 97812 | St. Clair District 8 |
18-00141-03-BR · | — | $1,717,889 | C-Hill Civil Contractors, Inc. | 2 | |
| Jun 16, 2023 | 76R50 | Various District 8 |
DIST 8 PATCHING 2023-1 · | — | $1,706,661 | Keeley & Sons, Inc. | 2 | |
| Jun 16, 2023 | 62R88 | Cook District 1 |
FAI 55 22 BJ · Bridge deck (SN 016-2665) overlay and joint repairs of I 55 (Stevenson Expressway) at US 12/20/45 (La- Grange | — | $1,656,000 | D. Construction, Inc. | 4 | |
| Jun 16, 2023 | 61J44 | Kane District 1 |
21-00190-00-RS · | — | $1,652,700 | J. A. Johnson Paving Company | 4 | |
| Jun 16, 2023 | 64P63 | Whiteside District 2 |
(107B-1)BDR&(107VB-2)BDR · | — | $1,610,549 | Civil Constructors, Inc. d/b/a/ Helm Civil | 2 | |
| Jun 16, 2023 | 78917 | Jefferson District 9 |
D9 BRIDGE REPAIR 2022-5 · | — | $1,602,470 | E. T. Simonds Construction Company | 2 | |
| Jun 16, 2023 | 78959 | Alexander District 9 |
(02-1B-1)BRR-1 · | — | $1,540,668 | Samron Midwest Contracting, Inc. | 2 | |
| Jun 16, 2023 | 76R52 | Various District 8 |
DIST 8 LTS 2024-1 · | — | $1,529,701 | Electrico, Inc. | 1 | |
| Jun 16, 2023 | 64R55 | Carroll District 2 |
(106 BR)BDR & (105VB-2)BDR · | — | $1,495,293 | Civil Constructors, Inc. d/b/a/ Helm Civil | 3 | |
| Jun 16, 2023 | 68H11 | Peoria District 4 |
(11R)W-2 · | — | $1,488,251 | R. A. Cullinan and Son, a div of UCM, Inc. | 1 | |
| Jun 16, 2023 | 74B23 | Coles District 7 |
(22,5)RS-3 · | — | $1,477,664 | Ne-Co Asphalt Co., Inc. | 1 | |
| Jun 16, 2023 | 62U63 | Cook District 1 |
FAI 55 22 DECK OVERLAY · Bridge deck (SN: 016-1056) overlay and joint repair of the structure located at 1-55 (EB) Ramp to Franklin Ave | — | $1,461,679 | Martam Construction Incorporated | 4 | |
| Jun 16, 2023 | 97804 | Monroe District 8 |
20-00061-01-RS · | — | $1,435,980 | Christ Bros. Asphalt, Inc. | 1 | |
| Jun 16, 2023 | 76R92 | Randolph District 8 |
73BP-3 · | — | $1,432,548 | Civil Coatings and Construction Inc. | 4 | |
| Jun 16, 2023 | 99710 | Hamilton District 9 |
19-00115-00-RS · | — | $1,432,052 | E. T. Simonds Construction Company | 2 | |
| Jun 16, 2023 | 95937 | Lawrence District 7 |
20-00129-00-RS · | — | $1,389,384 | Ambraw Asphalt Materials, Inc. | 1 | |
| Jun 16, 2023 | 78960 | Williamson District 9 |
(1R,20,23,26)RS-2 · | — | $1,383,930 | Samron Midwest Contracting, Inc. | 2 | |
| Jun 16, 2023 | 91624 | Vermilion District 5 |
22-00219-00-RS · | — | $1,345,785 | G. M. Sipes Construction, Inc. | 3 | |
| Jun 16, 2023 | 70581 | Champaign District 5 |
4BR · | — | $1,337,000 | Duce Construction Company | 2 | |
| Jun 16, 2023 | 93804 | Cass District 6 |
18-00080-00-BR · | — | $1,329,997 | County Contractors, Inc. | 3 | |
| Jun 16, 2023 | 76R93 | St Clair District 8 |
82-5VB-BJR-1 · | — | $1,292,571 | Keeley & Sons, Inc. | 2 | |
| Jun 16, 2023 | 46626 | Lake District 1 |
D 1 REFLECTOR REPL 24-08 · Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p | — | $1,279,775 | Superior Road Striping, Inc. | 2 | |
| Jun 16, 2023 | 97813 | St. Clair District 8 |
21-00268-06-RS · | — | $1,263,097 | The Kilian Corporation | 1 |
1–100 of 218Next ›
Source: IDOT Transportation Bulletin "Unit Price Tabulation of Bids" for each letting. Totals are as read; IDOT does not publish an engineer's estimate there, so estimate columns stay blank. Bid Potato backfills the last two years. Confirm against IDOT's As Accepted tabulation.