(101,103)RS-2
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Illinois Valley Paving, a div of UCM, Inc. Low bidder | $10,801,690 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Illinois Valley… |
|---|---|---|---|---|---|---|
| 1 | X0326440 | SURF REM VAR DP (SPL) | 5,630 | SQ YD | $19.20 | |
| 2 | X4060995 | TEMPORARY RAMP SPL | 1,240 | SQ YD | $23.40 | |
| 3 | Z0049799 | PROT RESET SURVEY MRK | 14 | EACH | $1,258.98 | |
| 4 | Z0070202 | SURVEY MARKER VAULT | 1 | EACH | $1,332.56 | |
| 5 | 40200800 | AGG SURF CSE B | 120 | TON | $63.00 | |
| 6 | 40600290 | BIT MATLS TACK CT | 150,910 | POUND | $1.83 | |
| 7 | 40600370 | LONG JOINT SEALANT | 57,900 | FOOT | $3.01 | |
| 8 | 40600982 | HMA SURF REM BUTT JT | 960 | SQ YD | $11.46 | |
| 9 | 40600990 | TEMPORARY RAMP | 240 | SQ YD | $10.19 | |
| 10 | 40603219 | P HMA BC IL-9.5FG N90 | 21,470 | TON | $154.01 | |
| 11 | 40604164 | P HMA SC IL-9.5 D N90 | 24,010 | TON | $147.91 | |
| 12 | 40800050 | INCIDENTAL HMA SURF | 1,190 | TON | $214.19 | |
| 13 | 42400300 | PC CONC SIDEWALK 6 | 670 | SQ FT | $24.55 | |
| 14 | 42400800 | DETECTABLE WARNINGS | 76 | SQ FT | $42.72 | |
| 15 | 44000155 | HMA SURF REM 1 1/2 | 208,280 | SQ YD | $3.23 | |
| 16 | 44000164 | HMA SURF REM 3 3/4 | 5,190 | SQ YD | $7.27 | |
| 17 | 44000500 | COMB CURB GUTTER REM | 140 | FOOT | $21.83 | |
| 18 | 44000600 | SIDEWALK REM | 330 | SQ FT | $14.55 | |
| 19 | 44201811 | CL D PATCH T1 14 | 88.7 | SQ YD | $290.98 | |
| 20 | 44201815 | CL D PATCH T2 14 | 3,767.7 | SQ YD | $264.73 | |
| 21 | 44201819 | CL D PATCH T3 14 | 498.6 | SQ YD | $264.73 | |
| 22 | 44201821 | CL D PATCH T4 14 | 511.6 | SQ YD | $264.73 | |
| 23 | 48102100 | AGG WEDGE SHLD TYPE B | 10,100 | TON | $42.00 | |
| 24 | 60260100 | INLETS ADJUST | 1 | EACH | $1,182.94 | |
| 25 | 60605000 | COMB CC&G TB6.24 | 140 | FOOT | $135.73 | |
| 26 | 64200108 | SHOULDER RUM STRIP 8 | 113,480 | FOOT | $0.2900 | |
| 27 | 67000400 | ENGR FIELD OFFICE A | 6 | CAL MO | $3,174.79 | |
| 28 | 67000600 | ENGR FIELD LAB | 6 | CAL MO | $1,904.87 | |
| 29 | 67100100 | MOBILIZATION | 1 | L SUM | $282,642.90 | |
| 30 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $29,400.00 | |
| 31 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $114,711.71 | |
| 32 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $4,534.44 | |
| 33 | 70107025 | CHANGEABLE MESSAGE SN | 28 | CAL DA | $157.50 | |
| 34 | 70300100 | SHORT TERM PAVT MKING | 58,510 | FOOT | $0.0100 | |
| 35 | 70300150 | SHRT TRM PAVT MK REM | 4,880 | SQ FT | $0.0100 | |
| 36 | 78000200 | THPL PVT MK LINE 4 | 11,690 | FOOT | $2.26 | |
| 37 | 78000400 | THPL PVT MK LINE 6 | 115 | FOOT | $11.55 | |
| 38 | 78001110 | PAINT PVT MK LINE 4 | 118,440 | FOOT | $0.1500 | |
| 39 | 78011025 | GRV RCSD PVT MRKG 5 | 11,690 | FOOT | $0.1100 | |
| 40 | 78011035 | GRV RCSD PVT MRKG 7 | 115 | FOOT | $0.2600 | |
| 41 | 78100100 | RAISED REFL PAVT MKR | 738 | EACH | $42.26 | |
| 42 | 78300200 | RAISED REF PVT MK REM | 738 | EACH | $14.30 |